Stepwise post-synthetic linker installation in rare-earth metal–organic frameworks
Secondary linkers with different length are installed in a stepwise fashion inside rare-earth MOFs consisting of less connected RE 6 clusters.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Secondary linkers with different length are installed in a stepwise fashion inside rare-earth MOFs consisting of less connected RE 6 clusters.
The Cabibbo-Kobayashi-Maskawa quark mixing matrix currently does not satisfy unitarity at the 2σ-level. This could be the result of an inaccurate value of one or both of its largest matrix elements V us and V ud . In the case of V ud , the most precise measurement is obtained from the f t -value measurements of superallowed beta-transitions between 0 + states. The accuracy of this determination can, in turn, be tested by extracting V ud in other transitions including superallowed transitions between mirror nuclei. The Superallowed Transition Beta-Neutrino Decay Ion Coincidence Trap (St. Benedict) is currently under construction at the Nuclear Science Laboratory of the University of Notre Dame to perform such a determination, with the goal of shedding more light on this tension with unitarity. St. Benedict will take a radioactive ion beam produced by TwinSol , thermalize it in a large volume gas catcher, then transport it in two separate differentially-pumped volumes using a radio-frequency (RF) carpet and a radio-frequency quadrupole (RFQ) ion guide before injecting it in an RFQ trap to create cool ion bunches for injection in the measurement Paul trap. In this paper, we detail the installation of the beam preparation components of St. Benedict, and present the results of the first RIBs successfully stopped and extracted from its gas catcher.
High field side lower hybrid current drive (HFS LHCD) is promising method for efficient, off axis current drive. To operate this system, development of an expandable combination radio frequency (RF) and vacuum interface was necessary to allow the long (~2 m) waveguides to thermally expand with respect to the DIII-D 0 degree R-1 port extension without damage to the waveguide or excessive force on the vacuum seals which was previously observed when baking the waveguides during operations that were installed in 2024. Design of a custom bellows assembly with RF feedthrough that allows >20mm of waveguide thermal expansion is presented. Fabrication of this bellows assembly required simultaneously vacuum brazing multiple 304 stainless steel flanges to an oxygen free high conductivity copper waveguide section which required significant manufacturing development.
A compact solid state neutral particle analyzer (SSNPA) diagnostic, previously installed at NSTX-U, has been moved to MAST-U and successfully operated in the first physics campaign (MU01). The SSNPA operates by detecting the flux of fast neutral particles produced by charge exchange (CX) reactions to diagnose the fast ion distribution. The diagnostic consists of three 16-channel sensors, which provide a radial view of the plasma and have a sightline intersection with the South–South neutral beam line. From this radial geometry, active CX signals from mostly trapped particles are observed. Each channel has a spatial resolution of 3–4 cm, a temporal resolution of 200 kHz, and an average pitch angle resolution of a few degrees. The three-sensor configuration allows for coarse energy resolution of the CX signals; each sensor sees similar sightlines but different filter thicknesses alter the energy cutoffs by known amounts. Experimental data show that all channels are collecting data as intended. The signal to noise ratio is typically around 15. Preliminary data analysis shows a correlation between the SSNPA signal and magnetohydrodynamic activity in the plasma as expected.
The aging of electrical cables has been the subject of substantial research and development (R&D) projects performed by national and international laboratories, universities, and private organizations for many years. This R&D was conducted to develop guidance, equipment, and techniques to support aging management of in-service cables in industrial facilities such as nuclear power plants, research reactors, waste facilities, and fuel fabrication plants. Through these research efforts, condition monitoring technologies have been developed that can determine the severity of age-related degradation that occurs in industrial cables and insulation polymers during service. This paper summarizes the results of aging assessments that were performed for cables installed in two U.S. nuclear power plants, one a pressurized water reactor and one a boiling water reactor. These cables had been in service for over 40 years and during plant operation were exposed to harsh environmental conditions including elevated temperatures and radiation. For these assessments, a comprehensive series of measurements was performed to assess the aged condition of the cables. These cables came from different manufacturers, were manufactured in different years, and were constructed with a variety of jacket and insulation polymers including chloro-sulfonated polyethylene (CSPE), cross-linked polyethylene (XLPE)/cross-linked polyolefin (XLPO), neoprene, and ethylene propylene rubber (EPR). The goal of these assessments was to determine the current aged condition of the cable polymers and provide an estimate of how long the cable insulation materials could remain exposed to their in-service environmental conditions before reaching their end-of-life condition. Both nuclear power plants have received license renewals to extend their operation from 40 to 60 years, and the utilities need objective evidence to show that critical components such as cables will be able to function safely and reliably during the extended operating period. Furthermore, the results of these assessments showed that the cables exhibited different aged conditions depending on the type of polymers they were constructed with and the environment they were exposed to during service. Some of the cables and insulation polymers showed signs of significant age-related degradation and were estimated to have approximately 5 years of remaining service life. Other cables exhibited no signs of significant age-related degradation and were estimated to have 50 years or more of remaining service life. Using the results of these cable aging assessments, plant personnel were able to (1) determine the overall aged condition of cables and insulation polymers using objective test results, (2) identify aged or degraded cables before they caused operability issues, and (3) avoid unnecessary and costly replacement of cables that can continue to operate safely and reliably.
The GlueX experiment takes place in experimental Hall D at Jefferson Lab (JLab). With a linearly polarized photon beam of up to 12 GeV energy, GlueX is a dedicated experiment to search for hybrid mesons via photoproduction reactions. The low-intensity (Phase I) of GlueX was recently completed; the high-intensity (Phase II) started in 2020 including an upgraded particle identification system, known as the DIRC (Detection of Internally Reflected Cherenkov light), utilizing components from the decommissioned BaBar experiment. The identification and separation of the kaon final states will significantly enhance the GlueX physics program, by adding the capability of accessing the strange quark flavor content of conventional (and potentially hybrid) mesons. Here, we report that the installation and commissioning of the DIRC detector has been successfully completed.
The ICARUS T600 liquid argon (LAr) time projection chamber (TPC) underwent a major overhaul at CERN in 2016–2017 to prepare for the operation at FNAL in the Short Baseline Neutrino (SBN) program. This included a major upgrade of the photo-multiplier system and of the TPC wire read-out electronics. The full TPC wire read-out electronics together with the new wire biasing and interconnection scheme are described. The design of a new signal feed-through flange is also a fundamental piece of this overhaul whose major feature is the integration of all electronics components onto the signal flange. Initial functionality tests of the full TPC electronics chain installed in the T600 detector at FNAL are also described.
Accurate flood estimation in snow-dominated and high-latitude regions remains challenging due to complex interactions among rainfall, snowmelt, and rain-on-snow (ROS) processes, which are not captured in conventional precipitation-based intensity-duration-frequency (PREC-IDF) curves. This study evaluates the Next-Generation IDF (NG-IDF) framework, an extension of PREC-IDF that incorporates total water available for runoff (precipitation minus changes in snow water equivalent), in two contrasting Alaskan watersheds of Department of Defense (DoD) significance: the Little Chena River Basin (LCRB) in interior Alaska, a tributary of the Chena River that flows through Fort Wainwright and near Eielson Air Force Base, and the Upper Ship Creek Basin (USCB), which drains Joint Base Elmendorf-Richardson near Anchorage. Using long-term SNOTEL observations and event-based rainfall-runoff modeling, NG-IDF and PREC-IDF flood estimates were compared against observation-based flood frequency analyses. Results show that NG-IDF consistently reduces flood-estimation bias by 15–20% relative to PREC-IDF, particularly for snowmelt- and ROS-dominated events. In the interior LCRB, permafrost conditions can substantially amplify flood responses during snowmelt events, an effect not explicitly represented in standard design tools. These findings demonstrate that NG-IDF provides a more physically consistent and transferable framework for flood estimation in cold regions, with potential relevance to mission-critical DoD installation resilience. Projected increases in ROS frequency and permafrost degradation across Alaska further emphasize the need to integrate physics-based hydrologic models that explicitly represent snow and permafrost processes to enhance design resilience and operational readiness for military and other critical infrastructure.
Renewable energy production and development will drastically affect how we meet global energy demands, while simultaneously reducing the impact of climate change. Although the possible effects of renewable energy production (mainly from solar- and wind-energy facilities) on wildlife have been explored, knowledge gaps still exist, and collecting data from wildlife remains (when negative interactions occur) at energy installations can act as a first step regarding the study of species and communities interacting with facilities. In the case of avian species, samples can be collected relatively easily (as compared to other sampling methods), but may only be able to be identified when morphological characteristics are diagnostic for a species. Therefore, many samples that appear as partial remains, or “feather spots”—known to be of avian origin but not readily assignable to species via morphology—may remain unidentified, reducing the efficiency of sample collection and the accuracy of patterns observed. To obtain data from these samples and ensure their identification and inclusion in subsequent analyses, we applied, for the first time, a DNA barcoding approach that uses mitochondrial genetic data to identify unknown avian samples collected at solar facilities to species. We also verified and compared identifications obtained by our genetic method to traditional morphological identifications using a blind test, and discuss discrepancies observed. Our results suggest that this genetic tool can be used to verify, correct, and supplement identifications made in the field and can produce data that allow accurate comparisons of avian interactions across facilities, locations, or technology types. We recommend implementing this genetic approach to ensure that unknown samples collected are efficiently identified and contribute to a better understanding of wildlife impacts at renewable energy projects.
For assemblies of cavities in cleanrooms, single-use tooling systems are made for the alignment and installation of ancillary components such as couplers and bellows. To minimize the number of tooling sets created, a design has been created to standardize alignment features to allow for assembly of different components with one set of tooling. A prototype set of tooling has been developed to with the required degrees of freedom for multiple assemblies while minimizing deformation during the assembly process. Prototype designs have been created for PIP-II SSR2 and 650 Cavities and for AUP Crab Cavities. Using 3D printing, this tooling can be quickly adjusted to allow for different ancillary components. The development process and status of the design will be discussed.
A large cluster of High-Performance Computing (HPC) equipment at the Lawrence Livermore National Laboratory in California was retrofitted with an Asetek cooling system. The Asetek system is a hybrid scheme with water-cooled cold plates on high-heat-producing components in the information technology (IT) equipment, and with the remainder of the heat being removed by conventional air-cooling systems. In order to determine energy savings of the Asetek system, data were gathered and analyzed two ways: using top-down statistical models, and bottom-up engineering models. The cluster, “Cabernet”, rejected its heat into a facilities cooling water loop which in turn rejected the heat into the same chilled water system serving the computer-room air handlers (CRAHs) that provided the air-based cooling for the room. Because the “before” and “after” cases both reject their heat into the chilled water system, the only savings is due to reduction in CRAH fan power. The top-down analysis showed a 4% overall energy savings for the data center (power usage effectiveness (PUE) —the ratio of total data center energy to IT energy— dropped from 1.60 to 1.53, lower is better); the bottom-up analysis showed a 3% overall energy savings (PUE from 1.70 to 1.66) and an 11% savings for the Cabernet system by itself (partial PUE of 1.51). Greater savings, on the order of 15-20%, would be possible if the chilled water system was not used for rejecting the heat from the Asetek system. About 37% of the heat from the Cab system was rejected to the cooling water, lower than at other installations.
As directed in the Consolidation Appropriations Act, 2016, the National Nuclear Security Administration (NNSA) initiated the preconceptual design and development of a Lifecycle Cost Estimate for the Surplus Plutonium Disposition (SPD) Dilute and Dispose Program. Based on August 2016 Program Requirements Document and subsequent supplemental guidance, LANL prepared the Lifecycle Cost Estimate under key assumptions that meet the program’s requirements. For Dilute and Dispose, the program would disposition surplus Pu by diluting oxide produced at LANL with inhibitor materials, packaging the materials in containers, and shipping the containers to a deep geologic repository for permanent disposal. The base assumption is that LANL would disassemble pits, convert the Pu metal to oxide, and characterize and package the material for shipment to SRS, where it would be diluted prior to geologic disposal at the WIPP site in New Mexico. Another major assumption for the Dilute and Dispose option is that LANL would increase the current oxide production rate (or throughput) to 1500 kg/year, 5 times higher than the maximum annual production of ~300 Kgs executed by the ARIES Oxide Production Program at LANL. Analysis based on the ARIES program’s throughput model revealed that 15 pieces of equipment would need to be installed within PF-4 and certain facility improvements would need to be accomplished in order to meet the desired throughput levels. The additional equipment would be essentially identical to equipment already used within PF-4 for existing operations.
The document provides instructions to follow for software and server installation and implementation.
The information below is presented in response to requests for additional information that resulted from a phone conference on November 12, 2020 between Harvey Kaplan of the New Mexico State Historic Preservation Office, DOE NNSA Los Alamos Field Office Manhattan Project National Historical Park Representative, Vicki Loucks, LANL Program Manager for Manhattan Project National Historical Park, Cheryl Abeyta, and LANL Historic Buildings Program Staff, Jeremy Brunette and J.T. Stark. The DOE NNSA Field Office (Field Office) initiated the call to propose additional work be performed to a previously reviewed project, “Restoration of TA-18-0001 (Slotin Building)” (LA-UR-19-26609) (HPD Log # 111110). Of the six actions discussed on the call, which included (1) exterior paint color, (2) entrance ramps, (3) non-period metal siding removal, (4) interior floor finish, (5) reopening secondary entrance door, and (6) addition of utility cabinet with period doors, additional information for two of the actions was requested for further review. The two actions, the construction of entrance ramps and installation of a utility cabinet are addressed in detail.
Coupled renewable-battery powerplants differ from the traditional concept of independent siting of electricity resources within transmission networks. Prior research on the value proposition and cost savings from coupling did not consider the geographic constraint of co-location. This paper fills the gap by assessing how pricing volatility differences between nodes within electricity markets impact the system value of coupled renewable-battery projects as compared to independent VRE and battery installations. We use wholesale power market prices from 2012–2019 across the seven main U.S. independent system operators (ISOs) with a linear optimization program to compare the electricity market value of coupled projects to the value of the same underlying sub-components, deployed separately. We find that additional value from adding a 4-hour battery sized to 50% of renewable-plant nameplate capacity is $\$$10/MWh across ISOs on average. The highest boost occurs in California ($\$$15/MWh), where the value of adding storage to solar rises over time in tandem with increased solar penetration in the region. If renewables and batteries are deployed independently, we estimate that $\$$12.5/MWh of additional value could be achieved because of more flexibility on battery siting and operation. The $\$$12.5/MWh coupling penalty is reduced to $\$$1.6/MWh when considering alternative approaches to integrating battery storage. This result implies that renewable-battery power plants will play an increasing role in electricity systems if they can be built for $\$$2–$\$$13/MWh less than independent projects of comparable size. However, the wide regional variation in coupling penalties, along with the importance of conditions captured in our sensitivity cases, suggests the tradeoff between coupling penalties and savings will vary by situation. Therefore, roles exist for independent and coupled projects from a system optimization perspective.
Remove the vacuum pump from the package and setup following the instructions in the installation manual.
During the week of August 25th, 2021, three Electric Phenomenon Cluster (EPC) sensors were installed at the Savannah River Site (SRS) owned, Dominion Energy (DE) operated 504-2G substation.
This project was performed under a Cooperative Research & Development Agreement (CRADA) between the National Renewable Energy Laboratory (NREL) and Acciona Energy USA (AE). The purpose was to advance an NREL TRL 3 technology that was developed during the previous CRADA from completed laboratory testing to full-scale process installation and testing at AE's Nevada Solar One (NSO) power plant. The project's objective was to complete full-scale implementation and performance verification of the NREL hydrogen mitigation technology at the Nevada Solar One (NSO) power plant in Boulder City, Nevada.