Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “human reliability analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Using Systems Engineering to Develop an Integrated Crew Health and Performance System to Mitigate Risk for Human Exploration Missions

New space exploration missions are currently being designed to take humanity beyond low Earth orbit (LEO) to cis-lunar space, the lunar surface, and eventually to Mars. These missions carry increased risks due to a number of factors, including distance from Earth, exposure to deep space hazards, reduced capacity and ability to resupply and evacuate, and increased communication delays. As distance from Earth grows and mission length increases, a growing proportion of mission risk can be attributed to the “human system.” Almost twenty years ago, the Institute of Medicine in the United States recommended the early and complete integration of the human system into the spacecraft and mission design process to mitigate this increased risk inherent in exploration missions. Exploration missions will require increasing levels of crew self-sufficiency that will challenge the current operational paradigms established in LEO. Enabling progressive Earth independence requires management of the increasingly complex interactions among spacecraft systems and integration of all the data and functions that affect human health and performance into one coordinated system –the Crew Health and Performance (CHP) system. This system is a critical spacecraft system that is analogous to other systems such as propulsion, guidance and navigation, or avionics. Design and integration of the CHP system requires the evidence-based merger of typically disparate disciplines such as medicine, human factors, and life support system design, using systems engineering (SE) practices. SE provides traceability of spacecraft requirements and enables reliable and repeatable trade space analysis of the many competing options for hardware and software to be included in the mission architecture. The approach described here enables spacecraft and mission designers to align the scope of a CHP system with mission specific requirements, decrease risk to the crew, and increase the probability of mission success.

Kerry McGuire↗

Human Factors Engineering Program Review Model (NUREG-0711)Revision 3: Update Methodology and Key Revisions

The U.S. Nuclear Regulatory Commission (NRC) reviews the human factors engineering (HFE) programs of applicants for nuclear power plant construction permits, operating licenses, standard design certifications, and combined operating licenses. The purpose of these safety reviews is to help ensure that personnel performance and reliability are appropriately supported. Detailed design review procedures and guidance for the evaluations is provided in three key documents: the Standard Review Plan (NUREG-0800), the HFE Program Review Model (NUREG-0711), and the Human-System Interface Design Review Guidelines (NUREG-0700). These documents were last revised in 2007, 2004 and 2002, respectively. The NRC is committed to the periodic update and improvement of the guidance to ensure that it remains a state-of-the-art design evaluation tool. To this end, the NRC is updating its guidance to stay current with recent research on human performance, advances in HFE methods and tools, and new technology being employed in plant and control room design. NUREG-0711 is the first document to be addressed. We present the methodology used to update NUREG-0711 and summarize the main changes made. Finally, we discuss the current status of the update program and the future plans.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Integrated emergency control board including design extended conditions for Krsko NPP - 297

In the aim of implementing post-Fukushima safety measures, Krsko Nuclear Power Plant is developing a Safety Upgrade Program. Krsko NPP is upgrading the remote shutdown capabilities and implementing ways to prevent and mitigate the consequences of potential Severe Accidents. This modification enhances remote shutdown capabilities of the plant to prevent potential severe accidents and improve the ways to mitigate their consequences. Within the set of plant design modifications, addressed the design, construction, and commissioning, of a new Emergency Control Room (EMCB. Tecnatom is the responsible of the design modification of the plant together with Idom, that participates with Tecnatom in the project as a joint venture, who provides a new set of field instrumentation, including its design and the corresponding wiring. EMCB integrates Human- System Interface throughout centralizing capabilities to safety shutdown and cooldown the plant as well as to control the new Design Extension Systems. The process relies on a Human Factors Engineering (HFE) analysis applying a specific methodology based on NUREG-0711 . Tecnatom has developed a specific HFE Program Management Plan to proceed with the analysis in a documented, traceable and reliable way. HFE activities ends with an Integrated System Validation in the actual full scope simulator involving MCR crews. This paper describes different phases of the project, the integrated schedule between HFE and I and C activities, benefits of upgrading main and emergency control rooms beyond design bases and addresses Tecnatom lessons learned obtained during the project execution. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Modeling of human operator dynamics in simple manual control utilizing time series analysis

Time series analysis is applied to model human operator dynamics in pursuit and compensatory tracking modes. The normalized residual criterion is used as a one-step analytical tool to encompass the processes of identification, estimation, and diagnostic checking. A parameter constraining technique is introduced to develop more reliable models of human operator dynamics. The human operator is adequately modeled by a second order dynamic system both in pursuit and compensatory tracking modes. In comparing the data sampling rates, 100 msec between samples is adequate and is shown to provide better results than 200 msec sampling. The residual power spectrum and eigenvalue analysis show that the human operator is not a generator of periodic characteristics.

Agarwal, G. C.↗

Illumination requirements for operating a space remote manipulator

Critical issues and requirements involved in illuminating remote manipulator operations in space help establish engineering designs for these manipulators. A remote manipulator is defined as any mechanical device that is controlled indirectly or from a distance by a human operator for the purpose of performing potentially dangerous or hazardous tasks to increase safety, reliability, and efficiency. Future space flights will rely on remote manipulators for a variety of tasks including satellite repair and servicing, structural assembly, data collection and analysis, and performance of contingency tasks. Carefully designed illumination of these manipulators will assure that these tasks will be completed efficiently and successfully. Studies concerning the influence of illumination on operation of a remote manipulator are few. Available results show that illumination can influence how successfully a human operates a remote manipulator. The intent of this study was to more fully examine this topic.

Chandlee, George O.↗

Best Practices for Reliable and Robust Spacecraft Structures

A study was undertaken to capture the best practices for the development of reliable and robust spacecraft structures for NASA s next generation cargo and crewed launch vehicles. In this study, the NASA heritage programs such as Mercury, Gemini, Apollo, and the Space Shuttle program were examined. A series of lessons learned during the NASA and DoD heritage programs are captured. The processes that "make the right structural system" are examined along with the processes to "make the structural system right". The impact of technology advancements in materials and analysis and testing methods on reliability and robustness of spacecraft structures is studied. The best practices and lessons learned are extracted from these studies. Since the first human space flight, the best practices for reliable and robust spacecraft structures appear to be well established, understood, and articulated by each generation of designers and engineers. However, these best practices apparently have not always been followed. When the best practices are ignored or short cuts are taken, risks accumulate, and reliability suffers. Thus program managers need to be vigilant of circumstances and situations that tend to violate best practices. Adherence to the best practices may help develop spacecraft systems with high reliability and robustness against certain anomalies and unforeseen events.

Raju, Ivatury S.↗

Integrated Trajectory, Habitat, and Logistics Analysis and Trade Study for Human Mars Missions

Environmental Control and Life Support System (ECLSS) architecture selection has profound implications for mission cost and mass extending far beyond the ECLSS itself. Similarly, other mission architecture decisions – particularly involving transportation systems – can influence optimal ECLSS architectures. Loop closure influences requirements for water, oxygen, and other consumables. System maintainability and reliability influences spares mass and risk. System, consumables, and spares mass interact with transportation system architectures and propellant demands and propulsion element sizing. All these interactions with other systems must be considered when evaluating ECLSS options. Analyses that focus only on maximizing ECLSS loop closure – or minimizing ECLSS mass, or minimizing ECLSS life cycle cost – may lead to sub-optimal or even counterproductive system architecture and investment decisions at the mission level. For example, an ECLSS architecture that minimizes ECLSS life cycle cost but results in excessively high logistics mass could lead to significantly increased transportation system costs or make interplanetary transportation infeasible. Increased loop closure could result in higher development costs and higher mass if system/spares mass increases outweigh consumables reduction. In addition, systems mass and consumables mass are not directly comparable and have different impacts on propellant requirements, as consumables mass changes over the course of the mission. This paper presents an integrated analysis examining the overall impact of different ECLSS and transportation architectures on mass for a crewed Mars mission, including the habitat and transportation systems as well as consumables, spares, and propellant. Key observations are discussed, along with opportunities for further sensitivity analysis and model development. Overall, ECLSS development activities must consider their impacts at the mission level, as part of an integrated system, rather than in isolation.

Mars↗

Integrated Trajectory, Habitat, and Logistics Analysis and Trade Study for Human Mars Missions

Environmental Control and Life Support System (ECLSS) architecture selection has profound implications for mission cost and mass extending far beyond the ECLSS itself. Similarly, other mission architecture decisions – particularly involving transportation systems – can influence optimal ECLSS architectures. Loop closure influences requirements for water, oxygen, and other consumables. System maintainability and reliability influences spares mass and risk. System, consumables, and spares mass interact with transportation system architectures, including propellant demands and propulsion element sizing. All these interactions with other systems must be considered when evaluating ECLSS options. Analyses that focus only on maximizing ECLSS loop closure – or minimizing ECLSS mass, or minimizing ECLSS life cycle cost – may lead to sub-optimal or even counterproductive system architecture and investment decisions at the mission level. For example, an ECLSS architecture that minimizes ECLSS life cycle cost but results in excessively high logistics mass could lead to significantly increased transportation system costs or make interplanetary transportation infeasible. Increased loop closure could result in higher development costs and higher mass if system/spares mass increases outweigh consumables reduction. In addition, systems mass and consumables mass are not directly comparable and have different impacts on propellant requirements, as consumables mass changes over the course of the mission. This paper presents an integrated analysis examining the overall impact of different ECLSS and transportation architectures on Earth departure mass for a crewed Mars mission, including the habitat and transportation systems as well as consumables, spares, and propellant. Key observations are discussed, along with opportunities for further sensitivity analysis and model development. Overall, ECLSS development activities must consider their impacts at the mission level, as part of an integrated system, rather than in isolation.

Mars↗

The US Support Program Assistance to the IAEA Safeguards Information Technology, Collection, and Analysis 2008

One of the United States Support Program's (USSP) priorities for 2008 is to support the International Atomic Energy Agency's (IAEA) development of an integrated and efficient safeguards information infrastructure, including reliable and maintainable information systems, and effective tools and resources to collect and analyze safeguards-relevant information. The USSP has provided funding in support of this priority for the ISIS Re-engineering Project (IRP), and for human resources support to the design and definition of the enhanced information analysis architecture project (nVision). Assistance for several other information technology efforts is provided. This paper will report on the various ongoing support measures undertaken by the USSP to support the IAEA's information technology enhancements and will provide some insights into activities that the USSP may support in the future.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Data Collection and Analysis Challenges and Mitigation Strategies for Quantitative Human Factors Research Studies in Nuclear Power Plant Modernization

The United States (U.S.) Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program Plant Modernization Pathway is conducting targeted research and development (R&D) to address aging and reliability concerns with the legacy instrumentation and control and related information systems of the U.S. LWR fleet. In this effort, the application of human factors engineering (HFE) provides an important role in ensuring new digital plant technologies enable broad innovation and business improvement with continued operational safety. Evaluation is a key activity in HFE, which often occurs iteratively through the system design lifecycle. While qualitative methods are important in collecting information of how users perform tasks through observations, quantitative methods are equally important in assessing system design based on performance. In collecting and analyzing this quantitative data, there are notable challenges in the nuclear HFE domain that may threaten the validity and reliability of the inferences made in these studies. Notable challenges include small sample size and limited resources, large error variance and small effect size, an “adding test features to losing degrees of freedom” dilemma, non-normal distribution, and heterogeneity of variance. The results in control room usability studies are often statistically non-significant, which makes it hard to interpret. This work discusses these challenges across different scientific viewpoints and provides real-world examples of these challenges in practice. Collectively, the objective of this work is to position these challenges to the larger data science community as a means of identifying future opportunities to address these issues.

99 GENERAL AND MISCELLANEOUS↗

Parts Quality Management: Direct Part Marking via Data Matrix Symbols for Mission Assurance

A United States Government Accountability Office (GAO) review of twelve NASA programs found widespread parts quality problems contributing to significant cost overruns, schedule delays, and reduced system reliability. Direct part-marking with Data Matrix symbols could significantly improve the quality of inventory control and parts lifecycle management. This paper examines the feasibility of using 15 marking technologies for use in future NASA programs. A structural analysis is based on marked material type, operational environment (e.g., ground, suborbital, orbital), durability of marks, ease of operation, reliability, and affordability. A cost-benefits analysis considers marking technology (data plates, label printing, direct part marking) and marking types (two-dimensional machine-readable, human-readable). Previous NASA parts marking efforts and historical cost data are accounted for, including in-house vs. outsourced marking. Some marking methods are still under development. While this paper focuses on NASA programs, results may be applicable to a variety of industrial environments.

Moss, Chantrice↗

Operator Insights and Usability Evaluation of Machine Learning Assistance for Power Grid Contingency Analysis

Introducing machine learning (ML) assistance into any established process comes with adoption barriers, including entrenched procedures, technological and human readiness levels, human-machine trust, and work culture resistance to change. These barriers are even greater in critical operations such as operating a national or regional power grid, in which both regulatory frameworks and the importance of maintaining reliability levels causes additional resistance to the adoption of new computational support. Developers of future systems and job aides must consider not only technical aspects, but also whether new systems are usable by power system operators. This work presents the methodology and results of a study to evaluate the usability and readiness of a prototype recommender system for power grid contingency analysis. We explore operator cognitive load and evaluate operator performance when solving a collection of scenarios both with and without recommender assistance. We also examine operator trust in the system. We report insights gained on the readiness of the system using a collection of evaluation techniques.

Human-Machine Teaming, Power Systems, usability ev↗

Multi-Frequency Analysis of Simulated versus Observed Variability in Tropospheric Temperature

Studies seeking to identify a human-caused global warming signal generally rely on climate model estimates of the “noise” of intrinsic natural variability. Assessing the reliability of these noise estimates is of critical importance. We evaluate here the statistical significance of differences between climate model and observational natural variability spectra for global-mean mid- to upper-tropospheric temperature (TMT). We use TMT information from satellites and large multimodel ensembles of forced and unforced simulations. Our main goal is to explore the sensitivity of model-versus-data spectral comparisons to a wide range of subjective decisions. These include the choice of satellite and climate model TMT datasets, the method for separating signal and noise, the frequency range considered, and the statistical model used to represent observed natural variability. Of particular interest is the amplitude of the interdecadal noise against which an anthropogenic tropospheric warming signal must be detected. We find that on time scales of 5–20 years, observed TMT variability is (on average) overestimated by the last two generations of climate models participating in the Coupled Model Intercomparison Project. This result is relatively insensitive to different plausible analyst choices, enhancing confidence in previous claims of detectable anthropogenic warming of the troposphere and indicating that these claims may be conservative. A further key finding is that two commonly used statistical models of short-term and long-term memory have deficiencies in their ability to capture the complex shape of observed TMT spectra.

54 ENVIRONMENTAL SCIENCES↗

Evaluate the application of modal test and analysis processes to structural fault detection in MSFC - STS project elements

The Space Transportation System (STS) is a complex and expensive flight system intended to carry unique payloads into low Earth orbit and return. A catastrophic failure, such as STS 51-L, resulted in the loss of both human life as well as expensive and unique hardware. The impact of this incident reaffirms the need to do everything possible to ensure the integrity and reliability of STS. One means of achieving this goal is to expand the number of inspection technologies available. Reported here is the evaluation of the use of modal analysis and test techniques for the purpose of assessing the structural integrity of STS components for which Marshall Space Flight Center has responsibility. This entailed reviewing existing literature and developing a low-level experimental program determine the feasibility of using this technology for structural fault detection.

Springer, William T.↗

Parts Quality Management: Direct Part Marking of Data Matrix Symbol for Mission Assurance

A United States Government Accountability Office (GAO) review of twelve NASA programs found widespread parts quality problems contributing to significant cost overruns, schedule delays, and reduced system reliability. Direct part marking with Data Matrix symbols could significantly improve the quality of inventory control and parts lifecycle management. This paper examines the feasibility of using direct part marking technologies for use in future NASA programs. A structural analysis is based on marked material type, operational environment (e.g., ground, suborbital, Low Earth Orbit), durability of marks, ease of operation, reliability, and affordability. A cost-benefits analysis considers marking technology (label printing, data plates, and direct part marking) and marking types (two-dimensional machine-readable, human-readable). Previous NASA parts marking efforts and historical cost data are accounted for, including inhouse vs. outsourced marking. Some marking methods are still under development. While this paper focuses on NASA programs, results may be applicable to a variety of industrial environments.

Moss, Chantrice↗

Trades Between Opposition and Conjunction Class Trajectories for Early Human Missions to Mars

Candidate human missions to Mars, including NASA's Design Reference Architecture 5.0, have focused on conjunction-class missions with long crewed durations and minimum energy trajectories to reduce total propellant requirements and total launch mass. However, in order to progressively reduce risk and gain experience in interplanetary mission operations, it may be desirable that initial human missions to Mars, whether to the surface or to Mars orbit, have shorter total crewed durations and minimal stay times at the destination. Opposition-class missions require larger total energy requirements relative to conjunction-class missions but offer the potential for much shorter mission durations, potentially reducing risk and overall systems performance requirements. This paper will present a detailed comparison of conjunction-class and opposition-class human missions to Mars vicinity with a focus on how such missions could be integrated into the initial phases of a Mars exploration campaign. The paper will present the results of a trade study that integrates trajectory/propellant analysis, element design, logistics and sparing analysis, and risk assessment to produce a comprehensive comparison of opposition and conjunction exploration mission constructs. Included in the trade study is an assessment of the risk to the crew and the trade offs between the mission duration and element, logistics, and spares mass. The analysis of the mission trade space was conducted using four simulation and analysis tools developed by NASA. Trajectory analyses for Mars destination missions were conducted using VISITOR (Versatile ImpulSive Interplanetary Trajectory OptimizeR), an in-house tool developed by NASA Langley Research Center. Architecture elements were evaluated using EXploration Architecture Model for IN-space and Earth-to-orbit (EXAMINE), a parametric modeling tool that generates exploration architectures through an integrated systems model. Logistics analysis was conducted using NASA's Human Exploration Logistics Model (HELM), and sparing allocation predictions were generated via the Exploration Maintainability Analysis Tool (EMAT), which is a probabilistic simulation engine that evaluates trades in spacecraft reliability and sparing requirements based on spacecraft system maintainability and reparability.

Mattfeld, Bryan↗

Applied Operations Research: Augmented Reality in an Industrial Environment

Augmented reality is the application of computer generated data or graphics onto a real world view. Its use provides the operator additional information or a heightened situational awareness. While advancements have been made in automation and diagnostics of high value critical equipment to improve readiness, reliability and maintenance, the need for assisting and support to Operations and Maintenance staff persists. AR can improve the human machine interface where computer capabilities maximize the human experience and analysis capabilities. NASA operates multiple facilities with complex ground based HVCE in support of national aerodynamics and space exploration, and the need exists to improve operational support and close a gap related to capability sustainment where key and experienced staff consistently rotate work assignments and reach their expiration of term of service. The initiation of an AR capability to augment and improve human abilities and training experience in the industrial environment requires planning and establishment of a goal and objectives for the systems and specific applications. This paper explored use of AR in support of Operation staff in real time operation of HVCE and its maintenance. The results identified include identification of specific goal and objectives, challenges related to availability and computer system infrastructure.

Cole, Stuart K.↗

Tritium transfer in pigs - A model test

In the frame of IAEA EMRAS (Environmental Modelling for Radiation Safety) programme, there was developed a scenario for models ' testing starting with unpublished data for a sow fed with OBT for 84 days. The scenario includes model predictions for the dynamics of tritium in urine and faeces and HTO and OBT in organs at sacrifice. There have been done two inter-comparison exercises and most of the models succeeded to give predictions better than a factor 3 to 5, excepting faeces. There has been done an analysis of models' structure, performance and limits in order to be able to build a model of moderate complexity with a reliable predictive power, able to be applied for human dosimetry, also, when OBT data are missing. (authors)

07 ISOTOPE AND RADIATION SOURCES↗