Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “grid scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Development of the Space Debris Sensor

The Space Debris Sensor (SDS) is a NASA experiment scheduled to fly aboard the International Space Station (ISS) starting in 2017. The SDS is the first flight demonstration of the Debris Resistive/Acoustic Grid Orbital NASA-Navy Sensor (DRAGONS) developed and matured by the NASA Orbital Debris Program Office. The DRAGONS concept combines several technologies to characterize the size, speed, direction, and density of small impacting objects. With a minimum two-year operational lifetime, SDS is anticipated to collect statistically significant information on orbital debris ranging from 50 micron to 500 micron in size. This paper describes the SDS features and how data from the ISS mission may be used to update debris environment models. Results of hypervelocity impact testing during the development of SDS and the potential for improvement on future sensors at higher altitudes will be reviewed.

Hamilton, J.↗

Robust Scheduling of Microgrids Considering Unintentional Islanding Conditions

This paper proposes a robust scheduling model for microgrids considering the stochastic unintentional islanding conditions. The proposed model minimizes the total operating cost of the microgrid by efficiently coordinating the supply of power from local distributed energy resources and the main grid. To capture the prevailing uncertainties in renewable generation and demand as well as unintentional islanding conditions, a two-stage adaptive robust optimization model is formulated to minimize the total operating cost under the worst realization of the modeled uncertainties. The column and constraint generation (C&CG) method is used to solve the problem in an iterative manner. The solution of the proposed scheduling model ensures robust microgrid operation in consideration of all possible realization of renewable generation, demand and unintentional islanding condition. Numerical simulations on a microgrid consisting of a wind turbine, a PV panel, a fuel cell, two micro-turbines, a diesel generator and a battery demonstrate the effectiveness of the proposed approach.

Liu, Guodong↗

Resilient Microgrid Scheduling Considering Multi-Level Load Priorities

In this paper, we propose a novel resilient microgrid scheduling model considering the multi-level load priorities. The resiliency of the microgrid is guaranteed by quickly adjusting the output of committed local resources and shedding the loads with low priorities when the power supply from the main grid is interrupted. Considering the uncertainty of renewable energy resources and loads as well as exchanged power at PCC, the probability of successful islanding (PSI) is used to quantify the resiliency of electricity supply for various loads with different priorities. Then, the multi-level priorities are enforced through chance constrains. Results of numerical simulation validate the proposed resilient scheduling model. In addition, the impacts of resiliency requirement of loads with high priority on the resiliency of loads with low priority are analyzed as well.

Liu, Guodong↗

Intelligent industrial demand response to increase grid flexibility and reliability: A review

The rapid transition toward renewable energy has introduced challenges in grid stability due to the intermittency of non-dispatchable sources like solar and wind. Industrial Demand Response (IDR) offers a promising, cost-effective solution that adjusts energy consumption patterns to align with supply, increases renewable utilization, and reduces costs. This review provides an updated analysis of IDR, sorting technologies into five categories: energy storage, scheduled energy usage, operational flexibility, on-site generation, and intelligent operations. Energy storage solutions, while requiring little flexibility, often have the longest payback periods. While slightly better, on-site generation also has longer payback periods, ranging from 5 to 20 years or more. Scheduled energy usage, operational flexibility, and intelligent operations allow significant peak reduction at lower capital costs but require greater flexibility. While 15–20 % peak reduction is within the range of all five categories, scheduled energy use and on-site energy generation are shown to have reductions of up to 70–80 % in select scenarios. Combining multiple IDR strategies from these five categories maximizes both financial and operational benefits. Synergistic approaches are shown to enhance grid stability while reducing costs. As the grid evolves, IDR will enable a more flexible, renewable-powered future that will benefit industrial facilities and the broader energy system.

Demand flexibility↗

MPCPy: An Open-Source Software Platform for Model Predictive Control in Buildings

Within the last decade, needs for building control systems that reduce cost, energy, or peak demand, and that facilitate building-grid integration, district-energy system optimization, and occupant interaction, while maintaining thermal comfort and indoor air quality, have come about. Current PID and schedule-based control systems are not capable of fulfilling these needs, while Model Predictive Control (MPC) could. Despite the critical role MPC-enabled buildings can play in future energy infrastructures, widespread adoption of MPC within the building industry has yet to occur. To address barriers associated with system setup and configuration, this paper introduces an open-source software platform that emphasizes use of self-tuning adaptive models, usability by non-experts of MPC, and a flexible architecture that enables application across projects.

Blum, David↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I -- National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Thanks to advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India's RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (LBNL), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU's anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD $920 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment - from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India's 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Microgrid Optimal Scheduling With Chance-Constrained Islanding Capability

To facilitate the integration of variable renewable generation and improve the resilience of electricity sup-ply in a microgrid, this paper proposes an optimal scheduling strategy for microgrid operation considering constraints of islanding capability. A new concept, probability of successful islanding (PSI), indicating the probability that a microgrid maintains enough spinning reserve (both up and down) to meet local demand and accommodate local renewable generation after instantaneously islanding from the main grid, is developed. The PSI is formulated as mixed-integer linear program using multi-interval approximation taking into account the probability distributions of forecast errors of wind, PV and load. With the goal of minimizing the total operating cost while preserving user specified PSI, a chance-constrained optimization problem is formulated for the optimal scheduling of mirogrids and solved by mixed integer linear programming (MILP). Numerical simulations on a microgrid consisting of a wind turbine, a PV panel, a fuel cell, a micro-turbine, a diesel generator and a battery demonstrate the effectiveness of the proposed scheduling strategy. Lastly, we verify the relationship between PSI and various factors.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Grid resolution and solution convergence for Mars Pathfinder forebody

As part of the Discovery Program, NASA Plans to launch a series of probes to Mars. The Mars Pathfinder project is the first of this series with a scheduled Mars arrival in July 1997. The entry vehicle will perform a direct entry into the atmosphere and deliver a lander to the surface. Predicting the entry vehicle's flight performance and designing the forebody heatshield requires knowledge of the expected aerothermodynamic environment. Much of this knowledge can be obtained through computational fluid dynamic (CFD) analysis.

Nettelhorst, Heather L.↗

Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India’s Electric Grid, Vol. 1. National Study

The use of renewable energy (RE) sources, primarily wind and solar generation, is poised to grow significantly within the Indian power system. The Government of India has established a target of 175 gigawatts (GW) of installed RE capacity by 2022, including 60 GW of wind and 100 GW of solar, up from 29 GW wind and 9 GW solar at the beginning of 2017. Using advanced weather and power system modeling made for this project, the study team is able to explore operational impacts of meeting India’s RE targets and identify actions that may be favorable for integration. Our primary tool is a detailed production cost model, which simulates optimal scheduling and dispatch of available generation in a future year (2022) by minimizing total production costs subject to physical, operational, and market constraints. Our team comprises a core group from the Power System Operation Corporation, Ltd. (POSOCO), which is the national grid operator (with representation from the National, Southern, and Western Regional Load Dispatch Centers) under Ministry of Power, National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (Berkeley Lab), and a broader modeling team that includes Central Electricity Authority (CEA), POWERGRID (the central transmission utility, CTU), and State Load Dispatch Centers in Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan, and Andhra Pradesh. Our model includes high-resolution wind and solar data (forecasts and actuals), unique properties for each generator, CEA/CTU’s anticipated buildout of the power system, and enforced state-to-state transmission flows. Assuming the fulfillment of current efforts to provide better access to the physical flexibility of the power system, we find that power system balancing with 100 GW of solar and 60 GW of wind is achievable at 15-minute operational timescales with minimal RE curtailment. This RE capacity meets 22% of total projected 2022 electricity consumption in India with annual RE curtailment of 1.4%, in line with experiences in other countries with significant RE penetrations (Bird et al. 2016). Changes to operational practice can further reduce the cost of operating the power system and reduce RE curtailment. Coordinating scheduling and dispatch over a broader area is the largest driver to reduce costs, saving INR 6300 crore (USD 980 million) annually when optimized regionally. Lowering minimum operating levels of coal plants (from 70% to 40%) is the biggest driver to reduce RE curtailment—from 3.5% down to 0.76%. In fact, this operating property is more influential than faster thermal generation ramp rates in lowering the projected levels of curtailment. While this study does not answer every question relevant to planning for India’s 2022 RE targets, it is an important step toward analyzing operational challenges and cost saving opportunities using state-of-the-art power system planning tools. Further analysis can build upon this basis to explore optimal renewable resource and intrastate transmission siting, system stability during contingencies, and the influence of total power system investment costs on customer tariffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Joint optimal scheduling for electric vehicle battery swapping-charging system based on wind farms

Insufficiencies in charging facilities limit the broad application of electric vehicles (EVs). In addition, EV can hardly represent a green option if its electricity primarily depends on fossil energy. Considering these two problems, this paper studies a battery swapping-charging system based on wind farms (hereinafter referred to as W-BSCS). In a W-BSCS, the wind farms not only supply electricity to the power grid but also cooperate with a centralized charge station (CCS), which can centrally charge EV batteries and then distribute them to multiple battery swapping stations (BSSs). The operational framework of the W-BSCS is analyzed, and some preprocessing technologies are developed to reduce complexity in modeling. Then, a joint optimal scheduling model involving a wind power generation plan, battery swapping demand, battery charging and discharging, and a vehicle routing problem (VRP) is established. Then a heuristic method based on the exhaustive search and the Genetic Algorithm is employed to solve the formulated NP-hard problem. Numerical results verify the effectiveness of the joint optimal scheduling model, and they also show that the W-BSCS has great potential to promote EVs and wind power.

17 WIND ENERGY↗

Development, deployment and operations of ATLAS databases.

In preparation for ATLAS data taking, a coordinated shift from development towards operations has occurred in ATLAS database activities. In addition to development and commissioning activities in databases, ATLAS is active in the development and deployment (in collaboration with the WLCG 3D project) of the tools that allow the worldwide distribution and installation of databases and related datasets, as well as the actual operation of this system on ATLAS multi-grid infrastructure. We describe development and commissioning of major ATLAS database applications for online and offline. We present the first scalability test results and ramp-up schedule over the initial LHC years of operations towards the nominal year of ATLAS running, when the database storage volumes are expected to reach 6.1 TB for the Tag DB and 1.0 TB for the Conditions DB. ATLAS database applications require robust operational infrastructure for data replication between online and offline at Tier-0, and for the distribution of the offline data to Tier-1 and Tier-2 computing centers. We describe ATLAS experience with Oracle Streams and other technologies for coordinated replication of databases in the framework of the WLCG 3D services.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

The Feasibility of Moving PMU Data in the Future Power Grid

The power grid is a complex network connecting electricity providers with their consumers. With an increasing consumer base requiring more resources and the requirement to integrate significant renewable sources, maintaining the network requires new and innovative management solutions. To manage this complexity and provide precise, real-time views of the grid, Phasor Measurement Units (PMUs) are undergoing widespread deployment. These units provide measurements as often as 60 times per second, with an accurate time identifier attached to each reading, enabling real-time monitoring of the network. However, this new capability generates much more data than the current infrastructure is designed to handle. With the expectation that there will eventually be tens of thousands of PMUs monitoring the transmission lines, the power community is looking towards accumulating multiple terabytes of data per day - several orders of magnitude beyond current data acquisition rates. This has led to questions being raised in the power community about whether or not a significant research effort is required to effectively transfer the volume of information generated by these new data streams. This paper answers that question by comparing a worst-case data generation scenario with several alternative networking protocols and historical trends in protocol advancement. Based on this analysis we are able to conclude that transferring the information between the PMUs and the resulting data repositories is feasible. We recognize that there are issues beyond transferring the data that need to be addressed such as effective access to historical data, data transfer latency, cyber security, and data analysis. There is also an extensive engineering trade-off that the power companies will need to make to decide the best mix of networking protocols for their particular PMU deployments, since that requires significant assumptions about proprietary information including deployment cost, deployment schedules, PMU locations, and available resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Towards Optimal and Executable Distribution Grid Restoration Planning With a Fine-Grained Power-Communication Interdependency Model

Distribution service restoration (DSR) under natural disasters is always a critical and challenging problem for utility companies. An effective solution must not ignore the power-communication interdependency as various systems are getting increasingly connected in the Smart Grid era. In this paper, we propose a two-layer distribution system model with both power and communication components. Based on this model, we formulate the restoration process as a routing problem that schedules the path and action sequence of utility crews that involves repairing damaged components, closing power switches, and enabling communication paths between the control center and remote field devices. Further, we develop a simulation-based method to quantitatively evaluate the restoration process with public reference models of large-scale power systems. The experimental results show that our method improves the total restored energy up to 57.6% and reduces the recovery time up to 63% by considering the power-communication interdependency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Out-of-Core Streamline Visualization on Large Unstructured Meshes

It's advantageous for computational scientists to have the capability to perform interactive visualization on their desktop workstations. For data on large unstructured meshes, this capability is not generally available. In particular, particle tracing on unstructured grids can result in a high percentage of non-contiguous memory accesses and therefore may perform very poorly with virtual memory paging schemes. The alternative of visualizing a lower resolution of the data degrades the original high-resolution calculations. This paper presents an out-of-core approach for interactive streamline construction on large unstructured tetrahedral meshes containing millions of elements. The out-of-core algorithm uses an octree to partition and restructure the raw data into subsets stored into disk files for fast data retrieval. A memory management policy tailored to the streamline calculations is used such that during the streamline construction only a very small amount of data are brought into the main memory on demand. By carefully scheduling computation and data fetching, the overhead of reading data from the disk is significantly reduced and good memory performance results. This out-of-core algorithm makes possible interactive streamline visualization of large unstructured-grid data sets on a single mid-range workstation with relatively low main-memory capacity: 5-20 megabytes. Our test results also show that this approach is much more efficient than relying on virtual memory and operating system's paging algorithms.

Ueng, Shyh-Kuang↗

A low-cost centralized HVAC control system solution for energy savings, load shedding, and improved maintenance

University campuses rely on centralized controls for managing and optimizing complex HVAC systems in larger buildings. However, most campuses also have many smaller buildings with packaged HVAC systems controlled by a stand-alone thermostat. Even when these distributed and often overlooked systems have modern programmable thermostats, they cannot be centrally monitored or controlled, and they are typically not programmed adequately. This paper describes the implementation of a low-cost centralized control solution for these systems serving smaller campus buildings, mostly under 5,000 sf and representative of light commercial spaces. Thanks to advances in technology spurred by residential and commercial IoT developments, simple networked thermostat solutions exist that can easily replace original thermostats, and, connect these systems to a web-based portal for monitoring and control. We show that, with small customizations, these platforms can be integrated into facility management workflows. Beyond the energy savings potential from improved scheduling and closer management of these systems, there are significant advantages for maintenance crews since these systems can now be monitored on smart phones or tablets. A grid-responsive load-shedding program has also been implemented for additional cost savings. The networked thermostats can also be connected to additional systems such as economizer controls for improved ventilation management and energy savings. With data from these systems integrated centrally, it can also be used for improved analytics and fault detection. A toolkit has been developed to share the program with other campuses, whether for energy savings, improved management of ventilation, or a more proactive maintenance approach.

Fauchier-Magnan, Nicolas↗

Improving Wind Farm Dispatchability Using Model Predictive Control for Optimal Operation of Grid-Scale Energy Storage

This paper demonstrates the use of model-based predictive control for energy storage systems to improve the dispatchability of wind power plants. Large-scale wind penetration increases the variability of power flow on the grid, thus increasing reserve requirements. Large energy storage systems collocated with wind farms can improve dispatchability of the wind plant by storing energy during generation over-the-schedule and sourcing energy during generation under-the-schedule, essentially providing on-site reserves. Model predictive control (MPC) provides a natural framework for this application. By utilizing an accurate energy storage system model, control actions can be planned in the context of system power and state-of-charge limitations. MPC also enables the inclusion of predicted wind farm performance over a near-term horizon that allows control actions to be planned in anticipation of fast changes, such as wind ramps. This paper demonstrates that model-based predictive control can improve system performance compared with a standard non-predictive, non-model-based control approach. It is also demonstrated that secondary objectives, such as reducing the rate of change of the wind plant output (i.e., ramps), can be considered and successfully implemented within the MPC framework. Specifically, it is shown that scheduling error can be reduced by 81%, reserve requirements can be improved by up to 37%, and the number of ramp events can be reduced by 74%.

Halamay, Douglas↗

Forecasting Wind and Solar Generation: Improving System Operations, Greening the Grid (Spanish Version)

This document is the Spanish version of 'Greening the Grid- Forecasting Wind and Solar Generation Improving System Operations'. It discusses improving system operations with forecasting with and solar generation. By integrating variable renewable energy (VRE) forecasts into system operations, power system operators can anticipate up- and down-ramps in VRE generation in order to cost-effectively balance load and generation in intra-day and day-ahead scheduling. This leads to reduced fuel costs, improved system reliability, and maximum use of renewable resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Thermo-Hydrological Modeling of Thermal Energy Storage in a Depleted Oil Reservoir

Thermal energy storage in oil and gas reservoirs leverages the existing surface and subsurface infrastructure, which can pave the way for economic production of geothermal energy. Existing studies on geothermal energy storage are focused mostly on the use of aquifers with more homogeneous rock and fluid properties. Coupling of heat and fluid flow in a multiphase-multicomponent system, such as an oil reservoir, is imperative especially if existing oil field assets need to be repurposed as required for a sustainable energy transition. The objective is to model the subsurface thermo-hydrological processes associated with reservoir performance and operational sustainability. The model evaluates formation pressure and temperature within the reservoir and at the injection/production wells during multiple charge and discharge cycles. Hot water (approximately 200 degrees C) heated by Concentrating Solar Power (CSP) at high pressure is injected into the existing oil reservoir for storage and produced as thermal energy for power generation, which will be accompanied by enhanced oil recovery. To demonstrate the coupled fluid and heat flow during the injection/production cycle in the subsurface reservoir, TOUGH3 (developed by Berkeley Lab) is used to simulate the thermo-hydrological (TH) processes in a multiphase, multicomponent system. Two well geometries are considered within the reservoir grid: 1) a single-well huff-n-puff system (same well is used for injection and production), and 2) an isolated injection-production well doublet. Seasonal charge and discharge cycling are implemented based on the scheduling specified in the model input file. The model reports pressure, temperature, enthalpy, liquid fluxes, heat fluxes, pore velocities, and changes in porosity & permeability due to temperature and pressure variations during the cyclic Reservoir Thermal Energy Storage (RTES) operations. The results from the simulations can be used to optimize the operational parameters (such as well spacing and injection/production rates) and round-trip efficiency for surface power-plants coupled with thermal energy storage over time. They can also serve as important inputs for levelized cost of storage estimations. The research will help to design and integrate surface renewable energy sources, such as concentrating solar power (CSP), with RTES to help balance out power supply and demand on the grid.

CSP↗