Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “electric grid systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Discrete and Integrated Solutions for Hybrid PV Plants Without Momentary Cessation in Low SCR and High Penetration PE Grids

With the increased penetration of power electronic (PE) based loads and sources, advanced solutions may be required for the enhancement of grid stability in regions with low short circuit ratio (SCR) and high penetration PE grids. The requirement of advanced solutions arises from the gradual paradigm shift of the electric grid from the traditional electric machine dominant system to a high penetration of PE-based system. One of the major challenges with such systems in recent times is the momentary cessation during alternating current (ac) grid transmission faults. During momentary cessation, PE-based resources cease to operate, thus creating probable reliability challenges for the grid. In this paper, potential feasible options to provide continuity of operation during such scenarios are presented. The options are considered through identifying upgrades in existing and upcoming discrete development of photovoltaic (PV) and energy storage systems (ESS) termed as discrete hybrid PV plants. Additionally, an advanced concept of integrated development of PV and ESS connecting to ac transmission grid links called multi-port autonomous reconfigurable solar power plant (MARS) is evaluated. The developed new solutions are evaluated for different grid use cases and scenarios in PSCAD.

Marthi, Phani Ratna Vanamali↗

Bishop Paiute Single Family Solar Home Project: Phase 4 (Final Technical Report)

The Bishop Paiute Tribe is committed to energy efficiency, renewable energy, and environmental protection and has a vision to install solar energy systems on all buildings on the Reservation where technically feasible. Through completion of the Bishop Paiute Tribe Residential Solar Program – Phase 4, Bishop Paiute Tribe continued its successful model partnering with non-profit solar installer GRID Alternatives to advance its vision and build energy self-sufficiency on the Bishop Paiute Reservation. The Bishop Paiute Tribe Residential Solar Program – Phase IV deployed 67 kW-AC of new clean, renewable energy through grid-tied, net-metered rooftop solar electric systems installed on a total of 20 (one more than the planned 19) existing owner-occupied, single-family homes for low-income families on the Reservation. This represents nearly 14% of the Reservation’s total “unsolarized” homes. These systems were provided at no cost to the homeowners, who will also receive energy efficiency education to further reduce energy consumption and lower electric bills. GRID led a solar installation for three (3) of the homes where Tribal/community members, were given an opportunity in participating in on-the-roof trainings to gain new skills while installing solar for their low-income community members. Subcontractors through GRID Sub Contractor Partnership Program (GRID SPP) led solar installations for seventeen (17) of the homes. Each installation provided paid employment for a solar trainee trainees hired by the SPP subcontractors as entry level solar installers. It is estimated that the installed 67 kW-AC of solar will produce at least 120,000 kWh/year, displacing at least 30-75% of the 20 homes’ total electricity use for a combined system lifetime electricity cost savings for the low-income homeowners of about $\$$500,000. It is further estimated that the installed renewable energy systems installed will prevent greenhouse gases by about 1,000 tons, equivalent to planting approximately 25,000 trees. Following the successful completed installations, it is expected that the Reservation and surrounding communities will benefit from improved air quality via reduced wood stove use for heating. Cumulatively with other initiatives, the project will result in nearly 40% of the Reservation’s solarizable homes being solarized. Overall, the triple impact of the phase 4 of the Bishop Paiute Tribe Residential Solar Program – Phase 4 is: 1) affordable energy for low-income families; 2) on-site clean energy production, 3) hands on training and paid solar installation work for local tribal/community workers. These impacts will support and grow the Tribe’s energy, economic, environmental, and social self-sufficiency and sovereignty amongst the neediest on the Reservation.

14 SOLAR ENERGY↗

Environmental and economic optima of solar home systems design: A combined LCA and LCC approach

Here, we compare the economic and environmental optimal design of Solar Home Systems (SHSs) and explore the role of economic incentives (such as tariffs and technology costs) in approximating the two optima. To achieve that, we present a methodology for the environmental and economic evaluation of grid-connected SHSs: user-scale electric systems involving a photovoltaic (PV) power system and a battery energy storage system. The proposed methodology is based on a mixed integer linear programming (MILP) optimization, life cycle assessment and life cycle costing. This methodological framework is applied to a case study involving a typical SHS installation in Italy. The results of the environmental optimal design brought to the evaluation of a 3.25 kW PV assisted by 8.66 kWh of nickel cobalt manganese batteries, whereas the costs of the SHS are minimized by a small PV system (less than 1 kW). Results underline that the environmental optimal configurations rely on battery technologies, which entails a significant cost compared to the grid connection. In contrast, the economic optimal design solutions is less impactful than the grid mix both from an environmental and economic points of view. Thanks to a reduction of batteries and PV costs, the environmental impact of the economic optimal design is expected to decrease in the future.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Architecture, Voltage, and Components for a Turboelectric Distributed Propulsion Electric Grid

The development of a wholly superconducting turboelectric distributed propulsion system presents unique opportunities for the aerospace industry. However, this transition from normally conducting systems to superconducting systems significantly increases the equipment complexity necessary to manage the electrical power systems. Due to the low technology readiness level (TRL) nature of all components and systems, current Turboelectric Distributed Propulsion (TeDP) technology developments are driven by an ambiguous set of system-level electrical integration standards for an airborne microgrid system (Figure 1). While multiple decades' worth of advancements are still required for concept realization, current system-level studies are necessary to focus the technology development, target specific technological shortcomings, and enable accurate prediction of concept feasibility and viability. An understanding of the performance sensitivity to operating voltages and an early definition of advantageous voltage regulation standards for unconventional airborne microgrids will allow for more accurate targeting of technology development. Propulsive power-rated microgrid systems necessitate the introduction of new aircraft distribution system voltage standards. All protection, distribution, control, power conversion, generation, and cryocooling equipment are affected by voltage regulation standards. Information on the desired operating voltage and voltage regulation is required to determine nominal and maximum currents for sizing distribution and fault isolation equipment, developing machine topologies and machine controls, and the physical attributes of all component shielding and insulation. Voltage impacts many components and system performance.

electric faults↗

Design and performance assessment of a dual-mode latent thermal storage integrated heat pump across multiple climate zones

The electrification of space cooling and heating systems risks overloading the existing electrical grid during peak hours. Heat pumps integrated with thermal energy storage (HP-TES) offer a promising solution by shifting peak loads to off-peak hours, reducing grid strains. This work presents the design and assessment of a dual-mode HP-TES that uses a single 22°C phase-change material (PCM) as a heat source or sink in heating and cooling modes, respectively. Performance assessment was conducted using Modelica-based transient models, and full-year simulations were conducted across eight US climate zones using typical weather data. Two HP-TES performance metrics: peak energy reduction and recharge energy increases, were defined by comparing HP-TES energy consumption with base HP peak consumptions. Annual heating demand reductions (40–65%) exceeded cooling demand reductions (15–20%) due to the elimination of peak-hour backup heating. Cooling mode recharge energy requirements (0–10%) were reduced in locations with lower summer nighttime temperatures, while heating recharge requirements were lower than the high base-peak energy demand from backup heating. Simplified rapid methods that were 10 7 times faster than annual simulations were developed to predict seasonal cooling and heating energy reductions, and recharge energy requirements, with maximum deviations of ±2.5% and ±3.5% points. These methods enabled rapid parametric studies that identified optimal location-specific PCM temperatures between 22°C and 27°C, highlighting the need to consider both discharge and recharge energy requirements to achieve sustainable, energy-efficient peak load shifting across various climate zones.

25 ENERGY STORAGE↗

Technology Innovation Opportunities for the U.S. Buildings Sector [Slides]

Technology innovation can improve the competitiveness of American companies and the lives of American families. This report identifies promising building technology innovation opportunities to: • Make buildings more affordable, efficient, healthy, and resilient for all Americans. • Increase the international competitiveness of U.S. businesses. • Improve the integration of buildings with the electric grid to reduce consumer and grid system costs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Extending the operating range and safety of Li-ion batteries with new fluorinated electrolytes

Orbia Fluor and Energy Materials (formerly Koura) has successfully developed a new class of fluorinated electrolyte solvents for lithium-ion batteries. In collaboration with Silatronix and Argonne National Laboratory, the team synthesized and screened over 20 novel fluorinated compounds, optimizing formulations that significantly enhance battery performance across critical metrics such as thermal stability, fast-charging capability, and cycling life at extreme temperatures. Electrolytes with fluorinated molecules developed in this program demonstrated superior performance in 2 Ah pouch cells, achieving over 1000 fast-charge cycles with minimal capacity fade, outperforming conventional carbonate-based electrolytes. Mechanistic studies revealed that the fluorinated electrolytes promote a stable solid electrolyte interphase at the anode and reduce cathode metal dissolution, contributing to improved long-term stability. These advancements mark a significant step toward safer, more efficient batteries for applications ranging from grid storage to defense systems to electric vehicles. We gratefully acknowledge DOE’s financial support through contract DE-EE0009642.

25 ENERGY STORAGE↗

Evaluating the potential of short-term instrument deployment to improve distributed wind resource assessment

Distributed wind projects, which are connected at the distribution level of an electricity system or in off-grid applications to serve specific or local energy needs, often rely solely on wind resource models to establish wind speed and energy generation expectations. Historically, anemometer loan programs have provided an affordable avenue for more accurate onsite wind resource assessment, and the lowering cost of lidar systems has shown similar advantages for more recent assessments. While a full 12 months of onsite wind measurement is the standard for correcting model-based long-term wind speed estimates for utility-scale wind farms, the time and capital investment involved in gathering onsite measurements must be reconciled with the energy needs and funding opportunities that drive expedient deployment of distributed wind projects. Much literature exists to quantify the performance of correcting long-term wind speed estimates with 1 or more years of observational data, but few studies explore the impacts of correcting with months-long observational periods. This study aims to answer the question of how short you can go in terms of the observational time period needed to make impactful improvements to model-based long-term wind speed estimates. Three algorithms, multivariable linear regression, adaptive regression splines, and regression trees, are evaluated for their skill at correcting long-term wind resource estimates from the European Centre for Medium-Range Weather Forecasts Reanalysis version 5 (ERA5) using months-long periods of observational data from 66 locations across the US. On average, correction with even 1 month of observations provides significant improvement over the baseline ERA5 wind speed estimates and produces median bias magnitudes and relative errors within 0.22 m s −1 and 4 percentage points of the median bias magnitudes and relative errors achieved using the standard 12 months of data for correction. However, in cases when the shortest observational periods (1 to 2 months) used for correction are not well correlated with the overlapping ERA5 reference, the resultant long-term wind speed errors are worse than those produced using ERA5 without correction. Summer months, which are characterized by weaker relative wind speeds and standard deviations for most of the evaluation sites, tend to produce the worst results for long-term correction using months-long observations. The three tested algorithms perform similarly for long-term wind speed bias; however, regression trees perform notably worse than multivariable linear regression and adaptive regression splines in terms of correlation when using 6 months or less of observational data for correction. Translating the analysis to wind energy, median relative errors in the capacity factor are on average within 10 % using 1 month of training. If the observation period used for correction is not well correlated with the reference data, however, misrepresentation of the observed capacity factor can be substantial. The risk associated with poor correlation between the observed and reference datasets decreases with increasing training period length. In the worst-correlation scenarios, the median capacity factor relative errors from using 1, 3, and 6 months are within 47 %, 26 %, and 16 %, respectively.

17 WIND ENERGY↗

Phase 1 of the First Solar Small Power System Experiment (experimental System No. 1). Volume 1: Technical Studies for Solar Point-focusing, Distributed Collector System, with Energy Conversion at the Collector, Category C

The technical and economic feasibility of a solar electric power plant for a small community is evaluated and specific system designs for development and demonstration are selected. All systems investigated are defined as point focusing, distributed receiver concepts, with energy conversion at the collector. The preferred system is comprised of multiple parabolic dish concentrators employing Stirling cycle engines for power conversion. The engine, AC generator, cavity receiver, and integral sodium pool boiler/heat transport system are combined in a single package and mounted at the focus of each concentrator. The output of each concentrator is collected by a conventional electrical distribution system which permits grid-connected or stand-alone operation, depending on the storage system selected.

Clark, T. B.↗

Cost and Performance Model for Photovoltaic Systems

Lifetime cost and performance (LCP) model assists in assessment of design options for photovoltaic systems. LCP is simulation of performance, cost, and revenue streams associated with photovoltaic power systems connected to electric-utility grid. LCP provides user with substantial flexibility in specifying technical and economic environment of application.

Borden, C. S.↗

A Major Solar Eruptive Event in July 2012: Defining Extreme Space Weather Scenarios

A key goal for space weather studies is to define severe and extreme conditions that might plausibly afflict human technology. On 23 July 2012, solar active region 1520 (approx. 141 deg W heliographic longitude) gave rise to a powerful coronal mass ejection (CME) with an initial speed that was determined to be 2500+/-500 km/s. The eruption was directed away from Earth toward 125 deg W longitude. STEREO-A sensors detected the CME arrival only about 19 h later and made in situ measurements of the solar wind and interplanetary magnetic field. In this paper, we address the question of what would have happened if this powerful interplanetary event had been Earthward directed. Using a well-proven geomagnetic storm forecast model, we find that the 23-24 July event would certainly have produced a geomagnetic storm that was comparable to the largest events of the twentieth century (Dst approx. - 500 nT). Using plausible assumptions about seasonal and time-of-day orientation of the Earth's magnetic dipole, the most extreme modeled value of storm-time disturbance would have been Dst= - 1182 nT. This is considerably larger than estimates for the famous Carrington storm of 1859. This finding has far reaching implications because it demonstrates that extreme space weather conditions such as those during March of 1989 or September of 1859 can happen even during a modest solar activity cycle such as the one presently underway. We argue that this extreme event should immediately be employed by the space weather community to model severe space weather effects on technological systems such as the electric power grid.

solar longitude↗

The Technical and Economic Potential of Hydrogen within the United States

Hydrogen markets have an opportunity to grow as its value as an energy intermediate increases. Hydrogen’s estimated serviceable consumption potential in the United States is 106 MMT/yr which is a ten-fold increase over the current market size. That opportunity is driven primarily by increased demands for metals refining, biofuel and hydrocarbon production, supplementing the natural gas system, seasonal storage for the electricity grid, and fuel cell electric vehicles. The U.S. has many renewable, nuclear, and fossil resources that each could meet that demand itself. The economic potential, which considers both costs to produce hydrogen and willingness of applications to pay for it, is 22 to 41 MMT/yr. The range is impacted by factors that impact the cost to produce including the price of natural gas and the cost of electrolyzers. It is also impacted by competition to provide the same services as hydrogen including electrification.

electrolysis↗

Moving toward a framework for electricity and heat equivalence in energy systems analysis

Sustaining, maintaining, and upgrading the electricity grid, while meeting decarbonization goals is a challenge facing policymakers, regulators, grid operators, and investors. Simultaneously meeting demands for future capacity, retiring older inefficient technologies, and addressing externalities from energy production and use requires more diverse and inclusive technologies to avoid constraints and shortfalls in grid capability. Changing the energy production paradigm by encouraging alternative technologies was a key driver for FERC Order 2222. This stimulus for developing new small-scale generation will complement and supplement the existing fleet only if it attracts new investment. This investment must reflect technology that goes beyond the energy-only characteristics of traditional generation, creating systems where suites of energy-equivalent outputs are enhanced by environmental quality benefits and offsets. We use energy system designs to highlight the contribution that measuring and accounting for equivalency values provides net increases in capacity, electricity, and alternative fuels while simultaneously reducing carbon waste impacts.

42 ENGINEERING↗

Decarbonization of Residential Building Energy Supply: Impact of Cogeneration System Performance on Energy, Environment, and Economics

Electrical and thermal loads of residential buildings present a unique opportunity for onsite power generation, and concomitant thermal energy generation, storage, and utilization, to decrease primary energy consumption and carbon dioxide intensity. This approach also improves resiliency and ability to address peak load burden effectively. Demand response programs and grid-interactive buildings are also essential to meet the energy needs of the 21st century while addressing climate impact. Given the significance of the scale of building energy consumption, this study investigates how cogeneration systems influence the primary energy consumption and carbon footprint in residential buildings. The impact of onsite power generation capacity, its electrical and thermal efficiency, and its cost, on total primary energy consumption, equivalent carbon dioxide emissions, operating expenditure, and, most importantly, thermal and electrical energy balance, is presented. The conditions at which a cogeneration approach loses its advantage as an energy efficient residential resource are identified as a function of electrical grid’s carbon footprint and primary energy efficiency. Compared to a heat pump heating system with a coefficient of performance (COP) of three, a 0.5 kW cogeneration system with 40% electrical efficiency is shown to lose its environmental benefit if the electrical grid’s carbon dioxide intensity falls below 0.4 kg CO 2 per kWh electricity.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Primary Frequency Control Using Motor Drives for Short Term Grid Disturbances

Industrial motor systems make up a quarter of all electric sales in the United States. Variable speed drives (VSDs) can provide energy efficiency savings to the customer by regulating motor speed based on specific and varying needs. In addition to the benefits provided to the customer, VSDs can provide support to the grid through ancillary services. The Center for Ultra-Wide-Area Resilient Electric Energy Transmission Networks (CURENT) developed a power electronics converter-based grid emulator to allow testing of various power system architectures and demonstration of key technologies in monitoring, control, actuation, and visualization. This paper proposes using an active front-end VSD's connected motor load to provide frequency regulation to a large scale power grid. Each part of the emulator is described including motor and power electronics model and control. The proposed frequency regulation is implemented in VSDs and modeled in both a transmission system in EMTDC/PSCAD and verified on CURENT's hardware testbed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine (Final Report)

As the nation continues to encourage, through market structures and financial incentives, the proliferation of intermittent renewable electricity, how to optimize the ever-changing electric grid and identify means to retain and improve resilience, while ensuring continued reductions in GHG emissions, will be critical. According to Bloomberg, wind & solar generated 10.5% of US electricity in 2020 and that percentage continues to grow. In support of expanding renewable energy use, and to address its intermittent nature, this project will develop the Hydrogen Storage for Flexible Fossil Fuel Power Generation platform that is dispatchable, reliable, repeatable and have the ability to produce zero or negative carbon power while interfacing with geology capable of CO2 and hydrogen storage. GTI Energy (GTIE) and team members Illinois State Geological Survey (ISGS), Mitsubishi Heavy Industries America (MHIA), Ameren Illinois, Hexagon Purus, and the Low Carbon Resources Initiative (LCRI) completed a Phase I Conceptual Study under contract DE-FE0032012 for Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine. The Hydrogen Storage for Flexible Fossil Fuel Power Generation platform addresses the intermittent nature of the expanding use of Variable Renewable Energy (VRE) generation. The low cost of the electricity (COE) generated results in greater dispatch and more operation at higher power levels (higher efficiency), fewer short intervals, and fewer start/stop cycles. The reliable, resilient system can produce zero carbon power and store hydrogen. It will demonstrate hydrogen storage in geologic formations like those used in natural gas underground storage thus enabling large scale storage of hydrogen in sedimentary strata across the United States rather than in geographically restricted salt caverns. The Phase I study confirmed the system is feasible and generates power at lower cost than other low carbon approaches. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production. The study advanced the maturity of the H 2 storage-based system with flexible power generation by completing a Pre-FEED study (Phase II). The Pre-FEED focused on the selected Energy Farm on the University of Illinois Urbana-Champaign (UIUC) site that includes above ground and underground hydrogen storage, low-carbon hydrogen production (GTI’s Compact Hydrogen Generator, CHG) with underground CO2 sequestration, and a 40-MW class gas turbine. The Pre-FEED addressed the entire system and its interconnection to the natural gas and electric grid and mitigation of key risks, such as storage behavior, load-following, and system operation. During Phase 1 of the project, the team completed key tasks, which moved the entire demonstration project, specific components and approaches closer to commercialization. These Phase I Accomplishments include: Completing System Requirements Review; Completing System Layout and Modeling - Heat & Mass Balance and Process Flow Diagram; Completing modelling of 9 turbine performance cases; Evaluating rock strata for underground storage of hydrogen and sequestration of carbon dioxide; Completing initial modelling of underground storage of hydrogen and withdrawal with evaluation of loss and water production; Identifying roadable storage for above ground hydrogen storage; Identifying existing electrical infrastructure for receiving/delivering electricity; Identifying existing gas supply infrastructure for receiving natural gas; Document concept design/development plans in required reports. Conclusions: The 12-month Feasibility study in Phase I study was completed and confirmed the system is feasible and generates power at lower cost than other low carbon approaches and even lower cost than the reference NGCC plant without carbon capture when taking advantage of 45Q carbon credits. The study enabled the fidelity of the concept to be improved and allowed identification of the requirements for the system. Defining the individual system and component requirements was performed via the system requirements review with the whole team. These requirements were then incorporated into and iterated with our Heat & Mass Balance process model and process flow diagrams were generated to reflect the overall system. This information was then used to complete the TEA and show economic feasibility. Large scale non-salt geologic storage of hydrogen is an enabling technology for a hydrogen-fired turbine that can be retrofitted into large-scale electric generating units (EGU). Our demonstration will include 428 MWh or ~4 hours full load of hydrogen storage (above and underground). Carbon capture inherent to the CHG process can capture 90% CO 2 (with upgrades to >98%). This system provides a COE of 23% savings relative to an NGCC with a post combustion amine system. Our proposed storage system decouples carbon capture and hydrogen production from power production; therefore, we expect our proposed system’s efficiency and variable COE to be superior resulting in overall higher dispatch and reduced deep cycling. Our demonstration will be full to multi-day hydrogen storage and has the potential for longer (seasonal) duration commercially. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production.

03 NATURAL GAS↗

PETSc DMNetwork: A Library for Scalable Network PDE-Based Multiphysics Simulations

We present DMNetwork, a high-level package included in the PETSc library for the simulation of multiphysics phenomena over large-scale networked systems. The library aims at applications that have networked structures such as those in electrical, gas, and water distribution systems. DMNetwork provides data and topology management, parallelization for multiphysics systems over a network, and hierarchical and composable solvers to exploit the problem structure. DMNetwork eases the simulation development cycle by providing the necessary infrastructure through simple abstractions to define and query the network components. This article presents the design of DMNetwork, illustrates its user interface, and demonstrates its ability to solve multiphysics systems, such as an electric circuit, a network of power grid and water subnetworks, and transient hydraulic systems over large networks with more than 2 billion variables on extreme-scale computers using up to 30,000 processors.

extreme-scale computing↗

Architecture for Co-Simulation of Transportation and Distribution Systems with Electric Vehicle Charging at Scale in the San Francisco Bay Area

This work describes the Grid-Enhanced, Mobility-Integrated Network Infrastructures for Extreme Fast Charging (GEMINI) architecture for the co-simulation of distribution and transportation systems to evaluate EV charging impacts on electric distribution systems of a large metropolitan area and the surrounding rural regions with high fidelity. The current co-simulation is applied to Oakland and Alameda, California, and in future work will be extended to the full San Francisco Bay Area. It uses the HELICS co-simulation framework to enable parallel instances of vetted grid and transportation software programs to interact at every model timestep, allowing high-fidelity simulations at a large scale. This enables not only the impacts of electrified transportation systems across a larger interconnected collection of distribution feeders to be evaluated, but also the feedbacks between the two systems, such as through control systems, to be captured and compared. The findings are that with moderate passenger EV adoption rates, inverter controls combined with some distribution system hardware upgrades can maintain grid voltages within ANSI C.84 range A limits of 0.95 to 1.05 p.u. without smart charging. However, EV charging control may be required for higher levels of charging or to reduce grid upgrades, and this will be explored in future work.

24 POWER TRANSMISSION AND DISTRIBUTION↗