Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “drilling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Infrared Spectral Observations While Drilling into a Frozen Lunar Simulant

Past and continuing observations indicate an enrichment of volatile materials in lunar polar regions. While these volatiles may be located near the surface, access to them will likely require subsurface sampling, during which it is desirable to monitor the volatile content. In a simulation of such activities, a multilayer lunar simulant was prepared with differing water content, and placed inside a thermal vacuum chamber at Glenn Research Center (GRC). The soil profile was cooled using liquid nitrogen. In addition to the soil, a drill and infrared (IR) spectrometer (~1600-3400 nm) were also located in the GRC chamber. We report the spectral observations obtained during a sequence where the drill was repeatedly inserted and extracted, to different depths, at the same location. We observe an overall increase in the spectral signature of water ice over the duration of the test. Additionally, we observe variations in the water ice spectral signature as the drill encounters different layers.

volatile content↗

Estimating Water Ice Abundance from Short-Wave Infrared Spectra of Drill Cuttings at Cryogenic Temperatures

NASA's Resource Prospector (RP) mission intends to visit a lunar polar region to characterize the volatile distribution. Part of the RP payload, the Near-infrared Volatile Spectrometer System (NIRVSS) is a spectrometer operating from 1600-3400 nm that provides sensitivity to water ice, and other volatiles. For multiple years, the NIRVSS system has been incorporated into on-going RP payload testing in a cryogenic vacuum facility at Glenn Research Center. Soil tubes of lunar simulants, prepared with known amounts of water, are placed in the vacuum chamber and cooled to cryogenic temperatures (soil temperatures of 110-170 K) and placed under low vacuum (a few x 10(exp -6) Torr). During these tests NIRVSS continuously measures spectra of soil cuttings emplaced onto the surface by a drill. Real time processing of NIRVSS spectra produces two spectral parameters associated with water ice absorption features near 2000 and 3000 nm that can be used to inform decision making activities such as delivery of the soil to a sealable container. Post-test collection and analyses of the soils permit characterization the water content as a function of depth. These water content profiles exhibit the characteristics of a vacuum desiccation zone to depths of about 40 cm. Subsequent to completion of the tests, NIRVSS spectra are processed to produce two spectral parameters associated with water ice absorption features near 2000 and 3000 nm. These features can be evaluated as a function of time, and correlated with drill depth, and other measurements, throughout the drilling activities. Until now no effort was attempted to quantitatively relate these parameters to water abundance. This is the focus of our efforts to be presented.

NASA's Resource Prospector (RP)↗

Probabilistic Risk Analysis (PRA) of a Mobile Offshore Drilling Unit (MODU) Dynamic Positioning System (DPS)

Probabilistic Risk Assessment (PRA) has been utilized by NASA in a variety of space oriented projects. It has served as one of the primary risk identification and ranking tools. Recent developments in the oil and gas industry have presented opportunities for NASA to lend their PRA expertise to both ongoing and developmental projects within the industry. As a result, NASA has entered into an agreement with Anadarko Petroleum Company (APC) to collaboratively develop PRAs for different aspects of the subsea drilling and completion process of well development. This paper documents how PRA was applied to estimate the probability that a Mobile Offshore Drilling Unit (MODU) equipped with a generically configured Dynamic Positioning System (DPS) loses location and needs to initiate an emergency disconnect. Since this project was in essence a pilot project, the PRA described in this paper is intended to be generic such that the vessel meets the general requirements of an International Maritime Organization (IMO) Maritime Safety Committee (MSC)/Circ. 645 Class 3 dynamically positioned vessel. The results of this analysis are not intended to be applied to any specific drilling vessel, although provisions were made to allow the analysis to be configured to a specific vessel if required.

Thigpen, Eric B.↗

Drilling Subsurface Ice at the Haughton Crater Analog Site

Over a decade of evolutionary development of integrated automated drilling and sample handling at the terrestrial polar Mars analog site at Haughton Crater has made it possible to propose missions that could sample 1-2m into rocks and ice on Mars. The eventual search for biomarkers and signs of past or extant life in Mars polar regions will require sample acquisition there below the desiccated and irradiated surface. Drilling and drill tests at the Haughton Crater site since 1998 have also shown a retreat downward of the active-layer boundary in annual measurements.

subsurface↗

Design and Development of a Robust Chuck Mechanism for the Mars2020 Coring Drill

The Sampling and Caching Subsystem (SCS) onboard the Mars2020 rover includes a coring drill that can perform coring, abrasion, and regolith collection operations. The coring drill requires a chuck mechanism to allow for the changing of the bits needed to perform sampling. The chuck mechanism must be capable of securely connecting a bit under drilling, rover slip, and pullout loads, but also readily release a bit after application of these loads. The Mars2020 chuck consists of a ball lock mechanism that allows for robust engagement and release of bit assemblies that is preloaded to ensure a secure, stiff connection between the bit assembly and the rest of the corer. To prevent jamming, the chuck incorporates rollers to preload the ball lock. The rollers are mounted onto a flexured cam that minimizes changes in internal mechanism loads that result from thermally induced dimensional changes, further mitigating the potential for jamming. The chuck mechanism is moved between engaged, disengaged, and loose chuck positions by rotating the cam with a gearmotor that incorporates a magnetic detent brake that prevents inadvertent mechanism motion under design loads. Ongoing testing is occurring on the qualification model in a dirty environment while coring and abrading rocks in a Mars representative environment.

Barletta, Anthony↗

Percussion Mechanism for the Mars2020 Coring Drill

The Mars2020 rover includes a Sampling & Caching Subsystem (SCS) that is required to acquire core samples of hard rocks and to abrade rocky surfaces flat and smooth in order to facilitate surface science. Hard, high strength rocks exhibit brittle failure modes, and can be drilled and chiseled efficiently using percussive impacts. The coring drill percussion mechanism was designed to provide those impacts with variable output force and to be used with various drill bits. A unique hammering mechanism, using a base-driven hammer, powered by a conventional rotary actuator driving a Scotch yoke, was designed to robustly provide the required function in a Martian environment for a life exceeding 2 million impacts.

Chrystal, Kyle↗

STIG: A Two-Speed Transmission Aboard the Mars2020 Coring Drill

The coring drill, part of the Sampling & Caching Subsystem (SCS) aboard the Mars2020 rover, demands a wide range of drill bit torque and speed capabilities during sample acquisition operations. The two driving operating points are high speed, low torque for rotary-percussive coring, as well as low speed, high torque for separating the rock core sample from its parent rock. The spindle twin-input transmission (STIG) allows these and other operating points to be reached with an actuator of substantially less peak power and maximum current draw than that of a single-speed actuator. Rather than containing gearing of its own, the transmission interfaces to an actuator with two outputs of different gear ratios, allowing the transmission to select one of the two of the outputs to be coupled to the drill bit. This paper describes the design, capabilities, and challenges associated with the transmission and the dual-output actuator.

Szwarc, Timothy↗

Drilling, Completion, and Data Collection Plans An Assessment of Geological Carbon Sequestration Options in the Illinois Basin: Phase III

Executive Summary The Illinois Basin – Decatur Project (IBDP) is managed by the Midwest Geological Sequestration Consortium (MGSC) and is led by the Illinois State Geological Survey (ISGS) at the University of Illinois. The project site is located on the Archer Daniels Midland Company (ADM) property in Decatur, Illinois, and is a fully integrated carbon capture and storage (CCS) project that uses CO₂ captured from the ethanol-producing fermentation process at the ADM corn-processing plant (Finley et. al., 2013). IBDP has a goal of injecting one million tonnes of CO₂ into the basal sands of the Mt. Simon Sandstone over a three-year period. This is a multifaceted project, and this report details the planning and results of the drilling, completions, well testing, log data acquisition, and the Health, Safety, and Environment (HSE) aspects of the project. Three deep wells were planned for the IBDP: • The injection well: Injection Well #1 (CCS1); • The monitoring well (both in-zone and above seal): Verification Well #1 (VW1); and • The geophone monitoring well: Geophysical Monitoring Well #1 (GM1). The detailed plans for these wells are attached to the appendices of this document. The wells were drilled successfully with little deviation from the original plans. The biggest change from the plan to execution was the need to adjust for larger-than-expected loss of circulation in the Potosi section of the Knox Formation. The completions reports also attached to this document detail the well constructions as they were actually built. Injectivity testing was carried out, and the perforating plans were adjusted based on the results. Additional perforations and acidizing were performed as a result of the injectivity testing. The testing plans are detailed in this report along with the actual testing results. The injectivity testing results were used in the modeling and simulation efforts. Detailed HSE plans were developed and implemented during the planning and execution phases of the project. The implementation included an HSE Bridging Document, which served to unify the HSE policies of the project partners and key subcontractors. The HSE plan and actual HSE results are presented in this document. There were no recordable HSE incidents during the project. A detailed logging program was developed based on project needs. The log data were acquired in accordance with the plan, and both the plan and log results are presented in this report. Log data were heavily utilized by the research staff, modelers, reservoir engineers, and for technical and permitting efforts. 5 Several key lessons were learned during the project: • Safety in operations and execution is paramount and is only achieved through proper planning and behavior control. The certainty of this was reinforced through implementation of this lesson and the resultant flawless HSE performance during the project. • Losses of drilling fluid circulation were larger than anticipated within the Potosi Formation. Circulation was only recovered through cementing the loss zones. • When possible, minimizing complexity in permit requirements and well designs is preferable. • The size of the wells were outside of the standard experience and expertise typical within the basin, and therefore required substantial planning and ramp-up of contractors and partners to meet project objectives. • With multiple stakeholders and research partners, establishing objectives and requirements early and adhering to change request procedures throughout the project are critical to manage competing data and sampling objectives that may be detrimental to overall progress. The well construction and completion operations were successfully executed, with all wells built in a manner that achieved excellent wellbore integrity. Log planning involved a number of stakeholders and technical specialists. Data collection from logging, coring, and testing was excellent. Time and effort spent with the associated contractors and suppliers to develop a well plan beyond normal scope proved highly successful, resulting in a well-construction and completion project that surpassed expectations. The world-class HSE results also demonstrate the commitment of all stakeholders in the project. The details follow in the body of this document

01 COAL, LIGNITE, AND PEAT↗

Subsea processor for underwater drilling operations

A subsea processor may be located near the seabed of a drilling site and used to coordinate operations of underwater drilling components. The subsea processor may be enclosed in a single interchangeable unit that fits a receptor on an underwater drilling component, such as a blow-out preventer (BOP). The subsea processor may issue commands to control the BOP and receive measurements from sensors located throughout the BOP. The subsea processor may relay information to the surface for recording or monitoring. The subsea processor may also be programmed with a model from which to base operation of the BOP, such as in emergency conditions.

42 ENGINEERING↗

Optimizing Rate of Penetration and Tripping Decision-Making using Real-Time Bit Wear Monitoring While Drilling Geothermal Wells

Understanding bit wear while drilling is critical to minimizing non-productive time (NPT) and optimizing rate of penetration (ROP). Lengthening drilling runs with damaged bits does not only lower the ROP, but also elevates the risk of inducing severe bit damage, which could potentially lead to time-consuming fishing operations. When drillers believe the bit has worn off substantially, the bit is tripped out to be replaced. On geothermal wells, tripping can take up to 20% of the overall well construction time, and this is generally acknowledged as an opportunity for improvement. Ideally, a bit run should be terminated before the bit is damaged beyond repair. At the same time, premature bit pulls are to be avoided as well. This study aims to leverage bit and tooth wear metrics that can be obtained in real time to characterize bit condition in order to optimize ROP and determine the optimal time to pull the bit. Two metrics were explored in this study: a bit wear metric that incorporated depth-of-cut, and a tooth wear metric developed by Bourgoyne & Young characterizing the state of bit teeth dull. Both metrics were computed using recorded data from 12¼ inches roller cone insert bit runs in five geothermal wells targeting a granodiorite formation in the western United States. Together with the actual dull grades, determined after the bits were pulled to surface, the metric trends were interpreted to characterize the downhole bit condition and identify the point at which the bit should have optimally been tripped out. The insights from studying the actual dull grades and how they relate to the two metrics were used to establish a reliable bit pull criterion. The bit wear metric trend correctly showed a noticeable departure from baseline for bits experiencing major dulling behavior. Additionally, the tooth wear model predicted the cutter dull within two dull grades for most runs, with better performance in predicting the inner teeth dull. Moreover, the combination of the bit wear and tooth wear metrics was effective in revealing the cause of the bit performance impairment. Proactive tracking of these two metrics in real-time can facilitate geothermal drilling ROP optimization and better-informed tripping decision-making, thereby avoiding wasted time and cost.

Ashari, Rahmat↗

3D Play Fairway Analysis for Examining of Superhot Drilling Production Scenarios: Preprint

The DEEPEN (DE-risking Exploration for geothermal Plays in magmatic ENvironments) project was a multi-laboratory, international effort to reduce uncertainty and improve resource characterization in superhot geothermal systems. Building on this foundation, this work advances open-source tools designed to lower the exploration risk and cost of superhot geothermal projects while promoting transparency, reproducibility, and efficiency in exploration workflows. These tools are being tested at two key sites: (1) the Nesjavellir Geothermal Area in Iceland, where the Icelandic Deep Drilling Project (IDDP) will drill its third well, and (2) Newberry Volcano in Oregon, USA, where Mazama Energy will pilot the first superhot enhanced geothermal system (EGS). A major outcome is the creation of a modular, open-source Python framework for play fairway analysis (PFA) in 2D and 3D, called geoPFA. The PFA workflow has been expanded to produce pseudo conceptual models, and will soon be refined to assess reservoir components through integration with the thermo-hydraulic-mechanical-chemical (THMC) simulator TReactMech, to enable iterative coupling between PFA and THMC models, improving characterization of superhot systems. All three of the Icelandic Deep Drilling Project's production scenarios were analyzed via this framework: (1) a superhot deep injection well paired with conventional production wells at Nesjavellir, (2) a superhot deep production well at Nesjavellir, and (3) superhot enhanced geothermal system at Newberry Volcano. This analysis provides useful insights around conceptual modeling of these production scenarios, helping to inform decisions around which scenario is best suited for which types of environments.

15 GEOTHERMAL ENERGY↗

Drilling and cutting of thin metal plates in water with radiation of a repetitively pulsed Nd : YAG laser

The conditions of drilling and cutting of 0.15-mm-thick titanium and stainless steel plates in water with the radiation of a repetitively pulsed Nd : YAG laser having the mean power up to 30 W are studied experimentally in the absence of water and gas jets. Dependences of the maximal cutting speed in water on the radiation power are obtained, the cutting efficiency is determined, and the comparison with the conditions of drilling and cutting of plates in air is carried out.

42 ENGINEERING↗

Deep Drilling and Sampling via the Wireline Auto-Gopher Driven by Piezoelectric Percussive Actuator and EM Rotary Motor

The ability to penetrate subsurfaces and perform sample acquisition at depths of meters is critical for future NASA in-situ exploration missions to bodies in the solar system, including Mars and Europa. A corer/sampler was developed with the goal of acquiring pristine samples by reaching depths on Mars beyond the oxidized and sterilized zone. To developed rotary-hammering coring drill, called Auto-Gopher, employs a piezoelectric actuated percussive mechanism for breaking formations and an electric motor rotates the bit to remove the powdered cuttings. This sampler is a wireline mechanism that is incorporated with an inchworm mechanism allowing thru cyclic coring and core removal to reach great depths. The penetration rate is being optimized by simultaneously activating the percussive and rotary motions of the Auto-Gopher. The percussive mechanism is based on the Ultrasonic/Sonic Drill/Corer (USDC) mechanism that is driven by piezoelectric stack and that was demonstrated to require low axial preload. The Auto-Gopher has been produced taking into account the a lessons learned from the development of the Ultrasonic/Sonic Gopher that was designed as a percussive ice drill and was demonstrated in Antarctica in 2005 to reach about 2 meters deep. A field demonstration of the Auto-Gopher is currently being planned with objective of reaching as deep as 3 to 5 meters in tufa subsurface.

Auto-Gopher↗

Compact Drilling and Sample System

The Compact Drilling and Sample System (CDSS) was developed to drill into terrestrial, cometary, and asteroid material in a sryogenic, vacuum environment in order to acquire subsurface samples.

cryo↗

Effect of Dual-Phase Heat Treatment on Microstructure and Mechanical Properties of S135 High-Strength Drill Pipe Steel

Effect of dual-phase heat treatment (DPHT) on microstructure and mechanical properties of S135 high-strength drill pipe steel was studied by means of optical microscope, scanning electron microscope and mechanical property testing. The results show that the ferrite–martensite dual-phase microstructures were obtained at 760-800 °C. With increase in DPHT temperature, the volume fraction of martensite increases and the ferrite decreases. When the DPHT temperature is low, martensite is distributed as an island on the ferrite matrix, and ferrite is distributed as an island on the martensite matrix when the DPHT temperature is high. The hardness and strength of the steel increase, the plasticity and toughness decrease, the steel changes from ductile fracture to brittle fracture and the micro-fracture morphology changes from dimple to cleavage with increase in DPHT temperature. The strain hardening exponent of the as-received steel shows one ‘n’ value, but exhibits two ‘n’ values after DPHT. When the DPHT temperature is 750 °C, the relative content of martensite in the duplex structure is 15-20%, and the impact energy of the steel is similar to that of the as-received S135 drill pipe steel, and the strength is increased by about 15%. Micropores and micro-cracks on the subsurface of tensile fracture surface are mainly formed at the martensite/ferrite phase boundary or in the martensite slit.

36 MATERIALS SCIENCE↗

Air-coupled method to investigate the lowest-order antisymmetric Lamb mode in stubbed and air-drilled phononic plates

In this work, we applied a robust and fully air-coupled method to investigate the propagation of the lowest-order antisymmetric Lamb (A{sub 0}) mode in both a stubbed and an air-drilled phononic-crystal (PC) plate. By measuring simply the radiative acoustic waves of A{sub 0} mode close to the plate surface, we observed the band gaps for the stubbed PC plate caused by either the local resonance or the Bragg scattering, in frequency ranges in good agreement with theoretical predictions. We measured then the complete band gap of A{sub 0} mode for the air-drilled PC plate, in good agreement with the band structures. Finally, we compared the measurements made using the air-coupled method with those obtained by the laser ultrasonic technique.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Development of a Low-Cost Rotary Steerable Drilling System

The project had the goal to develop and commercialize a low-cost rotary steerable system (LCRSS) capable of operating downhole at conventional pressures and temperatures to reduce operating costs by a minimum of 50% and lost-in-hole charges by at least 50% over the currently offered systems. The LCRSS system developed under this project does reduce operating costs by 55% and lost-in-hole charges by at least 50%. The developed product is not commercializable in its current form. The overall objective was to develop and commercialize a low cost rotary steerable system (LCRSS) capable of operating downhole at conventional pressures and temperatures (20,000 psi/150 C) while reducing the operating costs by 50% and the lost-in-hole charges by 50% over the currently available systems. The proposed reduction in costs were to be realized through the significant reduction in tool complexity, a corresponding increase in tool reliability as expressed in the mean-time between failure (MTBF), and a reduction in the time and costs required to service tools after each field operation. Ultimately, the LCRSS system was to be capable of drilling 7 7/8 in. to 9 5/8 in. borehole diameters. The project was divided into three Phases, of which Phases I & II were previously completed and reported on, and are part of the case file. Therefore, the previously reported information is not repeated herein. Phase III included the fabrication of two field ready prototypes that were to be subjected to a series of drilling tests at GTI Catoosa, DOE RMOTC, and at customer partnering wells, if possible, as appropriate in the timing of the field test objectives to fully exercise all elements of the LCRSS. These tests were conducted in an iterative process based on a performance/reliability improvement cycle with the goal of demonstrating the system met all aspects required for commercial viability. These tests were conducted to achieve continuous runs of 100+ hours with well trajectories that fully exercised the tool's build/turn/drop/hold target capabilities and its higher end ratings for bit weight, torque and rotary speed. The tool teardowns were rigorously analyzed at the conclusion of each field run to assess component wear rates and to fully document any detrimental behavior(s) observed.

15 GEOTHERMAL ENERGY↗