Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “data sheet”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Patch-level chamber-based CH4 and CO2 flux measurements in freshwater and salt marshes of coastal Louisiana

This dataset contains chamber-based carbon dioxide and methane flux measurements from ecohydrological patches in two coastal wetlands in Louisiana (within the footprint of AmeriFlux sites US-LA2 and US-LA3). Measurements span four patches, two per wetland. At the freshwater marsh (US-LA2), patches were dominated by Sagittaria lancifolia or co-dominated by Sagittaria lancifolia and Typha latifolia. At the salt marsh site (US-LA3), patches were dominated by Spartina alterniflora or Juncus roemerianus. Flux measurements included (i) wetland surface-level measurements encompassing the entire soil-water-vegetation column and (ii) soil-water surface chamber measurements that excluded emergent vegetation. At US-LA3, open-water pools were common and were also measured as a patch type. With this data we aimed to assess differences in gas flux pathways within ecohydrological patches across different wetland types. Files can be read in any program or code typical of processing .csv file types. "PatchChambers_LA2LA3.csv" covers flux data from patch level chambers which includes bulk CO2/CH4 flux encompassing water, soil, and vegetation within each chamber. "Water_Soil_SurfaceChamber_LA2LA3.csv" has CO2/CH4 flux data from chambers measuring only the water-soil surface without the effects of vegetation. Metadata can be found in the similarly named files for each data sheet ("xxxx_md.csv").

54 ENVIRONMENTAL SCIENCES↗

Sandia National Laboratories, California Chemical Management Program Annual Report

The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Chemical Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This program annual report describes the activities undertaken during the calender past year, and activities planned in future years to implement the Chemical Management Program, one of six programs that supports environmental management at SNL/CA. SNL/CA is responsible for tracking chemicals (chemical and biological materials), providing Material Safety Data Sheets (MSDS) and for regulatory compliance reporting according to a variety of chemical regulations. The principal regulations for chemical tracking are the Emergency Planning Community Right-to-Know Act (EPCRA) and the California Right-to-Know regulations. The regulations, the Hazard Communication/Lab Standard of the Occupational Safety and Health Administration (OSHA) are also key to the CM Program. The CM Program is also responsible for supporting chemical safety and information requirements for a variety of Integrated Enabling Services (IMS) programs primarily the Industrial Hygiene, Waste Management, Fire Protection, Air Quality, Emergency Management, Environmental Monitoring and Pollution Prevention programs. The principal program tool is the Chemical Information System (CIS). The system contains two key elements: the MSDS library and the chemical container-tracking database that is readily accessible to all Members of the Sandia Workforce. The primary goal of the CM Program is to ensure safe and effective chemical management at Sandia/CA. This is done by efficiently collecting and managing chemical information for our customers who include Line, regulators, DOE and ES and H programs to ensure compliance with regulations and to streamline customer business processes that require chemical information.

54 ENVIRONMENTAL SCIENCES↗

Commercialization of New Lattice-Matched Multi-Junction Solar Cells Based on Dilute Nitrides: July 8, 2010 - March 7, 2012

All the milestones for this program were achieved and in most cases, particularly those related to cell performance, more samples were supplied than was required, and the deliverables substantially exceed the performance milestones. Moreover, the cell deliverables sent to NREL for evaluation were cells 4 mm or 5.5 mm, nearly 5 to 10 times larger in area than the 2 mm cells called for in the subcontract, and one of the most common sizes in the CPV industry. For the entire program there were 12 separate cell performance milestones, the most important of which was the 3J cell efficiency. Phase 1 had 2 3J efficiency milestones and Phase 2 had three. For the Phase 1 milestone calling for 38% efficiency, NREL measured a peak efficiency of 41.1%, about 2% higher than the data sheet values of commercial cells at that time. The efficiencies measured in Phase 1 exceed the Phase 2 cell performance milestones in the subcontract’s original Statement of Work. Cells submitted to NREL as part of this subcontract, although not as deliverables, were measured to have a new World Record cell efficiency of 43.5%, breaking the previous World Record by 1.2% absolute. In addition to improved cell performance, during Phase 1 a modeling capability for designing ARCs was developed and verified by comparing the measured current from a cell using a specific ARC with the current predicted by the model. This model was then used to design a new ARC giving lower reflectivity and a corresponding higher cell current. Again the prediction of the model was verified by measured cell properties. In Phase 2, the modeling capability was used to design a glass matched ARC, the type most in use in the CPV industry, which was tuned to the band structure of a 3J cell with a dilute nitride bottom cell. Finally, tools and test methodologies were developed that enable HALT to be applied to cells to determine the operating and destruct limits and to determine or set bounds on the lifetime of the cells in typical CPV operating conditions. As part of this effort a novel HALT system was built that enabled cells to be subjected to light at concentrations up to 80 W/cm 2 , (800 suns) while the cell temperature could be held or cycled between -100C and +180C. As part of the Phase 2 effort the system was modified to enable the light to the cell to be interrupted at a maximum rate of 10 times/second. Tests using interrupted light at >500 suns on cells held at 180C showed no evidence of failure after a total of >22 sun-years of operation at 100C. Another key outcome of the reliability efforts of the program was from high temperature storage tests done independently of the HALT test. There were two key outcomes of this activity: 1) single junction GaInNAs cells showed no evidence of failure under the equivalent of at least 100 years of on-sun time operating at 100C and 2) we can conclude with 95% confidence that the probability of device failure after 30 sun-years of operation at 100C is less than 1.5%, and mostly less than 0.5%. Based on these results there is no reason to believe that dilute nitrides in and of themselves pose a reliability problem for CPV applications and that 3J cells using dilute nitrides have very low probability of failure during the expected 20-30 year life of a CPV power plant.

14 SOLAR ENERGY↗

Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites

This report presents a preliminary evaluation of removing used nuclear fuel (UNF) from 12 shutdown nuclear power plant sites. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites are Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, and San Onofre. The evaluation was divided into four components: characterization of the UNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory; a description of the on-site infrastructure and conditions relevant to transportation of UNF and GTCC waste; an evaluation of the near-site transportation infrastructure and experience relevant to shipping transportation casks containing UNF and GTCC waste, including identification of gaps in information; and, an evaluation of the actions necessary to prepare for and remove UNF and GTCC waste. The primary sources for the inventory of UNF and GTCC waste are the U.S. Department of Energy (DOE) RW-859 used nuclear fuel inventory database, industry sources such as StoreFUEL and SpentFUEL, and government sources such as the U.S. Nuclear Regulatory Commission. The primary sources for information on the conditions of site and near-site transportation infrastructure and experience included observations and information collected during visits to the Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, and Zion sites; information provided by managers at the shutdown sites; Facility Interface Data Sheets compiled for DOE in 2005; Services Planning Documents prepared for DOE in 1993 and 1994; industry publications such as Radwaste Solutions; and Google Earth. State and Regional Group representatives, a Tribal representative, and a Federal Railroad Administration representative participated in six of the shutdown site visits. Every site was found to have at least one off-site transportation mode option for removing its UNF and GTCC waste; some have multiple options. Experience removing large components during reactor decommissioning provided an important source of information used to identify the transportation mode options for the sites. Especially important in conducting the evaluation were site visits, through which information was obtained that would not have been available otherwise. Extensive photographs taken during the site visits proved to be particularly useful in documenting the current conditions at or near the sites. Additional conclusions from this evaluation include: The 12 shutdown sites use designs from 4 different suppliers involving 9 different (horizontal and vertical) dry storage systems that would require the use of 8 different transportation cask designs to remove the UNF and GTCC waste from the shutdown sites; Although there are common aspects, each site has some unique features and/or conditions; Although some regulatory actions will be required, all UNF at the initial 9 shutdown sites (Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, and Zion) is in licensed systems that can be transported, including a small amount of high-burnup fuel; Each site indicated that 2-3 years of advance time would be required for its preparations before shipments could begin; Most sites have more than one transportation option, e.g., rail, barge, or heavy haul truck, as well as constraints and preferences. It is expected that additional site visits will be conducted to add to the information presented in the evaluation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites

A preliminary evaluation of removing spent nuclear fuel (SNF) from 13 shutdown nuclear power plant sites was performed. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, and Vermont Yankee. The evaluation was divided into four components: Characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory A description of the on-site infrastructure at the shutdown sites An evaluation of the near-site transportation infrastructure and transportation experience at the shutdown sites An evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. The primary sources for the inventory of SNF and GTCC waste were the U.S. Department of Energy (DOE) spent nuclear fuel inventory database, industry publications such as StoreFUEL, and government sources such as the U.S. Nuclear Regulatory Commission. The primary sources for information on the conditions of on-site infrastructure and near-site transportation infrastructure and experience included information collected during site visits, information provided by managers at the shutdown sites, Facility Interface Data Sheets compiled for DOE in 2005, Services Planning Documents prepared for DOE in 1993 and 1994, industry publications such as Radwaste Solutions, and Google Earth. State staff, State Regional Group representatives, a Tribal representative, and a Federal Railroad Administration representative have participated in nine of the shutdown site visits. Every shutdown site was found to have at least one off-site transportation mode option for removing its SNF and GTCC waste; some have multiple options. Experience removing large components during reactor decommissioning provided an important source of information used to identify the transportation mode options for the sites. Especially important in conducting the evaluation were site visits, through which information was obtained that would not have been available otherwise. Extensive photographs taken during the site visits proved to be particularly useful in documenting the current conditions at or near the sites. Additional conclusions from this evaluation include: The 13 shutdown sites use designs from 4 different suppliers involving 11 different (horizontal and vertical) dry storage systems that would require the use of 9 different transportation cask designs to remove the SNF and GTCC waste from the shutdown sites. Although some changes to transportation certificates of compliance will be required, the SNF at the initial 9 shutdown sites (Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, and Zion) is in dual purpose dry storage canisters that can be transported, including a small amount of high-burnup fuel. Most sites indicated that 2-3 years of advance time would be required for its preparations before shipments could begin. Some sites could be ready in less time. As additional sites such as Fort Calhoun, Clinton, Quad Cities, Pilgrim, Oyster Creek, and Diablo Canyon shut down, these sites will be included in updates to the evaluation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Cure Schedule for Stycast 2651/Catalyst 11.

The Henkel technical data sheet (TDS) for Stycast 2651/Catalyst 11 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation was motivated by (1) a desire to cure at a single temperature for ease of manufacture and (2) a desire to keep the cure temperature low (to minimize residual stress build-up associated with the cooldown from the cure temperature to room temperature) without excessively limiting the cure reaction due to vitrification (i.e., material glass transition temperature, T g , exceeding cure temperature).

36 MATERIALS SCIENCE↗

Cure Schedule for Stycast 2651/Catalyst 9.

The Emerson & Cuming technical data sheet (TDS) for Stycast 2651/Catalyst 9 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation uses one of the schedules within the TDS and adds a “post cure” to obtain full reaction.

36 MATERIALS SCIENCE↗

Document Release of CSAM 99-140 to DNFSB for Review, October 17, 2018

The data sheet on HFE-7200 from 3M is included in attachment 2. Unfortunately, at this time, the Criticality Safety Group cannot allow the replacement of TCE by HFE-7200 for the reasons discussed below. The moderating and reflecting properties of HFE-7200 were compared to trichloroethylene (TCE) and water. The results of several calculations are presented in attachment 1 and indicate that water is a far superior moderator than either HFE-7200 or TCE, but HFE-7200 results in significantly higher reactivity than TCE. The criticality safety evaluation for machining (CSM1020) credited the usage of TCE and this material was included in the Monte Carlo calculations to determine the reactivity of the upset conditions. Unfortunately, since the results of these calculations are relatively high, it cannot be determined without significant re-evaluation whether the replacement of conservatisms were employed in CSM1020 to simplify the calculations, it is likely that a re-evaluation considering less conservative models would allow the approval of HFE-7200. The Criticality Safety Group will include HFE-7200 when the evaluation for machining is upgraded to higher mass limits (with shape control).

61 RADIATION PROTECTION AND DOSIMETRY↗

Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites

A preliminary evaluation of removing spent nuclear fuel (SNF) from 14 shutdown nuclear power plant sites was performed. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, Vermont Yankee, and Fort Calhoun. The evaluation was divided into four components: (1) characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory, (2) a description of the on-site infrastructure at the shutdown sites, (3) an evaluation of the near-site transportation infrastructure and transportation experience at the shutdown sites, and (4) an evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. The primary sources for the inventory of SNF and GTCC waste were the U.S. Department of Energy (DOE) spent nuclear fuel inventory database, industry publications such as StoreFUEL, and government sources such as the U.S. Nuclear Regulatory Commission. The primary sources for information on the conditions of on-site infrastructure and near-site transportation infrastructure and experience included information collected during site visits, information provided by managers at the shutdown sites, Facility Interface Data Sheets compiled for DOE in 2005, Services Planning Documents prepared for DOE in 1993 and 1994, industry publications such as Radwaste Solutions, and Google Earth. State representatives, State Regional Group representatives, Tribal representatives, and a Federal Railroad Administration representatives have participated in eleven of the shutdown site visits. Every shutdown site was found to have at least one off-site transportation mode option for removing its SNF and GTCC waste; some have multiple options. Experience removing large components during reactor decommissioning provided an important source of information used to identify the transportation mode options for the sites. Especially important in conducting the evaluation were site visits, through which information was obtained that would not have been available otherwise. Extensive photographs taken during the site visits proved to be particularly useful in documenting the current conditions at or near the sites. Additional conclusions from this evaluation include: The 14 shutdown sites use designs from 4 different suppliers involving 11 different (horizontal and vertical) dry storage systems that would require the use of 9 different transportation cask designs to remove the SNF and GTCC waste from the shutdown sites. Although some changes to transportation certificates of compliance will be required, the SNF at the initial 9 shutdown sites (Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, and Zion) is in dual purpose dry storage canisters that can be transported, including a small amount of high-burnup fuel. Most sites indicated that 2-3 years of advance time would be required for its preparations before shipments could begin. Some sites could be ready in less time. As additional sites such as Palisades, Pilgrim, Three Mile Island, Oyster Creek, Indian Point, and Diablo Canyon shut down, these sites will be included in updates to the evaluation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

DAP: Cosmic Plastics D33/6120 vs. Sumitomo Bakelite 52-01

As soon as you lay eyes on the two data sheets for these materials, Cosmic D33/6120 and Sumitomo Bakelite 52-01, there are some pretty clear differences in mechanical, thermal, electrical, and physical properties. There are three distinct hypotheses relating to why the plastics are so distinctly different from one another: 1. unique composition; 2. different molding procedure; and 3. separate molding parameters A closer look into each of these hypotheses is necessary in explaining why the Sumitomo Bakelite and Cosmic DAPs are so different from one another.

36 MATERIALS SCIENCE↗

A Brief Review of Sylgard 184

This paper will explore applications and functionality of the Dow material Sylgard 184. Pure Sylgard 184 is a “Two-part, clear, 10:1, RT and heat cure, good strength, UL and Mil Spec” material that has good dielectric properties. According to the Technical Data Sheet, Sylgard 184 has a base viscosity of 511 cP, mixed viscosity of 3500 cP, and a work time of 1.5 hours. The cured mate rial has a Shore A hardness of 43, a tensile strength of 980 PSI, and a dielectric strength of 500 volts/mil.

36 MATERIALS SCIENCE↗

Hybrid Solar System (Final Scientific/Technical Report)

GTI Energy (GTI) teamed with the University of California at Merced (UCM) to scaleup the hybrid solar system (HSS) technology for demonstrating its performance at the US Gypsum (USG) plant in Plaster City, California. The technology integrates two-stage concentrating solar collector with matching particle thermal transport and storage (TSS) system to deliver cost-effective, and on-demand distributed high temperature industrial process heat up to 600°C with solar thermal, in this case to a gypsum kettle, to reduce its fuel use and carbon footprint. Current solar technologies, which reach these temperatures, are not distributable (towers) or cost-effective (dish). The research team developed a conceptual system design for host site retrofit, including preliminary heat balance, process flow diagram, particle to process heat exchanger and equipment placements at the site. Subsequently, parallel efforts were carried out at UCM to design, build and test a 12 m long commercial scale prototype concentrating thermal-only collector system and at GTI to design, build and test a matching 650°C capable particle TTS system. The nominal 50 kWth collector consists of a parabolic trough and three 4 m long two-stage receivers in series. Prior to on-sun testing, a 4 m long receiver was fabricated and successfully tested at 650 °C in a laboratory setting for 100 hrs of continuous operation showing less than 15% radiation loss. A 7 m wide x 17 m long parabolic trough was then installed at UCM for on-sun testing of the 12 m long receiver, and concurrently several 4 m long receivers were built. The optics of the parabolic trough were calibrated, and on-sun test were carried out on 12 m long receivers. During tests, the intense solar radiation (53x) caused the absorber tubes in the receivers to bend, reducing the overall optical efficiency. To address the bending issue, a self-consistent algorithm that includes ray tracing, thermal and deformation models was developed to perform thermal stress analysis on absorbers for parabolic solar collectors. Results obtained with this algorithm showed a dramatic rise in deformation as absorber tube length increases. A combined efficiency parameter that includes the occluded area for the mounts was developed to obtain an optimized tube length obtained. Based on the results, a length of 2.7 m for the absorber + 0.2 m for the coupler was chosen to minimize any bending and optimize optical efficiency while maintaining ease of mounting. The associated particle TTS system was designed, built and successfully tested at GTI. It includes storage, receiving and lock hoppers and piping that simulates the transfer of captured solar energy to an actual industrial furnace. Tests over 77 charge-discharge cycles demonstrated <2% particle degradation, with no problematic particle accumulations and no flow interruptions. The piping pressure drop was about 5 psi. The team also worked with Stanley Consultants (Stanley) to prepare conceptual and preliminary engineering packages to facilitate follow-on development and commercialization efforts. These include process and instrumentation diagram’s (P&ID’s), general arrangements, electrical one-line, project definitions document, equipment data sheets, schedule, and construction cost estimate for 2 MWth system. Updated HSS technology commercialization and customer engagement plans and detailed costs and evaluated market trade-offs and manufacturing.

03 NATURAL GAS↗

Equipment Qualification Report Environmental Qualification of GNB Absolyte Valve Regulated Lead Acid (VRLA) 1600 Ah100G33 Battery Rack Assembly (24590-QL-POA-EDB0-00001-11-00002_00A)

Greenberry Environmental Qualification Report 550001.001-35.0.5 provides basis for assignment of qualified life for: GNB Absolyte Valve Regulated Lead Acid (VRLA) 1600 Ah 100G33 Battery Rack Assembly in accordance with the requirements specified 24590-WTP-3PS-G000-T0015 (Rev 2) and Environmental Qualification Plan 550001.001-35.0.1 (Rev. 3). The equipment qualification basis represents the most conservative capability of the equipment. The analysis performed for the qualification is not less conservative than the bounding environmental conditions detailed in contract documents issued to Greenberry in contract 24509-QL-POA-EDB0-00001 Rev.0. The qualified life of 10 years has been established based upon an end-condition objective of the equipment condition indicators that correlate to the ability of equipment to perform its safety function. The VRLA Battery Cell Assembly was aged by 10 years (minimum) in accordance with conditions specified by Bechtel Equipment Qualification Datasheet 24590-LAW-EUQ-UPE 00003 Rev. 3 and the process conditions specified by the Instrument Data Sheet 24590-LAW EUD-UPE-00009 Rev. 2. Greenberry Industrial has contracted with GNB Industrial Battery Co located at 4115 S Zero St, Fort Smith, AR 72908 to perform age conditioning, monitoring, and capacity testing in accordance with Environmental Qualification Plan 550001.001-35.0.1 Rev. 1. The required process at the stated conditions set by the parameters established by the plan were completed satisfactorily. The details of the of the test process observed by Greenberry is detailed in the attached Seismic Test Log 550001.001-7.0.3, including examples of the objective evidence collected during the qualification process.

54 ENVIRONMENTAL SCIENCES↗

H3D Characterization Memo

The H3D was characterized using GADRAS 19.3.5 using data sent by the IAEA. Everything related to the measurement setup was provided by the IAEA. The sources measured were detailed and the distance from the detector was also provided. The data sheets of the sources were used to determine the source activity at the time of calibration, as needed for characterization.

97 MATHEMATICS AND COMPUTING↗

Chemical Process Safety at TRISO-Based, Metal-Based, and Salt-Based Fuel Fabrication Facilities: Technical Assessment and Guidance Assessment

As part of efforts to prepare for potential and ongoing safety reviews for licensing of advanced non-light-water reactor fuel cycles, the U.S. Nuclear Regulatory Commission (NRC) tasked Pacific Northwest National Laboratory to prepare an assessment on the state of knowledge of potential chemical processes at fuel cycle facilities supporting the front end of these fuel cycles, and to assess the associated regulatory guidance. This report provides a technical assessment of chemical process safety considerations to support NRC licensing reviews of fabrication processes for tri-structural isotropic (TRISO) based, metallic-based, and salt-based fuels. The assessments involved collecting publicly available information on the fuel fabrication processes to (i) identify the operational process steps, characteristics and chemicals involved, (ii) identify the physical safety considerations and health safety considerations during licensing reviews of the various process steps, and (iii) collect information to support assessments of severity of accidents and potential mitigative measures to be implemented. The assessment provides a foundational basis on chemical process safety considerations for advanced fuel fabrication activities, although it is recognized that licensing reviews may necessitate design-specific considerations. The specific conditions under which chemical hazards emerge will require process-specific considerations, highlighting the importance of process-informed interpretation. The assessment also determined that exposure guidelines and limits to assess the consequences of acute exposures are limited for some chemicals, although alternative limits and supplementary information from databases or safety data sheets provide sufficient information to evaluate consequences of acute exposures. In addition, it was identified that metallic and salt fuel fabrication processes may involve beryllium, which is an exposure hazard. The regulatory framework for the licensing of advanced fuel cycle facilities, per 10 CFR Part 70 Domestic Licensing of Special Nuclear Material, is deemed robust and flexible to address the chemical safety considerations in this report. A review was conducted on various regulatory guidance and technical basis documents. This included reviewing NUREG-1520, Revision 2, Standard Review Plan for Fuel Cycle Facilities License Applications – Final Report and the process descriptions in Appendix A of NUREG/CR-6410, Nuclear Fuel Cycle Facility Accident Analysis Handbook, to address advanced fuel types. As new fuels will involve process-specific chemical uses, process-specific considerations are provided in this report. Additionally, it is noted that the U.S. Department of Energy protective action criteria database includes Temporary Emergency Exposure Limits (TEELs) for process-specific chemicals. This report provides technical information to support chemical safety assessments of new advanced fuel cycle facilities and identifies technical and safety information to support licensing reviews. No regulatory barriers were identified for the licensing of advanced fuel cycle facilities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Observed Temperature Effects on Load Cells

Researchers at Oak Ridge National Laboratory subjected load cells to a range of temperatures beyond their compensated range to characterize the temperature effect on the minimum dead load output over their entire operating temperature range. In modern front-end nuclear fuel cycle facilities, load cells are often used in UF6 feed and withdrawal stations to monitor the material being fed to or withdrawn from the cylinders. Load cells exhibit some temperature dependence; however, manufacturers try to minimize temperature effects by compensating load cells over a range of temperatures (typically from -10 °C to +40 °C (+14 °F to +104 °F)). Load cells in modern UF6 feed and withdrawal stations tend to operate beyond this range: down to -25 °C and up to 80 °C (-13 °F to 176 °F). While load cell data sheets often include specifications for the temperature effect on the minimum dead load output and the sensitivity over the compensated range, they do not include specifications for expected effects outside of this range. In this paper, we discuss our test setup and preliminary results of testing load cells representative of those that may be used in UF6 feed and withdrawal stations.

Mattingly, Gavin↗

Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites

In this paper, a preliminary evaluation of removing used nuclear fuel (UNF) from 12 shutdown sites was conducted. Shutdown sites are defined as those commercial nuclear power reactor sites where the nuclear power reactors have been shut down and the site has been decommissioned or is undergoing decommissioning. The shutdown sites were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, and San Onofre. The evaluation was divided into four components: • characterization of the UNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory • a description of the on-site infrastructure and conditions relevant to transportation activities • an evaluation of the near-site transportation infrastructure and experience relevant to shipping transportation casks containing UNF from the shutdown sites, including gaps in information • an evaluation of the actions necessary to prepare for and remove UNF and GTCC waste from the shutdown sites. The primary sources for the inventory of UNF and GTCC waste are the DOE RW-859 used nuclear fuel inventory database, industry sources such as StoreFUEL and SpentFUEL, and government sources such as the NRC. The primary sources for the information on the site conditions and near-site transportation infrastructure and experience include site visits to the Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, and Zion sites; information provided by managers at the shutdown sites; Facility Interface Data Sheets compiled for DOE in 2005; Services Planning Documents prepared for DOE in 1993 and 1994; industry publications such as Radwaste Solutions; and Google Earth. State and Regional Group representatives, a Tribal representative, and a Federal Railroad Administration representative participated in six of the shutdown site visits. All sites were found to have at least one off-site transportation mode option for removing their UNF and GTCC waste, and some sites have two options. Large component removals during reactor decommissioning provided an important source of information in determining transportation mode options. Especially important in conducting the evaluation were site visits, through which information was obtained that would not have been available otherwise. Extensive photographs taken during the site visits proved to be particularly useful in documenting the current conditions at or near the sites. Additional conclusions from this evaluation include: • Although there are common aspects, each site has some unique features and/or conditions. • The 12 sites use designs from 4 different suppliers, including 9 different (horizontal and vertical) storage systems that would require 8 different transportation cask designs. • Although some regulatory actions will be required, all UNF at the initial 9 shutdown sites (Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, and Zion) is in licensed systems that can be transported, including a small amount of high-burnup fuel. • Each site indicated that 2-3 years of advanced time is required for preparations prior to pick-up. • Most sites have multiple transportation options, e.g., rail, barge, or heavy haul truck, as well as constraints and preferences. It is expected that additional site visits will be conducted to update the information used in the evaluation. Additional sites may be added to the evaluation if further site closures are announced.

shutdown sites, used nuclear fuel, NFST, Nuclear F↗

Transitioning from Construction to Startup at WTP from a Plant Engineering Perspective - 16461

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is a one-of-a-kind facility being designed, built and commissioned for the U.S. Department of Energy by Bechtel National, Inc. and principal subcontractor URS to solidify liquid radioactive waste stored in underground tanks at the Hanford Site. WTP consists of 20 infrastructure facilities and structures, known as Balance of Facilities, designed to support the Plant's four major facilities - Pretreatment Facility, High-Level Waste Vitrification Facility, Low-Activity Waste Vitrification Facility and the Analytical Laboratory. As construction moves toward startup and commissioning, a turnover process facilitates the transition of facilities and systems between organizations. The transition from Construction is initiated by an approved Design Completion List, which documents that design and construction have been completed, and the facility or system is ready for startup testing. Qualified individuals perform an inspection to ensure the facility or system has been constructed per the design during an eight-week engineering walk-down. During this phase in turnover, Plant Engineering personnel are responsible for updating and maintaining the Master Equipment List, developing spare parts recommendations, developing and issuing instrument calibration data sheets, evaluating temporary modifications, and supporting plant operations and maintenance activities. As of 2015, two electrical switchgear buildings and the non-radioactive liquid waste disposal system have been turned over from Construction to Startup. This paper discusses the turnover process, organizational interfaces, and experiences from a Plant Engineering perspective. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗