Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “construction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Design and Construction of a Prototype B1pF Large Aperture Rutherford Cable Superconducting Magnet for the EIC Interaction Region

Brookhaven National Laboratory (BNL) was chosen to host the international Electron-Ion Collider (EIC), which will collide high energy and highly polarized hadron and electron beams with a center of mass energy up to 140 GeV. The Interaction Region (IR) requires several large aperture, relatively high field superconducting dipole and quadrupole magnets, some of which are very closely spaced. B1pF is a large aperture (300 mm coil ID), medium field (4.2 T), 3 meter long superconducting dipole magnet. Its size is larger than the largest superconducting magnet in the RHIC accelerator (180 mm DX dipole, 4.2 T, 3.7 m long). As such, B1pF was chosen as the representative magnet to be prototyped to demonstrate the technological choice, design and construction details. Here, this paper describes the analyses and considerations which informed both the magnet and magnet tooling designs. This paper will summarize the construction results so far, in particular the plan for novel coil winding tooling and the test coil winding & curing program that was carried out prior to coil and magnet construction.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Design and Construction of a Superconducting “Direct Wind” R&D Magnet for the EIC Interaction Region

Brookhaven National Laboratory (BNL) was chosen to host the international Electron-Ion Collider (EIC), which will collide high energy and highly polarized hadron and electron beams with a center of mass energy up to 140 GeV. The Interaction Region (IR) [1] requires several large aperture, relatively high field superconducting dipole and quadrupole magnets, some of which are very closely spaced.\r\nA value engineering effort is underway as part of the EIC Project to construct and test a Direct Wind magnet [2] (coil comprised of NbTi conductor deposited directly onto a support tube, in this instance tapered, and secured mechanically against Lorentz forces afterwards) to replace two Rutherford cable collared magnets. This magnet exceeds the combination of aperture, number of coil \r\nlayers, and magnetic field, as compared to existing accelerator and R&D Direct Wind magnets to date. Furthermore, construction has been completed using a newly commissioned winding machine, upgraded in anticipation of the upcoming EIC production coil fabrication. Design, analysis, construction issues, lessons learned and accomplishments to date shall be discussed, including the \r\nachieved corrections to multipoles made to successive coil layers based on warm magnetic measurements of preceding layers.

43 PARTICLE ACCELERATORS↗

Localized Evaluation for Constructing Discrete Vector Fields

Topological abstractions offer a method to summarize the behavior of vector fields, but computing them robustly can be challenging due to numerical precision issues. One alternative is to represent the vector field using a discrete approach, which constructs a collection of pairs of simplices in the input mesh that satisfies criteria introduced by Forman's discrete Morse theory. While numerous approaches exist to compute pairs in the restricted case of the gradient of a scalar field, state-of-the-art algorithms for the general case of vector fields require expensive optimization procedures. This paper introduces a fast, novel approach for pairing simplices of two-dimensional, triangulated vector fields that do not vary in time. The key insight of our approach is that we can employ a local evaluation, inspired by the approach used to construct a discrete gradient field, where every simplex in a mesh is considered by no more than one of its vertices. Specifically, we observe that for any edge in the input mesh, we can uniquely assign an outward direction of flow. We can further expand this consistent notion of outward flow at each vertex, which corresponds to the concept of a downhill flow in the case of scalar fields. Working with outward flow enables a linear-time algorithm that processes the (outward) neighborhoods of each vertex one-by-one, similar to the approach used for scalar fields. Here, we couple our approach to constructing discrete vector fields with a method to extract, simplify, and visualize topological features. Empirical results on analytic and simulation data demonstrate drastic improvements in running time, produce features similar to the current state-of-the-art, and show the application of simplification to large, complex flows.

97 MATHEMATICS AND COMPUTING↗

Proton Improvement Plan – II: Overview of Progress in the Construction

The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab’s particle accelerator complex to enable the world’s most intense neutrino beam for LBNF/DUNE and a broad particle physics program for many decades to come. PIP-II will deliver 1.2 MW of proton beam power from the Main Injector, upgradeable to multi-MW capability. The central element of PIP-II is an 800 MeV linac, which comprises a room temperature front end followed by an SRF accelerator. The front end has been constructed and operated with (pulsed & CW) beam in the PIP-II Injector Test facility (PIP2IT). The SRF accelerator consists of five different types of cavities/cryomodules, including Half Wave Resonators (HWR), Single Spoke and elliptical resonators operating at state-of-the-art parameters. The first two PIP-II cryomodules, HWR and Single Spoke Resonator 1 (SSR1) are installed in PIP2IT and have accelerated beam to 17 MeV. PIP-II is the first U.S. accelerator project that will be constructed with significant contributions from international partners, including India, Italy, France, United Kingdom and Poland. The project was recently baselined, and site construction is underway

43 PARTICLE ACCELERATORS↗

Revising Apetrei’s bounding volume hierarchy construction algorithm to allow stackless traversal

Stackless traversal is a technique to speed up range queries by avoiding usage of a stack during the tree traversal. One way to achieve that is to transform a given binary tree to store a left child and a skip-connection (also called an escape index). In general, this operation requires an additional tree traversal during the tree construction. For some tree structures, however, it is possible to achieve the same result at a reduced cost. We propose one such algorithm for a GPU hierarchy construction algorithm proposed by Karras in Karras 2012. Furthermore, we show that our algorithm also works with the improved algorithm proposed by Apetrei in Apetrei 2014, despite a different ordering of the internal nodes. We achieve that by modifying Apetrei’s algorithm to restore the original Karras’ ordering of the internal nodes. Using the modified algorithm, we show how to construct a hierarchy suitable for a stackless traversal in a single bottom-up pass.

97 MATHEMATICS AND COMPUTING↗

Hydrogen production from high-volume organic construction and demolition wastes

The Energy & Environmental Research Center (EERC) has partnered with Simonpietri Enterprises, LLC (SEL) with the objective of developing an integrated waste preparation, gasification, and syngas cleanup process capable of using a high-volume, negative-value, highly contaminated feedstock consisting of construction and demolition (C&D) waste to economically produce 99+% pure hydrogen. The target is to achieve $\$$1/kg H2 at a modular scale ranging from 5- to 50-MWe-equivalent size by testing the gasification of organic C&D debris containing treated waste lumber and construction materials, permanently sequestering contaminants into the ash. C&D debris waste is one the largest-volume waste streams in the United States; is already aggregated and available across the country, lending itself to hub operations; and has fewer alternatives for energy conversion than are available for coal, biomass, and municipal solid waste because of contamination from treated lumber and other construction materials.

08 HYDROGEN↗

Alloy 625 Qualification Pathway for ASME Section III Division 5 Class A construction

The American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section III Division 5 provides construction and inspection rules to ensure the safety of nuclear components operating at elevated temperatures, defined as those operating above 700°F (370°C) or 800°F (425°C), depending on the material type. At present, there are six materials approved for Class A (high safety significance) component construction under ASME BPVC Section III Division 5. Out of these six materials, five materials are steels or iron-based alloys and one material, Alloy 617, is a nickel alloy. Nickel alloys are stronger than steels; however, Alloy 617 consists of 10-15% cobalt, and activation is a concern under irradiation. Therefore, there is a need to qualify new nickel alloy with lower cobalt content. Alloy 625 is one candidate which has similar mechanical properties at elevated temperature compared to Alloy 617 and has a maximum of 1% cobalt. Although Alloy 625 material properties have been developed in the past to support allowable stress development under ASME Section II, new test results would be needed to qualify this material for elevated temperature component construction under ASME Section III Division 5. The purpose of this report is to describe a path towards developing a Nuclear Code Case to qualify Alloy 625 (UNS N06625; Grade 1 and Grade 2) for elevated temperature nuclear use in accordance with the ASME BPVC rules. This report reviews the existing database on Alloy 625, presents proposed test campaign, and discusses potential paths for accelerating the accelerated material qualification process.

36 - MATERIALS SCIENCE↗

Rapid Construction of an Infectious Clone of the Zika Virus, Strain ZKC2

Zika virus (ZIKV) has had detrimental effects on global public health in recent years. This is because the management of the disease has been limited, in part because its pathogenic mechanisms are not yet completely understood. Infectious clones are an important tool that utilize reverse genetics; these can be used to modify the ZIKV genomic RNA at the DNA level. A homologous recombination clone was used to construct pWSK29, a low copy plasmid that contained sequences for a T7 promoter, the whole genome of ZIKV ZKC2 strain, and a hepatitis delta virus ribozyme. High fidelity PCR was then used to amplify the T7 transcription template. The transcript was then transfected into susceptible cells via lipofection to recover the ZIKV ZKC2 strain. Finally, the virulence of rZKC2 was evaluated both in vitro and in vivo . The rZKC2 was successfully obtained and it showed the same virulence as its parent, the ZIKV ZKC2 strain (pZKC2), both in vitro and in vivo . The 3730 (NS2A-D62G) mutation site was identified as being important, since it had significant impacts on rZKC2 recovery. The 4015 (NS2A, A157V) mutation may reduce virus production by increasing the interferon type I response. In this study, one of the earliest strains of ZIKV that was imported into China was used for infectious clone construction and one possible site for antiviral medication development was discovered. The use of homologous recombination clones, of PCR products as templates for T7 transcription, and of lipofection for large RNA transfection could increase the efficiency of infectious clone construction. Our infectious clone provides an effective tool which can be used to explore the life cycle and medical treatment of ZIKV.

Qin, Zhiran↗

Optimizing the Design of Diatom Biosilica-Targeted Fusion Proteins in Biosensor Construction for Bacillus anthracis Detection

In vivo functionalization of diatom biosilica frustules by genetic manipulation requires careful consideration of the overall structure and function of complex fusion proteins. Although we previously had transformed Thalassiosira pseudonana with constructs containing a single domain antibody (sdAb) raised against the Bacillus anthracis Sterne strain, which detected an epitope of the surface layer protein EA1 accessible in lysed spores, we initially were unsuccessful with constructs encoding a similar sdAb that detected an epitope of EA1 accessible in intact spores and vegetative cells. This discrepancy limited the usefulness of the system as an environmental biosensor for B. anthracis. We surmised that to create functional biosilica-localized biosensors with certain constructs, the biosilica targeting and protein trafficking functions of the biosilica-targeting peptide Sil3T8 had to be uncoupled. We found that retaining the ER trafficking sequence at the N-terminus and relocating the Sil3T8 targeting peptide to the C-terminus of the fusion protein resulted in successful detection of EA1 with both sdAbs. Homology modeling of antigen binding by the two sdAbs supported the hypothesis that the rescue of antigen binding in the previously dysfunctional sdAb was due to removal of steric hindrances between the antigen binding loops and the diatom biosilica for that particular sdAb.

59 BASIC BIOLOGICAL SCIENCES↗

Surrogate Constructed Scalable Circuits ADAPT-VQE in the Schwinger model

Inspired by recent advancements of simulating periodic systems on quantum computers, we develop a new approach, (SC)$^2$-ADAPT-VQE, to further advance the simulation of these systems. Our approach extends the scalable circuits ADAPT-VQE framework, which builds an ansatz from a pool of coordinate-invariant operators defined for arbitrarily large, though not arbitrarily small, volumes. Our method uses a classically tractable ``Surrogate Constructed'' method to remove irrelevant operators from the pool, reducing the minimum size for which the scalable circuits are defined. Bringing together the scalable circuits and the surrogate constructed approaches forms the core of the (SC)$^2$ methodology. Our approach allows for a wider set of classical computations, on small volumes, which can be used for a more robust extrapolation protocol. While developed in the context of lattice models, the surrogate construction portion is applicable to a wide variety of problems where information about the relative importance of operators in the pool is available. As an example, we use it to compute properties of the Schwinger model - quantum electrodynamics for a single, massive fermion in $1+1$ dimensions - and show that our method can be used to accurately extrapolate to the continuum limit.

Gustafson, Erik [RIACS, Mtn. View] (ORCID:00000001↗

Orbital construction support equipment

Approximately 200 separate construction steps were defined for the three solar power satellite (SPS) concepts. Detailed construction scenarios were developed which describe the specific tasks to be accomplished, and identify general equipment requirements. The scenarios were used to perform a functional analysis, which resulted in the definition of 100 distinct SPS elements. These elements are the components, parts, subsystems, or assemblies upon which construction activities take place. The major SPS elements for each configuration are shown. For those elements, 300 functional requirements were identified in seven generic processes. Cumulatively, these processes encompass all functions required during SPS construction/assembly. Individually each process is defined such that it includes a specific type of activity. Each SPS element may involve activities relating to any or all of the generic processes. The processes are listed, and examples of the requirements defined for a typical element are given.

Source record↗

Investigation of the effects of construction and stage filling of reservoirs on the environment and ecology: Preproject baseline

The author has identified the following significant results: (1) LANDSAT imagery can be used effectively as a baseline for detection of environmental change, resulting from construction of a major inland reservoir. (2) Forest cover can be observed adequately on two-band composite enlargements at a scale of 1:130,000. (3) Forest cover delineated on LANDSAT enlargements compares accurately with ground truth at a scale of 1:250,000. (4) A dual image mapping technique superimposing winter, summer, and spring scenes using the zoom transfer scope facilitates the determination. (5) The same technique can be used to detect changes in the project area, resulting from construction activities. (6) High altitude aircraft imagery can also be used to interpret changes in land use and forest type. (7) Construction operations can be more clearly detailed on the air photos than on LANDSAT imagery.

Riggins, R. E.↗

An algorithm for constructing minimal order inverses

In this paper an algorithm is presented for constructing minimal order inverses of linear, time invariant, controllable and observable, multivariable systems. By means of simple matrix operations, a 'state-overdescribed' system is first constructed which is an inverse of the given multivariable system. A simple Gauss-Jordan type reduction procedure is then used to remove the redundancy in the state vector of the inverse system to obtain a minimal order inverse. When the given multivariable system is not invertible, the algorithm enables a minimal order inverse of an invertible subsystem to be constructed. Numerical examples are given to illustrate the use of the algorithm.

Patel, R. V.↗

Space construction base operations in support of solar power satellite development

Development of the Solar Power Satellite (SPS) system for initial operation in the late 1990's requires substantial orbital development activities in the mid-1980's leading to a key system development decision in about 1987. A manned Space Construction Base (SCB) in low-earth orbit is needed to support the SPS orbital development program. The SPS system development issues are defined, along with a candidate development program for resolving these issues. The development hardware systems of interest for the mid-1980's include: (1) a tapered linear array microwave antenna (123 x 125.6 m 'cross') with a 57-kW/rf amplitron output, which is SCB constructed and operated in low-earth orbit initially, and, subsequently, unmanned in geosynchronous earth orbit; and (2) a SCB-constructed and -operated 9 x 14.4 m planar array antenna (358 kW/rf/) powered by a 455-kWe silicon photovoltaic solar collector.

Mckhann, G. G.↗

Solar power satellite. System definition study. Part 1, volume 3: Construction, transportation and cost analyses

Concepts developed for both LEO and GEO construction of photovoltaic and thermal engine satellites are analyzed. Topics discussed include: satellite construction; crew scheduling; crew jobs and organizations; operator productivity rating; constructability rating; transportation systems for cargo launch, refueling operations, personnel transport, and orbit transfer; collision analysis, cost analysis, and radiation evironment and effects.

Source record↗

Photovoltaic power-system options for the manned space construction base

The function of the proposed manned Space Construction Base (SCB) is to provide a permanent manned orbital facility for the construction and operation of a variety of space experiments, ranging from a space-processing development to on-orbit-constructed microwave radiometers and antennas. A typical SCB system might reach initial operational capability in low earth orbit in 1985, have a 10-year mission duration, and have an initial power requirement of 50 kWe. A summary of the requirements imposed by the SCB on the electrical power system (EPS) is presented in a table. Attention is given to EPS options, baseline power platform system operations, an energy storage system evaluation, advanced-technology NiCd batteries and lifetime, and orbital buildup operations.

Mckhann, G. G.↗

Orbital construction support equipment - Manned remote work station

The Manned Remote Work Station (MRWS) is a versatile piece of orbital construction support equipment which can support in-space construction in various modes of operation. Proposed near-term Space Shuttle mission support and future large orbiting systems support, along with the various construction modes of MRWS operation, are discussed. Preliminary flight subsystems requirements and configuration design are presented. Integration of the MRWS development test article with the JSC Mockup and Integration Facility, including ground-test objectives and techniques for zero-g simulations, is also presented.

Nassiff, S. H.↗

Planning for large construction projects in space

The paper discusses briefly some broad plans for developing the technology needed for large construction projects in space ranging from orbiting solar power stations to large communications antennas. Space construction classes include assembly of modules, deployment of compacted structures, assembly of passive preformed pieces, and fabrication of structures from sheet stock. Technological areas related to structural concepts include (1) analyses for prediction of structural behavior, structural/control interaction, electromagnetic and control performance, and integrated design development; (2) electronics for signal conditioning and data acquisition, power distribution, and signal channel interference and multipaction; (3) concepts for shape control, attitude/pointing control, and orbital transfer and station keeping; and (4) materials and techniques for 30-year dimensional stable composites, thermal control, thin-lightweight structural alloys, and material joining in space. The concept of a power module for the construction operations is discussed along with a concept for a habitability module.

Disher, J. H.↗