Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “coil design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Advanced blade-shaped thermal energy storage device: Development and application

Thermal energy storage (TES) using phase change materials (PCMs) is a promising approach for capturing and reusing excess thermal energy, yet widespread adoption is limited by low thermal conductivity, bulky configurations, and inadequate scalability. Here, this study presents a modular, blade-shaped TES prototype designed to address these challenges. The device integrates a lightweight aluminum shell, an embedded serpentine coil for active or passive heat exchange, and a cost-effective corrugated metal mesh for enhanced PCM thermal conductivity. With thickness-to-length and thickness-to-width ratios of 0.03 and 0.08, respectively, the blade-shaped TES achieves a compact, modular form factor suitable for space-constrained applications. Experimental testing demonstrated the efficient charge and discharge behavior of blade-shaped TES, capturing PCM superheating, phase-change transitions, and subcooling dynamics, with charging and discharging efficiencies of 94.9% and 94.6%, respectively. Also, the system can potentially achieve higher energy density than that of conventional TES designs. When integrated into a household refrigerator during the study, three blade-shaped TES modules successfully shifted 100% of peak-time compressor operation to off-peak hours, reducing energy consumption while maintaining more stable compartment temperatures. The blade-shaped TES's thin geometry, modularity, and enhanced thermal performance support scalable deployment across residential, commercial, and industrial applications, providing a versatile, cost-effective solution for high-efficiency, demand-flexible thermal energy management.

Blade-shaped↗

Assessment of MQXF Quench Heater Insulation Strength and Test of Modified Design

The HL-LHC interaction region magnet triplets (Q1,Q2, and Q3) will be composed of superconducting Nb 3 Sn quadrupoles. The MQXF quadrupole protection system is based on CLIQ (Coupling-Loss Induced Quench system) and outer layer quench heaters. Furthermore, this paper reports a summary of quench heaters to coil high voltage tests performed on MQXF short and long coils in air after fabrication, and in air and He gas after magnet training. Breakdown voltage values demonstrate good margin with respect to the Electrical design criteria for the HL-LHC inner triplet mag-nets. A modification in the quench heater installation-with an extra layer of fiber glass between the coil and the quench heater trace-has been proposed and tested in a mirror magnet to further increase electrical margins. Results demonstrated improvements of high voltage margin at the expense of a clear increase of hot spot temperature.The baseline heater to coil insulation was assessed to be able to guarantee safe operation for the Nb 3 Sn quadrupole magnets for the interaction regions of HL-LHC.

43 PARTICLE ACCELERATORS↗

Modular Design of Receiver Side Power Electronics for 200 kW High Power Dynamic Wireless Charging System

Dynamic wireless power transfer (DWPT) can provide energy to EVs in motion and extend the drive range. By upscaling the charging power to 200 kW (High Power DWPT), the percentage of electrified roadway reduces and the solution becomes cost-effective. However, coil coupling-coefficient variation during vehicle movement fluctuates the transferred power which is unfavorable for vehicle battery. Secondary regulation design can smooth the power but the converter design becomes very challenging due to requirement in high power, high efficiency, fast control, as well as high power density since the unit will be onboard. This paper provides the modular design approach of a 200 kW secondary side unit to achieve high performance and scalability. The DC/DC converter using SiC devices demonstrated 98.3% efficiency.

Xue, Lincoln↗

Magnetic design of the commutational magnet and quadrupoles for PERLE accelerator

PERLE (Powerful Energy Recovery LINAC for Experiment) is a high-power Energy Recovery LINAC (ERL) facility with 20 mA beam current and beam energy from 250 MeV to 500 MeV featuring three passes through two cryomodules. It is a hub for validation of the ERL technology development towards future energy and intensity frontier machines. Design challenges of PERLE and its beam parameters make it a test-bed to validate multi-turn high current ERL operation for the LHeC. It will be the first ERL for some pioneering experiment of the eN interaction with radioactive nuclei. In this work, design and optimization of the commutational magnet (B-com) used to spread/combine the three beams and one series of the quadrupole magnet is discussed. It gives the design parameters including: yoke geometry, pole profile, and material, and calculation of the excitation current needed to drive the magnet, the coil parameters and the number of turns. The B-com magnet is optimized for a 30° bending angle with magnetic field of 0.88 T along the magnet length and a harmonic content of 0.036%. The quadrupole magnet is designed for a gradient field of 34.15 T/m and experiences saturation above this value. Further studies to avoid saturation and achieve the maximum gradient of 44.1 T/m required by the beam dynamics is undergoing.

Abukeshek, R.↗

Magnetic design of the commutational magnet and quadrupoles for PERLE accelerator

PERLE (Powerful Energy Recovery LINAC for Experiment) is a high-power Energy Recovery LINAC (ERL) facility with 20 mA beam current and beam energy from 250 MeV to 500 MeV featuring three passes through two cryomodules. It is a hub for validation of the ERL technology development towards future energy and intensity frontier machines. Design challenges of PERLE and its beam parameters make it a test-bed to validate multi-turn high current ERL operation for the LHeC. It will be the first ERL for some pioneering experiment of the eN interaction with radioactive nuclei. In this work, design and optimization of the commutational magnet (B-com) used to spread/combine the three beams and one series of the quadrupole magnet is discussed. It gives the design parameters including: yoke geometry, pole profile, and material, and calculation of the excitation current needed to drive the magnet, the coil parameters and the number of turns. The B-com magnet is optimized for a 30° bending angle with magnetic field of 0.88 T along the magnet length and a harmonic content of 0.036%. The quadrupole magnet is designed for a gradient field of 34.15 T/m and experiences saturation above this value. Further studies to avoid saturation and achieve the maximum gradient of 44.1 T/m required by the beam dynamics is undergoing.

Abukeshek, R.↗

A Full-length Quench Antenna for MQXFA Production Series Quadrupole Magnet Testing

The MQXFA production series quadrupoles being built for the Hi-Lumi (HL) LHC upgrade by the US Accelerator Upgrade Project (US-HL-LHC AUP) will have very limited instrumentation for characterizing quench events that occur during magnet training and performance validation testing. In order to understand the origin of the quenches, and whether they have some implication for ongoing magnet fabrication, it was decided to build a full-length Quench Antenna (QA) with axial resolution of 50mm to be employed during cold testing in the anticryostat used for magnetic measurements. The goal is to have fineresolution, full-length coverage detection of quench events axially, as well as to have azimuthal resolution on the order of the cable width (about 1 degree for the cross-section), in a device that can be used both for vertical and horizontal testing. To achieve this, a 5m long QA with 128 channels of high-speed data acquisition has been designed and fabricated. The cylindrical antenna features an array of 12 full-length, dipole- and quadrupole-bucked coils positioned radially in the QA interior for azimuthal localization, and over 100 individual channels of short, high-sensitivity, antennas etched as flexible PCB circuits (which also buck dipole and quadrupole fields) wrapped circumferentially on the cylinder exterior in steps of 50mm along the magnet length for axial detection. This report discusses the design, construction and analysis of the MQXFA QA, and first results from using the antenna during quench testing in the production magnets.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Toroidal Field Reversing Switch

A motor-driven, high-current switch is being designed by Stäubli Electrical Connectors in collaboration with Princeton Plasma Physics Laboratory to reverse the DIII-D Toroidal field coil current. The existing field reversing procedure requires approximately 4 h of labor performed between run days to reconfigure the bus work, thus requiring a separate run day to complete experimental scans with both field directions. This typically results in different wall conditions which complicate the results or make them invalid. The proposed switch will complete the reversal process in approximately 4-5 min, between shots, so that wall conditions are not a factor, and easily fits within the 10-12 min DIII-D shot cycle. The switch is a compact design fitting into a 157.5 × 41 cm envelope. The switch uses two copper pins that slide between Stäubli MULTILAM contacts. The switch is rated for total current of 180-kA dc for 10 s with a 12-min repetition rate; the maximum operating coil current is 124-kA dc. The switch diagnostics include: voltage drop, current monitor, thermal monitors, position sensors, and motor torque. Here, the switch is rated for 300 cycles per year, and 3000 cycles overall before contact replacement, with contact inspection yearly. The design details and operation of the switch are covered in this article.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Overview of the ASDEX Upgrade results

After a 26-month vent ASDEX Upgrade (AUG) went back in operation with a newly designed upper W-divertor suitable for alternative divertor configurations (featuring in-vessel coils and cryo-pump). Parameter scans and an extensive set of measurements were obtained and their interpretation is ongoing. Prompted by the ITER wall change, dedicated experiments on non-boronized plasma startup were contrasted to that employing asymmetric and more symmetric boronizations. The asymmetric boronization proved to be as beneficial as the more symmetric one, which is in contrast to previous model calculations assuming perfect sticking of boron (measurements suggest sticking ≈ 0.3). In the startup phase also the impurity influxes at the outboard limiters were investigated contrasting the unboronized case featuring cold edges (low- Z radiation) to the boronized case, in which the lifetime of the boron layers could be estimated. Pedestal stability investigations revealed that the quasi-continuous exhaust (QCE) regime is obtained when ballooning modes are active in the vicinity of the separatrix and the global peeling-ballooning stability is high enough. Thus, at high enough shaping and high gas flux both can be achieved and QCE is a consequence. The closely related enhanced D-alpha (EDA) mode is not clearly distinguishable from QCE, e.g. the quasi-coherent mode characteristic for EDA also shows up in QCE. In QCE the impurity transport is behaving benign as could be measured for Ne with a novel analysis method making use of a comprehensive set of CXRS measurements. For high radiative fractions the regime of the X-point radiator (XPR) is accessible at AUG and the understanding of its access conditions and behaviour is further developed. Due to the localized radiative cooling at the X-point the XPR can be well diagnosed and thus controlled. For negative triangularity shapes, further experiments at increased shaping resulted in strongly heated L-mode plasmas avoiding ELMs. Two integrated modelling approaches towards ITER suggested that core W-accumulation will be no issue for ITER and that the fusion yield in ITER may be Q = 12 (i.e. ITPA20-IL scaling is too pessimistic). Further, investigations of the ITER ramp-down in AUG provide insights into maintaining position control. Various aspects of shattered pellet injection were investigated in AUG and one of the results show that with increasing Ne fraction the radiation during the current quench increases and the current decay becomes faster.

ASDEX Upgrade↗

Flexible Stellarator Physics Facility

We propose to build a Flexible Stellarator Physics Facility to explore promising regions of the vast parameter space of disruption-free stellarator solutions for Fusion Pilot Plants (FPPs). The FESAC Long Range Plan recognized the quasi-symmetric stellarator as “the leading US approach to developing disruption-free, low-recirculating-power fusion configurations”. To deliver the ambitious Decadal Vision for Commercial Fusion Energy, we must establish a persuasive stellarator program in parallel to the tokamak one: the stellarator will prove to be a better path to a reactor if theoretical predictions are confirmed and novel optimization techniques and strategies work as desired. Since the release of the Long Range Plan in 2020, stellarators have arguably made the most significant advances of all fusion concepts. Groundbreaking results from W7-X demonstrated low neoclassical transport and the successful operation of the island divertor. Advances in theory and modeling now allow us to minimize turbulent transport, to achieve equilibria with precise quasisymmetry, to reduce neoclassical transport and fast ion loss to levels far below what has been previously achieved, and to minimize the effect of coil manufacturing errors. If realized, these advances will lead to cost-effective stellarator designs with confinement comparable to tokamaks but without the fundamental challenges of disruptions and current drive.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

HTS to NbTi Joints for Fusion Magnet Cost Savings

This paper describes methods of employing high field High Temperature Superconductors (HTS), only where high field capability and high current density is needed in superconducting coils. The approach lends itself, in particular, to Toroidal Field (TF) coils used in fusion reactors. The initial idea was to develop a conductor joint design or designs that would allow joints between expensive high field High Temperature Superconductors (HTS) Rare Earth Barium Copper Oxide (REBCO) conductors to low cost NbTi lower field conductors.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Redesign of the Coils for the 60T Controlled-Waveform Magnet at NHMFL

Driven by the1.4 GW generator, the 60T Controlled Waveform (60 TCW) magnet was the most powerful controlled waveform system in the world and had always been one of most important magnets to the National High Magnetic Field (NHMFL) and high-field research community because of its following unique features: (1) quasi-static field up to 60 T with 100 ms flat-top and total pulse-length of about 2000 ms, (2) variable magnetic field waveforms such as staircase and triangle with flat-top (3) relative large bore (32 mm) and (4) very fast cooling time (20 minutes) between pulses [Boebinger, 2001], [Crooker et al. 2001]. The magnet is composed of nine concentric coils, with each coil consisting of several conductor winding layers reinforced by a high-strength metallic shell. The magnet underwent a catastrophic failure in 2000 and all the coils had to be rebuilt. In late 2014 the second magnet version failed near the mid-plane of coil 7. The simulations afterward that incident indicated that the overall strength of the coil would be increased by replacing a section of the reinforcing shell with Zylon fiber-epoxy composite. This reduces the stress and thus significantly lowers the level of plastic deformation in the windings. The role of the metal and Zylon fiber reinforcing layers in bearing the axial and radial Lorentz forces has been studied to optimize the magnet design. Here, the results of the optimization will be discussed as well as challenges that have been presented in rebuilding the individual coils of the magnet.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Concrete Thermal Energy Storage Enabling Flexible Operation without Coal Plant Cycling

The work described in this report is responsive to the Office of Fossil Energy program “Energy Storage for Fossil Power Generation.” The pilot plant built as a result of this project demonstrated the feasibility and performance of a concrete thermal energy storage (CTES) system integrated with a supercritical coal power plant. The 10 MWh electrical (>25 MWh thermal) CTES unit, developed by Storworks Power, was designed to enable flexible operation of coal plants without cycling damage. The project's key technical achievements showcase a significant advancement in energy storage technology. A modular CTES system using 42 “Bolderblocs” units was successfully designed and constructed at Alabama Power’s Plant Gaston Unit 5, with each block containing embedded stainless-steel coils in specialized, cost-effective high-temperature concrete. The system interfaced seamlessly with the plant's 3500 psig (241 barg), 1000°F (538°C) supercritical steam, demonstrating operational flexibility. Over 86 full cycles, the CTES exhibited rapid charging and discharging capabilities, effectively mimicking steam turbine feed conditions and handling varying load profiles and storage durations. Performance validation confirmed the system's ability to consistently meet design target steam conditions of 75 bar-a and ~400°C for nominal baseline discharge. The concrete material withstood repeated thermal cycling without degradation, validating earlier lab-scale tests. Integration of balance of plant components, including a condensate management system with storage tank and air-cooled condenser, minimized plant interfaces and water consumption. A robust control scheme ensured safe, automated operation across various scenarios. Key learnings from the project were invaluable: 1. Initial concrete drying and commissioning procedures were refined for future deployments, enhancing efficiency in subsequent installations. 2. System flexibility exceeded expectations, with rapid response to changing conditions. 3. Design improvements were identified including optimized insulation and piping that will enhance overall system efficiency in future deployments 4. Full cycle thermal roundtrip efficiencies exceeded 88%. While the roundtrip electrical efficiency was somewhat limited by known challenges using input steam, such constraints may be mitigated by swapping steam for hot air as thermal input. 5. A summary of key performance parameters for the pilot test and predicted performance of a full scale commercial system with specified improvements determined from the pilot are shown in Section 8. The project faced challenges, including COVID-19 delays and host plant availability constraints. However, these were overcome through adaptive planning and execution. The successful management of these obstacles demonstrated the resilience and adaptability of the project team and the robustness of the CTES technology. This successful pilot demonstrates the potential for CTES to enhance coal plant flexibility, supporting grid stability as renewable penetration increases. The validated design and operational data provide a solid foundation for scaling up to utility-scale implementations, potentially transforming how thermal plants operate in evolving energy landscapes. The system's ability to rapidly respond to changing grid conditions while maintaining high efficiency makes it a promising solution for balancing intermittent renewable energy sources. Furthermore, the project highlighted the potential for even greater efficiencies in future iterations. The use of air as an input medium could potentially eliminate the limitations observed with steam input, opening new possibilities for energy storage applications beyond coal plant integration. In conclusion, this pilot project not only achieved its primary goals but also uncovered additional benefits and potential applications of the CTES technology. It represents a significant step forward in addressing the challenges of grid stability and flexibility in an increasingly renewable-driven energy landscape.

01 COAL, LIGNITE, AND PEAT↗

Extended-MHD simulations of disruption mitigation via massive gas injection in SPARC

Recent developments to the M3D-C1 code enable higher fidelity modeling of disruptions, and can be applied in the design verification of reactor-scale tokamaks. Among these new capabilities is a method to mesh conducting vessel structures such as coils and passive plates, packing of the toroidal mesh around gas injectors, as well as anisotropic resistivity inside the vessel structures. We present extended-magnetohydrodynamic (MHD) simulations of disruption mitigation via massive gas injection (MGI) in SPARC. The goal of this study is to inform the disruption mitigation layout of SPARC and aid in the design of an effective gas injector configuration. Fully three-dimensional simulations with M3D-C1 are carried out for various injector configurations with the primary goal of determining the effect of different MGI parameters on heat loads and vessel forces. The simulations include a model for impurity ionization, recombination, advection and radiation, as well as spatially resolved conducting structures around the plasma. A localized mixture of deuterium and neon with a small toroidal and poloidal width is injected in up to six locations. We demonstrate that M3D-C1 can model a rapid shutdown via MGI using narrow and more realistic gas plumes than in previous simulations. As a result of the q = 1 surface in the SPARC baseline case a sawtooth is observed early in the simulations. Despite the sawtooth and the onset of edge MHD instabilities, the impurity distribution remains localized around the injector locations, but enables a radiative shutdown of the plasma. We find that using the maximum of six gas injectors results in a lower peaking factor and leads to a more even distribution of radiation toroidally than using two injectors.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Mechanical Design of the MARCO Solenoid Detector Magnet

MARCO is the superconducting solenoid for ePIC, the new particle physics detector of the upcoming Electron Ion Collider (EIC) at the Brookhaven National Laboratory (NY, USA). The magnet has a 2.84 m warm bore diameter and is 3.85 m long. This 15 tons magnet provides a 2.0 T central field at the interaction point with a nominal current of about 4 kA at 4.5 K. The coil is composed of 6 layers of copper stabilized NbTi Rutherford in channel conductor (RIC) and it is wound internally to the brass mandrel. Here, this paper presents the detailed mechanical design of the magnet, starting with the magnet description, the material properties and the acceptance criteria considered. Then, the coil pack properties homogenization process is described. Subsequently, the 2D and 3D calculation models and their assumptions are described. At last, the computational results for the cool down and the energization are discussed. Index Terms—Superconducting Detector Magnet, material properties, homogenization, detector, EIC.

Reymond, Hugo [Commissariat a l'Energie Atomique e↗

An adjoint method for determining the sensitivity of island size to magnetic field variations

An adjoint method to calculate the gradient of island width in stellarators is presented and applied to a set of magnetic field configurations. The underlying method for calculation of the island width is that of Cary & Hanson ( Phys. Fluids B, vol. 3, issue 4, 1991, pp. 1006–1014) (with a minor modification), and requires that the residue of the island centre be small. Therefore, the gradient of the residue is calculated in addition. Both the island width and the gradient calculations are verified using an analytical magnetic field configuration introduced by Reiman & Greenside ( Comput. Phys. Commun. , vol. 43, issue 1, 1986, pp. 157–167). The method is also applied to the calculation of the shape gradient of the width of a magnetic island in a National Compact Stellarator Experiment (NCSX) vacuum configuration with respect to positions on a coil. A gradient-based optimization is applied to a magnetic field configuration studied by Hanson & Cary ( Phys. Fluids , vol. 27, issue 4, 1984, pp. 767–769) to minimize stochasticity by adding perturbations to a pair of helical coils. Although only vacuum magnetic fields and an analytical magnetic field model are considered in this work, the adjoint calculation of the island width gradient could also be applied to a magnetohydrodynamic (MHD) equilibrium if the derivative of the magnetic field, with respect to the equilibrium parameters, is known. Using the island width gradient calculation presented here, more general gradient-based optimization methods can be applied to design stellarators with small magnetic islands. Moreover, the sensitivity of the island size may itself be optimized to ensure that coil tolerances, with respect to island size, are kept as high as possible.

Physics↗

Development of a high current density, high temperature superconducting cable for pulsed magnets

Abstract A low AC loss Rare Earth Barium Copper Oxide (REBCO) cable, based on the VIPER cable technology has been developed by Commonwealth Fusion Systems for use in high field, REBCO based tokamaks. The new cable is composed of partitioned and transposed copper ‘petals’ shaped to fit together in a circular pattern with each petal containing a REBCO tape stack and insulated from each other to reduce AC losses. A stainless steel jacket adds mechanical robustness—also serving as a vessel for solder impregnation—while a tube runs through the middle for cooling purposes. Additionally, fiber optic sensors are placed under the tape stacks for quench detection. To qualify this design, a series of experiments were conducted as part of the SPARC tokamak Central Solenoid Model Coil program—to retire the risks associated with full scale, fast ramping, high flux HTS Central Solenoid (CS) and Poloidal Field (PF) coils for tokamak fusion power plants and net energy demonstrators. These risk study and risk reduction experiments include (1) AC loss measurement and model validation in the range of ~5 T/s, (2) an IxB electromagnetic loading of over 850 kN/m at the cable level and up to 300 kN/m at the stack level, (3) a transverse compression resilience of over 350 MPa, (4) manufacturability at tokamak relevant speeds and scales, (5) cable to cable joint performance, (6) fiber optic based quench detection speed, accuracy, and feasibility, and (7) overall winding pack integration and magnet assembly. The result is a cable technology, now referred to as PIT VIPER, with AC losses that measure fifteen times lower (at ~5 T/s) than its predecessor technology; a 2% or lower degradation of critical current (Ic) at high IxB electromagnetic loads; no detectable Ic degradation up to 570 MPa of transverse compression on the cable unit cell; end to end magnet manufacturing, consistently producing Ic values within 7% of the model prediction; cable to cable joint resistances at 20 K on the order of ~15 nΩ; and fast, functional quench detection capabilities that do not involve voltage taps. This cable technology will be tested comprehensively in a Central Solenoid Model Coil to prove its readiness for compact, high field tokamak operation.

Sanabria, Charlie (ORCID:0000000150175309)↗

Nonlinear two-fluid modeling of plasma response to RMPs for the ELM control in the ITER baseline

Numerical modeling, combining the toroidal ideal MHD code GPEC and the nonlinear two-fluid MHD code TM1, was used for comprehensive studies of the plasma response to resonant magnetic perturbations (RMPs) with toroidal mode number n = 1–5 for controlling edge-localized modes (ELMs) in ITER for the standard operation scenario (15 MA Q = 10). Several issues related to RMP ELM control are investigated, including the optimization of the RMP coils configuration, the evaluation of the magnitude of density pump-out and the q95 windows of ELM suppression. GPEC calculates the magnetic response, which consistently includes the very important edge kink/peeling response to static magnetic perturbations. Furthermore, GPEC two-dimensional scans of the relative coil current phasing among the three rows of internal coils, at fixed coil current amplitude, reveal the optimal phasing for the RMP coil configuration with n = 1–5, respectively. The poloidal half wavelength of resonant mode at the edge of plasma calculated by GPEC indicates that the midplane row coils have the best resonant coupling with the plasma for n = 2, while the upper and lower row coils have the best resonant coupling with the plasma for n = 3. Based on the plasma kinetic equilibrium and the GPEC calculations of the magnetic response, TM1 was used to simulate the conditions for RMP field penetration in the ITER pedestal. TM1 shows magnetic island formation at the foot of ITER pedestal with RMP coil current threshold ranging from 4 kAt to 8 kAt with n = 2 to 4. These magnetic islands at the pedestal-foot lead to density pump-out, the magnitude of which scales as ${I}_{\text{RMP}}^{0.5}$ and ranges from 5% to 20% at the pedestal-top when scanning the coil current from 4 to 60 kAt. The density pump-out is found to be weaker for higher n RMP. The nonlinear TM1 simulations also show field penetration at the pedestal-top, where the threshold of RMP coil current depends on the q 95 . The alignment of the magnetic island and the location of the pedestal-top decreases the height and width of the pedestal to suppress ELMs. Simulations by two-dimensional scans of RMP coil current and q 95 reveal the accessible q 95 windows of ELM suppression for both n = 3 and 4 RMPs. The predicted q 95 windows of ELM suppression are very similar to the ones in currently operating tokamaks and the required RMP coil current for ELM suppression is less than 40–50 kAt, which is well within the designed capability for ITER. In addition, the simulations indicate that wide q 95 windows of ELM suppression may be accessible in ITER by operating with dominant n = 4 (or n = 5) RMPs.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Recent Progress of JT-60SA Project toward Plasma Operation

Superconducting tokamak JT-60SA plays an essential role in fusion research and development by supporting and complementing ITER project, providing directions to the DEMO design activity and fostering next generation scientists and engineers. Since the incident of the Equilibrium Field coil #1 during the Integrated Commissioning (IC) in March 2021, both EU and JA Implementing agencies (IAs) have examined how to ensure safety operation of JT-60SA by mitigating the risk of possible discharge occurrence inside the cryostat. Based on the experience of the Global Paschen tests, the IAs have established a strategy of risk mitigation measures, which is a combination of (i) reinforcement of insulation, (ii) avoiding unnecessary voltage application to the coil systems and (iii) immediate de-energization of the coils when deteriorated vacuum condition is detected. Thanks to the considerable efforts of the Integrated Project Team (IPT) members, the IC restarted in May 2023. After the confirmation of superconducting state of coil systems (TF, EF and CS), the coil energization test and the plasma operation (OP-1) starts. The first plasma was successfully achieved on 23 October 2023 with a limited value of applied voltage and current to the coils. The plasma configuration control will be also confirmed with low plasma current and low auxiliary heating power conditions. Based on the IO-F4E-QST collaboration, activities of JT-60SA have been shared with the IO and provided an important lesson learned for ITER assembly and commissioning, and will provide an outstanding contribution to fusion research at large. After OP-1, Maintenance & Enhancement phase 1 (M/E-1) starts from January 2024, in which in-vessel components are installed, and heating system and diagnostic system are extensively upgraded to allow high power heating experiment planned in OP-2. In order to make the best use of JT-60SA, newly organized JT-60SA experiment team will refine the research plan in the future high heating power operation phase.

Broader Approach activities↗