Evaluating the Impacts of Coordination for Cascaded Hydropower Plants on the Mid-Columbia
The Mid-Columbia region in the U.S. Pacific Northwest includes seven large, cascaded hydropower plants with a combined nameplate capacity of nearly 14 GW. These plants have several different operators, and there is currently limited coordination among the operators. We develop a detailed model of the Mid-Columbia system that captures both river flow constraints and power system operations. We then place this detailed model within a production cost model of a 2030 system of the Western Interconnection to evaluate how coordination of the Mid-Columbia hydropower plants might impact operations throughout the interconnection. We find that coordination of the Mid-Columbia plants leads to more generation from the Mid-Columbia plants and increased revenues for the Mid-Columbia operators. This benefit is achieved primarily through better utilization of the storage reservoirs and decreased spill through the cascade. We also evaluate the impacts of look-ahead on production costs and find that longer look-ahead values result in lower system-wide production costs.