Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “WIND POWER”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Wind Powering America's Regional Stakeholder Meetings and Priority State Reports: FY11 Summary

Beginning in 2010, DOE conducted an assessment of Wind Powering America (WPA) activities to determine whether the methods the department had used to help grow the wind industry to provide 2% of the nation's electrical energy should be the same methods used to achieve 20% of the nation's energy from wind (as described in the report 20% Wind Energy by 2030: Increasing Wind Energy's Contribution to U.S. Electricity Supply). After the assessment, it was determined that the initiative's state-based activities should be phased out as part of a shift to regional-based approaches. To assist with this transition, WPA hosted a series of 1-day regional meetings at six strategic locations around the country and a single teleconference for island states, U.S. territories, and remote communities. This report summarizes the results of the inaugural regional meetings and the state reports with a focus on ongoing wind deployment barriers in each region.

17 WIND ENERGY↗

Wind Powering America's Regional Stakeholder Meetings and Priority State Reports: FY11 Summary

Beginning in 2010, DOE conducted an assessment of Wind Powering America (WPA) activities to determine whether the methods the department had used to help grow the wind industry to provide 2% of the nation's electrical energy should be the same methods used to achieve 20% of the nation's energy from wind (as described in the report 20% Wind Energy by 2030: Increasing Wind Energy's Contribution toU.S. Electricity Supply). After the assessment, it was determined that the initiative's state-based activities should be phased out as part of a shift to regional-based approaches. To assist with this transition, WPA hosted a series of 1-day regional meetings at six strategic locations around the country and a single teleconference for island states, U.S. territories, and remote communities.This report summarizes the results of the inaugural regional meetings and the state reports with a focus on ongoing wind deployment barriers in each region.

17 WIND ENERGY↗

Wind Power as a Virtual Synchronous Generator (WindVSG)

This project investigated the theory, implemented it in hardware, and validated the Wind as a Virtual Isochronous Generator (WindVSG) concept by combining the advantages of modern dynamic inverter technologies with static, dynamic, and transient electromechanical properties of synchronous machines. During this project we demonstrated how to control the inverters of wind turbine generators (wind alone or in parallel with other GFM sources, such battery energy storage) so that wind power behaves like a synchronous machine-based power plant with a conventional prime mover. For this purpose, testing was conducted at NLR ARIES facility with real 2.5 MW wind-turbine generator operating in GFM mode under dynamic and transient conditions. The team also developed models and conducted simulations for GFM wind power to evaluate stability impacts of GFM operation on power grid. This report describes efforts by the NLR team working in collaboration GE Vernova during 3-year project.

17 WIND ENERGY↗

Wind Power Today - 2010

This report provides an overview of the Wind Program's accomplishments and activities in 2010.

17 WIND ENERGY↗

Wind Vision: A New Era for Wind Power in the United States (Highlights); U.S. Department of Energy (DOE), NREL (National Renewable Energy Laboratory)

This is a four-part Wind Vision project, consisting of Wind Vision Highlights, Executive Summary, a Full Report, and Appendix. The U.S. Department of Energy (DOE) Wind Program, in close cooperation with the wind industry, led a comprehensive analysis to evaluate future pathways for the wind industry. The Wind Vision report updates and expands upon the DOE's 2008 report, 20% Wind Energy by 2030, and defines the societal, environmental, and economic benefits of wind power in a scenario with wind energy supplying 10% of national end-use electricity demand by 2020, 20% by 2030, and 35% by 2050.

17 WIND ENERGY↗

Evaluation of Wind Power Forecasts from the Vermont Weather Analytics Center and Identification of Improvements

The goal of this analysis was to assess the wind power forecast accuracy of the Vermont Weather Analytics Center (VTWAC) forecast system and to identify potential improvements to the forecasts. Based on the analysis at Georgia Mountain, the following recommendations for improving forecast performance were made: 1. Resolve the significant negative forecast bias in February-March 2017 (50% underprediction on average) 2. Improve the ability of the forecast model to capture the strong diurnal cycle of wind power 3. Add ability for forecast model to assess internal wake loss, particularly at sites where strong diurnal shifts in wind direction are present. Data availability and quality limited the robustness of this forecast assessment. A more thorough analysis would be possible given a longer period of record for the data (at least one full year), detailed supervisory control and data acquisition data for each wind plant, and more detailed information on the forecast system input data and methodologies.

17 WIND ENERGY↗

A quick guide to wind power forecating : state-of-the-art 2009.

This document contains a summary of the main findings from our full report entitled 'Wind Power Forecasting: State-of-the-Art 2009'. The aims of this document are to provide guidelines and a quick overview of the current state-of-the-art in wind power forecasting (WPF) and to point out lines of research in the future development of forecasting systems.

17 WIND ENERGY↗

Characteristics of wind power on Savonius rotor using a guide-box tunnel

This study investigates to improve and adjust the output power of Savonius rotor under various wind power and suggests the method of prevention the rotor from strong wind disaster. In this study, as the appropriate device to achieve the purpose of it, a guide-box tunnel is employed. The guide-box tunnel is like a rectangular box as wind passage in which a test rotor is included. The area ratio between the inlet and exit of it is variable to adjust the inlet mass flow rate or input power. At first, the experiment was conducted to find the adequate configuration which would provide the best relative performance. The present experiment, however, does not include the test to retain the guide-box tunnel from the strong wind. The experiments include the static torque test of the fixed rotor at any phase angle and the dynamic torque test at rotation of them. Consequently, it was found that the maximum rotor rotational speed was achieved in the range of the guide-box area ratio between 0.3 and 0.7 and the value of the output power coefficient of the rotor with guide-box tunnel of the area ratio 0.43 increases about 1.5 times with three blades and 1.23 times with two blades greater than that without guide-box tunnel, respectively. It seemed that the performance of Savonius rotor within the guide-box tunnel is comparable enough with other methods for augmentation and control of the output. (author)

17 WIND ENERGY↗

Characterizing and analyzing ramping events in wind power, solar power, load, and netload

Here, one of the biggest concerns associated with integrating a large amount of renewable energy into the power grid is the ability to handle large ramps in the renewable power output. For the sake of system reliability and economics, it is essential for power system operators to better understand the ramping features of renewable, load, and netload. An optimized swinging door algorithm (OpSDA) is used and extended to accurately and efficiently detect ramping events. For wind power ramps detection, a process of merging 'bumps' (that have a different changing direction) into adjacent ramping segments is included to improve the performance of the OpSDA method. For solar ramps detection, ramping events that occur in both clear-sky and measured (or forecasted) solar power are removed to account for the diurnal pattern of solar generation. Ramping features are extracted and extensively compared between load and netload under different renewable penetration levels (9.77%, 15.85%, and 51.38%). Comparison results show that (i) netload ramp events with shorter durations and smaller magnitudes occur more frequently when renewable penetration level increases, and the total number of ramping events also increases; and (ii) different ramping characteristics are observed in load and netload even with a low renewable penetration level.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enhanced Short-Term Wind Power Forecasting and Value to Grid Operations: Preprint

The current state of the art of wind power forecasting in the 0- to 6-hour time frame has levels of uncertainty that are adding increased costs and risk on the U.S. electrical grid. It is widely recognized within the electrical grid community that improvements to these forecasts could greatly reduce the costs and risks associated with integrating higher penetrations of wind energy. The U.S.Department of Energy has sponsored a research campaign in partnership with the National Oceanic and Atmospheric Administration (NOAA) and private industry to foster improvements in wind power forecasting. The research campaign involves a three-pronged approach: 1) a 1-year field measurement campaign within two regions; 2) enhancement of NOAA's experimental 3-km High-Resolution Rapid Refresh(HRRR) model by assimilating the data from the field campaign; and 3) evaluation of the economic and reliability benefits of improved forecasts to grid operators. This paper and presentation provides an overview of the regions selected, instrumentation deployed, data quality and control, assimilation of data into HRRR, and preliminary results of HRRR performance analysis.

17 WIND ENERGY↗

Operating Reserves and Wind Power Integration: An International Comparison

The determination of additional operating reserves in power systems with high wind penetration is attracting a significant amount of attention and research. Wind integration analysis over the past several years has shown that the level of operating reserve that is induced by wind is not a constant function of the installed capacity. Observations and analysis of actual wind plant operating data has shown that wind does not change its output fast enough to be considered as a contingency event. However, the variability that wind adds to the system does require the activation or deactivation of additional operating reserves. This paper provides a high-level international comparison of methods and key results from both operating practice and integration analysis, based on the work in International Energy Agency IEA WIND Task 25 on Large-scale Wind Integration. The paper concludes with an assessment of the common themes and important differences, along with recent emerging trends.

17 WIND ENERGY↗

Benchmarking Wind Power Operating Costs in the United States: Results from a Survey of Wind Industry Experts

This paper draws on a survey of wind industry professionals to clarify trends in the operational expenditures (OpEx) of U.S. land-based wind power plants. The paper also highlights key drivers of those trends. We find that average all-in lifetime OpEx has declined from approximately $\$$80/kW-yr ($\$$35/MWh) for projects built in the late 1990s to a level that is approaching $\$$40/kW-yr ($\$$11/MWh) for projects under construction in 2018. Turbine operations and maintenance (O&M) costs—inclusive of scheduled and unscheduled maintenance—represent the single largest component of overall OpEx and the primary source of cost reductions over the last decade. We observe wide ranges of OpEx over time; for example, survey respondents cite a range in average expected costs for projects commissioned between 2015 and 2018 from $\$$33/kW-yr to $\$$59/kW-yr. Notably, these broad ranges include high levels of variability in both turbine O&M costs and non-turbine OpEx. Potential technical and strategic drivers of this variability are highlighted. We also use historical OpEx learning rates, showing a 9% OpEx reduction for each doubling of global installed wind capacity, to project a further $\$$5–$\$$8/kW-yr (12%–18%) OpEx reduction from 2018 to 2040. When compared with the broader literature, these findings suggest that continued OpEx reductions may contribute 10% or more of the expected reductions in land-based wind’s levelized cost of energy. Moreover, these estimates may understate the importance of OpEx owing to the multiplicative effects through which operational advancements influence not only O&M costs but also component reliability, performance, and plant-level availability—thereby affecting levelized costs though OpEx reduction and by enhancing annual energy production and plant lifetimes. Given the limited quantity and comparability of previously available OpEx data, the data and trends reported here may usefully inform OpEx assumptions used by electric system planners, analysts, modelers, and research and development managers. The results may also provide useful benchmarks to the wind industry, helping developers and asset owners compare their OpEx expectations with historical experience and other industry projections.

17 WIND ENERGY↗

Wind Power Curve Modeling in Simple and Complex Terrain

Our previous work on wind power curve modeling using statistical models focused on a location with a moderately complex terrain in the Altamont Pass region in northern California (CA). The work described here is the follow-up to that work, but at a location with a simple terrain in northern Oklahoma (OK). The goal of the present analysis was to determine the gain in predictive ability afforded by adding information beyond the hub-height wind speed, such as wind speeds at other heights, as well as other atmospheric variables, to the power prediction model at this new location and compare the results to those obtained at the CA site in the previous study. While we reach some of the same conclusions at both sites, many results reported for the CA site do not hold at the OK site. In particular, using the entire vertical profile of wind speeds improves the accuracy of wind power prediction relative to using the hub-height wind speed alone at both sites. However, in contrast to the CA site, the rotor equivalent wind speed (REWS) performs almost as well as the entire profile at the OK site. Another difference is that at the CA site, adding wind veer as a predictor significantly improved the power prediction accuracy. The same was true for that site when air density was added to the model separately instead of using the standard air density adjustment. At the OK site, these additional variables result in no significant benefit for the prediction accuracy.

17 WIND ENERGY↗