Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Transportation and logistics”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Port Authority of New York and New Jersey Sustainable Aviation Fuel Logistics and Production Study

The Port Authority of New York and New Jersey (PANYNJ) sustainability commitment is to meet the goals set by the Paris Agreement, with an interim greenhouse gas reduction target of 35% by 2025 and 80% by 2050. PANYNJ is seeking sustainable solutions to reduce carbon emissions for all public forms of transportation, including aviation. Similarly, the global aviation industry adopted the Carbon Offsetting and Reduction Scheme for International Aviation (CORSIA), which seeks to cap net carbon dioxide (CO 2 ) aviation emissions at 2020 levels through 2035. Industry has also set a goal of reducing CO 2 emissions by 50% compared to 2005 levels by 2050. Sustainable aviation fuel (SAF), made from non-petroleum feedstocks, is a near-term alternative fuel that reduces emissions from air transportation. The National Renewable Energy Laboratory (NREL) conducted a resource assessment and a techno-economic analysis to identify the potential for production in the port district. Although SAF could be sourced from other areas of the United States or imported, an evaluation of local production was conducted due to the potential positive impacts of a circular economy by converting local waste feedstocks into SAF for use at nearby airports. The study found that the highest volumes of feedstock nearby were municipal solid waste and woody biomass. SAF must be blended with Jet A up to certain percent determined by ASTM International fuel quality standards prior to use in aircraft. SAF from a stand-alone facility could be delivered by barge, rail, or truck to a Linden, New Jersey based terminal for blending with Jet A or it could be blended in the Gulf region and shipped via the Colonial pipeline to one of the terminals. The investment will take place at the terminal(s) to accommodate SAF/Jet A blends and it will be business as usual for the airports in how they receive fuel and distribute it to aircraft.

09 BIOMASS FUELS↗

NASA Ares I Crew Launch Vehicle Upper Stage Overview

By incorporating rigorous engineering practices, innovative manufacturing processes and test techniques, a unique multi-center government/contractor partnership, and a clean-sheet design developed around the primary requirements for the International Space Station (ISS) and Lunar missions, the Upper Stage Element of NASA's Crew Launch Vehicle (CLV), the "Ares I," is a vital part of the Constellation Program's transportation system. Constellation's exploration missions will include Ares I and Ares V launch vehicles required to place crew and cargo in low-Earth orbit (LEO), crew and cargo transportation systems required for human space travel, and transportation systems and scientific equipment required for human exploration of the Moon and Mars. Early Ares I configurations will support ISS re-supply missions. A self-supporting cylindrical structure, the Ares I Upper Stage will be approximately 84' long and 18' in diameter. The Upper Stage Element is being designed for increased supportability and increased reliability to meet human-rating requirements imposed by NASA standards. The design also incorporates state-of-the-art materials, hardware, design, and integrated logistics planning, thus facilitating a supportable, reliable, and operable system. With NASA retiring the Space Shuttle fleet in 2010, the success of the Ares I Project is essential to America's continued leadership in space. The first Ares I test flight, called Ares 1-X, is scheduled for 2009. Subsequent test flights will continue thereafter, with the first crewed flight of the Crew Exploration Vehicle (CEV), "Orion," planned for no later than 2015. Crew transportation to the ISS will follow within the same decade, and the first Lunar excursion is scheduled for the 2020 timeframe.

Davis, Daniel J.↗

NASA Ares I Crew Launch Vehicle Upper Stage Overview

By incorporating rigorous engineering practices, innovative manufacturing processes and test techniques, a unique multi-center government/contractor partnership, and a clean-sheet design developed around the primary requirements for the International Space Station (ISS) and Lunar missions, the Upper Stage Element of NASA's Crew Launch Vehicle (CLV), the "Ares I," is a vital part of the Constellation Program's transportation system. Constellation's exploration missions will include Ares I and Ares V launch vehicles required to place crew and cargo in low-Earth orbit (LEO), crew and cargo transportation systems required for human space travel, and transportation systems and scientific equipment required for human exploration of the Moon and Mars. Early Ares I configurations will support ISS re-supply missions. A self-supporting cylindrical structure, the Ares I Upper Stage will be approximately 84' long and 18' in diameter. The Upper Stage Element is being designed for increased supportability and increased reliability to meet human-rating requirements imposed by NASA standards. The design also incorporates state-of-the-art materials, hardware, design, and integrated logistics planning, thus facilitating a supportable, reliable, and operable system. With NASA retiring the Space Shuttle fleet in 2010, the success of the Ares I Project is essential to America's continued leadership in space. The first Ares I test flight, called Ares I-X, is scheduled for 2009. Subsequent test flights will continue thereafter, with the first crewed flight of the Crew Exploration Vehicle (CEV), "Orion," planned for no later than 2015. Crew transportation to the ISS will follow within the same decade, and the first Lunar excursion is scheduled for the 2020 timeframe.

McArthur, J. Craig↗

Capacitated p -hub approach for park-and-ride facility location problem under nested logit demand function: polyhedral approaches

By generalizing the unconstrained p-hub approach for the park-and-ride (P&R) facility location problem under the multinomial logit demand function, the capacitated p-hub approach for the problem under the nested logit demand function captures a broader range of real-world cases. To solve this problem optimally, we introduce a mixed-integer linear program and accelerate its solution by enhancing the branch-and-cut procedure. To address the problem at a large scale, we introduce two other polyhedral approaches: variable neighborhood search (VNS) and adaptive randomized rounding (ARR). Downtown areas in Seoul have a high modal share of public transportation and congested road traffic, yet P&R has not been widely implemented. Therefore, we apply the ARR procedure to solve a real-world problem using traffic and geographic data from the Seoul metropolitan area. ARR performs better than VNS and addresses real-world cases. The solutions obtained by ARR present a phased expansion plan that encourages policymakers to start installing a small number of P&Rs immediately.

Capacitated p-hub approach↗

Techno‐economic assessment of single‐stream feedstock logistics supply chain for corn stover and grain

Abstract The state‐of‐technology for corn stover harvest is a multi‐pass system that collects the stover after grain harvest. An alternative is a single‐stream system where the grain and stover are harvested as a bulk material co‐stored and preserved by anerobic fermentation, and finally, co‐transported to a biorefinery. In the present work, four single‐pass whole‐plant bulk systems were compared with a conventional multi‐pass bale system. The single‐stream systems consisted of the harvest of corn grain and a portion of the stover fraction. Four machine configurations were simulated. This work predicted that a multi‐pass bale system would result in a material cost of 111.80 $2021 Mg –1 stover DM delivered to the biorefinery gate. Alternatively, the lowest cost single‐stream system was the self‐propelled forage harvester (SPFH) configured with the whole‐plant header, which delivered feedstock for 74.76 $2021 Mg stover DM –1 . In addition to machine configuration, a sensitivity analysis was performed to understand important drivers of feedstock cost. These analyses revealed that feedstock cost increased with moisture content, fertilizer price, and biorefinery size, and decreased with harvest season length, crop yield, and grower participation. This work demonstrated that single‐stream systems could reduce corn stover feedstock costs in comparison with state‐of‐technology systems. © 2022 The Authors. Biofuels, Bioproducts and Biorefining published by Society of Industrial Chemistry and John Wiley & Sons Ltd.

09 BIOMASS FUELS↗

Woody Feedstock 2022 State of Technology Report

The U.S. Department of Energy promotes production of advanced liquid transportation fuels from lignocellulosic biomass by funding fundamental and applied research that advances the state of technology (SOT). As part of its involvement in this mission, Idaho National Laboratory completes an annual SOT report for n th -plant and 1 st -plant woody biomass feedstock logistics. The purpose of the SOT is to provide the status of feedstock supply system technology development for woody biomass to biofuels relative to technical targets and cost goals from specific design cases, based on data and experimental results. Conventional feedstock supply systems need to be modified to meet the demands of conversion pathways, specifically to have the ability to adjust the quality of the raw biomass materials. Advanced systems incorporate innovative methods of material handling, preprocessing and supply chain configuration. In advanced designs, variability of the raw biomass can be reduced to produce feedstocks of a uniform format, moving toward biomass commoditization. Against this backdrop, the 2022 Woody SOT for low-ash woody feedstocks utilizes feedstock fractionation by incorporating technologies that can separate the biomass into its anatomical fractions (wood, bark, needle, and extrinsic ash) to reduce impurities and attempt to maximize the retention of usable fractions that satisfy downstream quality considerations. By using a series of air classification steps, this strategy can reduce the extrinsic ash in forest residues, separate out a majority of the incoming needles (which can be supplied to alternate markets), and maximize the retention of whitewood in the usable fraction. The fractionated forest residues are then mixed with clean-pine chips in a 50-50 blend to prepare the feedstock for the desired conversion pathway. The n th -plant analysis estimated the delivered cost for the feedstock at $\$$69.23/dry ton (2016$\$$) which represents a $\$$6.64/dry ton decrease compared to the cost estimate of the 2021 Woody SOT supply system for low-ash woody feedstocks. The quality requirements in the 2022 Woody SOT were identical to those of the 2021 Woody SOT at = 1.00 wt % ash and = 50.51 wt% carbon. The cost savings derive primarily from reductions in dry matter losses during air classification. The GHG emissions for the n th -plant analysis were estimated at 178.39 kg CO2e/dry ton compared to 178.71 kg CO 2 e/dry ton in the 2021 Woody SOT, a decrease of 0.32 kg CO2e/dry ton. The small change stems from an increase in emissions attributed to preprocessing and slightly larger savings in emissions from transportation. In the 1 st -plant analysis of the 2022 Woody SOT system, the average throughput was estimated to be approximately 2,128 dry tons/day or 96.51% of the name plate capacity. During the simulation the daily throughput ranged from 1,090 dry tons/day to 2,200 dry tons/day, or 49.43% to 99.75% of the daily nameplate capacity. After the year of operation 722,403 tons of processed feedstock were produced in total without regard to quality considerations (99.64% of the annual nameplate capacity). The variability in throughput was primarily caused by equipment failures in the system. Regular failures, downtime caused by routine maintenance per manufacturer guidelines, contributed to a majority 62.50% of failures and 62.60% of downtime. Failures due to wear were the other cause of disruption within the system, impacting the rotary shear and orbital screen and accounting for 37.50% of the failures and 37.40% of the total downtime. Ultimately the system was on stream for 87.84% during the simulation period, which is only 2.16 percentage points below the nth-plant assumption for on-stream time. The production cost of the system averaged $\$$71.66/dry ton. The costs ranged from a minimum of $\$$71.23/dry ton to a maximum of $\$$2,115.30/dry ton. When dry matter losses (disposed low-quality fractions as well as other losses such as in grinders) were considered the costs increased to an average of $\$$75.11/dry ton with a minimum of $\$$74.69/dry ton and a maximum of $\$$2,136.86/dry ton...

09 BIOMASS FUELS↗

Spatial Optimization of Multiscale Biorefinery Deployment for a Diversified Bioeconomy in the United States

Strategic biorefinery siting is critical for a diversified bioeconomy, yet industry, policy, and research often focus on either large-scale biofuel plants or smaller-scale specialty bioproduct facilities, with limited coordination across scales. We address this gap by modeling biorefinery deployment spanning a 28-fold difference in capacity. We developed an open-source, spatially explicit framework integrating techno-economic analysis with logistics and refinery cost surrogate models to evaluate multiscale miscanthus-derived biorefineries across the rainfed U.S. for the production of ethanol, succinic acid, lactic acid, potassium sorbate, and acrylic acid. Overall costs change little as feedstock density increases, while transport distances decrease by ∼30 to 67% (∼100 km) and siting flexibility improves. Specifically, a 5-fold feedstock density increase (2% to 10% of suitable land) reduces minimum selling prices by <10% (e.g., 0.27 USD·gal –1 for ethanol). This limited economic sensitivity suggests dense planting is not required for competitive deployment, particularly for smaller-scale facilities. Representing collection areas as irregular rather than circular expands the feasible space under low-density scenarios. While large-scale refineries anchor regional supply chains, smaller facilities retain spatial flexibility even when large refineries are established. These findings highlight the importance of spatial representation and multiscale coordination for robust, regionally tailored biomanufacturing networks to advance renewable carbon integration without extensive land conversion.

biorefinery siting↗

Woody Feedstocks 2019 State of Technology Report

The U.S. Department of Energy promotes production of advanced liquid transportation fuels from lignocellulosic biomass by funding fundamental and applied research that advances the state of technology (SOT). As part of its involvement with this overall mission, Idaho National Laboratory completes annual SOT reports for nth-plant biomass feedstock logistics. The purpose of the SOTs is to provide the status of feedstock supply system technology development for biomass to biofuels, based on actual data and experimental results relative to technical targets and cost goals from specific design cases. The 2019 Woody Feedstock SOT presents the State of Technology for feedstock supply to three individual thermochemical conversion pathways that utilize woody feedstocks: Indirect Liquefaction (IDL), Catalytic Fast Pyrolysis (CFP), and Algal-blend Hydrothermal liquefaction (AHTL). The 2019 reactor throat delivered feedstock costs were found to be $63.54/dry ton, $70.15/dry ton and $70.31/dry ton, respectively (2016$).

09 BIOMASS FUELS↗

Woody Feedstocks 2020 State of Technology Report

The U.S. Department of Energy promotes production of advanced liquid transportation fuels from lignocellulosic biomass by funding fundamental and applied research that advances the state of technology (SOT). As part of its involvement with this overall mission, Idaho National Laboratory completes annual SOT reports for nth-plant biomass feedstock logistics. The purpose of the SOTs is to provide the status of feedstock supply system technology development for biomass to biofuels, based on actual data and experimental results relative to technical targets and cost goals from specific design cases. The 2020 Woody Feedstock SOT is separated into three separate pathways that utilize woody feedstocks: indirect liquefaction (IDL), catalytic fast pyrolysis (CFP), and algal-blend hydrothermal liquefaction (AHTL).

09 BIOMASS FUELS↗

Woody Feedstocks 2021 State of Technology Report

The U.S. Department of Energy promotes production of advanced liquid transportation fuels from lignocellulosic biomass by funding fundamental and applied research that advances the state of technology (SOT). As part of its involvement with this overall mission, Idaho National Laboratory completes annual SOT reports for n th -plant biomass feedstock logistics. The purpose of the SOTs is to provide the status of feedstock supply system technology development for biomass to biofuels, based on actual data and experimental results relative to technical targets and cost goals from specific design cases.

09 BIOMASS FUELS↗

Lunar Base Construction Planning

Previous lunar missions and campaigns have been restricted to using robotic landers and lunar orbiting satellites as well as sortie type of operations using astronaut crews(NASA Apollo program).Now, the next phase of lunar exploration has begun under NASA’s Artemis program and there has been an international response where other nations such as China, Russia, India, Canada, Japan and theEuropean Union of nations, have all expressed interest in either collaborating or competing with NASA on theMoon. This next phase has an overarching goal of achieving a permanent human presence on theMoon via sustainable methods. A lunar base with human occupancy will require infrastructure to provide shelter, utilities, landing/launch pads, roads, communications, power and all the other necessities to sustain human life and protect equipment.Since human biology is not well suited for surviving in the lunar environment, there will be many forms of automated equipment, autonomy and robotic helpers that will minimize the amount of Extra-Vehicular Activity(EVA) required by the crew. This will mean that the radiation dosage received by the crew will stay within acceptable and safe career doses. Radiation shielding via the use of regolith can also mitigate radiation dangers.The required infrastructure must be constructed, but the mass and logistics of bringing all the construction materials from Earth are prohibitive, which makes the necessary construction difficult to achieve.In-Situ Resource Utilization (ISRU) aims to solve this challenge by sourcing construction materials locally or “in-situ”. This means that their transportation can be completely eliminated, resulting in large cost savings by avoiding the launch out of Earth’s deep gravity well and subsequent trans lunar injection, lunar orbit capture and landing. This paper will give ahistorical review and current status of lunar construction planning and a high level introduction to the required infrastructure and construction equipment that will be required to robotically build a lunar base using in-situ resources.It will also organize these tasks into logical groupings so that technology development and implementation can be pursued within a framework that can be referenced by all involved.

Lunar↗

Herbaceous Feedstock 2022 State of Technology Report

The U.S. Department of Energy promotes production of advanced liquid transportation fuels from lignocellulosic biomass by funding fundamental and applied research that advances the state of technology (SOT). As part of its involvement in this mission, Idaho National Laboratory completes an annual SOT report for nth-plant and 1st-plant herbaceous biomass feedstock logistics. The purpose of the SOT is to provide the status of feedstock supply system technology development for herbaceous biomass to biofuels relative to technical targets and cost goals from specific design cases, based on data and experimental results. Although conventional feedstock supply systems form the backbone of the emerging biofuels industry, they have limitations that restrict widespread implementation on a national scale. To meet the demands of the future industry, the feedstock supply system must shift from the conventional system to what has been termed “advanced” supply systems. In advanced designs, a distributed network of aggregation and processing centers, termed “depots,” are employed near the points of biomass production (i.e., the field or forest) to reduce feedstock variability and produce feedstocks of a uniform format, moving toward biomass commoditization. The 2022 Herbaceous SOT is part of a vision of achieving an implemented advanced feedstock supply system, which produces a stable, tradable commodity at the decentralized distributed depot. It utilizes feedstock fractionation by incorporating technologies that can separate the biomass into its anatomical fractions (leaves, husks, stems and cobs) to reduce impurities and produce fractions that satisfy downstream quality considerations. By using a series of air classification steps, this strategy can reduce the extrinsic ash in corn stover and produce enriched tissue fractions that can be blended to a conversion specification or converted individually in optimized biochemical conversion campaigns. Additionally, a majority of the leaves (which do not meet the quality specification) are separated out early and can be supplied to alternate markets. The 2022 Herbaceous SOT incorporates an advanced biomass fractionation and processing system to produce pellets enriched tissues from three-pass corn stover. The resulting enriched pellets are delivered to the biorefinery individually where they can be blended to a specification or converted in campaigns where the conditions are optimized for each tissue. Unused fractions can be sent to a a midstream market or to a different conversion process that is better suited to their properties to offset the cost of the delivered feedstock. The main benefits from the proposed system can be summarized as: (1) $6.86/dry ton (2016$) lower cost for the air classification due to elimination of the requirement to discard the high ash lights fraction; (2) $1.56/dry ton lower delivered cost by selling the unsuitable leaf fraction into the feed market as a midstream co-product (assuming a selling price that is 11% higher than their cost of production); (3) 0.98% increase in carbohydrate content (from 60.16% to 61.14%); and (4) 0.97% decrease in ash content (from 6.00% to 5.03%) compared to the 2021 Herbaceous SOT. Overall, the 2022 nth-plant Herbaceous SOT predicts a modeled delivered feedstock cost of $78.64/dry ton (2016$) if it is assumed that the enriched leaf fraction is sold at its production cost; this is a slight increase of $0.43/dry ton increase from the 2021 Herbaceous SOT nth-Supply case cost. The increased cost derived from a $0.38/dry ton increase in transportation and handling cost to procure more biomass (to replace the enriched leaf fraction that was not delivered to the biorefinery. The total preprocessing cost was $0.27/dry ton higher than the 2021 result because of updates to energy consumption, purchasing price and dry matter loss data for the rotary shear ($3.00/dry ton increase) and the pelleting mill ($4.52/dry ton increase). The data utilized were generated in pilot-scale tests in the Biomass Feedstock National User Facility (BFNUF) at INL and at Forest Concepts, including tests for rotary shear and pelleting of the air classified fractions. A greenhouse gas emissions analysis was performed by Argonne National Laboratory using the most up to date version of the Greenhouse Gases, Regulated Emissions, and Energy use in Transportation model (GREET®). The analysis showed an increase of 17.34 kg CO2e/dry ton from the 2021 SOT (67.71 kg CO2e/ton in the 2021 Herbaceous SOT to 85.05 kg CO2e/ton in the 2022 Herbaceous SOT). The net increase is primarily attributed to increased energy consumption in pelleting mill.

09 BIOMASS FUELS↗

A User-Centered Design Exploration of Factors That Influence the Rideshare Experience

The rise of real-time information communication through smartphones and wireless networks enabled the growth of ridesharing services. While personal rideshare services (individuals riding alone or with acquaintances) initially dominated the market, the popularity of pooled ridesharing (individuals sharing rides with people they do not know) has grown globally. However, pooled ridesharing remains less common in the U.S., where personal vehicle usage is still the norm. Vehicle design and rideshare services may need to be tailored to user preferences to increase pooled rideshare adoption. Based on a large, national U.S. survey (N = 5385), the results of exploratory and confirmatory factor analyses suggested that four key factors influence riders’ willingness to consider pooled ridesharing: comfort/ease of use, convenience, vehicle technology/accessibility, and passenger safety. A binomial logistic regression was conducted to determine how the four factors influence one’s willingness to consider pooled ridesharing. The two factors that positively influence riders’ willingness to consider pooled ridesharing are vehicle technology/accessibility (B = 1.10) and convenience (B = 0.94), while lack of passenger safety (B = –0.63) and comfort/ease of use (B = –0.17) are pooled ridesharing deterrents. Understanding user-centered design and service factors are critical to increase the use of pooled ridesharing services in the future.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Lunar Base Construction Overview

Previous lunar missions and campaigns have been restricted to using robotic landers and lunar orbiting satellites as well as sortie type of operations using astronaut crews (NASA Apollo program). The next phase of lunar exploration has begun under NASA’s Artemis program and there has been an international response where other nations such as China, Russia, India, Canada, Japan and the European Union of nations, have all expressed interest in either collaborating or competing with NASA on the Moon. This next phase has an over arching goal of achieving a permanent human presence on the Moon via sustainable methods. A lunar base with human occupancy will require infrastructure to provide shelter, utilities, landing/launch pads, roads, communications, power and all the other necessities to sustain human life and protect equipment. Since human biology is not well suited for surviving in the lunar environment, there will be many forms of automated equipment, autonomy and robotic helpers that will minimize the amount of Extra-Vehicular Activity (EVA) required by the crew. This will mean that the radiation dosage received by the crew will stay within acceptable and safe career doses. The required infrastructure must be constructed, but the mass and logistics of bringing all the construction materials from Earth are prohibitive, which makes the necessary construction difficult to achieve. In-Situ Resource Utilization (ISRU) aims to solve this challenge by sourcing construction materials locally or “in-situ”. This means that their transportation can be completely eliminated, resulting in large cost savings by avoiding the launch out of Earth’s deep gravity well and subsequent trans lunar injection, lunar orbit capture and landing. This paper will give an overview of the required construction tasks and related equipment that will be required to robotically build a lunar base using in-situ resources. It will also organize these tasks into logical groupings so that technology development and implementation can be pursued within a framework that can be referenced by all involved.

Construction↗

Lunar Base Construction Overview

Previous lunar missions and campaigns have been restricted to using robotic landers and lunar orbiting satellites as well as sortie type of operations using astronaut crews (NASA Apollo program). Now, the next phase of lunar exploration has begun under NASA’s Artemis program and there has been an international response where other nations such as China, Russia, India, Canada, Japan and the European Union of nations, have all expressed interest in either collaborating or competing with NASA on the Moon. This next phase has an over arching goal of achieving a permanent human presence on the Moon via sustainable methods. A lunar base with human occupancy will require infrastructure to provide shelter, utilities, landing/launch pads, roads, communications, power and all the other necessities to sustain human life and protect equipment. Since human biology is not well suited for surviving in the lunar environment, there will be many forms of automated equipment, autonomy and robotic helpers that will minimize the amount of Extra-Vehicular Activity (EVA) required by the crew. This will mean that the radiation dosage received by the crew will stay within acceptable and safe career doses. Radiation shielding via the use of regolith can also mitigate radiation dangers. The required infrastructure must be constructed, but the mass and logistics of bringing all the construction materials from Earth are prohibitive, which makes the necessary construction difficult to achieve. In-Situ Resource Utilization (ISRU) aims to solve this challenge by sourcing construction materials locally or “in-situ”. This means that their transportation can be completely eliminated, resulting in large cost savings by avoiding the launch out of Earth’s deep gravity well and subsequent trans lunar injection, lunar orbit capture and landing. This paper will give an overview of the required construction tasks and related equipment that will be required to robotically build a lunar base using in-situ resources. It will also organize these tasks into logical groupings so that technology development and implementation can be pursued within a framework that can be referenced by all involved.

Lunar Base↗

Clearance Analysis of CTC2 (on ELC4) to S-TRRJ HRS Radiator Rotation Envelope

In response to the planned retirement of the Space Shuttle Program, International Space Station (ISS) management began stockpiling spare parts on the ISS. Many of the larger orbital replacement units were stored on the Expedite the Processing of Experiments to Space Station (EXPRESS) Logistics Carriers (ELCs) mounted on the end of the S3 and P3 truss segments, immediately outboard of the Thermal Radiator Rotary Joints (TRRJs) and their attached radiators. In an August 2009 computer-aided design (CAD) assessment, it was determined that mounting the Cargo Transport Container (CTC) 2 on the inboard face of ELC4 as planned would create insufficient clearance between the CTC2 and the rotational envelope of the radiators when the TRRJs were rotated to a gamma angle of 35.0 degrees. The true clearance would depend on how the Unpressurized Cargo Carrier Attachment System (UCCAS) was mounted to the S3 truss and how the ELC4 was attached to it. If the plane of the UCCAS attachment points were tilted even slightly inboard, it would significantly change the clearance between CTC2 and the Starboard TRRJ (S-TRRJ) radiators. Additionally, since CTC2 would be covered in multilayer insulation (MLI), the true outer profile of CTC2 was not captured in the CAD models used for the clearance assessment. It was possible that, even if the S-TRRJ radiators cleared CTC2, they could snag the MLI covering. In the fall of 2010, the Image Science and Analysis Group (ISAG) was asked to perform an on-orbit clearance analysis to determine the location of CTC2 on ELC4 and the S-TRRJ radiators at the angle of closest approach so that a positive clearance could be assured. To provide the measurements as quickly as possible to aid in the assessment, it was decided that the clearance analysis would be broken into two phases. Phase I: The location and orientation of the UCCAS fittings, which support and hold the ELC4 in place, would be measured relative to the ISS Analytical Coordinate System (ISSACS) as defined by nine preexisting Space Vision System (SVS) targets affixed to the forward/zenith side of the S1 and S3 truss segments. The location of the outboard edge of the S-TRRJ radiator would also be measured when positioned at the angle of closest approach to CTC2 (gamma = 35.0 degrees). This data would allow the Digital Pre-Assembly Group to predict how the ELC4 would sit on the UCCAS and how that would translate into the clearance between CTC2 and the S-TRRJ radiators. Phase II: After the ELC4 was delivered and installed into the UCCAS, the position of the CTC2 mounting plate on the inboard face of ELC4, would be measured in the ISSACS coordinate system relative to the SVS control points used in Phase I. Although CTC2 would not yet be mounted on ELC4, the working envelope of CTC2 could be mathematically added to the measured position of ELC4 to produce a best estimate for CTC2's mounted location. Comparing CTC2's best estimated location to the S-TRRJ radiator (measured in Phase I); relative to the ISSACS coordinate system, would provide a direct measurement of the expected clearance. Due to the impending delivery of ELC4 (scheduled for January 2011), planning for the Phase I clearance analysis began immediately. Using the Dynamic Onboard Ubiquitous Graphics (DOUG) program, ISAG designed a way to acquire images of the SVS control points on truss segments S1 and S3, the aft facing edge of the S-TRRJ Heat Rejection Subsystem (HRS) radiator, and the three UCCAS latch mechanisms mounted on the zenith face of the S3 truss using the Space Station Remote Manipulator System (SSRMS). To minimize the number of SSRMS movements, the Special Purpose Dexterous Manipulator (SPDM) would be attached to the SSRMS. This would make it possible to park the SPDM in one position and acquire multiple images by changing the viewing orientation of the SPDM body cameras using the pan/tilt units on which they are mounted. Using this implementation concept, ISAG identified four SSRMS/SPDM positions from which the majority of the needed imagery could be acquired. Five additional images would be acquired using the CP-3 external ISS camera mounted on the S1 truss immediately inboard of ELC4. Based on a photogrammetric simulation, it was estimated that the measured location of the HRS radiator and UCCAS latch points would be accurate to about 0.3 in. in each of the three axes relative to ISSACS. Working with ROBO, ISAG collected 78 images of the ISS December 29, 2010. From this imagery, the best 40 were selected for use in the analysis process. The images were radiometrically enhanced to improve color and contrast and loaded into the FotoG analysis software along with the camera parameters and control data, which consisted of the coordinates for the nine SVS targets on the S1 and S3 trusses in the ISSACS coordinate system.

Liddle, Donn↗

NASA Plans for In Situ Resource Utilization (ISRU) Development, Demonstration, and Implementation

The United States (US) National Aeronautics and Space Administration’s (NASA) Artemis Moon to Mars program has four major goals: (1) Returning Americans to the Moon: 1st Woman & 1st Person of Color, (2) Learning to live and work on the Moon, (3) Translating lessons learned so that the United States has capabilities and operational experience for a mission to Mars, and (4) Inspires the next generation of explorers, researchers, scientists, and engineers worldwide. Overarching all of this, the NASA Artemis program also continues to follow Space Policy Directive One (SPD-1) which directs the US to lead an innovative and sustainable exploration program with commercial and international partners. A major objective to achieve the Artemis program goals and SPD-1 is to understand and characterize the resources that exist at these destinations, and to learn how to utilize these resources for sustained human exploration and the commercialization of space. This ability, commonly known as In Situ Resource Utilization (ISRU), involves any hardware or operation that harnesses and utilizes local resources to create products and services for robotic and human explo-ration. The NASA ISRU program is focused on the production of mission consumables and com-modities to enable sustained human exploration, such as rocket propellants, life support consuma-bles, fuel cell reactants, feedstock for manufacturing and construction, and nutrients for food and plant growth. In particular, propellants make up a significant fraction of the mass launched from Earth, are critical to mission success, and can reduce the cost for reusable transportation. Important for enabling long term surface stays, greater independence from Earth, and growing lunar infra-structure are the abilities to perform construction and manufacturing from in situ-derived metals and materials to create and expand on the infrastructure and reduce the logistical resupply needed for sustained surface and space operations. To achieve these ISRU capabilities, NASA, in partner-ship with industry, academia, and international partners has initiated a multi-faceted program which involves (i) Determining Customer Needs (Type and Quantity of Commodities), (ii) supporting ground Development of Hardware and Systems until Ready for Lunar Flight, (iii) utilize Commer-cial Lunar Payload Services (CLPS) flights to fly resource assessment missions with the Science Mission Directorate (SMD), and public-private partnership (PPP) ISRU demonstrations of critical technologies and processes, and (iv) performing commercial-led end-to-end ‘Pilot’ Plant production of commodities and demonstration of usage at a scale and duration that minimizes or eliminates risk for full implementation of ISRU-derived commodities in mission critical applications. This paper will discuss the technologies, mission studies, and accomplishments achieved to date for the ISRU multi-faceted program, and plans for continued ground development and flight missions to reduce the risk of full ISRU implementation.

In situ resource utilization↗

Hydrogen and Electric Charging Infrastructure for Heavy-Duty Trucks: A Nationally Scalable Megaregion Assessment

Decarbonizing regional and long-haul freight is challenging due to the limitations of battery-electric commercial vehicles and infrastructure constraints. Hydrogen fuel cell medium- and heavy-duty vehicles (MHDVs) offer a viable alternative, aligning with the decarbonization goals of the Department of Energy and commercial entities. Historically, alternative fuels like compressed natural gas and liquefied propane gas have faced slow adoption due to barriers like infrastructure availability. To avoid similar issues, effective planning and deploying zero-emission hydrogen fueling infrastructure is crucial. This research develops deployment plans for affordable, accessible, and sustainable hydrogen refueling stations, supporting stakeholders in the decarbonized commercial vehicle freight system. It aims to benefit underserved and rural energy-stressed communities by improving air quality, reducing noise pollution, and enhancing energy resiliency. This research also provides a blueprint for replacing diesel in over-the-road Class 8 freight truck applications with hydrogen fueling solutions. The study focuses on the Texas Triangle Megaregion (I-45, I-35, and I-10), the I-10 corridor between San Antonio, TX, and Los Angeles, CA, and the I-5/CA-99 corridors between Los Angeles, CA, and San Francisco, CA. This area represents a significant portion of U.S. heavy-duty freight movement, carrying ~8.5% of the national freight volume. Using the OR-AGENT (Optimal Regional Architecture Generation for Efficient National Transport) modeling framework, the study conducts an advanced assessment of commercial vehicles, road and freight networks, and energy systems. The framework integrates data on freight mobility, traffic, weather, and energy pathways to deliver a region-specific, optimized vehicles powertrain architectures, infrastructure deployment solutions, operational logistics, and energy pathways. By considering all vehicle origin-destination pairs utilizing these corridors and all feasible fueling station location options, the framework's genetic algorithm identifies the minimum number and optimal locations of hydrogen refueling stations, ensuring no vehicle is stranded. It also determines fuel schedules and quantities at each station. A roadmap for station deployment based on multiple adoption trajectories ensures a strategic rollout of hydrogen refueling infrastructure.

Sujan, Vivek [ORNL] (ORCID:0000000269882342)↗