Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Transmission Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

EMT Models to Evaluate Traveling Wave-Based Protection in Distribution System

The distribution system is going through significant changes. One of them is the high penetration of inverter-based distributed energy resources in the distribution system. Due to this high penetration, there is a need for a better protection system. Multiple organizations are working on creating novel protection techniques for distribution systems with high penetration of inverter-based DERs. One such innovative method is the use of traveling waves to detect and locate faults. Transmission system protection utilizes this approach, and commercial solutions exist for the transmission system. Using this approach in the distribution system is not straightforward and presents some challenges for implementation. This presentation will discuss the need for using wide-band models to model the traveling wave phenomenon in the distribution system.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Leveraging PMU for Protection and Control

This presentation discusses the application of synchronized measurement in transmission system protection. The proposed wide area system protection (WASP) scheme uses PMU data to perform zonal current differential protection for the whole transmission system with high IBR penetration. This novel protection concept uses synchronized measurement, which is one of the key tasks proposed in the award DE-EE0010655.

14 SOLAR ENERGY↗

Visualizing Fault Induced Traveling Waves In Medium Voltage Systems

Traveling waves are induced in power systems during most transient events in the grid. These waves travel close to the speed of light in overhead lines and 50% to 60% the speed of light in underground cables. Even though traveling wave-based protection schemes for transmission systems are available commercially, traveling waves in medium voltage distribution networks are still in research space. Compared to transmission system, medium voltage distribution systems contain more reflections and refractions. Thus, visualization is challenging and is critical in locating faults in distribution network. To address this visualization challenge, this paper presents an open-source tool to visualize the traveling waves using Bewley lattice approach. The developed visualization tool will be useful for the protection engineers to detect and triangulate fault locations in the medium voltage systems and isolate the faults.

Bewley Lattice↗

Optimized Dispatch of Distributed Energy Resources for Resiliency and Power Quality Improvements at the Grid-Edge

Distributed Energy Resources (DERs) installed on low-voltage distribution systems, both utility-owned and nonutility owned may be employed to make improvements to system resiliency and power quality, in addition to simply serving load demand. By selectively dispatching active and reactive power from these existing DERs, improvements in voltage profiles and service availability during adverse events may be achieved. Further benefits can be gained by optimally choosing which DERs to dispatch power from, and the distribution of power from those DERs. For a given operating condition, using Linear Programming methods, optimal power dispatch values for individual DERs can be determined, while considering variables such as voltage gains, losses in the lines and the DERs, and DER reserve capacities. One such optimization technique is developed in this paper, and results from a real-time simulation study on a modified IEEE 13-bus distribution system with three DERs, are being presented. The operation of the optimized DER selection and dispatch algorithm is shown during normal operation of the transmission system when the DERs operate in grid-connected mode. Similar analyses can drive decision making during transmission system failure when the DERs operate in grid-forming or islanded mode.

Chowdhury, Prithwiraj Roy↗

2020 IEEE PES Innovative Smart Grid Technologies Europe (ISGT-Europe)

Recent proliferation of distributed energy sources in distribution or sub-transmission systems necessitates close monitoring of these three-phase power grids which typically operate under unbalanced loading conditions. Unlike the transmission systems where the network equations are commonly based on the positive sequence component models, a detailed three phase model will have to be used in implementing network applications for these systems. In the specific case of the state estimator, where measurement and parameter errors may bias the solution, bad data and parameter error detection algorithms should also be incorporated. Implementing the state estimator and error detection algorithms for three-phase systems impose additional computational burden and modifications to the state estimation code. This paper proposes a practical solution to avoid these issues by using synchronized phasor measurements and modal decoupling. The previously developed parameter error detection algorithm based on the normalized Lagrange multipliers (NLM) test is applied to the measurements independently in each mode in parallel, not only saving CPU time but also avoiding new code development for a three-phase estimator. Different parameter error scenarios are created and tested to verify the effectiveness of the proposed error detection approach.

Khalili, Ramtin↗

Fundamental limitations caused by RF propagation

Propagation phenomena affect the design of radio frequency (RF) transmission systems. Propagation phenomena limit the suitability of portions of the frequency band for some applications, limit the reliability of RF transmission systems, and provide a means of coupling unwanted signals from one system to another with the potential of producing interference. The possibility of interference is the fundamental limitation to the unrestricted use of the frequency band. Phenomena affecting suitability, reliability, and the potential for interference are considered for frequencies in the 1- to 300-GHz range.

Crane, R. K.↗

Analysis to Inform CA Grid Integration Rules for PV: Final Report on Inverter Settings for Transmission and Distribution System Performance

The fourth solicitation of the California Solar Initiative (CSI) Research, Development, Demonstration and Deployment (RD&D) Program established by the California Public Utilities Commission (CPUC) supported the Electric Power Research Institute (EPRI), National Renewable Energy Laboratory (NREL), and Sandia National Laboratories (SNL) with data provided from Pacific Gas and Electric (PG&E), Southern California Edison (SCE), and San Diego Gas and Electric (SDG&E) conducted research to determine optimal default settings for distributed energy resource advanced inverter controls. The inverter functions studied are aligned with those developed by the California Smart Inverter Working Group (SIWG) and those being considered by the IEEE 1547 Working Group. The advanced inverter controls examined to improve the distribution system response included power factor, volt-var, and volt-watt. The advanced inverter controls examined to improve the transmission system response included frequency and voltage ride-through as well as Dynamic Voltage Support. This CSI RD&D project accomplished the task of developing methods to derive distribution focused advanced inverter control settings, selecting a diverse set of feeders to evaluate the methods through detailed analysis, and evaluating the effectiveness of each method developed. Inverter settings focused on the transmission system performance were also evaluated and verified. Based on the findings of this work, the suggested advanced inverter settings and methods to determine settings can be used to improve the accommodation of distributed energy resources (PV specifically). The voltage impact from PV can be mitigated using power factor, volt-var, or volt-watt control, while the bulk system impact can be improved with frequency/voltage ride-through.

14 SOLAR ENERGY↗

Availability Assessment Based Case-Sensitive Power System Restoration Strategy

Increasingly frequent severe weather events in recent years threaten the security of power systems and result in major power outages throughout the world. The development of reasonable power system restoration (PSR) solutions is therefore urgently needed to speed up the recovery of the power supply while at the same time steering clear of vulnerable and risky equipment. This paper aims to develop a case-sensitive PSR model for power transmission systems that can adjust restoration solutions according to the evaluated availability of outage equipment in specific blackout scenarios and weather conditions. A novel PSR model that integrates the startup of generating units, formulation of the restoration network, renewable energy sources, and availability assessment of devices is proposed. A reformulated model is also proposed to relieve the computational burden of complex PSR problems. The availability of outage equipment is comprehensively assessed based on historical operating records, fault diagnosis results, and weather conditions. The assessed availability results are sensitive to the characteristics of real blackout cases and will support system operators generate case-sensitive PSR solutions while mitigating the vulnerable equipment. The feasibility and effectiveness of the proposed PSR model and its reformulations are verified through case studies.

availability assessment↗

Great Lakes O shore Wind Project: Utility and Regional Integration Study

This project aims to identify transmission system upgrades needed to facilitate offshore wind projects as well as operational impacts of offshore generation on operation of the regional transmission system in the Great Lakes region. A simulation model of the US Eastern Interconnection was used as the test system as a case study for investigating the impact of the integration of a 1000MW offshore wind farm operating in Lake Erie into FirstEnergy/PJM service territory. The findings of this research provide recommendations on offshore wind integration scenarios, the locations of points of interconnection, wind profile modeling and simulation, and computational methods to quantify performance, along with operating changes and equipment upgrades needed to mitigate system performance issues introduced by an offshore wind project.

17 WIND ENERGY↗

Orbital assembly and maintenance study. Executive summary

A sound, practical approach for the assembly and maintenance of very large structures in space is presented. The methods and approaches for assembling two large structures are examined. The maintenance objectives include the investigation of methods to maintain five geosynchronous satellites. The two assembly examples are a 200-meter-diameter radio astronomy telescope and a 1,000-meter-diameter microwave power transmission system. The radio astronomy telescope operates at an 8,000-mile altitude and receives RF signals from space. The microwave power transmission system is part of a solar power satellite that will be used to transmit converted solar energy to microwave ground receivers. Illustrations are included.

Gorman, D.↗

New Gear Transmission Error Measurement System Designed

The prime source of vibration and noise in a gear system is the transmission error between the meshing gears. Transmission error is caused by manufacturing inaccuracy, mounting errors, and elastic deflections under load. Gear designers often attempt to compensate for transmission error by modifying gear teeth. This is done traditionally by a rough "rule of thumb" or more recently under the guidance of an analytical code. In order for a designer to have confidence in a code, the code must be validated through experiment. NASA Glenn Research Center contracted with the Design Unit of the University of Newcastle in England for a system to measure the transmission error of spur and helical test gears in the NASA Gear Noise Rig. The new system measures transmission error optically by means of light beams directed by lenses and prisms through gratings mounted on the gear shafts. The amount of light that passes through both gratings is directly proportional to the transmission error of the gears. A photodetector circuit converts the light to an analog electrical signal. To increase accuracy and reduce "noise" due to transverse vibration, there are parallel light paths at the top and bottom of the gears. The two signals are subtracted via differential amplifiers in the electronics package. The output of the system is 40 mV/mm, giving a resolution in the time domain of better than 0.1 mm, and discrimination in the frequency domain of better than 0.01 mm. The new system will be used to validate gear analytical codes and to investigate mechanisms that produce vibration and noise in parallel axis gears.

Oswald, Fred B.↗

Remote driving with reduced bandwidth communication

Oak Ridge National Laboratory has developed a real-time video transmission system for low bandwidth remote operations. The system supports both continuous transmission of video for remote driving and progressive transmission of still images. Inherent in the system design is a spatiotemporal limitation to the effects of channel errors. The average data rate of the system is 64,000 bits/s, a compression of approximately 1000:1 for the black and white National Television Standard Code video. The image quality of the transmissions is maintained at a level that supports teleoperation of a high mobility multipurpose wheeled vehicle at speeds up to 15 mph on a moguled dirt track. Video compression is achieved by using Laplacian image pyramids and a combination of classical techniques. Certain subbands of the image pyramid are transmitted by using interframe differencing with a periodic refresh to aid in bandwidth reduction. Images are also foveated to concentrate image detail in a steerable region. The system supports dynamic video quality adjustments between frame rate, image detail, and foveation rate. A typical configuration for the system used during driving has a frame rate of 4 Hz, a compression per frame of 125:1, and a resulting latency of less than 1s.

Depiero, Frederick W.↗

Status of the design of the ITER ECE diagnostic

In this study, the baseline design for the ITER electron cyclotron emission (ECE) diagnostic has entered the detailed preliminary design phase. Two plasma views are planned, a radial view and an oblique view that is sensitive to distortions in the electron momentum distribution near the average thermal momentum. Both views provide high spatial resolution electron temperature profiles when the momentum distribution remains Maxwellian. The ECE diagnostic system consists of the front-end optics, including two 1000 K calibration sources, in equatorial port plug EP9, the 70-1000 GHz transmission system from the front-end to the diagnostics hall, and the ECE instrumentation in the diagnostics hall. The baseline ECE instrumentation will include two Michelson interferometers that can simultaneously measure ordinary and extraordinary mode ECE from 70 to 1000 GHz, and two heterodyne radiometer systems, covering 122-230 GHz and 244-355 GHz. Significant design challenges include 1) developing highly-reliable 1000 K calibration sources and the associated shutters/mirrors, 2) providing compliant couplings between the front-end optics and the polarization splitter box that accommodate displacements of the vacuum vessel during plasma operations and bake out, 3) protecting components from damage due to stray ECH radiation and other intense millimeter wave emission and 4) providing the low-loss broadband transmission system.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

An Architectural Survey of the REECo Maintenance Compound, Area 6, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to install a 26.45-mile-long 138-kilovolt (kV) transmission line on the Nevada National Security Site (NNSS) in Nye County, Nevada. This new transmission line will upgrade the electrical transmission system and provide reliable power between Mercury Switching Station in Area 23 and the U1a Facility in Area 1. The proposed upgrade to the power transmission system constitutes an undertaking subject to review under Section 106 of the National Historic Preservation Act (NHPA) (54 United States Code [USC] § 306101) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800. A portion of this new transmission line will cross the western perimeter of the Reynolds Electrical and Engineering Company (REECo) Maintenance Compound located in Area 6 of the NNSS. This compound with its trade shops, storage sheds, and yards served as a general construction facility that supported nuclear testing activities on the NNSS from 1967 to 1992. Although three architectural resources in the compound have previously been recorded and evaluated for the National Register of Historic Places (NRHP), other resources within it have not, nor has the compound been recorded and evaluated as a potential district. The State Historic Preservation Officer (SHPO) concurred with NNSA/NFO’s determination that the unevaluated REECo Maintenance Compound will be adversely affected by the proposed undertaking (Reed 2021). The NNSA/NFO, in consultation with the SHPO, then developed the Memorandum of Agreement DE-GM58-22NA25553 between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Installation of a 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility and the Removal of the Historic 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility in Areas 1, 3, 5, 6, and 23 of the Nevada National Security Site, Nye County, hereafter referred to as the MOA. This architectural survey report was prepared in accordance with MOA Stipulation III.B. It describes the origins, history, layout, and functions of the REECo Maintenance Compound during the Cold War and identifies contributing and noncontributing resources. The report defines a district boundary based on archival research and the field survey and concludes with an appendix that presents digital color images of the compound with descriptions and a map key showing image viewpoints and directions. Although none of the architectural resources are recommended individually eligible, the district evaluation concludes the REECo Maintenance Compound is eligible as a historic district for listing in the NRHP under the Secretary of the Interior’s Significance Criteria A and C at the local level. The historic district retains all seven aspects of integrity and conveys its significance under the abovementioned criteria.

138 kV↗

Enabling Principles for Dual Participation by Energy Storage as a Transmission and Market Asset

Because the electric transmission system is sized to meet the highest levels of customer demand, much of its designed capacity goes unused during average operating conditions. As a uniquely flexible and scalable asset capable of providing multiple grid services, energy storage can be deployed to support the transmission system and then also provide services to energy markets when not needed for transmission. This paper reviews the technical barriers in transmission planning practices and energy market design that prevent the realization of dual-use energy storage projects that provide both regulated transmission and competitive market services. Current practices create barriers against the identification of energy storage in the transmission planning process and against the participation of a regulated transmission asset in competitive energy markets. A review of regional transmission plans identifies best practices for including energy storage in the planning process by directing planners to proactively identify such projects or by providing clear mechanisms for stakeholders to propose them. Creating a market participation model for dual-use energy storage assets requires establishing when an asset will be allowed to participate in the market, how it will participate in the market, and where it will recover its costs. In answering these questions, key principles must be satisfied, such as prioritizing reliability, incrementally building on existing market design, and balancing competing objectives. Several policy options exist for satisfying those principles, giving grid operators and stakeholders significant flexibility in developing a dual-use participation model in accordance with regional policies and conditions. By objectively framing the issue and identifying policy options, this paper may inform subsequent proceedings on dual-use energy storage and be a resource to regional market operators, utilities, developers, regulators, policymakers, and other stakeholders as they collectively work on this complex issue.

24 POWER TRANSMISSION AND DISTRIBUTION↗

OPALCO - Decatur Island Solar and Energy Storage Project: An Assessment of Battery Technical Performance

Orcas Power & Light Cooperative (OPALCO) is a member-owned, nonprofit cooperative utility that provides energy services to approximately 11,200 customers across 20 islands in San Juan County, Washington. OPALCO’s mostly hydroelectric power is generated by Bonneville Power Administration and delivered to the islands by submarine cables. In 2016, as part of the second round of funding from the Washington state Clean Energy Fund, OPALCO received a $1 million matching grant to support a project that deployed a 504-kW LG community photovoltaic (PV) system in combination with a 1 MW/2 MWh lithium-iron-phosphate battery energy storage system (BESS) on Decatur Island, Washington. The Decatur Island Substation is essential to ensuring reliable energy for the residents of the San Juan Islands as it is the point of interconnection with the mainland transmission system. The BESS, in combination with the community solar array, will deliver an innovative method to both defer the costly upgrade of the transmission system and allow for other high-value applications intended to benefit the utility and its customers. In 2018, Pacific Northwest National Laboratory (PNNL) completed a preliminary economic assessment for several identified use cases in collaboration with OPALCO. Between August 2021 and May 2022, extensive testing was conducted, and the results were used to assess the technical performance of the BESS subjected to actual field operations. Both reference performance and use case tests were performed: (a) Reference performance tests assess the general technical capabilities of the BESS, such as energy capacity, round-trip efficiency (RTE), ramp rate, and signal tracking capability. These are the first tests performed (baseline) and are repeated after use case tests (post cycle). A standardized U.S. Department of Energy (DOE) energy storage performance protocol was used to characterize the BESS, including representative duty cycle profiles, test procedure guidance, and calculation guidance for determining key characteristics. (b) Use case tests examine the performance of the BESS for specific use cases using duty cycles developed by PNNL in collaboration with OPALCO. Four use cases were selected for testing: 1) demand charge reduction, 2) load shaping, 3) outage mitigation, and 4) transmission deferral. The use case duty cycles were developed based on utility and site-specific characteristics in addition to the technical characteristics and physical capabilities of the BESS. Use case tests were performed between the baseline and post cycle tests. This report describes the BESS and its components, presents testing and performance analysis results, and shares key insights and lessons learned from this project. Outcomes of the tests and analyses will help OPALCO understand the performance of the Decatur Island BESS in its current state and design appropriate operational strategies for this and other BESSs over the long term.

14 SOLAR ENERGY↗