Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TENNESSEE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Cost Effectiveness of ASHRAE Standard 90.1-2016 for the State of Tennessee

This report describes the methodology and results of a state cost-effectiveness analysis of ASHRAE Standard 90.1-2016. Moving to the Standard 90.1-2016 edition from Standard 90.1-2013 is found to be cost-effective for the state. Annual energy cost savings, added construction costs, and life-cycle costs are all described and presented here for various building types and climate zones.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cost-Effectiveness Analysis of the Residential Provisions of the 2015 IECC for Tennessee

These analyses evaluate the cost-effectiveness of the prescriptive path of the 2015 edition of the International Energy Conservation Code (IECC), relative to the 2012 and 2009 IECC for all 50 states and the District of Columbia. The analysis covers one- and two-family dwelling units, townhomes, and low-rise multifamily residential buildings covered by the residential provisions of the 2015 IECC. These reports were originally published in October 2015, and revised in February 2016 to update numbers reported in certain results tables.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Annual Stormwater Report for the Y-12 National Security Complex Oak Ridge, Tennessee

This is the eighth annual stormwater report prepared in accordance with the modified National Pollutant Discharge Elimination System permit issued to the Y-12 National Security Complex (Y-12) on April 1, 2014. This modified permit removed the authorization to augment flow in East Fork Poplar Creek (EFPC) and thus removed the requirement to sample this effluent in conjunction with other major outfalls on EFPC. The general condition of the site continues to improve. The repair of Outfall 014 is complete and sampling was performed in 2020 from the new Outfall 014 structure. This repair marks a significant improvement in the storm drain network infrastructure. There are several construction and demolition activities currently in progress at Y-12. These include the construction of the Uranium Processing Facility, the Mercury Treatment Facility on EFPC, the site-wide power grid upgrade, and the demolition of the Biology Complex. Current stormwater protections have proven effective in 2020; however, moving forward, these projects will present challenges for the protection of stormwater. Therefore, oversight of these activities, and all other construction and demolition projects, will continue to be a priority in 2021. Y-12 will continue to implement appropriate best management practices and reduce outside material storage areas where possible.

54 ENVIRONMENTAL SCIENCES↗

Annual Stormwater Report for the Y-12 National Security Complex Oak Ridge, Tennessee

This is the ninth annual stormwater report prepared in accordance with the modified National Pollutant Discharge Elimination System permit issued to the Y-12 National Security Complex (Y-12) on April 1, 2014. This modified permit removed the authorization to augment flow in East Fork Poplar Creek (EFPC) and thus removed the requirement to sample this effluent in conjunction with other major outfalls on EFPC. There are several construction and demolition activities currently in progress at Y-12. These include the construction of the Uranium Processing Facility (UPF), the Mercury Treatment Facility (MTF) on EFPC, the site-wide power grid upgrade, construction of an Emergency Operations Center, construction of a new Fire Station, Security Improvement Revitalization Program (SIRP), West End Protection Area Reduction (WEPAR) Project, and the demolition of the Biology Complex. Current stormwater protections have proven effective in 2021. However, moving forward, challenges to protect stormwater will continue from these projects. Therefore, oversight of these activities, and all other construction and demolition projects, will continue to be a priority in 2022. Y-12 will continue to implement appropriate Best Management Practices and reduce outside material storage areas where possible.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost-Effectiveness of ANSI/ASHRAE/IES Standard 90.1-2019 for Tennessee

This report describes the methodology and results of a state cost-effectiveness analysis of ASHRAE Standard 90.1-2019. Moving to the Standard 90.1-2019 edition from Standard 90.1-2016 is found to be cost-effective for the state. Annual energy cost savings, added construction costs, and life-cycle costs are all described and presented here for various building types and climate zones.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Towards Development of a Conceptual Model for Mercury in Bear Creek, Oak Ridge, Tennessee (FY23 Update)

Mercury concentrations in fish in Bear Creek are elevated and comparable to concentrations seen in fish in East Fork Poplar Creek (EFPC) on the Oak Ridge Reservation, even though aqueous inorganic mercury concentrations are orders of magnitude lower in Bear Creek than in EFPC. Acknowledging that the relationship between aqueous and fish tissue mercury concentrations is not linear, and that methylmercury (MeHg) concentrations are likely more related to fish tissue concentrations than aqueous total mercury (Hg T ) concentrations, MeHg production is not easily predicted or controlled. In Bear Creek, where aqueous Hg T concentrations are low, factors other than mercury loading drive the transformation of mercury to MeHg and subsequent trophic transfer to fish. Initial development of a waste disposal facility (Environmental Management Disposal Facility; EMDF) in Bear Creek Valley has begun, and operation of the EMDF has the potential to increase mercury inputs to Bear Creek. Consequently, understanding the factors contributing to elevated MeHg concentrations in water and fish in Bear Creek has increased relevance and importance. This report summarizes data from recent and historical compliance and investigatory studies with an eye toward building a conceptual model to understand the processes affecting mercury transport and transformation in the Bear Creek watershed, as well as to highlight key knowledge gaps in our understanding of these processes that warrant further investigation. The conceptual model will provide a strong technical basis for prioritizing and optimizing potential mitigation actions or best management practices to minimize potential negative effects of the EMDF related to mercury in Bear Creek.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TASTI-GRID: Improving Electric Grid Resilience across the State of Tennessee

Residential, industrial, and large load data center facility expansion have exacerbated management backlogs. Additionally, as newer technologies emerge in larger utility providers, a chasm between urban and rural resilience grows – creating segmentation across the state. With new development, industries, and large load additions to the electric grid across the Volunteer state, utilities must contend with these new connections, management backlogs, and technology gaps – while addressing an increase in major outages with more frequent extreme weather events, such as Hurricane Helene in 2024. This issues, in turn, have given way to greater vulnerabilities in adjacent infrastructure – including transportation and emergency management services, among others.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Technoeconomic Studies for the Rorex Creek Pumped Storage Hydro Project: An Evaluation of New Pumped Storage Hydro in the Tennessee Valley Authority System

This report evaluates the economic viability of the proposed 1,200 MW, 23,365 MWh Rorex Creek Pumped Storage Hydro (PSH) plant that would be located near Pisgah, Alabama. In addressing this question, this study has developed processes, models and data that better value PSH from a utility perspective, more specifically a vertically integrated utility, enabling optimal PSH design and deployment. This study is designed to enhance TVA’s toolset in making PSH investment decisions and contribute to the design of a more cost-effective, stable future grid. These techniques can then be applied to a broader range of assets and utilities.

Cohen, Stuart↗

East Tennessee Technology Park 2006 Illness and Injury Surveillance Report

The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of illness and injury surveillance activities that provide an early warning system to detect health problems among workers. The Illness and Injury Surveillance Program monitors illnesses and health conditions that result in an absence, occupational injuries and illnesses, and disabilities and deaths among current workers.

54 ENVIRONMENTAL SCIENCES↗

Independent Verification Final Summary Report for the David Witherspoon, Inc. 1630 Site Knoxville, Tennessee

The primary objective of the independent verification was to determine if BJC performed the appropriate actions to meet the specified “hot spot” cleanup criteria of 500 picocuries per gram (pCi/g) uranium-238 (U-238) in surface soil. Specific tasks performed by the independent verification team (IVT) to satisfy this objective included: 1) performing radiological walkover surveys, and 2) collecting soil samples for independent analyses. The independent verification (IV) efforts were designed to evaluate radioactive contaminants (specifically U-238) in the exposed surfaces below one foot of the original site grade, given that the top one foot layer of soil on the site was removed in its entirety.

61 RADIATION PROTECTION AND DOSIMETRY↗

2007 East Tennessee Technology Park Annual Illness and Injury Surveillance Report

The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of illness and injury surveillance activities that provide an early warning system to detect health problems among workers. The Illness and Injury Surveillance Program monitors illnesses and health conditions that result in an absence, occupational injuries and illnesses, and disabilities and deaths among current workers.

99 GENERAL AND MISCELLANEOUS↗

2007 East Tennessee Technology Park Annual Illness and Injury Surveillance Report

The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of illness and injury surveillance activities that provide an early warning system to detect health problems among workers. The Illness and Injury Surveillance Program monitors illnesses and health conditions that result in an absence, occupational injuries and illnesses, and disabilities and deaths among current workers.

54 ENVIRONMENTAL SCIENCES↗

Groundwater Protection Program Management Plan For The U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

This document presents the Groundwater Protection Program (GWPP) management plan for the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12). The Y-12 GWPP functions as the primary point-of-contact for groundwater-related issues at Y-12, provides stewardship of the extensive network of groundwater monitoring wells at Y-12, and serves as a resource for technical expertise, support, and historical data for groundwater-related activities at Y-12. These organizational functions each serve the primary programmatic purpose of the GWPP, which is to ensure that groundwater monitoring activities within areas under Y-12 administrative control provide representative data in compliance with the multiple purposes of applicable state and federal regulations, DOE orders, and the corporate policies of Babcock & Wilcox Technical Services Y-12 LLC (hereafter referenced as B&W Y-12), the Y-12 management and operations (M&O) contractor for DOE. B&W Y-12 is a new corporate name, assumed in January 2007, for the company formerly known as BWXT Y-12, L.L.C., hereafter referenced as BWXT. This GWPP management plan addresses the requirements of DOE Order 450.1A Environmental Protection Program (hereafter referenced as DOE O 450.1A), which emphasize a site-wide approach for groundwater protection at each DOE facility through implementation of groundwater surveillance monitoring. Additionally, this plan addresses the relevant and applicable GWPP elements and goals described in the DOE O 450.1A technical guidance documents issued in June 2004 (DOE 2004) and May 2005 (DOE 2005). This GWPP management plan is a 'living' document that is reviewed annually, revised and reissued every three years, and is formatted to provide for updating individual sections independent of the rest of the document. Section 2 includes a short description of the groundwater system at Y-12, the history of groundwater monitoring at Y-12 and the corresponding evolution of the GWPP, and an overview of ongoing Y-12 groundwater monitoring activities. Section 3 describes the key elements of the GWPP management strategy. Organizational roles and responsibilities of GWPP personnel are outlined in Section 4. Section 5 presents an overview of the GWPP project plans for applicable programmatic elements. Section 6 lists the reports, plans, and documents that are referenced for technical and administrative details.

54 ENVIRONMENTAL SCIENCES↗

Calculation Package for the Analysis of Performance of Cells 1-6, with Underdrain, of the Environmental Management Waste Management Facility Oak Ridge, Tennessee

This calculation package presents the results of an assessment of the performance of the 6 cell design of the Environmental Management Waste Management Facility (EMWMF). The calculations show that the new cell 6 design at the EMWMF meets the current WAC requirement. QA/QC steps were taken to verify the input/output data for the risk model and data transfer from modeling output files to tables and calculation.

54 ENVIRONMENTAL SCIENCES↗

K-311-1/K-310-3 Purge Cascade Process Description, Oak Ridge Environmental Management Accelerated Cleanup Project, Oak Ridge, Tennessee

K-311-1 was constructed along with the rest of the K-25 Building in the 1943-1945 timeframe. K-311-1 was equipped with Size 3 converters and Size 38 Allis Chalmers{trademark} single-stage centrifugal compressors driven by 3600 rpm electric motors, and the unit operated as the 'bottom' unit flow-wise in K-25. The depleted flow from the bottom stage in K-311-1 passed through booster compressors and flowed to the K-601 Building where the depleted or 'tails' material was removed. In 1948, after the K-27 Building was completed, the decision was made to operate K-27 and K-25 in series rather than operate the two buildings as separate entities. To facilitate this operation, concrete bases were poured and two sets of booster compressors were installed in the extreme West end of the K-311-1 cell floor. These compressors were enclosed in heated housings and consisted of Size 38 compressors. One pair was to boost the 'B' flow between K-25 and K-27, and one pair was to boost the 'A' flow between the buildings. Each station operated with one compressor on-stream and the other in standby. (Reference 9) Each station also was equipped with a Size 2 after-cooler located in the discharge stream downstream of the junction of the onstream and standby compressors. Additional gaseous diffusion capacity was added at Oak Ridge as K-29, K-31, and K-33 were constructed and placed in service in the early 1950s. As a result of the additional process equipment added by these buildings, in-leakage of light gases to the cascade including light gases introduced into the cascade as a result of purging operations threatened to exceed the capacity of the existing K-312 Purge Cascade facilities in the K-25 Building. As a result, in 1954 K-311-1 was converted to a side purge cascade to remove light gases from the process gas stream as the stream entered K-25 from K-27. Low molecular weight gas in-leakage in K-33, K-31, K-29, and K-27 was removed by the K-311-1 Side Purge Facility and a relatively pure stream of UF6 then passed from K-311-1 into the upstream cells in K-25. In-leakage of light gases in the K-25 Building continued to be removed by the K-312 Purge Facilities. K-311-1 operated as a Side Purge Cascade from 1954 until the K-25 Building was shut down in 1964; at that time K-311-1 became the Oak Ridge Gaseous Diffusion Plant (ORGDP) Top (and only) Purge Cascade. The adjacent K-310-3 Unit was operated along with K-311-1 as the top purge cascade and K-310-2 was also operated at times to supplement cells in the K311-1/K-310-3 Purge Cascade. K-311-1 was shut down on February 14, 1977, after the newer, larger capacity K-402-9 Purge Cascade was placed in operation. K-310-3 continued to operate until the K-402-8 Coolant Removal Unit was placed in service, and K-310-3 was shut down on March 14, 1978. Since the K-311-1 and K-310-3 units continued to operate after K-25 shutdown, removal of equipment such as valves and piping for other projects did not occur in this area. As a result, these two units have not been exposed to atmospheric wet air over the years as much of the remainder of K-25 has been exposed. Any deposits or residual gases contained in K-311-1 or K-310-3 are not likely to be fully hydrolyzed.

54 ENVIRONMENTAL SCIENCES↗

Analysis of failed and nickel-coated 3093 beam clamp components at the East Tennessee Technology Park (ETTP).

The U.S. Department of Energy and its contractor, Bechtel Jacobs Company (BJC), are undertaking a major effort to clean up the former gaseous diffusion facility (K-25) located in Oak Ridge, TN. The decontamination and decommissioning activities require systematic removal of contaminated equipment and machinery followed by demolition of the buildings. As part of the cleanup activities, a beam clamp, used for horizontal life lines (HLLs) for fall protection, was discovered to be fractured during routine inspection. The beam clamp (yoke and D-ring) was a component in the HLL system purchased from Reliance Industries LLC. Specifically, the U-shaped stainless steel yoke of the beam clamp failed in a brittle mode at under less than 10% of the rated design capacity of 14,500 lb. The beam clamp had been in service for approximately 16 months. Bechtel Jacobs approached Argonne National Laboratory to assist in identifying the root cause of the failure of the beam clamp. The objectives of this study were to (1) review the prior reports and documents on the subject, (2) understand the possible failure mechanism(s) that resulted in the failed beam clamp components, (3) recommend approaches to mitigate the failure mechanism(s), and (4) evaluate the modified beam clamp assemblies. Energy dispersive x-ray analysis and chemical analysis of the corrosion products on the failed yoke and white residue on an in-service yoke indicated the presence of zinc, sulfur, and calcium. Analysis of rainwater in the complex, as conducted by BJC, indicated the presence of sulfur and calcium. It was concluded that, as a result of galvanic corrosion, zinc from the galvanized components of the beam clamp assembly (D-ring) migrated to the corroded region in the presence of the rainwater. Under mechanical stress, the corrosion process would have accelerated, resulting in the catastrophic failure of the yoke. As suggested by Bechtel Jacobs personnel, hydrogen embrittlement as a consequence of corrosion was also explored as a failure mechanism. Corroded and failed yoke samples had hydrogen concentrations of 20-60 ppm. However, the hydrogen content reduced to 4-11 ppm (similar to baseline as-received yoke samples) when the corrosion products were polished off. The hydrogen content in the scraped off corrosion product powders was >7000 ppm. These results indicate that hydrogen is primarily present in the corrosion products and not in the underlying steel. Rockwell hardness values on the corroded yoke and D-rings were R{sub c} {approx} 41-46. It was recommended to the beam clamp manufacturer that the beam clamp components be annealed to reduce the hardness values so that they are less susceptible to brittle failure. Upon annealing, hardness values of the beam clamp components reduced to R{sub c} {approx} 25. Several strategies were recommended and put in place to mitigate failure of the beam clamp components: (a) maintain hardness levels of both yokes and D-rings at R{sub c} < 35, (b) coat the yoke and D-rings with a dual coating of nickel (with 10% phosphorus) to delay corrosion and aluminum to prevent galvanic corrosion since it is more anodic to zinc, and (c) optimize coating thicknesses for nickel and aluminum while maintaining the physical integrity of the coatings. Evaluation of the Al- and Ni-coated yoke and D-ring specimens indicated they appear to have met the recommendations. Average hardness values of the dual-coated yokes were R{sub c} {approx} 25-35. Hardness values of dual-coated D-ring were R{sub c} {approx} 32. Measured average coating thicknesses for the aluminum and nickel coatings for yoke samples were 22 {micro}m (0.9 mils) and 80 {micro}m (3 mils), respectively. The D-rings also showed similar coating thicknesses. Microscopic examination showed that the aluminum coating was well bonded to the underlying nickel coating. Some observed damage was believed to be an artifact of the cutting-and-polishing steps during sample preparation for microscopy.

08 HYDROGEN↗