Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Staging Building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Orion Multi Purpose Crew Vehicle Environmental Control and Life Support Development Status

The Orion Multi Purpose Crew Vehicle (MPCV) is the first crew transport vehicle to be developed by the National Aeronautics and Space Administration (NASA) in the last thirty years. Orion is currently being developed to transport the crew safely from the Earth beyond Earth orbit. This year, the vehicle focused on building the Exploration Flight Test 1 (EFT1) vehicle to be launched in 2014. The development of the Orion Environmental Control and Life Support (ECLS) System, focused on the components which are on EFT1 which includes pressure control and active thermal control systems, is progressing through the design stage into manufacturing. Additional development work was done to keep the remaining component progressing towards implementation for a flight tests in 2017 and in 2020. This paper covers the Orion ECLS development from April 2011 to April 2012.

Lewis, John F.↗

Risk analysis simulation of rover operations for Mars surface exploration

Risk management advocates have long sought to directly influence the early stages of the systems engineering process through a more effective role in system design trade studies. The principal obstacle to this has been the lack of credible ways to represent and quantify mission risk—that is, a combination of the probability of mission success (“system safety”) and science value—for the project manager and the rest of the design team. If it were possible to quantify mission risk, then the effects of proposed mission and system design changes could be calculated, and along with life-cycle costs, could be used to explore the design space more extensively and select better designs. JPL has been working to build the capability to quantify the probability of mission success using a federation of diverse simulations and models, each of which contributes some vital piece of the puzzle. The initial institutional focus has been on Mars surface operations. This ensemble computing framework enables the diverse models and simulations to work together seamlessly. Recent work at JPL has demonstrated the capability to exercise this ensemble from end-to-end using an Oracle-based database to automatically move results from one model/simulation to the next stage in the analysis.

Shishko, Robert↗

Vertical axis wind rotors: Status and potential

The design and application of a vertical axis wind rotor is reported that operates as a two stage turbine wherein the wind impinging on the concave side is circulated through the center of the rotor to the back of the convex side, thus decreasing what might otherwise be a high negative pressure region. Successful applications of this wind rotor to water pumps, ship propulsion, and building ventilators are reported. Also shown is the feasibility of using the energy in ocean waves to drive the rotor. An analysis of the impact of rotor aspect ratio on rotor acceleration shows that the amount of venting between rotor vanes has a very significant effect on rotor speed for a given wind speed.

Vance, W.↗

Payload spin assembly for the commercial Titan launch vehicle

A contract was completed to design, build, and test a Payload Spin Assembly (PSA) for installation onto the Martin Marietta Titan 3 Commercial launch vehicle. This assembly provides launch support for satellite payloads up to 5783 kilograms (6.37 tons) and controls release, spin-up, and final separation of the satellite from the second stage. Once separated, the satellite's Perigee Kick Motor (PKM) boosts the satellite into its transfer orbit. The first successful flight occurred December 31, 1989. Requirements, design, test, and problems associated with this mechanical assembly are discussed.

Robinson, Wilf↗

Oxygen Compatibility and Challenge Testing of the PLSS Variable Oxygen Regulator (VOR) for the Advanced EMU

The Variable Oxygen Regulator (VOR), a stepper actuated two-stage mechanical regulator, is being developed for the purpose of serving as the Primary Oxygen Regulator (POR) and Secondary Oxygen Regulator (SOR) within the Advanced EMU PLSS, now referred to as the xEMU and xPLSS. Three prototype designs have been fabricated and tested as part of this development. Building upon the lessons learned from the 35 years of Shuttle/ISS EMU Program operation including the fleet-wide EMU Secondary Oxygen Pack (SOP) contamination failure that occurred in 2000, the VOR is being analyzed, designed, and tested for oxygen compatibility with controlled Non-Volatile Residue (NVR) and a representative worst-case hydro-carbon system contamination event (>100mg/sq ft dodecane). This paper discusses the steps taken in testing of VOR 2.0 with for oxygen compatibility and then discusses follow-on design changes implemented in the VOR 3.0 (3rd prototype) as a result.

Campbell, Colin↗

Launch Control Network Engineer

The Spaceport Command and Control System (SCCS) is being built at the Kennedy Space Center in order to successfully launch NASA’s revolutionary vehicle that allows humans to explore further into space than ever before. During my internship, I worked with the Network, Firewall, and Hardware teams that are all contributing to the huge SCCS network project effort. I learned the SCCS network design and the several concepts that are running in the background. I also updated and designed documentation for physical networks that are part of SCCS. This includes being able to assist and build physical installations as well as configurations. I worked with the network design for vehicle telemetry interfaces to the Launch Control System (LCS); this allows the interface to interact with other systems at other NASA locations. This network design includes the Space Launch System (SLS), Interim Cryogenic Propulsion Stage (ICPS), and the Orion Multipurpose Crew Vehicle (MPCV). I worked on the network design and implementation in the Customer Avionics Interface Development and Analysis (CAIDA) lab.

Medeiros, Samantha↗

Geologic Maps for Civil Engineering and Infrastructure Planning

The Artemis Program mandate for sustainable, long-term presence on the Moon requires learning to "Live Off the Land". Geologic maps enable a paradigm shift to model the development and scaling of infrastructure for robotic and human exploration inside a bounded system on the lunar surface. Relying on geologic maps produced from orbital data and robotic precursor missions, in-situ resource utilization (ISRU) will be required to produce infrastructure, building materials and consumables. The ISRU value chain must be mapped to identify linkages of resources, producers, processes and equipment capabilities for transforming excavated regolith into usable feedstocks. Coordination will be required to balance supply and demand across the whole system of lunar infrastructure and operations, at each stage of development.

Geologic Mapping↗

A knowledge based expert system for propellant system monitoring at the Kennedy Space Center

The Lox Expert System (LES) is the first attempt to build a realtime expert system capable of simulating the thought processes of NASA system engineers, with regard to fluids systems analysis and troubleshooting. An overview of the hardware and software describes the techniques used, and possible applications to other process control systems. LES is now in the advanced development stage, with a full implementation planned for late 1985.

Jamieson, J. R.↗

Computing the Envelope for Stepwise Constant Resource Allocations

Estimating tight resource level is a fundamental problem in the construction of flexible plans with resource utilization. In this paper we describe an efficient algorithm that builds a resource envelope, the tightest possible such bound. The algorithm is based on transforming the temporal network of resource consuming and producing events into a flow network with noises equal to the events and edges equal to the necessary predecessor links between events. The incremental solution of a staged maximum flow problem on the network is then used to compute the time of occurrence and the height of each step of the resource envelope profile. The staged algorithm has the same computational complexity of solving a maximum flow problem on the entire flow network. This makes this method computationally feasible for use in the inner loop of search-based scheduling algorithms.

Muscettola, Nicola↗

A Small Satellite Mission for Solar Coronagraphy

We present on a concept study of the Goddard Miniature Coronagraph (GMC) mission for measuring the plasma flow in the solar corona in the form of solar wind and coronal mass ejections (CMEs). These mass flows can dramatically alter the near-Earth space environment to hazardous conditions posing danger to human technology in space. The primary science objective of the mission is to measure the properties of CMEs, coronal structures, and the solar wind near the Sun. The miniaturization of the coronagraph involves using a single-stage optics and a polarization camera, both of which reduce the size of the coronagraph. GMC will be accommodated in a small satellite that can be built with CubeSat material to minimize cost. The development of the Dellingr mission at NASA/GSFC has provided expertise and a clear pathway to build the GMC mission. The hardware and software used for the Dellingr (a name derived from the god of the dawn in Norse mythology) Mission are technically sound, so the GMC mission can be fully defined. Software, pointing, control and communications systems developed for GSFC CubeSats can be readily adapted to cut costs. We present orbit options such as an ISS (International Space Station) orbit or a Sun-synchronous dawn-dusk polar orbit with the aim of maximizing solar observations.

Gopalswamy, N.↗

Mission and Implementation of an Affordable Lunar Return

We present an architecture that establishes the infrastructure for routine space travel by taking advantage of the Moon's resources, proximity and accessibility. We use robotic assets on the Moon that are teleoperated from Earth to prospect, test, demonstrate and produce water from lunar resources before human arrival. This plan is affordable, flexible and not tied to any specific launch vehicle solution. Individual surface pieces are small, permitting them to be deployed separately on small launchers or combined together on single large launchers. Schedule is our free variable; even under highly constrained budgets, the architecture permits this program to be continuously pursued using small, incremental, cumulative steps. The end stage is a fully functional, human-tended lunar outpost capable of producing 150 metric tonnes of water per year enough to export water from the Moon and create a transportation system that allows routine access to all of cislunar space. This cost-effective lunar architecture advances technology and builds a sustainable transportation infrastructure. By eliminating the need to launch everything from the surface of the Earth, we fundamentally change the paradigm of spaceflight.

Spudis, Paul↗

A New Heavy-Lift Capability for Space Exploration: NASA's Ares V Cargo Launch Vehicle

The National Aeronautics and Space Administration (NASA) is developing new launch systems and preparing to retire the Space Shuttle by 2010, as directed in the United States (U.S.) Vision for Space Exploration. The Ares I Crew Launch Vehicle (CLV) and the Ares V heavy-lift Cargo Launch Vehicle (CaLV) systems will build upon proven, reliable hardware derived from the Apollo-Saturn and Space Shuttle programs to deliver safe, reliable, affordable space transportation solutions. This approach leverages existing aerospace talent and a unique infrastructure, as well as legacy knowledge gained from nearly 50 years' experience developing space hardware. Early next decade, the Ares I will launch the new Orion Crew Exploration Vehicle (CEV) to the International Space Station (ISS) or to low-Earth orbit for trips to the Moon and, ultimately, Mars. Late next decade, the Ares V's Earth Departure Stage will carry larger payloads such as the lunar lander into orbit, and the Crew Exploration Vehicle will dock with it for missions to the Moon, where astronauts will explore new territories and conduct science and technology experiments. Both Ares I and Ares V are being designed to support longer future trips to Mars. The Exploration Launch Projects Office is designing, developing, testing, and evaluating both launch vehicle systems in partnership with other NASA Centers, Government agencies, and industry contractors. This paper provides top-level information regarding the genesis and evolution of the baseline configuration for the Ares V heavy-lift system. It also discusses riskbased, management strategies, such as building on powerful hardware and promoting common features between the Ares I and Ares V systems to reduce technical, schedule, and cost risks, as well as development and operations costs. Finally, it summarizes several notable accomplishments since October 2005, when the Exploration Launch Projects effort officially kicked off, and looks ahead at work planned for 2007 and beyond.

Sumrall, John P.↗

CARETS: A prototype regional environmental information system. Volume 3: Toward a national land use information system

It is recommended that a national land use information system be established by an agency of the Federal Government. This recommendation comes at a time of increasing demand for scientific information in support of environmentally relevant land use planning and management at all levels of government. It is also a time when new airborne and spaceborne remote sensors, tested in cooperation with the National Aeronautics and Space Administration (NASA) and the Earth Resources Observation Systems (EROS) Program of the Department of the Interior, make possible the gathering of land use information rapidly and on an unprecedented scale. Furthermore, information handling technology is developing toward a capability to receive, store, and disseminate the huge quantities of data that would be involved. The recommendation for the national land use information system is based upon careful analysis of the results of remote sensing experiments funded by NASA, EROS, and the Geography Program of the Geological Survey, with specific examples drawn from the demonstration project known as the Central Atlantic Regional Ecological Test Site (CARETS). CARETS is cast in the framework of a regional land use information system, channeling the flow bf information generated in response to users' declaration of their needs, through stages dealing with remote sensing data gathering systems, data processing and land mensuration, calibration in-terms of environmental impact, and evaluation with feedback from users. The proposed system would develop and implement a unified approach to the description and interpretation of the changing uses of the nation's land resources, building upon the base of interagency and intergovernmental cooperation already achieved in the experimental work to date. The land use data base that is being derived from high-altitude aerial color infrared photography would be the initial component of the recommended system. High-altitude photographic coverage would immediately be extended to as much of the nation as possible as technological developments and economic considerations permit. The system would later expand to include multiple-sensor, multiple-platform data sources. Six system characteristics are recommended: (1) High capacity storage of data available for quick retrieval, inexpensive processing, and update, (2) provision of accuracy appropriate to the scale of survey or to the level of detail dictated by different types of management and decision requirements; (3) permanent, publicly accessible sensor records for historical interpretation; (4) compatibility of the recording, storage, and retrieval system with all types of inputs, from ground observer to satellite; (5) products of diverse formats and scales, responsive to user feedback; (6) and standardization of formats, scales, and storage inputs to permit nationwide comparability.

Land use mapping↗

A study of Schwarz converters for nuclear powered spacecraft

High power space systems which use low dc voltage, high current sources such as thermoelectric generators, will most likely require high voltage conversion for transmission purposes. This study considers the use of the Schwarz resonant converter for use as the basic building block to accomplish this low-to-high voltage conversion for either a dc or an ac spacecraft bus. The Schwarz converter has the important assets of both inherent fault tolerance and resonant operation; parallel operation in modular form is possible. A regulated dc spacecraft bus requires only a single stage converter while a constant frequency ac bus requires a cascaded Schwarz converter configuration. If the power system requires constant output power from the dc generator, then a second converter is required to route unneeded power to a ballast load.

Stuart, Thomas A.↗

A study of Schwarz converters for nuclear powered spacecraft

High power space systems which use low dc voltage, high current sources such as thermoelectric generators, will most likely require high voltage conversion for transmission purposes. This study considers the use of the Schwarz resonant converter for use as the basic building block to accomplish this low-to-high voltage conversion for either a dc or an ac spacecraft bus. The Schwarz converter has the important assets of both inherent fault tolerance and resonant operation; parallel operation in modular form is possible. A regulated dc spacecraft bus requires only a single stage converter while a constant frequency ac bus requires a cascaded Schwarz converter configuration. If the power system requires constant output power from the dc generator, then a second converter is required to route unneeded power to a ballast load.

Stuart, Thomas A.↗

Ares Launch Vehicles Overview: Space Access Society

America is returning to the Moon in preparation for the first human footprint on Mars, guided by the U.S. Vision for Space Exploration. This presentation will discuss NASA's mission, the reasons for returning to the Moon and going to Mars, and how NASA will accomplish that mission in ways that promote leadership in space and economic expansion on the new frontier. The primary goals of the Vision for Space Exploration are to finish the International Space Station, retire the Space Shuttle, and build the new spacecraft needed to return people to the Moon and go to Mars. The Vision commits NASA and the nation to an agenda of exploration that also includes robotic exploration and technology development, while building on lessons learned over 50 years of hard-won experience. NASA is building on common hardware, shared knowledge, and unique experience derived from the Apollo Saturn, Space Shuttle, and contemporary commercial launch vehicle programs. The journeys to the Moon and Mars will require a variety of vehicles, including the Ares I Crew Launch Vehicle, which transports the Orion Crew Exploration Vehicle, and the Ares V Cargo Launch Vehicle, which transports the Lunar Surface Access Module. The architecture for the lunar missions will use one launch to ferry the crew into orbit, where it will rendezvous with the Lunar Module in the Earth Departure Stage, which will then propel the combination into lunar orbit. The imperative to explore space with the combination of astronauts and robots will be the impetus for inventions such as solar power and water and waste recycling. This next chapter in NASA's history promises to write the next chapter in American history, as well. It will require this nation to provide the talent to develop tools, machines, materials, processes, technologies, and capabilities that can benefit nearly all aspects of life on Earth. Roles and responsibilities are shared between a nationwide Government and industry team. The Exploration Launch Projects Office at the Marshall Space Flight Center manages the design, development, testing, and evaluation of both vehicles and serves as lead systems integrator. A little over a year after it was chartered, the Exploration Launch Projects team is testing engine components, refining vehicle designs, performing wind tunnel tests, and building hardware for the first flight test of Ares I-X, scheduled for spring 2009. The Exploration Launch Projects team conducted the Ares I System Requirements Review (SRR) at the end of 2006. In Ares' first year, extensive trade studies and evaluations were conducted to refine the design initially recommended by the Exploration Systems Architecture Study, conceptual designs were analyzed for fitness, and the contractual framework was assembled to enable a development effort unparalleled in American space flight since the Space Shuttle. Now, the project turns its focus to the Preliminary Design Review (PDR), scheduled for 2008. Taking into consideration the findings of the SRR, the design of the Ares I is being tightened and refined to meet the safety, operability, reliability, and affordability goals outlined by the Constellation Program. The Ares V is in the early design stage, focusing its activities on requirements validation and ways to develop this heavy-lift system so that synergistic hardware commonality between it and the Ares I can reduce the operational footprint and foster sustained exploration across the decades ahead.

Cook, Steve↗

A Modular Aerospike Engine Design Using Additive Manufacturing

A modular aerospike engine concept has been developed with the objective of demonstrating the viability of the aerospike design using additive manufacturing techniques. The aerospike system is a self-compensating design that allows for optimal performance over the entire flight regime and allows for the lowest possible mass vehicle designs. At low altitudes, improvements in Isp can be traded against chamber pressure, staging, and payload. In upper stage applications, expansion ratio and engine envelope can be traded against nozzle efficiency. These features provide flexibility to the System Designer optimizing a complete vehicle stage. The aerospike concept is a good example of a component that has demonstrated improved performance capability, but traditionally has manufacturing requirements that are too expensive and complex to use in a production vehicle. In recent years, additive manufacturing has emerged as a potential method for improving the speed and cost of building geometrically complex components in rocket engines. It offers a reduction in tooling overhead and significant improvements in the integration of the designer and manufacturing method. In addition, the modularity of the engine design provides the ability to perform full scale testing on the combustion devices outside of the full engine configuration. The proposed design uses a hydrocarbon based gas-generator cycle, with plans to take advantage of existing powerhead hardware while focusing DDT&E resources on manufacturing and sub-system testing of the combustion devices. The major risks for the modular aerospike concept lie in the performance of the propellant feed system, the structural integrity of the additive manufactured components, and the aerodynamic efficiency of the exhaust flow.

Peugeot, John↗

A New High Efficiency Segmented Thermoelectric Unicouple

To achieve high thermal-to-electric energy conversion efficiency, it is desirable to operate thermoelectric generator devices over large temperature gradients and also to maximize the thermoelectric performance of the materials used to build the devices. However, no single thermoelectric material is suitable for use over a very wide range of temperatures (approx. 300 - 1000 K). It is therefore necessary to use different materials in each temperature range where they possess optimum performance. This can be achieved in two ways: 1) multistage thermoelectric generators where each stage operates over a fixed temperature difference and is electrically insulated but thermally in contact with the other stages and 2) segmented generators where the p- and n-legs are formed of different segments joined in series. The concept of integrating new thermoelectric materials developed at the Jet Propulsion Laboratory (JPL) into a segmented thermoelectric generator has been presented in detail in earlier publications . This new generator is expected to operate over a 300-973 K temperature difference and will use novel segmented legs based on a combination of state-of-the-art thermoelectric materials and novel p-type Zn4Sb3, p-type CeFe4Sb12-based alloys and n-type CoSb3-based alloys. An increase in the conversion efficiency of about 60% is expected compared to conventional Bi2Te3- and PbTe-based generators. We present in this paper the latest experimental results from the bonding studies between the different segments of the p-legs, n-legs, and p-leg to n-leg interconnect. Evaluation of the bond quality was done by measuring the contact resistance across the joints as well as by detailed microstructure investigations to reveal any potential interdiffusion. Among the materials investigated as inter-layers between the different segments of the legs, Pd-Ag joining alloys have been found to provide mechanically stable and low electrical resistance bonds.

Caillat, T.↗