Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SITE APPROVALS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Letter Report to Address Comments on the Closure Report for Corrective Action Unit 224: Decon Pad and Septic Systems, Nevada Test Site, Nevada, Revision 0, March 2008

The Closure Report (CR) for Corrective Action Unit (CAU) 224, Decon Pad and Septic Systems, was approved by the Nevada Department of Environmental Protection (NDEP) on November 01, 2007. The approval letter contained the following two comments: Comment 1--For 06-05-01, 06-17-04, 06-23-01 provide evidence that the 6 inch VCP pipe originating from building CP-2 is no longer active and sealed to prevent possible future contamination. Comment 2--For the area that includes 06-03-01, provide evidence that active lines are no longer feeding the North and South lagoons and have been sealed to prevent possible future contamination. To address these comments, closure documentation was reviewed, and site visits were conducted to locate and document the areas of concern. Additional fieldwork was conducted in March 2008 to seal the lines and openings described in the two comments. Photographs were taken of the closed drains and lines to document that the NDEP comments were adequately addressed and potential inadvertent discharge to the environment has been eliminated. Investigation and closure documentation was reviewed to identify the locations of potential drains, lines, and other features that could receive and/or transmit liquid. Based on the investigation findings and subsequent closure activities, no openings, distribution boxes, or other features (excluding known floor drains at CP-2) that could receive liquid were found at the CP-2 location (Figure 1), and potential manholes for the north and south sewage lagoons were identified for Corrective Action Site (CAS) 06-03-01 (Figure 2). The distribution box identified in Figure 1 was not located during the investigation and was assumed to have been previously removed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SUBTASK 1.6 – BASIN ELECTRIC CARBON STORAGE RESEARCH PROJECT: NOVEL MONITORING TECHNIQUES

The Energy & Environmental Research Center (EERC) conducted baseline activities associated with an applied research project at Basin Electric Power Cooperative’s (Basin’s) carbon capture and storage (CCS) site in Beulah, North Dakota, to establish novel carbon storage-monitoring techniques as commercial methods under Cooperative Agreement No. DE-FE0024233, Subtask 1.6. The following report summarizes the baseline activities performed and briefly describes the subsequent (operational monitoring) activities that have been proposed to the U.S. Department of Energy (DOE) as part of the overall project to develop and demonstrate novel monitoring techniques at North America’s largest permitted CCS operation. Dakota Gasification Company (DGC), a wholly owned subsidiary of Basin, owns and operates the Great Plains Synfuels Plant (GPSP) approximately 5 miles northwest of the town of Beulah, North Dakota (Figure 1). In 2023, DGC received approval from the North Dakota Industrial Commission (NDIC) to develop a storage facility on-site for injecting a stream of carbon dioxide (CO2) captured from GPSP. DGC will transport the captured CO2 stream with approximately 6.8 miles of transmission lines that extend north of GPSP and inject >1 million tonnes (MMt) of CO2 annually (>1 MMt/yr) over a 12-year period with up to six underground injection control (UIC) Class VI-compliant injection wells completed in the Broom Creek Formation, a predominantly sandstone reservoir and saline aquifer underlying GPSP. The Broom Creek Formation lies approximately 5900 feet (ft) below ground surface (bgs) at GPSP. The commercial scale (i.e., >1 MMt/yr) of DGC’s permitted carbon storage project is ideal for developing and testing the novel monitoring techniques included within Subtask 1.6. The goals of this project are to demonstrate 1) the cost-effectiveness of novel monitoring technologies included as part of this research, 2) technology capability for tracking the CO2 plume and/or associated pressure response in the subsurface and monitoring out-of-zone migration, and 3) compliance with UIC Class VI program requirements. The research activities proposed for the overall project include 1) design of an automated, integrated, modular (AIM) monitoring station; 2) time-lapse electromagnetic (EM) field surveys; 3) drone-based surveillance studies; 4) time-lapse monitoring with seismic methods; 5) advanced wellbore-monitoring methods; 6) deployment of an AIM monitoring network; 7) EM monitoring of CO2 with real-time data processing; 8) continued seasonal drone-based surveillance studies; 9) seismic monitoring with passive and active surveys; and 10) wellbore monitoring with nuclear magnetic resonance (NMR) for near-surface characterization. Completion of Activities 1.0–5.0 (baseline activities) are described in this report. Upon authorization of funding by DOE, the EERC will initiate Activities 6.0– 10.0 (operational monitoring activities). Current state-of-the-art (SOA) carbon storage-monitoring techniques require countless labor hours dedicated to the acquisition of data. Once data are gathered, these SOA techniques often rely on commercial facilities to process raw data from the field. However, it is anticipated that next-generation monitoring techniques, such as those being demonstrated, will lower acquisition footprints, be less operationally intensive, and improve data acquisition efficiencies. These new techniques are more conducive to the application of machine learning, artificial intelligence, and automation, thus providing a pathway for integration into active control systems, informing site operability, and improving the integration of data for future CCS projects across the United States. Additionally, reclaimed and active mining lands are present within the project site, creating a unique opportunity to demonstrate the effectiveness of remote sensing and surface-based geophysics monitoring techniques at similar project sites that may include disturbed, unconsolidated, or actively excavated near-surface environments. The efforts included in the overall project will produce necessary designs, learnings, and data acquired during the baseline and operational monitoring periods that are necessary for time-lapse demonstration and validation of the described monitoring techniques. In addition, it is anticipated that the monitoring technologies included in this study will be compliant with UIC Class VI requirements to enable the potential for implementation at other CCS sites across the United States.

42 ENGINEERING↗

Pinellas County, Florida, Site Environmental Restoration Project Sitewide Environmental Monitoring Semiannual Progress Report for the Young - Rainey STAR Center June Through November 2016, January 2017

The Young - Rainey STAR Center (Science, Technology, and Research Center) at the Pinellas County, Florida, Site is a former U.S. Department of Energy (DOE) facility constructed in the mid-1950s. The 96-acre STAR Center is located in Largo, Florida, and lies in the northeast quarter of Section 13, Township 30 South, Range 15 East (Figure 1). While it was owned by DOE, the purpose of the site was to develop and manufacture components for the nation’s nuclear weapons program. In 1987, the U.S. Environmental Protection Agency (EPA) performed a Resource Conservation and Recovery Act Facility Assessment (EPA 1988) at the site to gather information on potential releases of hazardous materials. In February of 1990, EPA issued a Hazardous and Solid Waste Amendments permit to DOE, requiring DOE to investigate and perform remediation activities in those areas designated as solid-waste management units (SWMUs) contaminated by hazardous materials resulting from DOE operations. A total of 17 SWMUs were identified and investigated at the STAR Center. By 1997, 13 of the 17 SWMUs had been remediated or approved for no further action. More recently, the Florida Department of Environmental Protection (FDEP) executed Conditional Site Rehabilitation Completion Orders for the Northeast Site and the Wastewater Neutralization Area on July 27, 2016, stating that no further action is required for those SWMUs. The Building 100 Area (a combination of the Old Drum Storage Site and the Building 100-Industrial Drain Leaks SWMUs) comprises the only two active SWMUs at the STAR Center (Figure 2). This document serves as the semiannual progress report for the SWMUs by providing the results of recent monitoring activities and a summary of ongoing and projected work. The STAR Center is owned by the Pinellas County Industrial Development Authority, but DOE is responsible for remediation activities at the site. Additional background information for the site is contained in the Long-Term Surveillance and Maintenance Plan for the Pinellas Site (DOE 2016a). That document and other site-related documents can be accessed at this website: http://www.lm.doe.gov/Pinellas/Sites.aspx.

54 ENVIRONMENTAL SCIENCES↗

Addendum to the Closure Report for Corrective Action Unit 404: Roller Coaster Sewage Lagoons and North Disposal Trench, Tonopah Test Range, Nevada, Revision 1

This document constitutes an addendum to the September 1998, Closure Report for Corrective Action Unit 404: Roller Coaster Lagoons and Trench, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the modification of the UR for CAS TA-03-001-TARC Roller Coaster Lagoons. This UR was established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and was based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This reevaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to modify the UR for CAS TA-03-001-TARC to an administrative UR. Administrative URs differ from standard URs in that they do not require onsite postings (i.e., signs) or other physical barriers (e.g., fencing, monuments), and they do not require periodic inspections (see Section 6.2 of the Industrial Sites Project Establishment of Final Action Levels [NNSA/NSO, 2006c]). This Administrative UR was based on a “Remote Work Sites” future land use scenario that was used to calculate the FAL. The administrative UR will protect workers from an exposure exceeding that used in the calculation of the FAL (i.e., 336 hours per year). Any proposed activity within these use restricted areas that would potentially cause an exposure exceeding this exposure limit would require approval from the Nevada Division of Environmental Protection (NDEP). Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.

54 ENVIRONMENTAL SCIENCES↗

Addendum to the Closure Report for Corrective Action Unit 404: Roller Coaster Lagoons and Trench, Tonopah Test Range, Nevada, Revision 0

This document constitutes an addendum to the September 1998, Closure Report for Corrective Action Unit 404: Roller Coaster Lagoons and Trench, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS TA-03-001-TARC Roller Coaster Lagoons • CAS TA-21-001-TARC Roller Coaster N. Disposal Trench These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to modify these URs to administrative URs. Administrative URs differ from standard URs in that they do not require onsite postings (i.e., signs) or other physical barriers (e.g., fencing, monuments), and they do not require periodic inspections (see Section 6.2 of the Industrial Sites Project Establishment of Final Action Levels [NNSA/NSO, 2006c]). These Administrative URs were based on a “Remote Work Sites” future land use scenario that was used to calculate the FAL. The administrative UR will protect workers from an exposure exceeding that used in the calculation of the FAL (i.e., 336 hours per year). Any proposed activity within these use restricted areas that would potentially cause an exposure exceeding this exposure limit would require approval from the Nevada Division of Environmental Protection (NDEP). Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.

54 ENVIRONMENTAL SCIENCES↗

Addendum to the Closure Report for Corrective Action Unit 271: Areas 25, 26, and 27 Septic Systems Nevada Test Site, Nevada, Revision 0 with ROTC 1

This document constitutes an addendum to the August 2004, Closure Report for Corrective Action Unit 271, Areas 25, 26, and 27 Septic Systems as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the modification of the UR for CAS 27-05-02, Leachfield. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to modify the UR to an administrative UR. Administrative URs differ from standard URs in that they do not require onsite postings (i.e., signs) or other physical barriers (e.g., fencing, monuments), and they do not require periodic inspections (see Section 6.2 of the Industrial Sites Project Establishment of Final Action Levels [NNSA/NSO, 2006c]). This Administrative UR was based on an “Occasional Use Area” future land use scenario that was used to calculate the FAL. The administrative UR will protect workers from an exposure exceeding that used in the calculation of the FAL (i.e., 400 total work hours). Any proposed activity within this use restricted area that would potentially cause an exposure exceeding this exposure limit would require approval from the Nevada Division of Environmental Protection (NDEP). Requirements for inspecting and maintaining postings at this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.

01 COAL, LIGNITE, AND PEAT↗

Preserving the Mound Laboratory Legacy-The Mound Cold War Discovery Center - 19550

The Mound Cold War Discovery Center (MCWDC) opened at the former DOE Mound Laboratory in Miamisburg, Ohio, on April 23, 2018, approximately three years after the US Department of Energy (DOE) Office of Legacy Management, Dayton History, the Mound Science and EnergyMuseum Association (MSEMA), and the Mound Development Corporation signed the Mound Educational Center Memorandum of Agreement (MOA). This MOA designated each party's responsibilities for the facility and laid the groundwork for DOE to enter into a Cooperative Agreement with Dayton History to design, build, and perform initial operations of the educational center. Dayton History is a nonprofit organization that operates several historical facilities in Montgomery County, Ohio. The Mound Development Corporation is the nonprofit organization that operates the Mound Business Park, privately owned property previously associated with the former DOE Mound Laboratory. The US Atomic Energy Commission began operations at the Mound Laboratory in 1948 as an integrated research, development, and production facility that supported the nation's weapons and energy programs. In October 2015, DOE entered into a five-year Cooperative Agreement with Dayton History to preserve, protect, and make accessible legacy records and information about the history of the Mound site through the development of an educational center. Years One and Two were for design and construction, respectively. Years Three through Five were for operation of the new center. The new center, located in a building owned by the Mound Development Corporation, would carry on the mission started by the MSEMA, a nonprofit organization started by former Mound site employees more than 15 years ago after DOE mission work ended at the site. As part of the cooperative agreement, Dayton History is responsible for creating interactive displays and exhibits to draw, entertain, and educate the public on the Mound site's significant contributions to the protection of the nation; developing educational programs; and initiating marketing strategies for the long-term sustainability of the educational center. In 2016, parties to the MOA officially named the facility the Mound Cold War Discovery Center. The MCWDC was designed to preserve the history of the Mound site through effective, entertaining, and efficient communication of the history of the Mound Laboratory; the site's legacy to the US weapons production complex and space exploration program; and promote understanding of what has happened at the site since DOE mission work ended, including environmental cleanup under the Comprehensive Environmental Response, Compensation, and Liability Act and the regulator-approved end state of industrial/commercial land use with associated institutional controls. The cooperative agreement requires Dayton History to develop and implement marketing strategies to support the long-term sustainability of the MCWDC at the Mound site. Dayton History will submit a report after the first year of operation and every year thereafter during the period of the cooperative agreement. These reports will describe and status efforts to obtain sustainability and offer for consideration any operational changes, corrections, or suggestions that may improve the potential for sustainability. Prior to the end of the cooperative agreement, a sustainability assessment decision will be made by DOE to determine whether the MCWDC has enough community interest to financially sustain itself at the Mound site. The status of the MCWDC Legacy Fund established by Dayton History will be considered in DoE's assessment determination. If DOE determines that the MCWDC is not sustainable at the Mound site, the exhibits will be relocated to Carillon Historical Park in Dayton, with the five key exhibits that were predetermined in the MOA to be placed on permanent display, thereby maintaining the legacy of the Mound site. Dayton History is required to submit a final closeout report at the end of Year Five of the cooperative agreement. The report will describe all activities completed under the agreement, provide an assessment of how project goals were achieved or not achieved, and describe how the legacy of the site will be preserved. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Federal Facility Agreement and Consent Order: Nevada National Security Site Use Restriction Management Plan with ROTC 1

This Use Restriction Management Plan (URMP) provides the information needed to create, modify, and manage use restrictions (URs) for sites on the Nevada National Security Site (NNSS), and sites accessed through the NNSS main gate, that were closed using the corrective action alternative (CAA) of closure in place under the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended). (Note: This pertains to those FFACO sites not managed by the U.S. Department of Energy [DOE], Legacy Management.) The closure in place alternative is used for sites closed with residual contamination at levels requiring corrective action as determined using the FFACO process. The URs contain and control all requirements for long-term monitoring. This URMP also serves as the single repository of the URs implemented under the FFACO that identify use restricted areas and contain the current requirements for inspections, maintenance, and monitoring of the UR. The requirements in these URs replace all requirements listed in previous documentation. This consolidates post-closure monitoring requirements into a single source that ensures completeness and consistency of UR requirements and information. Standardized UR forms were developed to clearly document post-closure requirements that are consistent with current protocols and to ensure consistent information is contained in the URs. Standard notification, summary, and site controls statements were developed for all URs with provisions to insert site-specific options in the text. Current protocols for Industrial Sites and Soils URs are defined in this document and in the Soils Risk-Based Corrective Action (RBCA) Evaluation Process (DOE/EMNV, 2018). The standardized UR forms that have been approved to date are listed in Appendix A. Additional UR forms will be added once the review and approval process has been completed.

54 ENVIRONMENTAL SCIENCES↗

Design and biocompatibility of endovascular aneurysm filling devices

We report that the rupture of an intracranial aneurysm, which can result in severe mental disabilities or death, affects approximately 30,000 people in the United States annually. The traditional surgical method of treating these arterial malformations involves a full craniotomy procedure, wherein a clip is placed around the aneurysm neck. In recent decades, research and device development have focused on new endovascular treatment methods to occlude the aneurysm void space. These methods, some of which are currently in clinical use, utilize metal, polymeric, or hybrid devices delivered via catheter to the aneurysm site. In this review, we present several such devices, including those that have been approved for clinical use, and some that are currently in development. We present several design requirements for a successful aneurysm filling device and discuss the success or failure of current and past technologies. Lastly, we also present novel polymeric based aneurysm filling methods that are currently being tested in animal models that could result in superior healing.

47 OTHER INSTRUMENTATION↗

Interventional Radiology in the Diagnosis, Management, and Follow-Up of Pseudoaneurysms

Arterial wall disruption, as a consequence of inflammation/infection, trauma (penetrating or blunt), or iatrogenic causes, may result in pseudoaneurysm formation. Currently, iatrogenic causes are increasing as a result of the growth of endovascular intervention. The frequency of other causes also seems to be increasing, but this may simply be the result of increased diagnosis by better imaging techniques, such as multidetector contrast-enhanced computed tomography. Clinically, pseudoaneurysms may be silent, may present with local or systemic signs, or can rupture with catastrophic consequences. Open surgical repair, previously the mainstay of treatment, has largely been replaced by image-guided occlusion methods. On the basis of an experience of over 100 pseudoaneurysms, treatments at various anatomical sites, imaging modalities used for accurate diagnosis, current changing therapeutic options for pseudoaneurysm management, approved embolization agents, and clinical follow-up requirements to ensure adequate treatment will be discussed. Image-guided direct percutaneous and endovascular embolization of pseudoaneurysms are established treatment options with favorable success rates and minimal morbidity. The pendulum has now swung from invasive surgical repair of pseudoaneurysms to that of image-guided interventional radiology.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2011

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, field notes are included in Appendix D, and photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted May 3 and 4, 2011. Maintenance was performed at CAU 424, CAU 453, and CAU 487. At CAU 424, two surface grade monuments at Landfill Cell A3-3 could not be located during the inspection. The two monuments were located and marked with lava rock on July 13, 2011. At CAU 453, there was evidence of animal burrowing. Animal burrows were backfilled on July 13, 2011. At CAU 487, one use restriction warning sign was missing, and wording was faded on the remaining signs. A large animal burrow was also present. The signs were replaced, and the animal burrow was backfilled on July 12, 2011. As a best management practice, the use restriction warning signs at CAU 407 were replaced with standard Federal Facility Agreement and Consent Order signs on July 13, 2011. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2011, and the vegetation monitoring report is included in Appendix F.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2013

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2013 and includes inspection and repair activities completed at the following CAUs: • CAU 400: Bomblet Pit and Five Points Landfill (TTR) • CAU 407: Roller Coaster RadSafe Area (TTR) • CAU 424: Area 3 Landfill Complexes (TTR) • CAU 453: Area 9 UXO Landfill (TTR) • CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. Photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted on May 14, 2013. Maintenance was performed at CAU 400, CAU 424, and CAU 453. At CAU 400, animal burrows were backfilled. At CAU 424, erosion repairs were completed at Landfill Cell A3-3, subsidence was repaired at Landfill Cell A3-4, and additional lava rock was placed in high-traffic areas to mark the locations of the surface grade monuments at Landfill Cell A3-3 and Landfill Cell A3-8. At CAU 453, two areas of subsidence were repaired and animal burrows were backfilled. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2013. The vegetation monitoring report is included in Appendix F.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2014

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2014 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Photographs taken during inspections are included in Appendix D. The annual post-closure inspections were conducted on May 28, 2014. Maintenance was required at CAU 407. Animal burrows were backfilled and erosion repairs were performed. Vegetation monitoring was performed at CAU 407 in June 2014. The vegetation monitoring report is included in Appendix E.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Battery Energy Storage System (BESS) Licensing and Permitting [Slides]

This presentation provides an overview of the licensing, permitting, and regulatory frameworks governing Battery Energy Storage Systems (BESS) across multiple international contexts. It outlines foundational permitting considerations - including safety standards, siting requirements, regulatory and environmental obligations, and interconnection processes - alongside typical pathways for installation, approval, and inspection. The presentation summarizes key technical standards such as NFPA 855 and IEEE guidelines, and emphasizes best practices for safe and effective deployment. A series of detailed case studies from South Africa, Chile, Mexico, Brazil, Costa Rica, Honduras, and the Dominican Republic illustrates how different countries structure approval authority, evaluate environmental impacts, and integrate BESS into national grid systems. The deck concludes with insights on emerging challenges, including evolving regulatory frameworks, financial viability, and the need for pricing mechanisms that accurately value storage services.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Orbital transfer vehicle launch operations study. Volume 1: Executive summary

The purpose was to use the operational experience at the launch site to identify, describe and quantify the operational impacts of the various configurations on the Kennedy Space Center (KSC) and/or space station launch sites. Orbital Transfer Vehicle (OTV) configurations are being developed/defined by contractor teams. Lacking an approved configuration, the KSC Study Team defined a Reference Configuration to be used for this study. This configuration then become the baseline for the identification of the facilities, personnel and crew skills required for processing the OTV in a realistic manner that would help NASA achieve the lowest possible OTV life cycle costs. As the study progressed, researchers' initial apraisal that the vehicle, when delivered, would be a sophisticated, state-of-the-art vehicle was reinforced. It would be recovered and reused many times so the primary savings to be gained would be in the recurring-cycle of the vehicle operations--even to the point where it would be beneficial to break from tradition and make a significant expenditure in the development of processing facilities at the beginning of the program.

Source record↗

ESPC ESA Training Series: Photovoltaic (PV) Project Considerations

This training covers technical, economic and other photovoltaic (PV) project considerations. Technical topics include cost-effectiveness, resilience, cybersecurity, and electrical considerations. In addition, other topics, such as compatibility with agency mission, site plans, coordination with the serving utility, the National Environmental Policy Act, and agency approval requirements. Considerations specific to third-party owned/third-party financed PV projects are also covered, as well as available resources and templates for project development. The training also includes a recap of the first session in the Energy Savings Performance Contracts Energy Sales Agreements (ESPC ESA) Webinar Series.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0

Corrective Action Unit (CAU) 105 is located in Area 2 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 105 is a geographical grouping of sites where there has been a suspected release of contamination associated with atmospheric nuclear testing. This document describes the planned investigation of CAU 105, which comprises the following corrective action sites (CASs): • 02-23-04, Atmospheric Test Site - Whitney • 02-23-05, Atmospheric Test Site T-2A • 02-23-06, Atmospheric Test Site T-2B • 02-23-08, Atmospheric Test Site T-2 • 02-23-09, Atmospheric Test Site - Turk These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on April 30, 2012, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 105. The site investigation process will also be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with all CAU 105 CASs are from atmospheric nuclear testing activities. The presence and nature of contamination at CAU 105 will be evaluated based on information collected from a field investigation. Radiological contamination will be evaluated based on a comparison of the total effective dose at sample locations to the dose-based final action level. The total effective dose will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters placed at the center of each sample location will be used to measure external radiological dose. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; DOE, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted after the plan is approved.

54 ENVIRONMENTAL SCIENCES↗

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 574: Neptune, Nevada National Security Site, Nevada

This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for closure of Corrective Action Unit (CAU) 574, Neptune. CAU 574 is included in the Federal Facility Agreement and Consent Order (FFACO) (1996 [as amended March 2010]) and consists of the following two Corrective Action Sites (CASs) located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); (2) CAS 12-45-01, U12e.05 Crater (Blanca). This plan provides the methodology for the field activities that will be performed to gather the necessary information for closure of the two CASs. There is sufficient information and process knowledge regarding the expected nature and extent of potential contaminants to recommend closure of CAU 574 using the SAFER process. Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, field screening, analytical results, the results of the data quality objective (DQO) process (Section 3.0), and an evaluation of corrective action alternatives (Appendix B), closure in place with administrative controls is the expected closure strategy for CAU 574. Additional information will be obtained by conducting a field investigation to verify and support the expected closure strategy and provide a defensible recommendation that no further corrective action is necessary. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.

54 ENVIRONMENTAL SCIENCES↗