Space station safety study - Condensed summary report
Summary of space station safety study
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Summary of space station safety study
Education in safety awareness, pilot training, and accident reporting is discussed. Safety awareness and risk management are examined. Both quantitative and qualitive risk management are explored. Information dissemination on safety is considered.
At the request of the United States (U.S.) government, the International Atomic Energy Agency (IAEA) assembled a team of 20 senior safety experts to review the regulatory framework for the safety of operating nuclear power plants in the United States. This review focused on the effectiveness of the regulatory functions implemented by the NRC and on its commitment to nuclear safety and continuous improvement. One suggestion resulting from that review was that the U.S. Nuclear Regulatory Commission (NRC) incorporate lessons learned from periodic safety reviews (PSRs) performed in other countries as an input to the NRC’s assessment processes.
The rationale for aviation incident reporting systems is presented and contrasted to some of the shortcomings of accident investigation procedures. The history of the United State's Aviation Safety Reporting System (ASRS) is outlined and the program's character explained. The planning elements that resulted in the ASRS program's voluntary, confidential, and non-punitive design are discussed. Immunity, from enforcement action and misuse of the volunteered data, is explained and evaluated. Report generation techniques and the ASRS data analysis process are described; in addition, examples of the ASRS program's output and accomplishments are detailed. Finally, the value of incident reporting for the acquisition of safety information, particularly human error data, is explored.
Safety analysis simulations have been carried out using the SAS4A/SASSYS-1 safety analysis code system to update the baseline set of results for the Versatile Test Reactor conceptual design. Results from a previous revision of this work provided input for the Conceptual Safety Design Report summarizing the overall safety basis for the VTR. This work will also support future analyses that will be required for Chapter 13, “Accident Analysis,” of a preliminary safety analysis report. A number of transients have been evaluated based on categories of postulated accident sequences suggested for consideration in NUREG-1537. Ultimately, the full spectrum of event initiators and subsequent accident sequences will be defined through a probabilistic risk assessment of the plant design following the implementation of the Licensing Modernization Project guidelines as described in the VTR Safety Design Strategy. Since that process is ongoing, the present analysis addresses several transients that are expected to be bounding accident scenarios that represent the three key ways to perturb a reactor: through changes to the core inlet temperature, mass flow rate, or reactivity. These correspond to a loss of heat sink (LOHS), loss of flow (LOF) or station blackout (SBO), and transient overpower (TOP), respectively. Both Protected and Unprotected versions of these transients have been evaluated, along with additional transients that include transient overpower with one stuck rod, pump coast-down failures, seismic events, and overcooling events. At the current stage of design, transient simulation results for the Versatile Test Reactor indicate that large safety margins exist for many event initiators. However, several “enabling” assumptions have been made, in terms of both design features and design limits, in order to perform the analyses; and these assumptions will need to be revised as the design matures. In addition, a larger spectrum of events needs to be evaluated as part of the on-going probabilistic risk assessment process.
The final safety analysis report (FSAR) or the safety analysis report (SAR) for a particular spent nuclear fuel (SNF) cask system documents models and calculations used to demonstrate that a system meets the regulatory requirements under all normal, off-normal, and accident conditions of spent fuel storage, and normal and accident conditions of transportation. FSAR/SAR calculations and approved content specifications are intended to be bounding in nature to certify cask systems for a variety of fuel characteristics with simplified SNF loading requirements. Therefore, in general, loaded cask systems possess excess and uncredited criticality margins (i.e., the difference between the licensing basis and the as-loaded calculations). This uncredited margin could be quantified by employing more detailed cask-specific evaluations that credit the actual as-loaded cask inventory, and taking into account full (actinide and fission product) burnup credit. This uncredited criticality margin could be potentially used to offset (1) uncertainties in the safety basis that needs to account for the effects of system aging during extended dry storage prior to transportation, and (2) increases in SNF system reactivity over a repository performance period (e.g., 10,000 years or more) as the system undergoes degradation and internal geometry changes. This paper summarizes an assessment of cask-specific, as-loaded criticality margins for SNF stored at eight reactor sites (215 loaded casks were analyzed) under fully flooded conditions to assess the margins available during transportation after extended storage. It is observed that the calculated k eff margin varies from 0.05 to almost 0.3 Δk eff for the eight selected reactor sites, demonstrating that significant uncredited safety margins are present. In addition, this paper evaluates the sufficiency of this excess margin in applications involving direct disposal of currently loaded SNF casks.
The final safety analysis report (FSAR) or the safety analysis report (SAR) for a particular spent nuclear fuel (SNF) cask (both bare fuel and canister-based) system documents models and calculations used to demonstrate that a system meets the regulatory requirements under all normal, off-normal, and accident conditions of spent fuel storage, as well as the normal and accident conditions of transportation. FSAR/SAR calculations and approved content specifications are intended to be bounding in nature to certify cask systems for a variety of fuel characteristics with simplified SNF loading requirements. Therefore, in general, loaded cask systems possess excess and uncredited criticality margins (i.e., the difference between the licensing basis and the as-loaded calculations). This uncredited margin could be quantified by (1) employing more detailed cask-specific evaluations that credit the actual as-loaded cask inventory and (2) taking into account full (actinide and fission product) burnup credit. This uncredited criticality margin could be used to offset uncertainties in the safety basis to account for the effects of system aging during extended dry storage prior to transportation. Additionally, the uncredited criticality margin could also potentially be credited to offset increases in SNF system reactivity that may occur over a repository performance period (e.g., 10,000 years or more) as the system undergoes degradation and internal geometry changes. This paper summarizes an assessment of cask-specific as-loaded criticality margins for 215 loaded casks of SNF stored at eight reactor sites under fully flooded conditions to assess the margins available during transportation after extended storage. It is observed that the calculated k{sub eff} margin varies from 0.05 to almost 0.3 Δk{sub eff} for the eight selected reactor sites, demonstrating that significant uncredited safety margins are present. In addition, this paper evaluates the sufficiency of this excess margin in applications involving direct disposal of currently loaded SNF canisters (for canister-based systems) in a repository. (authors)
This was a collaborative effort between Lawrence Livermore National Security, LLC as manager and operator of Lawrence Livermore National Laboratory (LLNL) and BioSearch Technologies Inc. (BTI) of Novato, California, to develop Multiplexed Molecular Assays for the Rapid and Sensitive Detection of Microbial Agents of Concern for Bioterrorism and Food Safety for the Food and Drug Administration (FDA) Center for Food Safety and Applied Nutrition (CFSAN). There are no outstanding leans for this project.
NASA's Aviation Safety Program in the NASA Aeronautics Research Mission Directorate, which seeks to make aviation safer by developing tools for flight data analysis and interpretation and then by transferring these tools to the aviation industry, sponsored the development of Morning Report software. The software, created at Ames Research Center with the assistance of the Pacific Northwest National Laboratory, seeks to detect atypicalities without any predefined parameters-it spots deviations and highlights them. In 2004, Sagem Avionics Inc. entered a licensing agreement with NASA for the commercialization of the Morning Report software, and also licensed the NASA Aviation Data Integration System (ADIS) tool, which allows for the integration of data from disparate sources into the flight data analysis process. Sagem Avionics incorporated the Morning Report tool into its AGS product, a comprehensive flight operations monitoring system that helps users detect irregular or divergent practices, technical flaws, and problems that might develop when aircraft operate outside of normal procedures. Sagem developed AGS in collaboration with airlines, so that the system takes into account their technical evolutions and needs, and each airline is able to easily perform specific treatments and to build its own flight data analysis system. Further, the AGS is designed to support any aircraft and flight data recorders.
Propellant and explosive safety activities - management planning, static electricity and lightning hazards, and sensitivity measurement
This report describes advances in lithium-ion battery safety by use of alternative electrolytes and separators. Electrolytes based on hydrofluoro ether solvents and sulfonimide salts were characterized to determine electrochemical performance, thermal stability, and decomposition products. Flammability of these electrolytes was also tested under known cell failure mode conditions. Separators based on high melting temperature polymers and ceramics were developed by fiber spinning, casting, and vapor deposition techniques. Resulting high melt integrity separators show good electrochemical performance and improved thermal stability compared to commercial polyolefin separator materials.
Ignition potential of polymeric materials related to pyrolysis characteristics of material and atmospheric factors
Elements of the shuttle program that directly affect the mission success and crew safety were investigated. These elements included the shuttle orbiter, the main engine, the solid rocket boosters, avionic system, ground support equipment and the approach and landing operations. The thermal protection systems were studied in detail. Crew training and ground simulation test procedures were reviewed.
Summary and evaluation of NASA occupational safety and health activities focus on: policy; personnel; funding. Training activities, inspection, record-keeping, and interagency activities are included.
Many research reactors have been or will be shut down and are candidates for decommissioning. Most of the respective countries neither have a decommissioning policy nor the required expertise and funds to effectively implement a decommissioning project. The IAEA established the Research Reactor Decommissioning Demonstration Project (R{sup 2}D{sup 2}P) to help answer this need. It was agreed to involve the Philippine Research Reactor (PRR-1) as model reactor to demonstrate 'hands-on' experience as it is just starting the decommissioning process. Other facilities may be included in the project as they fit into the scope of R{sup 2}D{sup 2}P and complement to the PRR-1 decommissioning activities. The key outcome of the R{sup 2}D{sup 2}P will be the decommissioning of the PRR-1 reactor. On the way to this final goal the preparation of safety related documents (i.e., decommissioning plan, environmental impact assessment, safety analysis report, health and safety plan, cost estimate, etc.) and the licensing process as well as the actual dismantling activities could provide a model to other countries involved in the project. It is expected that the R{sup 2}D{sup 2}P would initiate activities related to planning and funding of decommissioning activities in the participating countries if that has not yet been done.
A draft safety evaluation of the scenario for spherical resorcinol-formaldehyde (SRF) resin fire inside the ion exchange column was performed by the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Fire Safety organization. The result of this draft evaluation suggested a potential change of the fire safety classification for the Cesium Ion Exchange Process System (CXP) emergency elution vessels, equipment, and piping, which may be overly bounding based on the fire performance data from the manufacturer of the ion exchange resin selected for use at the WTP. To resolve this question, the fire properties of the SRF resin were measured by Southwest Research Institute (SwRI), following the American Society for Testing and Materials (ASTM) standard procedures, through a subcontract managed by Pacific Northwest National Laboratory (PNNL). For some tests, the ASTM standard procedures were not entirely appropriate or practical for the SRF resin material, so the procedures were modified and deviations from the ASTM standard procedures were noted. This report summarizes the results of fire safety tests performed and reported by SwRI. The efforts by PNNL were limited to summarizing the test results provided by SwRI into one consolidated data report. All as-received SwRI reports are attached to this report in the Appendix. Where applicable, the precision and bias of each test method, as given by each ASTM standard procedure, are included and compared with the SwRI test results of the SRF resin.
The Radioactive Waste Disposal Facility (RWDF) Buryakovka was constructed in 1986 as part of the intervention measures after the accident at Chernobyl NPP (ChNPP). Today, RWDF Buryakovka is still being operated but its maximum capacity is nearly reached. Plans for enlargement of the facility exist since more than 10 years but have not been implemented yet. In the framework of an European Commission Project DBE Technology GmbH prepared a safety analysis report of the facility in its current state (SAR) and a preliminary safety analysis report (PSAR) based on the planned enlargement. Due to its history RWDF Buryakovka does not fully comply with today's best international practices and the latest Ukrainian regulations in this area. The most critical aspects are its inventory of long-lived radionuclides, and the non-existent multi-barrier waste confinement system. A significant part of the project was dedicated, therefore, to the development of a methodology for the safety assessment taking into consideration the facility's special situation and to reach an agreement with all stakeholders involved in the later review and approval procedure of the safety analysis reports. Main aspect of the agreed methodology was to analyze the safety, not strictly based on regulatory requirements but on the assessment of the actual situation of the facility including its location within the Exclusion Zone. For both safety analysis reports, SAR and PSAR, the assessment of the long-term safety led to results that were either within regulatory limits or within the limits allowing for a specific situational evaluation by the regulator. (authors)