Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Runtime systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Achieving balanced execution through runtime detection of performance variation

Systems, apparatuses, and methods for achieving balanced execution in a multi-node cluster through runtime detection of performance variation are described. During a training phase, performance counters and an amount of time spent waiting for synchronization is monitored for a plurality of tasks for each node of the multi-node cluster. These values are utilized to generate a model which correlates the values of the performance counters to the amount of time spent waiting for synchronization. Once the model is built, the values of the performance counters are monitored for a period of time at the start of each task, and these values are input into the model. The model generates a prediction of whether a given node is on the critical path. If the given node is predicted to be on the critical path, the power allocation of the given node is increased.

97 MATHEMATICS AND COMPUTING↗

Center for Programming Models for Scalable Parallel Computing (Final Report)

As part of the Center for Programming Models for Scalable Parallel Computing, Rice University collaborated with project partners in the design, development and deployment of language, compiler, and runtime support for parallel programming models to support application development for the “leadership-class” computer systems at DOE national laboratories. Work over the course of this project has focused on the design, implementation, and evaluation of a second-generation version of Coarray Fortran. Research and development efforts of the project have focused on the CAF 2.0 language, compiler, runtime system, and supporting infrastructure. This has involved working with the teams that provide infrastructure for CAF that we rely on, implementing new language and runtime features, producing an open source compiler that enabled us to evaluate our ideas, and evaluating our design and implementation through the use of benchmarks. The report details the research, development, findings, and conclusions from this work.

97 MATHEMATICS AND COMPUTING↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

CALORIE: A Constraint Language and Optimizing Runtime for Exascale Power Management (Final Report)

This final technical report summarizes the key accomplishments on the CALORIE project, a DOE Early Career award received by PI Henry Hoffmann at the University of Chicago. CALORIE’s main goal was to create principled methodologies, tools, and practices to help scientists and high-performance computing (HPC) operators maximize the performance and insights obtained from scientific computing applications in the face of exascale power constraints. The project accomplished these goals by completing the following objectives: • Designing a language for describing application goals (including constraints and objectives) and system capabilities. The application goals will include things like which simulations or simulations plus in situ analysis will be run together, what the power constraints are, and what requirements there are for in situ analysis (for example, a desired frame rate for visualization). The system capabilities include all components that can be adjusted to tradeoff power and performance. • Designing a runtime system that takes specified goals and capabilities and dynamically determines what capabilities to use to meet the goals. This runtime adapts to changes in goals, application behavior, or available capabilities to automatically maintain the goals despite unexpected disturbances. • Developing a foundational understanding of how power constraints affect the problem of scheduling applications in large-scale systems. This report provides an overview of the accomplishments related to each of these key objectives.

97 MATHEMATICS AND COMPUTING↗

Integration of energy storage with diesel generation in remote communities

Highlights Battery energy storage may improve energy efficiency and reliability of hybrid energy systems composed by diesel and solar photovoltaic power generators serving isolated communities. In projects aiming update of power plants serving electrically isolated communities with redundant diesel generation, battery energy storage can improve overall economic performance of power supply system by reducing fuel usage, decreasing capital costs by replacing redundant diesel generation units, and increasing generator system life by shortening yearly runtime. Fast-acting battery energy storage systems with grid-forming inverters might have potential for improving drastically the reliability indices of isolated communities currently supplied by diesel generation. Abstract This paper will highlight unique challenges and opportunities with regard to energy storage utilization in remote, self-sustaining communities. The energy management of such areas has unique concerns. Diesel generation is often the go-to power source in these scenarios, but these systems are not devoid of issues. Without dedicated maintenance crews as in large, interconnected network areas, minor interruptions can be frequent and invasive not only for those who lose power, but also for those in the community that must then correct any faults. Although the immediate financial benefits are perhaps not readily apparent, energy storage could be used to address concerns related to reliability, automation, fuel supply concerns, generator degradation, solar utilization, and, yes, fuel costs to name a few. These ideas are shown through a case study of the Levelock Village of Alaska. Currently, the community is faced with high diesel prices and a difficult supply chain, which makes temporary loss of power very common and reductions in fuel consumption very impactful. This study will investigate the benefits that an energy storage system could bring to the overall system life, fuel costs, and reliability of the power supply. The variable efficiency of the generators, impact of startup/shutdown process, and low-load operation concerns are considered. The technological benefits of the combined system will be explored for various scenarios of future diesel prices and technology maintenance/replacement costs as well as for the avoidance of power interruptions that are so common in the community currently. Graphic abstract Discussion In several cases, energy storage can provide a means to promote energy equity by improving remote communities’ power supply reliability to levels closer to what the average urban consumer experiences at a reduced cost compared to transmission buildout. Furthermore, energy equity represents a hard-to-quantify benefit achieved by the integration of energy storage to isolated power systems of under-served communities, which suggests that the financial aspects of such projects should be questioned as the main performance criterion. To improve battery energy storage system valuation for diesel-based power systems, integration analysis must be holistic and go beyond fuel savings to capture every value stream possible.

25 ENERGY STORAGE↗

Award ER25750: Coordinated Infrastructure for Fault Tolerance Systems Indiana University Final Report

The main purpose of the Coordinated Infrastructure for Fault Tolerance in Systems initiative has been to conduct research with a goal of providing end-to-end fault tolerance on a systemwide basis for applications and other system software. While fault tolerance has been an integral part of most high-performance computing (HPC) system software developed over the past decade, it has been treated mostly as a collection of isolated stovepipes. Visibility and response to faults has typically been limited to the particular hardware and software subsystems in which they are initially observed. Little fault information is shared across subsystems, allowing little flexibility or control on a system-wide basis, making it practically impossible to provide cohesive end-to-end fault tolerance in support of scientific applications. As an example, consider faults such as communication link failures that can be seen by a network library but are not directly visible to the job scheduler, or consider faults related to node failures that can be detected by system monitoring software but are not inherently visible to the resource manager. If information about such faults could be shared by the network libraries or monitoring software, then other system software, such as a resource manager or job scheduler, could ensure that failed nodes or failed network links were excluded from further job allocations and that further diagnosis could be performed. As a founding member and one of the lead developers of the Open MPI project, our efforts over the course of this project have been focused on making Open MPI more robust to failures by supporting various fault tolerance techniques, and using fault information exchange and coordination between MPI and the HPC system software stack from the application, numeric libraries, and programming language runtime to other common system components such as jobs schedulers, resource managers, and monitoring tools.

97 MATHEMATICS AND COMPUTING↗

XPRESS: eXascale PRogramming Environment and System Software, Final Report

The University of Oregon (UO) was a partner in the XPRESS project together with Sandia National Laboratories (SNL), Indiana University (IU), Lawrence Berkeley National Laboratory (LBL), Louisiana State University (LSU), Oak Ridge National Laboratory (ORNL), University of Houston (UH), and University of North Carolina (RENCI). UO's objective in the project was to develop "APEX (Asynchronous Performance Environment for eXascale)": performance measurement, analysis, feedback and control infrastructure to asynchronous tasking runtimes, specifically HPX (LSU) and HPX-5 (IU). During the project period, our efforts focused on the need to measure complex tasking models where the traditional instrumentation methods would not work due to an absent/meaningless call-path context and runtime control of task pre-emption and resumption, usually on a different operating system thread. In addition to the challenges of performance measurement, we developed a framework to provide information from all levels of the stack (hardware, operating system, runtime, application) to a feedback & control mechanism for controlling concurrency, task granularity, networking parameters, and other aspects of execution in order to improve execution performance, throughput and/or efficiency. UO demonstrated these developments on leading edge HPC machines at large scale, including a 2017 Gordon Bell submission in which APEX was used to optimize key bottlenecks in an astrophysics application. The following final report summarizes our accomplishments during the XPRESS project.

99 GENERAL AND MISCELLANEOUS↗

A Strawman for an HPC PowerStack

The landscape of High-Performance Computing (HPC) is changing as we enter the exascale era and power and energy management are key design points for any next generation of supercomputers. Efficiently utilizing procured power and optimizing performance of scientific applications under power and energy constraints is challenging due to several reasons including dynamic phase behavior, processor manufacturing variability and increasing heterogeneity of node-level components. Extending the scope from the node- and application-level up to the system-level introduces further challenges on top of power-unaware job scheduling, which is known to be NP-hard on its own. While there exists several individual efforts across the community to research automatic techniques for managing power and energy better, the majority of these techniques have been specialized to meet the needs of a specific HPC center or specific optimization goals and provide little support to connect them to each other. Some projects, most notably the PowerAPI efforts [1], discuss interfaces that form a good starting point for full stack integration, but these interfaces still need to be hooked up to the wide range of software components offered by academic partners, developers or vendors. Furthermore, a recent survey conducted by the EE HPC WG concluded that the majority of such techniques have lacked the application-awareness required to achieve the best system performance and throughput. Other observations were that each technique tended to target management of power and energy for a different subset of the site or system hardware and that the different techniques tended to perform management at different (and often conflicting) granularities. Unfortunately, the existing techniques have not been designed to coexist simultaneously on one site and cooperate on management in an integrated manner [2]. The lack of application-awareness, lack of coordinated management across different granularities, and the lack of widely accepted interfaces and consequent limited connectivity between modules, can result in substantially underutilized Watts and FLOPS. To address these gaps, the HPC community needs a holistic stack for power and energy management and none currently exists. In our view, a holistic stack is one that is extensible enough to support the present and anticipated future needs of various different HPC centers, one that achieves best system performance and throughput through application-awareness, one that is designed to coordinate management at different granularities, and one that enables the seamless integration of software components from different developers and vendors. In this seminar, our goal is bring together experts from academia, research laboratories, and industry in order to take stock of existing approaches, design points and power management concepts and requirements at the various participant’s institutions, and to design concepts for a holistic power and energy management stack, which we refer to as the HPC PowerStack. Further, we hope to take steps toward defining the interfaces necessary for providing a complete prototype shared among many groups. The intention is to align development and research efforts across the community so that we may share development resources, avoid duplicating effort, agree on common interfaces and reap the rewards together as a community. The intended final outcome of this collaboration will be a holistic, flexible and extensible concept of a software stack ecosystem that allows us to combine product-grade open-source software components to enable runtime optimization of system power, energy, and performance.

97 MATHEMATICS AND COMPUTING↗

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

A Hybrid Constraint Representation and Reasoning Framework

In this paper, we introduce JNET, a novel constraint representation and reasoning framework that supports procedural constraints and constraint attachments, providing a flexible way of integrating the constraint system with a runtime software environment and improving its applicability. We describe how JNET is applied to a real-world problem - NASA's Earth-science data processing domain, and demonstrate how JNET can be extended, without any knowledge of how it is implemented, to meet the growing demands of real-world applications.

Golden, Keith↗

Swarm Mentality: Toward Automatic Swarm State Awareness with Runtime Verification

Cyber-Physical Systems (CPSs) already exhibit impressive performance in all areas of human life, and swarms of CPSs promise to increase their capabilities even further. However, to effectively utilize CPS swarms their complexity of operation has to scale sub-linearly with the number of swarm members. Presenting the swarm to an operator as a single entity almost eliminates the additional per-member overhead entirely. To operate a swarm as one entity, and/or to increase the swarm’s autonomy, the operator and the swarm members need to reason and communicate at the same level of abstraction, i.e. the swarm needs a sense of “self.” Therefore, we require the ability to specify whole swarm properties yet monitor them at the member level. We examine one architecture for achieving this awareness by: 1) Defining a taxonomy for comparing techniques that synthesize this belief-state 2) Propose use of the Runtime Verification formal method to fill this role 3) Present preliminary designs for extending and embedding such a system in the Distributed Spacecraft Autonomy architecture to generate per-member monitors from swarm level specification.

Runtime Verification↗

Clang UPC Compiler (Clang UPC) v3.9.1-1

Clang Unified Parallel C (Clang UPC) provides a compilation and execution environment for programs written in the UPC (Unified Parallel C) language. The Clang UPC compiler extends the capabilities of the Clang LLVM C compiler to comply with the UPC Language Specification version 1.3. It includes support for UPC collectives and a configurable pointer-to-shared representation. The compiler generates programs that run on a wide variety of systems ranging from workstations to leadership-class supercomputers, in conjunction with the Berkeley UPC runtime and GASNet communication system. This compiler generates assembly code / object code directly for Intel processors and IBM PowerPC.

Hargrove, Paul↗

Achieving Runtime State Verification Assurance in Critical Cyber-Physical Infrastructures

Industrial Cyber-Physical Systems (ICPS) are an essential backbone of national critical infrastructures. They help monitor and control crucial cyber-enabled services such as energy generation. Commonly ICPS monitors the physical process through Supervisory Control and Data Acquisition (SCADA) systems. The SCADA ecosystem takes critical real-time and future system operational decisions based on the runtime state behavior of field sensors. Traditional SCADA systems use legacy and insecure communication protocols such as the Modbus protocol that lack adequate security mechanisms to provide robust runtime state behavior assurance of constrained field sensors. Therefore, constrained field sensors are commonly vulnerable to standard semantic attacks that gradually change the behavior state of infected devices. This paper discusses process integrity assurance techniques necessary to enhance the security of behavior-based protocols such as the Modbus protocol. The Runtime State Verification (RSV) protocol proposed in this paper aims to address semantic attacks in the SCADA ecosystem by integrating behavior-based Mandatory Results Automata (MRA) and a Hyperledger Fabric (HLF) network. The RSV protocol provides high process integrity assurance through enhanced behavior-based MRA suitable for the constrained field devices. A proof of concept of the RSV protocol has been evaluated in an emulated water-tube boiler. Preliminary evaluations of the RSV protocol aimed to measure the efficiency of the proposed protocol by monitoring an Combustion Efficiency (CE) process necessary to preserve optimal combustion, thus minimizing costs and future maintenance of water-tube boilers. We analyze the overall network overhead and latency of the proposed RSV protocol by evaluating the HLF network performance and comparing the proposed RSV protocol with the state-ofart BloSPAI protocol. Through the preliminary evaluations of the proposed RSV protocol, this paper demonstrates that the proposed RSV protocol overcomes the shortcomings and network overhead of the BloSPAI protocol by integrating behavior-based authentication through novel MRAs and HLF networks.

Rivera, Abel Gomez↗

Predicting runtime and resource utilization of jobs on integrated cloud and HPC systems

Recent advances in virtualization technologies used in cloud computing offer performance that closely approaches bare-metal levels. Combined with specialized instance types and high-speed networking services for cluster computing, cloud platforms have become a compelling option for high-performance computing (HPC). However, most current batch job schedulers in HPC systems are designed for homogeneous clusters and make decisions based on limited information about jobs and system status. Scientists typically submit computational jobs to these schedulers with a requested runtime that is often over- or under-estimated. More accurate runtime predictions can help schedulers make better decisions and reduce job turnaround times. Here, they can also support decisions about migrating jobs to the cloud to avoid long queue wait times in HPC systems.

97 MATHEMATICS AND COMPUTING↗