At least 271 records · Page 15

SOFIA Program SE and I Lessons Learned

Once a "Troubled Project" threatened with cancellation, the Stratospheric Observatory for Infrared Astronomy (SOFIA) Program has overcome many difficult challenges and recently achieved its first light images. To achieve success, SOFIA had to overcome significant deficiencies in fundamental Systems Engineering identified during a major Program restructuring. This presentation will summarize the lessons learn in Systems Engineering on the SOFIA Program. After the Program was reformulated, an initial assessment of Systems Engineering established the scope of the problem and helped to set a list of priorities that needed to be work. A revised Systems Engineering Management Plan (SEMP) was written to address the new Program structure and requirements established in the approved NPR7123.1A. An important result of the "Technical Planning" effort was the decision by the Program and Technical Leadership team to re-phasing the lifecycle into increments. The reformed SOFIA Program Office had to quickly develop and establish several new System Engineering core processes including; Requirements Management, Risk Management, Configuration Management and Data Management. Implementing these processes had to consider the physical and cultural diversity of the SOFIA Program team which includes two Projects spanning two NASA Centers, a major German partnership, and sub-contractors located across the United States and Europe. The SOFIA Program experience represents a creative approach to doing "System Engineering in the middle" while a Program is well established. Many challenges were identified and overcome. The SOFIA example demonstrates it is never too late to benefit from fixing deficiencies in the System Engineering processes.

Ray, Ronald J.↗

Collaborative Systems Engineering in the Ascent Abort-2 Crew Module/Separation Ring Project

Generally speaking, systems engineering (SE) tool-sets face a dilemma balancing power and accessibility. High-powered SE tools (MagicDraw, Cradle, Core, etc.) tend to be specialized and are available only to highly trained Systems Engineers, and/or through the use of a 'back room' developer team making the output products available to the broader team. On the other hand, highly accessible tools (MS Word, Excel, etc.) do not have the power to implement SE in a rigorous manner. NASA has to test all aspects of the new human-rated Orion Multi-Purpose Crew Vehicle spacecraft prior to its first crewed mission. The test program includes uncrewed launch abort flight tests to demonstrate the capability to save the crew in the event that a launch failure occurs. Orion's second abort flight test will be a low-altitude flight test known as "Ascent Abort 2 (AA-2)." This test is currently scheduled to be carried out at Cape Canaveral Air Force Station's Space Launch Complex 46 (SLC-46) in Florida in 2019. NASA's in-house AA-2 Crew Module and Separation Ring (CSR) Team is producing the crew module and separation ring. Operating jointly as both an Advanced Exploration Systems (AES) Project and an Orion Project, the CSR project charter includes development of innovative, streamlined and generally more efficient practices for creation of flight hardware and software. One result of this tasking has been development of a collaborative and data-centric systems engineering environment within the team's shared web environment (Microsoft SharePoint). Through the use of built-in, 'out of the box capabilities' present in MS SharePoint, the CSR Systems Engineering team has created (with some limited developer support) a data-centric architecture for the project's SE implementation, including functional and interface analysis, requirements development and management, risk management, verification planning and management, test results, and end item management. Data elements are linked between data structures so as to define and control relationships between item types, link requirements to parents and children, and link tests to the requirements that they verify. The overall project team integration is increased by also linking SE content to project management content over the project life cycle, including team communication, action items, configuration management, decisional and meeting materials, and life cycle reviews. This presentation will provide an overview of the collaborative SE environment, showing how it provides the power for a number of SE tasks while still providing the accessibility and transparency to allow the full project team to collaborate and succeed. Given the project phase, we'll be able to present a nearly full lifecycle discussion, from concept through verification and approaching delivery.

Systems Engineering environments↗

NASA’s Top Human System Research and Technology Needs for Mars

NASA is working with industry and international partners to return humans to the Moon and to eventually enable humans to explore Mars. Within NASA, several organizations work together to identify, prioritize, fund, execute, and operationalize the research and technology development (R&TD) that will be necessary to enable crew health and performance (CHP) during these future missions. These organizations include flight programs, the Health and Medical Technical Authority (HMTA), the Human Research Program, the Space Technology Mission Directorate, System Capability Leadership Teams, and other organizations, many of which existed for several years prior to the creation of the Moon-to-Mars (M2M) Program Office in 2023. A variety of constructs, vocabularies, and processes exist for managing risks and supporting strategic planning across these organizations. For example, M2M objectives, program risks, human system risks, human research gaps, capability gaps, and envisioned futures are all constructs currently used within NASA to identify and prioritize R&TD needs. These strategic planning constructs are evolving to allow M2M objectives and R&TD investments to be aligned and traced at a detailed level. A recognized need exists among stakeholder organizations to identify and communicate the highest CHP R&TD priorities in a unified and digestible way that addresses the perspectives of NASA’s CHP community. To achieve this, the HMTA arranged a series of discussions with representatives of NASA’s CHP community, during which the 8 highest priority CHP capabilities that will enable human missions to Mars, referred to as the “top human system capability needs for Mars”, were identified. The list includes Earth-independent human operations; Mars-duration food system; Mars-duration effects on human physiology; risk mitigations for vehicle atmospheres; computational injury and anthropometric models; exploration exercise countermeasures; individual variability in responses to spaceflight; and sensorimotor countermeasures. Existing tools and processes for strategic planning and risk management were evaluated, as well as the technical practicalities, cost, and schedule feasibility associated with potential R&TD investments in different capability need areas. This capability needs report is not owned by any one NASA organization and does not replace existing strategic or program planning processes; rather it aims to complement and inform them with a unified set of community generated priorities. These top capability needs will be re-evaluated periodically based on R&TD progress and the evolving M2M architecture.

technology gaps↗

NASA’s Top Human System Research and Technology Needs for Mars

NASA is working with industry and international partners to return humans to the Moon and to eventually enable humans to explore Mars. Within NASA, several organizations work together to identify, prioritize, fund, execute, and operationalize the research and technology development (R&TD) that will be necessary to enable crew health and performance (CHP) during these future missions. These organizations include flight programs, the Health and Medical Technical Authority (HMTA), the Human Research Program, the Space Technology Mission Directorate, System Capability Leadership Teams, and other organizations, many of which existed for several years prior to the creation of the Moon-to-Mars (M2M) Program Office in 2023. A variety of constructs, vocabularies, and processes exist for managing risks and supporting strategic planning across these organizations. For example, M2M objectives, program risks, human system risks, human research gaps, capability gaps, and envisioned futures are all constructs currently used within NASA to identify and prioritize R&TD needs. These strategic planning constructs are evolving to allow M2M objectives and R&TD investments to be aligned and traced at a detailed level. A recognized need exists among stakeholder organizations to identify and communicate the highest CHP R&TD priorities in a unified and digestible way that addresses the perspectives of NASA’s CHP community. To achieve this, the HMTA arranged a series of discussions with representatives of NASA’s CHP community, during which the 8 highest priority CHP capabilities that will enable human missions to Mars, referred to as the “top human system capability needs for Mars”, were identified. The list includes Earth-independent human operations; Mars-duration food system; Mars-duration effects on human physiology; risk mitigations for vehicle atmospheres; computational injury and anthropometric models; exploration exercise countermeasures; individual variability in responses to spaceflight; and sensorimotor countermeasures. Existing tools and processes for strategic planning and risk management were evaluated, as well as the technical practicalities, cost, and schedule feasibility associated with potential R&TD investments in different capability need areas. This capability needs report is not owned by any one NASA organization and does not replace existing strategic or program planning processes; rather it aims to complement and inform them with a unified set of community generated priorities. These top capability needs will be re-evaluated periodically based on R&TD progress and the evolving M2M architecture.

technology gaps↗

Managing information technology security risk

Information Technology (IT) Security Risk Management is a critical task for the organization to protect against the loss of confidentiality, integrity and availability of IT resources. As systems bgecome more complex and diverse and and attacks from intrusions and malicious content increase, it is becoming increasingly difficult to manage IT security risk. This paper describes a two-pronged approach in addressing IT security risk and risk management in the organization: 1) an institutional enterprise appraoch, and 2) a project life cycle approach.

security toolset↗

Managing Research in a Risk World

The Office of Chief Medical Officer (OCHMO) owns all human health and performance risks managed by the Human System Risk Board (HSRB). While the HSRB manages the risks, the Human Research Program (HRP) manages the research portion of the overall risk mitigation strategy for these risks. The HSRB manages risks according to a process that identifies and analyzes risks, plans risk mitigation and tracks and reviews the implementation of these strategies according to its decisions pertaining to the OCHMO risk posture. HRP manages risk research work using an architecture that describes evidence-based risks, gaps in our knowledge about characterizing or mitigating the risk, and the tasks needed to produce deliverables to fill the gaps and reduce the risk. A planning schedule reflecting expected research milestones is developed, and as deliverables and new evidence are generated, research progress is tracked via the Path to Risk Reduction (PRR) that reflects a risk's research plan for a design reference mission. HRP's risk research process closely interfaces with the HSRB risk management process. As research progresses, new deliverables and evidence are used by the HSRB in conjunction with other operational and non-research evidence to inform decisions pertaining to the likelihood and consequence of the risk and risk posture. Those decisions in turn guide forward work for research as it contributes to overall risk mitigation strategies. As HRP tracks its research work, it aligns its priorities by assessing the effectiveness of its contributions and maintaining specific core competencies that would be invaluable for future work for exploration missions.

Anton, W.↗

Risk Mitigation for Managing On-Orbit Anomalies

This slide presentation reviews strategies for managing risk mitigation that occur with anomalies in on-orbit spacecraft. It reviews the risks associated with mission operations, a diagram of the method used to manage undesirable events that occur which is a closed loop fault analysis and until corrective action is successful. It also reviews the fish bone diagram which is used if greater detail is required and aids in eliminating possible failure factors.

La, Jim↗

Managing Spacecraft Risk With Space Environments Testing Via Process Safety Management At The NASA Neil A. Armstrong Test Facility

The NASA Glenn Research Center’s Neil A. Armstrong Test Facility (GRC-ATF) is home to several unique, world class aerospace test facilities, including the In-Space Propulsion (ISP) Facility. The ISP Facility is NASA’s largest chamber designed to store and transfer large quantities of liquid hydrogen and liquid oxygen; and is designed to support developmental testing of upper stage chemical propulsion systems as well as fully integrated stages. The facility is also capable of providing thermal-vacuum simulation services to support testing of aerospace hardware, Cryogenic Fluid Management (CFM) systems and other In-Space propulsion programs. The U.S. Occupational Safety and Health Administration’s (OSHA) Process Safety Management (PSM) of Highly Hazardous Chemicals Standard (29 CFR 1910.119) is an analytical tool focused on preventing the release of chemicals and other energy sources. In a short timeframe, GRC-ATF was required to restore a PSM Program at the Facility. Although the summarized work is specific to the ground testing of rockets and space vehicles, the ISP Facility is used to verify system level requirements, some of these are safety requirements, and thus key to managing risks in space.

Safety↗

Managing Spacecraft Risk with Space Environments Testing via Process Safety Management at the NASA Neil A. Armstrong Test Facility (GRC-ATF)

The NASA Glenn Research Center’s Neil A. Armstrong Test Facility (GRC-ATF) is home to several unique, world class aerospace test facilities, including the In-Space Propulsion (ISP) Facility. The ISP Facility is NASA’s largest chamber designed to store and transfer large quantities of liquid hydrogen and liquid oxygen; and is designed to support developmental testing of upper stage chemical propulsion systems as well as fully integrated stages. The facility is also capable of providing thermal-vacuum simulation services to support testing of aerospace hardware, Cryogenic Fluid Management (CFM) systems and other In-Space propulsion programs. The U.S. Occupational Safety and Health Administration’s (OSHA) Process Safety Management (PSM) of Highly Hazardous Chemicals Standard (29 CFR 1910.119) is an analytical tool focused on preventing the release of chemicals and other energy sources. In a short timeframe, GRC-ATF was required to restore a PSM Program at the Facility. Although the summarized work is specific to the ground testing of rockets and space vehicles, the ISP Facility is used to verify system level requirements, some of these are safety requirements, and thus key to managing risks in space.

Safety↗

Miserable Risk Estimation: “Managing” Low-Probability, High-Consequence Risks

As with all bold endeavors, NASA missions must identify and manage their risks. While estimating the consequences of these risks is typically straightforward, it can be challenging to estimate their likelihood. This is especially true for low-probability risks, due both to the lack of operational data and the cognitive biases humans bring to risk estimation. In this talk, I will present both a tongue-in-cheek and “Management Science” approach to estimating low-probability, high-consequence risks. I then summon my Human Factors colleagues to provide NASA mission managers with the gentle guidance needed to avoid common errors in risk assessment

Mary K Kaiser↗

Risk-Informed Decision Making: Application to Technology Development Alternative Selection

NASA NPR 8000.4A, Agency Risk Management Procedural Requirements, defines risk management in terms of two complementary processes: Risk-informed Decision Making (RIDM) and Continuous Risk Management (CRM). The RIDM process is used to inform decision making by emphasizing proper use of risk analysis to make decisions that impact all mission execution domains (e.g., safety, technical, cost, and schedule) for program/projects and mission support organizations. The RIDM process supports the selection of an alternative prior to program commitment. The CRM process is used to manage risk associated with the implementation of the selected alternative. The two processes work together to foster proactive risk management at NASA. The Office of Safety and Mission Assurance at NASA Headquarters has developed a technical handbook to provide guidance for implementing the RIDM process in the context of NASA risk management and systems engineering. This paper summarizes the key concepts and procedures of the RIDM process as presented in the handbook, and also illustrates how the RIDM process can be applied to the selection of technology investments as NASA's new technology development programs are initiated.

Dezfuli, Homayoon↗

Management of Risks Associated with Application of Novel Materials in Novel Operating Environments in Novel Reactor Designs

There is currently no widely agreed, detailed general method for licensing a novel plant incorporating novel materials (or materials being deployed in novel environments); in many such situations, there are no directly applicable engineering code cases for decision-makers (including regulators) to rely on. This paper discusses a framework for solving this problem that is based on the Reliability and Integrity Management (RIM) approach delineated in ASME BPVC Section XI Division 2. NRC Regulatory Guide 1.246, Rev. 0, endorses, with conditions, the subject portion of the ASME Code. The proposed framework is meant to support development of a licensing case by addressing certain technical challenges. The framework discussed here is compatible with the Licensing Modernization Project, but applying it in a specific case will call for advances in the state of practice, if not the state of the art. The RIM approach calls for applicants to (a) allocate reliability targets to plant structures, systems, and components (SSCs), (b) show that they are able to relate the currently observed physical condition of each SSC in the program to its failure probability well enough to determine whether the target reliability allocations are being satisfied, allowing for uncertainty related to the novelty of the materials/designs/operating environments, and (c) be able to demonstrate that the proposed program of surveillances will reliably detect unacceptable degradation of an SSC before SSC failure occurs. These challenges are discussed in the paper, and a potentially applicable modeling approach based on cumulative damage rather than failure rates is briefly illustrated.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An Improved Risk Priority Measure for the Management of Project Risk

Monte Carlo-based project risk models are essential tools in project risk management, particularly for large, complex projects in which it is difficult to glean intuitively the importance of individual risks to the overall project. Conventional correlation-based methods for measuring the importance of contributing risks in such models are argued here to be both statistically flawed and unintuitive in the importance metrics they produce. Drawing on and adapting methods more traditionally associated with engineering risk models, Risk Reduction Worth (RRW) is introduced as an importance measure. RRW is shown to be statistically robust and provide an easily interpretable, quantitative measure of the importance of a risk to the overall performance of a project; specifically, measuring the extent to which removal of a risk would improve confidence in project outcomes. To ensure practicality of the method, an approach is described in which RRWs can be produced for all contributing risks based on a single Monte Carlo sample. This is demonstrated through application to a large, complex project risk model from which intuitive risk importance insights provide a robust, transparent basis for the allocation of risk management resources.

Risk↗

Risky Business

During my internship I worked on two major projects, recommending improvements for the Center's Risk Management Workshop and helping with the strategic planning efforts for Safety and Mission Assurance (S&MA). The risk management improvements is the key project I worked on this semester through my internship, while the strategic planning is the secondary assignment. S&MA Business Office covers both aspects in its delegation, getting both spans some of the work done in the office. A risk is a future event with a negative consequence that has some probability of occurring. Safety and Mission Assurance identifies, analyzes, plans, and tracks risk. The directorate offers the Center a Risk Management Workshop, and part of the ongoing efforts of S&MA is to make continuous improvements to the RM Workshop. By using the Project Management Institute's (PMI) Standard for Risk Management, I performed a gap analysis to make improvements for our materials. I benchmarked the PMI's Risk Management Standard, compared our Risk Management Workshop materials to PMI's standard, and identified any gaps in our material. My major findings were presented to the Business Office of S&MA for a decision on whether or not to incorporate the improvements. These suggestions were made by attending JSC working group meetings, Health, Safety and Environment (HSE) panel reviews and various risk review meetings. The improvements provide better understanding of risk management processes and enhanced risk tracking knowledge and skills. Risk management is an integral part of any engineering discipline, getting exposed to this section of engineering will greatly help shape my career in the future. Johnson Space Center is a world leader in risk management processes; learning risk management here gives me a huge advantage over my peers, as well as understanding decision making in the context of risk management will help me to be a well-rounded engineer. Strategic planning is an area I had not previously studied. Helping with the strategic planning efforts in S&MA has taught me how organizations think and function as a whole. S&MA is adopting a balanced scorecard approach to strategic planning. As part of this planning method strategic themes, objectives, and initiatives are formed. I attended strategic theme team workshops that formed the strategy map for the directorate and gave shape to the plan. Also during these workshops the objectives were discussed and built. Learning the process for strategic planning has helped me better understand how organizations and businesses function, which also helps me to be a more effective employee. Other assignments I had during my internship included completing the Safety and Mission Assurance Technical Excellent Program (STEP) Level 1, as well as doing a two week rotation through the Space Exploration division in S&MA, specifically working with a thermal protection systems (TPS) engineer. While working there, I learned about the Orion capsule and the SpaceX Dragon cargo capsule. I attended meetings to prepare the engineers for the upcoming Critical Design Reviews for both capsules and reviewed test data. Learning risk management, strategic planning, and working in the Space Exploration division has taught me about many aspects of S&MA. My internship at NASA has given me new experiences and taught me numerous subjects that I would have otherwise not learned. This opportunity has expanded my educational horizons and is helping me to become a more useful engineer and employee.

Yarbrough, Katherine↗

Cross-Cutting Risk Framework: Mining Data for Common Risks Across the Portfolio

The National Aeronautics and Space Administration (NASA) defines risk management as an integrated framework, combining risk-informed decision making and continuous risk management to foster forward-thinking and decision making from an integrated risk perspective. Therefore, decision makers must have access to risks outside of their own project to gain the knowledge that provides the integrated risk perspective. Through the Goddard Space Flight Center (GSFC) Flight Projects Directorate (FPD) Business Change Initiative (BCI), risks were integrated into one repository to facilitate access to risk data between projects. With the centralized repository, communications between the FPD, project managers, and risk managers improved and GSFC created the cross-cutting risk framework (CCRF) team. The creation of the consolidated risk repository, in parallel with the initiation of monthly FPD risk managers and risk governance board meetings, are now providing a complete risk management picture spanning the entire directorate. This paper will describe the challenges, methodologies, tools, and techniques used to develop the CCRF, and the lessons learned as the team collectively worked to identify risks that FPD programs projects had in common, both past and present.

risk-informed decision making↗

The Role of Space Medicine in Management of Risk in Spaceflight

The purpose of Space Medicine is to ensure mission success by providing quality and comprehensive health care throughout all mission phases to optimize crew health and performance and to prevent negative long-term health consequences. Space flight presents additional hazards and associated risks to crew health, performance, and safety. With an extended human presence in space it is expected that illness and injury will occur on orbit, which may present a significant threat to crew health and performance and to mission success. Maintaining crew health, safety and performance and preventing illness and injury are high priorities necessary for mission success and agency goals. Space flight health care should meet the standards of practice of evidence based clinical medicine. The function of Space Medicine is expected to meet the agency goals as stated in the 1998 NASA Strategic Plan and the priorities established by the Critical Path Roadmap Project. The Critical Path Roadmap Project is an integrated NASA cross-disciplinary strategy to assess, understand, mitigate, and manage the risks associated with long-term exposure to the space flight environment. The evidence based approach to space medicine should be standardized, objective process yielding expected results and establishing clinical practice standards while balancing individual risk with mission (programmatic) risk. The ability to methodically apply available knowledge and expertise to individual and mission health issues will ensure appropriate priorities are assigned and resources are allocated. NASA Space Medicine risk management process is a combined clinical and engineering approach. Competition for weight, power, volume, cost, and crew time must be balanced in making decisions about the care of individual crew with competing agency resources.

Clark, Jonathan B.↗

Lay and Expert Perceptions of Planetary Protection

As space scientists and engineers plan new missions to Mars and other planets in our solar system, they will face critical questions about the potential for biological contamination of planetary surfaces. In a society that places ever-increasing importance on the role of public involvement in science and technology policy, questions about risks of biological contamination will be examined and debated in the media, and will lead to the formation of public perceptions of planetary-contamination risks. These perceptions will, over time, form an important input to the development of space policy. Previous research in public and expert perceptions of technological risks and hazards has shown that many of the problems faced by risk-management organizations are the result of differing perceptions of risk (and risk management) between the general public and scientific and technical experts. These differences manifest themselves both as disagreements about the definition (and level) of risk associated with a scientific, technological or industrial enterprise, and as distrust about the ability of risk-management organizations (both public and private) to adequately protect people's health and safety. This report presents the results of a set of survey studies designed to reveal perceptions of planetary exploration and protection from a wide range of respondents, including both members of the general public and experts in the life sciences. The potential value of this research lies in what it reveals about perceptions of risk and benefit that could improve risk-management policies and practices. For example, efforts to communicate with the public about Mars sample return missions could benefit from an understanding of the specific concerns that nonscientists have about such a mission by suggesting areas of potential improvement in public education and information. Assessment of both public and expert perceptions of risk can also be used to provide an advanced signal of aspects of planetary exploration and protection that may be particularly sensitive or controversial and that could prove problematic from a risk-management standpoint, perhaps warranting a more stringent risk-management approach than would otherwise be the case based on technical considerations alone. The design of the study compares perceptions and attitudes about space exploration relevant to a Mars sample return mission between three respondent groups: (1) members of The Planetary Society, a group representing individuals with a strong interest in space-related issues, (2) a group of university-aged students, representing a population relatively sensitive to environmental hazards, and (3) a group of life scientists outside of the space research community. Members of The Planetary Society received the survey as part of a special issue of The Planetary Report on planetary protection, which contained a number of background articles on planetary protection and related topics. A synopsis of the issue was prepared as an introduction to the survey for the other two groups.

Race, Margaret S.↗

Program Risk Planning with Risk as a Resource

The current focus of NASA on cost effective ways of achieving mission objectives has created a demand for a change in the risk management process of a program. At present, there is no guidelines as to when risk taking is justified due to high cost for a marginal improvement in risk. As a remedial step, Dr. Greenfield of NASA, developed a concept of risk management with risk as a resource. In the report, the following topics are addressed: (1) the risk management approach; (2) planning risk and program life cycle; (3) key components of a typical program; (4) the risk trading methodology; (5) review and decision process; (6) merits of the proposed risk planning approach; and (7) recommendations.

Ray, Paul S.↗