Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

High-Penetration PV Deployment in the Arizona Public Service System, Phase 1 Update: Preprint

In an effort to better understand the impacts of high penetrations of photovoltaic generators on distribution systems, Arizona Public Service and its partners have begun work on a multi-year project to develop the tools and knowledge base needed to safely and reliably integrate high penetrations of utility- and residential-scale photovoltaics (PV). Building upon the APS Community Power Project --Flagstaff Pilot, this project will analyze the impact of PV on a representative feeder in northeast Flagstaff. To quantify and catalog the effects of the estimated 1.3 MW of PV that will be installed on the feeder (both smaller units at homes as well as large, centrally located systems), high-speed weather and electrical data acquisition systems and digital 'smart' meters are being designed andinstalled to facilitate monitoring and to build and validate comprehensive, high-resolution models of the distribution system. These models will be used to analyze the impacts of the PV on distribution circuit protection systems (including anti-islanding), predict voltage regulation and phase balance issues, and develop volt/var control schemes. This paper continues from a paper presented at the2011 IEEE PVSC conference that introduces the project and describes some of the preliminary consideration, as well as project plans and early results. This paper gives a status update of the project and presents selected results from Phase 2 of the project. It discusses baseline feeder modeling, load allocation, data acquisition, utility-scale PV integration, preliminary model validation, andplans for future phases.

14 SOLAR ENERGY↗

An Assessment of Irrigated Agriculture and Drought-related Hazard Risks for the Aral Sea Region

This was part of a larger UNDP/Uzbekistan project on the Aral Sea Region, which is a prominent ecological disaster caused by water diversion and unsustainable land use management. Columbia University CCSR and the Climate Impacts Group are working with the UNDP to explore climate change impacts on irrigated agriculture in the region, particularly with regards to yield changes and drought risk for wheat and cotton systems in the Amu Darya River Basin. My talk described our project plan and described the types of data that we would need from project partners in the country in order to connect our global satellites and models to local conditions.

Irrigated agriculture↗

Hydrodynamic Test Requirements Process Improvements

Hydrodynamic testing at Los Alamos National Laboratory would benefit from a process improvement for the requirements process. Cameo was used as a digital solution for requirements management to allow Lead Engineers to track requirements more effectively. This was identified as a process improvement throughout this Capstone project. This report includes a project proposal, business case, literature review, methodology, project plan, data analysis, decision-making report, financial analysis report, discussion, and conclusion. Initially, this project focused on figuring out a solution for the hydrotest requirement process improvements. The scope narrowed to focus on the use of Cameo for requirement capture and management. During this Capstone, four tests had digital models produced for requirements management in Cameo. The initial model was the baseline, with core requirements used across the tests. Commonalities in tests were used and the core requirements allowed for process efficiencies. In the data analysis, it was seen that overall, the implementation of using Cameo for requirements resulted in a decreasing trend for both schedule and normalized cost. Tests have different complexity levels which is also a factor in how long the requirements process will take. Additional data is needed to continue analyzing process improvements. Through decisionmaking and financial analysis, the recommendation was to use Cameo for requirements process improvement. Multiple experts provided feedback for requirements that were then captured within models. Numerous tangible and intangible benefits were identified with this process improvement. For return on investment, the metric of success was schedule reduction, which was overall seen. Four tests were analyzed, so future analysis will be needed. There is also not a great financial risk because the main cost would be purchasing more licenses. Individuals must generate requirements whether using this software or not. Overall, training is needed to help improve the skillsets of Lead Engineers but is already being supported on a regular frequency. A desktop guide was started associated with explaining the process, however, it is a work in progress. The team plans on adding additional information in the digital models to help status when requirements are met using verification methods and artifacts. From working on this project an improved understanding of Cameo and requirements was the result. There are future opportunities to extend the usage for requirements management and progress will continue after this project.

99 GENERAL AND MISCELLANEOUS↗

Research and Development of a Low Cost Solar Collector

This is a Final Technical Report on the Research and Development completed towards the development of a Low Cost Solar Collector conducted under the DOE cost-sharing award EE-0003591. The objective of this project was to develop a new class of solar concentrators with geometries and manufacturability that could significantly reduce the fully installed cost of the solar collector field for concentrated solar thermal power plants. The goal of the project was to achieve an aggressive cost target of $\$$170/m 2 , a reduction of up to 50% in the total installed cost of a solar collector field as measured against the current industry benchmark of a conventional parabolic trough. The project plan, and the detailed activities conducted under the scope of the DOE Award project addressed all major drivers that affect solar collector costs. In addition to costs, the study also focused on evaluating technical performance of new collector architectures and compared them to the performance of the industry benchmark parabolic trough. The most notable accomplishment of this DOE award was the delivery of a full-scale integrated design, manufacturing and field installation solution for a new class of solar collector architecture which has been classified as the Bi-Planar Fresnel Collector (BPFC) and may be considered as a viable alternative to the conventional parabolic trough, as well as the conventional Fresnel collectors. This was in part accomplished through the design and development, all the way through fabrication and test validation of a new class of Linear Planar Fresnel Collector architecture. This architecture offers a number of key differentiating features which include a planar light-weight frame geometry with small mass-manufacturable elements utilizing flat mirror sections. The designs shows significant promise in reducing the material costs, fabrication costs, shipping costs, and on-site field installation costs compared to the benchmark parabolic trough, as well as the conventional Fresnel collector. The noteworthy design features of the BPFC architecture include the use of relatively cheaper flat mirrors and a design which allows the mirror support beam sections to act as load-bearing structural elements resulting in more than a 36% reduction in the overall structural weight compared to an optimized parabolic trough. Also, it was shown that the utilization of small mass-produced elements significantly lowers mass-production and logistics costs that can more quickly deliver economies of scale, even for smaller installations while also reducing shipping and installation costs. Moreover, unlike the traditional Fresnel trough the BPFC architecture does not require complex articulating drive mechanisms but instead utilizes a standard parabolic trough hydraulic drive mechanism. In addition to the development of the Bi-Planar Fresnel Collector, an optimized conventional space-frame type parabolic trough was also designed, built, analyzed and field-tested during the first phase of this award. The design of the conventional space-frame parabolic collector was refined with extensive FEA and CFD analysis to reduce material costs and re-designed for simpler fabrication and more accurate lower-cost field assembly. This optimized parabolic trough represented an improvement over the state-of-the art of the traditional parabolic trough architecture and also served as a more rigorous and less subjective benchmark that was used for comparison of new candidate design architectures. The results of the expanded 1 st phase of the DOE award project showed that both the Optimized Parabolic Trough and the new Bi-Planar Fresnel Collector design concepts failed to meet the primary objectives for the project of achieving a 50% cost reduction from the industry reference total installed cost of $\$$350/m 2 . Results showed that the BPFC came in at projected total installed cost of $\$$237/m 2 representing a 32% savings compared to the industry benchmark conventional parabolic trough. And the cost reduction obtained by the Optimized Parabolic Trough compared to the industry benchmark reference was approximately 16.5% against the industry benchmark. The new BPFC design showed a weight savings of almost 36% compared to the optimized parabolic trough and a 50% reduction in field assembly labor and a 13% reduction in shipping volume. The BPFC design showed only a marginal improvement of 16% over the fully projected installed cost of the optimized parabolic trough benchmark developed as Concept One. During the course of the investigation numerous sensitivity analyses and other analytical studies were conducted to assess potential improvement opportunities, and further optimizations that could lead to cost reductions and performance improvements. Factors that could have a significant impact on high-volume costs were related to production and further improvements in design for manufacturability, automation, assembly jigs, and fixtures, and robotic welding etc. The wind modeling analysis showed that the Fresnel design concept did not reduce the wind load in a significant manner. The stress analysis showed that the design concept with almost a 36% lower weight than the parabolic trough and it was strong enough to withstand the expected wind loads and maintain targeting accuracy. The Initial on-sun optical testing showed that the Fresnel Trough was capable of concentrating sunlight effectively to the desired target and yielding an optical efficiency slightly lower than a parabolic trough.

14 SOLAR ENERGY↗

Evaluating Effects of Stressors from Marine and Hydrokinetic Energy

Potential environmental effects of marine and hydrokinetic (MHK) energy development are not well understood, yet regulatory agencies are required to make decisions in spite of substantial uncertainty about environmental impacts and their long-term consequences. An understanding of risks associated with interactions between MHK installations and aquatic receptors, including animals, habitats, and ecosystems, can help define key uncertainties and focus regulatory actions and scientific studies on interactions of most concern. During FY 2012, Pacific Northwest National Laboratory (PNNL) continued to follow project developments on the two marine and hydrokinetic projects reviewed for Environmental Risk Evaluation System (ERES) screening analysis in FY 2011: a tidal project in the Gulf of Maine using Ocean Renewable Power Company TidGenTM turbines and a wave project planned for the coast of Oregon using Aquamarine Oyster surge devices. The ERES project in FY 2012 also examined two stressor–receptor interactions previously identified through the screening process as being of high importance: 1) the toxicity effects of antifouling coatings on MHK devices on aquatic resources and 2) the risk of a physical strike encounter between an adult killer whale and an OpenHydro turbine blade. The screening-level assessment of antifouling paints and coatings was conducted for two case studies: the Snohomish County Public Utility District No. 1 (SnoPUD) tidal turbine energy project in Admiralty Inlet, Puget Sound, Washington, and the Ocean Power Technologies (OPT) wave buoy project in Reedsport, Oregon. Results suggest minimal risk to aquatic biota from antifouling coatings used on MHK devices deployed in large estuaries or open ocean environments. For the strike assessment of a Southern Resident Killer Whale (SRKW) encountering an OpenHydro tidal turbine blade, PNNL teamed with colleagues from Sandia National Laboratories (SNL) to carry out an analysis of the mechanics and biological consequences of different blade strike scenarios. Results of these analyses found the following: 1) a SRKW is not likely to experience significant tissue injury from impact by an OpenHydro turbine blade; and 2) if whale skin behaves similarly to the materials considered as surrogates for the upper dermal layers of whale skin, it would not be torn by an OpenHydro blade strike. The PNNL/SNL analyses could not provide insight into the potential for more subtle changes to SRKWs from an encounter with a turbine, such as changes in behavior, or inform turbine interactions for other whales or other turbines. These analyses were limited by the available time frame in which results were needed and focused on the mechanical response of whale tissues and bone to blade strike. PNNL proposes that analyses of additional turbine designs and interactions with other marine mammals that differ in size, body conformation, and mass be performed.

13 HYDRO ENERGY↗

Fibre Channel Development Final Report CRADA No. TC-0340-92-D

The Fibre Channel (FC) Development project was designed to enhance U.S. industrial competitiveness by accelerating the standardization and subsequent industrial acceptance of the American National Standards Institute’s (AIW) Fibre Channel Standard (now X3T1 1). It was also intended to give the principal U.S. participants a one- to two-year lead in developing heterogeneous high-speed computer networks, dktibuted computing through clustering, scientific visualization techniques, and high speed channels. The project was proposed to benefit U.S. industry as these high performance computing methods became generally available. In 1992-93, during the initial project phases, Fibre Channel PC) was emerging as a new ANSI standard. It was envisioned as becoming the mechanism for data transfer between the next generation of computers, and between these computers and their peripherals. Using this channel standard, U.S. computer vendors were expecting to be able to provide high-speed interoperability between heterogeneous computers and their storage devices, with data transfer rates greater than a GBit/sec. Our project was composed of key principal players in the FC standardization effort from both U.S. industry and the Department of Energy’s (DOES) Lawrence Liverrnore National Laboratory (LLNL). The industial participants were developing individual FC interfaces to operate with their platform products. LLNL’s role was to be a neutral testing site and a facilitator for helping to resolve conflicting interpretations of the embryonic Fibre Channel specification. LLNL anticipated that conflicts in the interpretation of such a standard would arise and require neutral resolution and that such resolutions would best be achieved in cooperation with the ANSI FC Working Group. Project plans included transferring to U.S. industry any resilient FC testing capabilities at the project conclusion.

42 ENGINEERING↗

Fibre Channel Development Final Report CRADA No. TC-0340-92-C

The Fibre Channel (FC) Development project was designed to enhance U.S. industrial competitiveness by accelerating the standardization and subsequent industrial acceptance of the American National Standards Institute’s (ANSI) Fibre Channel Standard (now X3T1 1). It was also intended to give the principal U.S. participants a one-to two-year lead in developing heterogeneous high-speed computer networks, distributed computing through clustering, scientific visualization techniques, and high speed channels. The project was proposed to benefit U.S. industry as these high performance computing methods became generally available. In 1992-93, during the initial project phases, Fibre Channel (FC) was emerging as a new ANSI standard. It was envisioned as becoming the mechanism for data transfer between the next generation of computers, and between these computers and their peripherals. Using this channel standard, U.S. computer vendors were expecting to be able to provide high-speed interoperatillity between heterogeneous computers and their storage devices, with data transfer rates greater than a GBit/sec. Our project was composed of key principal players in the FC standardization effort from both U.S. industry and the Department of Energy’s@OEs) Lawrence Liverrnore National Laboratory (LLNL). The industrial participants were developing individual FC interfaces to operate with their platform products. LLNL’s.role was to be a neutral testing site and a facilitator for helping to resolve conflicting interpretations of the embryonic Fibre Channel specification. LLNL anticipated that conflicts in the interpretation of such a standard would arise and require neutral resolution and that such resolutions would best be achieved in cooperation with the ANSI FC Working Group. Project plans included transferring to U.S. industry any resilient FC testing capabilities at the project conclusion.

42 ENGINEERING↗

Using Technology Readiness Level (TRL), Life Cycle Cost (LCC), and Other Metrics to Supplement Equivalent System Mass (ESM) in Advanced Life Support (ALS)

The ALS project plan goals are reducing cost, improving performance, and achieving flight readiness. ALS selects projects to advance the mission readiness of low cost, high performance technologies. The role of metrics is to help select good projects and report progress. The Equivalent Mass (EM) of a system is the sum of the estimated mass of the hardware, of its required materials and spares, and of the pressurized volume, power supply, and cooling system needed to support the hardware in space. EM is the total payload launch mass needed to provide and support a system. EM is directly proportional to the launch cost.

Jones, Harry↗

Assessing Risk and Driving Risk Mitigation for First-of-a-Kind Advanced Reactors

Planning and decision making amidst programmatic and technological risks represent significant challenges for projects. This presentation addresses the four step risk-assessment process needed to determine clear path forward to mature needed technology and design, license, and construct advanced nuclear power plants, which have never been built before, including Small Modular Reactors. This four step process has been carefully applied to the Next Generation Nuclear Plant. STEP 1 - Risk Identification Risks are identified, collected, and categorized as technical risks, programmatic risks, and project risks, each of which result in cost and schedule impacts if realized. These include risks arising from the use of technologies not previously demonstrated in a relevant application. These risks include normal and accident scenarios which the SMR could experience including events that cause the disablement of engineered safety features (typically documented in Phenomena Identification Ranking Tables (PIRT) as produced with the Nuclear Regulatory Commission) and design needs which must be addressed to further detail the design. Product - Project Risk Register contained in a database with sorting, presentation, rollup, risk work off functionality similar to the NGNP Risk Management System . STEP 2 - Risk Quantification The risks contained in the risk register are then scored for probability of occurrence and severity of consequence, if realized. Here the scoring methodology is established and the basis for the scoring is well documented. Product - Quantified project risk register with documented basis for scoring. STEP 3 - Risk Handling Strategy Risks are mitigated by applying a systematic approach to maturing the technology through Research and Development, modeling, test, and design. A Technology Readiness Assessment is performed to determine baseline Technology Readiness Levels (TRL). Tasks needed to mature the technology are developed and documented in a roadmap. Product - Risk Handling Strategy. STEP 4 - Residual Risk Work off The risk handling strategy is entered into the Project Risk Allocation Tool (PRAT) to analyze each task for its ability to reduce risk. The result is risk-informed task prioritization. The risk handling strategy is captured in the Risk Management System, a relational database that provides conventional database utility, including data maintenance, archiving, configuration control, and query ability. The tool's Hierarchy Tree allows visualization and analyses of complex relationships between risks, risk mitigation tasks, design needs, and PIRTs. Product - Project Risk Allocation Tool and Risk Management System which depict project plan to reduce risk and current progress in doing so.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SHASTA-HELP: Hydrogen Estimator for Logistical Planning Tool

Underground reservoirs offer a promising option for medium- and long-term hydrogen storage that could potentially be safer and more cost-effective than surface alternatives. Currently, there are three underground hydrogen storage (UHS) facilities in the United States, which operate solely in salt caverns and store hydrogen primarily for industrial purposes. Salt formations favorable for geologic storage are geographically limited in the U.S. If a hydrogen economy is to develop, expansion of UHS to other geologic formations such as depleted gas fields and saline aquifers will be necessary to increase the availability of hydrogen storage. While research into the feasibility of storing hydrogen in these formations is ongoing, tools and methodologies are needed for characterizing the hydrogen storage potential in these reservoirs. We introduce the Hydrogen Estimator for Logistical Planning (HELP) tool from the Subsurface Hydrogen Assessment, Storage, and Technology Acceleration (SHASTA) project (https://edx.netl.doe.gov/shasta). SHASTA-HELP is a suite of web-based tools that have numerous capabilities for UHS project planning.

Haeri, Foad↗

PDCI Wide-Area Damping Control: PSLF Simulations of the 2017 Test Plan - Light Summer Case

To demonstrate and validate the performance of the wide-area damping control system, the project plans to conduct closed-loop tests on the PDCI in spring/summer 2017. A test plan details the open and closed loop tests to be conducted on the PDCI using the wide-area damping control system. To ensure the appropriate level of preparedness, simulations were performed in order to predict and evaluate any possible unsafe operations before hardware experiments are attempted. This report contains the results from these simulations using the power system dynamics software PSLF (Power System Load Flow, trademark of GE). The simulations use the WECC (Western Electricity Coordinating Council) 2016 light summer and heavy summer base cases and the 2014 dual export base case. Because of the large volume of plots, the results were divided into three reports corresponding to the three base cases. This report contains results from the 2016 light summer base case.

25 ENERGY STORAGE↗

PDCI Wide-Area Damping Control: PSLF Simulations of the 2017 Test Plan - Heavy Summer Case

To demonstrate and validate the performance of the wide-area damping control system, the project plans to conduct closed-loop tests on the PDCI in spring/summer 2017. A test plan details the open and closed loop tests to be conducted on the PDCI using the wide-area damping control system. To ensure the appropriate level of preparedness, simulations were performed in order to predict and evaluate any possible unsafe operations before hardware experiments are attempted. This report contains the results from these simulations using the power system dynamics software PSLF (Power System Load Flow, trademark of GE). The simulations use the WECC (Western Electricity Coordinating Council) 2016 light summer and heavy summer base cases and the 2014 dual export base case. Because of the large volume of plots, the results were divided into three reports corresponding to the three base cases. This report contains results from the 2016 heavy summer base case.

25 ENERGY STORAGE↗

PDCI Wide-Area Damping Control: PSLF Simulations of the 2017 Test Plan - Dual Export Case

To demonstrate and validate the performance of the wide-area damping control system, the project plans to conduct closed-loop tests on the PDCI in spring/summer 2017. A test plan details the open and closed loop tests to be conducted on the PDCI using the wide-area damping control system. To ensure the appropriate level of preparedness, simulations were performed in order to predict and evaluate any possible unsafe operations before hardware experiments are attempted. This report contains the results from these simulations using the power system dynamics software PSLF (Power System Load Flow, trademark of GE). The simulations use the WECC (Western Electricity Coordinating Council) 2016 light summer and heavy summer base cases and the 2014 dual export base case. Because of the large volume of plots, the results were divided into three reports corresponding to the three base cases. This report contains results from the 2014 dual export base case.

25 ENERGY STORAGE↗

The Two-Column Aerosol Project (TCAP) Science Plan

The Two-Column Aerosol Project (TCAP) field campaign will provide a detailed set of observations with which to (1) perform radiative and cloud condensation nuclei (CCN) closure studies, (2) evaluate a new retrieval algorithm for aerosol optical depth (AOD) in the presence of clouds using passive remote sensing, (3) extend a previously developed technique to investigate aerosol indirect effects, and (4) evaluate the performance of a detailed regional-scale model and a more parameterized global-scale model in simulating particle activation and AOD associated with the aging of anthropogenic aerosols. To meet these science objectives, the Atmospheric Radiation Measurement (ARM) Climate Research Facility will deploy the ARM Mobile Facility (AMF) and the Mobile Aerosol Observing System (MAOS) on Cape Cod, Massachusetts, for a 12-month period starting in the summer of 2012 in order to quantify aerosol properties, radiation, and cloud characteristics at a location subject to both clear and cloudy conditions, and clean and polluted conditions. These observations will be supplemented by two aircraft intensive observation periods (IOPs), one in the summer and a second in the winter. Each IOP will deploy one, and possibly two, aircraft depending on available resources. The first aircraft will be equipped with a suite of in situ instrumentation to provide measurements of aerosol optical properties, particle composition and direct-beam irradiance. The second aircraft will fly directly over the first and use a multi-wavelength high spectral resolution lidar (HSRL) and scanning polarimeter to provide continuous optical and cloud properties in the column below.

54 ENVIRONMENTAL SCIENCES↗

Eastern Interconnection Demand Response Potential

Demand response (DR), one of the key components in the Smart Grid initiative, has received increasing interest in recent years among power utilities, independent system operators, and policy makers. With this surge of interest in DR, in April 2010 the Department of Energy (DOE) issued a research call to provide technical support to the interconnection-level electric infrastructure planning projects they had issued earlier in the year. In Area of Interest 2, they identified a need/purpose: “The Eastern Interconnection States’ Planning Council (EISPC) seeks to significantly improve the knowledge base and modeling capabilities of demand-side resources for purposes of transmission planning.” In response to the research call, Oak Ridge National Laboratory (ORNL) conducted a research project to estimate the DR potential peak load reductions in the Eastern Interconnection area over the next two decades until 2030, as well as analyzed costs and benefits occurring out of the DR resources. This final report is the outcome of the study by a team of ORNL researchers with diverse backgrounds in engineering, economics, and public policy.

demand response↗

Mission Options Scoping Tool for Mars Orbiters: Mass Cost Calculator (MC2)

Prior to developing the details of an advanced mission study, the mission architecture trade space is typically explored to assess the scope of feasible options. This paper describes the main features of an Excel-based tool, called the Mass-Cost-Calculator (MC2 ), which is used to perform rapid, high-level mass and cost options analyses of Mars orbiter missions. MC2 consists of a combination of databases, analytical solutions, and parametric relationships to enable quick evaluation of new mission concepts and comparison of multiple architecture options. The tool's outputs provide program management and planning teams with answers to "what if" queries, as well as an understanding of the driving mission elements, during the pre-project planning phase. These outputs have been validated against the outputs generated by the Advanced Projects Design Team (Team X) at NASA's Jet Propulsion Laboratory (JPL). The architecture of the tool allows for future expansion to other orbiters beyond Mars, and to non-orbiter missions, such as those involving fly-by spacecraft, probes, landers, rovers, or other mission elements.

orbiters↗

Startup Notification Report 3rd Quarter FY17.

This activity is being revised based on the November 2016 Project Plan and Installation Plan. These documents were developed and issued due to a change in the design responsibilities, assigned project personnel and the change in the installation of the RCS subsystems.

99 GENERAL AND MISCELLANEOUS↗

AdaNET research plan

The mission of the AdaNET research effort is to determine how to increase the availability of reusable Ada components and associated software engineering technology to both private and Federal sectors. The effort is structured to define the requirements for transfer of Federally developed software technology, study feasible approaches to meeting the requirements, and to gain experience in applying various technologies and practices. The overall approach to the development of the AdaNET System Specification is presented. A work breakdown structure is presented with each research activity described in detail. The deliverables for each work area are summarized. The overall organization and responsibilities for each research area are described. The schedule and necessary resources are presented for each research activity. The estimated cost is summarized for each activity. The project plan is fully described in the Super Project Expert data file contained on the floppy disk attached to the back cover of this plan.

Mcbride, John G.↗