Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Program verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Development of an Enhanced Payback Function for the Superior Energy Performance Program

The U.S. DOE Superior Energy Performance (SEP) program provides recognition to industrial and commercial facilities that achieve certification to the ISO 50001 energy management system standard and third party verification of energy performance improvements. Over 50 industrial facilities are participating and 28 facilities have been certified in the SEP program. These facilities find value in the robust, data driven energy performance improvement result that the SEP program delivers. Previous analysis of SEP certified facility data demonstrated the cost effectiveness of SEP and identified internal staff time to be the largest cost component related to SEP implementation and certification. This paper analyzes previously reported and newly collected data of costs and benefits associated with the implementation of an ISO 50001 and SEP certification. By disaggregating “sunk energy management system (EnMS) labor costs”, this analysis results in a more accurate and detailed understanding of the costs and benefits of SEP participation. SEP is shown to significantly improve and sustain energy performance and energy cost savings, resulting in a highly attractive return on investment. To illustrate these results, a payback function has been developed and is presented. On average facilities with annual energy spend greater than $2M can expect to implement SEP with a payback of less than 1.5 years. Finally, this paper also observes and details decreasing facility costs associated with implementing ISO 50001 and certifying to the SEP program, as the program has improved from pilot, to demonstration, to full launch.

Therkelsen, Peter↗

FAST-1.2 User Installation and Verification Guide: Developed Under NQA-1-2017

The purpose of this document is to provide the user information about the installation of Fuel Analysis for Steady state and Transient (FAST)-1.2 on their computers or servers. General information about the code and supported operating systems is described in Section 1.0. Self-service oriented FAST-1.2 software licensing steps are described in Section 2.0. An installation verification test suite is provided with FAST-1.2 and described in Section 3.0. A convenience script for converting Fuel Rod Analysis Program – Constant (FRAPCON) to FAST inputs is discussed in Section 4.0. FAST-1.2 was developed and released under a software quality assurance program based upon NQA-1-2017 at Pacific Northwest National Laboratory (PNNL). FAST-1.2 is the latest baseline code. The installation verification test suite contains both steady state and transient Anticipated Operation Occurrences (AOOs), accident conditions, such as Reactivity Initiated Accidents (RIAs) and Loss of Coolant Accidents (LOCAs).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Measuring Safeguards Culture

As the International Atomic Energy Agency (IAEA) implements a State Level Approach to its safeguards verification responsibilities, a number of countries are beginning new nuclear power programs and building new nuclear fuel cycle faculties. The State Level approach is holistic and investigatory in nature, creating a need for transparent, non-discriminatory judgments about a state's nonproliferation posture. In support of this need, the authors previously explored the value of defining and measuring a state's safeguards culture. We argued that a clear definition of safeguards culture and an accompanying set of metrics could be applied to provide an objective evaluation and demonstration of a country's nonproliferation posture. As part of this research, we outlined four high-level metrics that could be used to evaluate a state's nuclear posture. We identified general data points. This paper elaborates on those metrics, further refining the data points to generate a measurable scale of safeguards cultures. We believe that this work could advance the IAEA's goals of implementing a safeguards system that is fully information driven, while strengthening confidence in its safeguards conclusions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Verifying disarmament: scientific, technological and political challenges

There is growing interest in, and hopes for, nuclear disarmament in governments and nongovernmental organizations (NGOs) around the world. If a nuclear-weapon-free world is to be achievable, verification and compliance will be critical. VerifYing disarmament would have unprecedented scientific, technological and political challenges. Verification would have to address warheads, components, materials, testing, facilities, delivery capabilities, virtual capabilities from existing or shutdown nuclear weapon and existing nuclear energy programs and material and weapon production and related capabilities. Moreover, it would likely have far more stringent requirements. The verification of dismantlement or elimination of nuclear warheads and components is widely recognized as the most pressing problem. There has been considerable research and development done in the United States and elsewhere on warhead and dismantlement transparency and verification since the early 1990s. However, we do not today know how to verifY low numbers or zero. We need to develop the needed verification tools and systems approaches that would allow us to meet this complex set of challenges. There is a real opportunity to explore verification options and, given any realistic time frame for disarmament, there is considerable scope to invest resources at the national and international levels to undertake research, development and demonstrations in an effort to address the anticipated and perhaps unanticipated verification challenges of disarmament now andfor the next decades. Cooperative approaches have the greatest possibility for success.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Patient-specific QA and delivery verification of scanned ion beam at NIRS-HIMAC

Purpose: To evaluate a patient-specific QA program and system for constancy checking of a scanning delivery system developed at the National Institute of Radiological Sciences.Methods: For the patient-specific QA, all the planned beams are recalculated on a water phantom with treatment planning software (TPS). The recalculated dose distributions are compared with the measured distributions using a 2D ionization chamber array at several depths, and evaluated using gamma index analysis with criteria of 3% and 3 mm and a pass rate of 90%. For the constancy check, the authors developed the multiwire proportional chamber (MWPC), which can record the delivered 2D fluence images in a slice-by-slice manner. During irradiation for dosimetric QA with the 2D ionization chamber array and an accordion-type water phantom, the 2D fluence images are recorded using the MWPC in the delivery system. These recorded images are then compared to those taken in the treatment session to check the constancy check. This analysis also employs gamma index analysis using the same criteria as in the patient-specific QA. These patient-specific QA and constancy check evaluations were performed using the data of 122 patients.Results: In the patient-specific QA, the measured dose distributions agreed well with those calculated by the TPS, and the QA criteria were satisfied in all measurements. The additional check of the fluence comparison ensured the constancy of the delivered field during each treatment irradiation.Conclusions: The authors established a patient-specific QA program and additional check of delivery constancy in every treatment session. Fluence comparison is a strong tool for constancy checking of the delivery system.

61 RADIATION PROTECTION AND DOSIMETRY↗

Scenarios for exercising technical approaches to verified nuclear reductions

Presidents Obama and Medvedev in April 2009 committed to a continuing process of step-by-step nuclear arms reductions beyond the new START treaty that was signed April 8, 2010 and to the eventual goal of a world free of nuclear weapons. In addition, the US Nuclear Posture review released April 6, 2010 commits the US to initiate a comprehensive national research and development program to support continued progress toward a world free of nuclear weapons, including expanded work on verification technologies and the development of transparency measures. It is impossible to predict the specific directions that US-RU nuclear arms reductions will take over the 5-10 years. Additional bilateral treaties could be reached requiring effective verification as indicated by statements made by the Obama administration. There could also be transparency agreements or other initiatives (unilateral, bilateral or multilateral) that require monitoring with a standard of verification lower than formal arms control, but still needing to establish confidence to domestic, bilateral and multilateral audiences that declared actions are implemented. The US Nuclear Posture Review and other statements give some indication of the kinds of actions and declarations that may need to be confirmed in a bilateral or multilateral setting. Several new elements of the nuclear arsenals could be directly limited. For example, it is likely that both strategic and nonstrategic nuclear warheads (deployed and in storage), warhead components, and aggregate stocks of such items could be accountable under a future treaty or transparency agreement. In addition, new initiatives or agreements may require the verified dismantlement of a certain number of nuclear warheads over a specified time period. Eventually procedures for confirming the elimination of nuclear warheads, components and fissile materials from military stocks will need to be established. This paper is intended to provide useful background information for establishing a conceptual approach to a five-year technical program plan for research and development of nuclear arms reductions verification and transparency technologies and procedures.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Quantifying Operational Drivers of Multimodal Biometric Verification in Aerial Surveillance

Multimodal biometric verification is increasingly applied across operational contexts ranging from close-range security cameras and building-mounted surveillance to long-range ground sensors and unmanned aerial system (UAS) imagery. Variations in acquisition conditions—such as image resolution, viewing geometry, and motion artifacts—pose significant challenges for cross-domain algorithmic generalization. This study evaluates two independent multimodal biometric verification systems developed under the Intelligence Advanced Research Projects Activity (IARPA) Biometric Recognition and Identification at Altitude and Range (BRIAR) program, comparing performance on close-range and aerial datasets. Close-range video served as a baseline to quantify the decline in verification performance on aerial footage. The dataset included six UAS platforms, spanning small quadcopters at 10m altitude to medium-sized fixed-wing aircraft at 360m. Mixed-effects logistic regression identified image resolution (head and body pixel counts), head height, sensor characteristics, and algorithm selection as primary determinants of verification success, whereas demographic attributes and mission gait were not significant predictors. Activity type and collection site influenced performance in close-range data but had negligible impact on UAS imagery. These results clarify modality-specific strengths and limitations and highlight opportunities to enhance cross-domain biometric verification.

Peluso, Alina [ORNL] (ORCID:0000000328950406)↗

The CNSC's Inspector Training and Qualification Program and its Importance to the Nuclear Industry - 19370

Trained, qualified, and designated staff at the Canadian Nuclear Safety Commission (CNSC) conduct inspections of licensed nuclear sites as a method of compliance verification. This paper will describe the unique and comprehensive qualification process for CNSC inspectors, known as the Inspector Training and Qualification Program (ITQP). The ITQP includes service-line-specific training that is unique to each inspection group within the CNSC, dependent on the facility/industry type. The training requirements specific to staff in the Wastes and Decommissioning Division and its impact on safety at waste management sites across Canada will be discussed. This paper will specifically identify the importance of CNSC inspector training and detail how the unique training program requirements enable the CNSC to better identify and encourage compliance among nuclear waste and decommissioning sites in Canada. CNSC inspectors are designated under section 29 of the Nuclear Safety and Control Act (NSCA), and the powers of inspectors are outlined in section 32 of the NSCA. Having trained, qualified, and designated inspectors is paramount for both the CNSC and the nuclear industry. For the CNSC, this ensures that staff in the field are aware of potential hazards and how to mitigate such hazards (if applicable), that staff understand the regulatory framework and how to measure compliance against it, and that staff consistently apply CNSC values across the nuclear industry. For the industry, this ensures that staff present at nuclear facilities are knowledgeable and professional, that inspections are conducted in a consistent manner, and that any compliance actions issued are measurable and defendable against the regulatory framework. The CNSC's ITQP incorporates both theoretical (in-class and online) and practical training, and is broken down into six categories: mandatory training for all new employees; core training; service-line-specific training; on-the-job training; CNSC regulations training; and, recommended additional training. This paper will discuss in detail the specific aspects of each of these categories, the importance of each category including the difference between knowledge and skills acquired in theoretical versus hands-on training, and how CNSC staff in designated inspector positions (inspectors-in-training) progress through the program. The complete list of core training and service-line-specific training for inspectors in the Wastes and Decommissioning Division, including re-qualification requirements, will be explored throughout the paper. It is further important that CNSC designated inspectors undergo continuous learning to ensure that their skills remain up to date, as well as to ensure that inspectors requalify at defined intervals to enable the maintenance of the core knowledge and skills with which the determination of the person's qualification was based. The steps involved in this requalification process, as well as the importance of continuous learning and the maintenance of skills and knowledge will be further discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Phenix end-of-life natural convection test with the MARS-LMR code

The end-of-life test of Phenix reactor performed by the CEA provided an opportunity to have reliable and valuable test data for the validation and verification of a SFR system analysis code. KAERI joined this international program for the analysis of Phenix end-of-life natural circulation test coordinated by the IAEA from 2008. The main objectives of this study were to evaluate the capability of existing SFR system analysis code MARS-LMR and to identify any limitation of the code. The analysis was performed in three stages: pre-test analysis, blind posttest analysis, and final post-test analysis. In the pre-test analysis, the design conditions provided by the CEA were used to obtain a prediction of the test. The blind post-test analysis was based on the test conditions measured during the tests but the test results were not provided from the CEA. The final post-test analysis was performed to predict the test results as accurate as possible by improving the previous modeling of the test. Based on the pre-test analysis and blind test analysis, the modeling for heat structures in the hot pool and cold pool, steel structures in the core, heat loss from roof and vessel, and the flow path at core outlet were reinforced in the final analysis. The results of the final post-test analysis could be characterized into three different phases. In the early phase, the MARS-LMR simulated the heat-up process correctly due to the enhanced heat structure modeling. In the mid phase before the opening of SG casing, the code reproduced the decrease of core outlet temperature successfully. Finally, in the later phase the increase of heat removal by the opening of the SG opening was well predicted with the MARS-LMR code. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Some guidance on preparing validation plans for the DART Full System Models.

Planning is an important part of computational model verification and validation (V&V) and the requisite planning document is vital for effectively executing the plan. The document provides a means of communicating intent to the typically large group of people, from program management to analysts to test engineers, who must work together to complete the validation activities. This report provides guidelines for writing a validation plan. It describes the components of such a plan and includes important references and resources. While the initial target audience is the DART Full System Model teams in the nuclear weapons program, the guidelines are generally applicable to other modeling efforts. Our goal in writing this document is to provide a framework for consistency in validation plans across weapon systems, different types of models, and different scenarios. Specific details contained in any given validation plan will vary according to application requirements and available resources.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Verification of Electromagnetic Physics Models for Parallel Computing Architectures in the GeantV Project

An intensive R&D and programming effort is required to accomplish new challenges posed by future experimental high-energy particle physics (HEP) programs. The GeantV project aims to narrow the gap between the performance of the existing HEP detector simulation software and the ideal performance achievable, exploiting latest advances in computing technology. The project has developed a particle detector simulation prototype capable of transporting in parallel particles in complex geometries exploiting instruction level microparallelism (SIMD and SIMT), task-level parallelism (multithreading) and high-level parallelism (MPI), leveraging both the multi-core and the many-core opportunities. We present preliminary verification results concerning the electromagnetic (EM) physics models developed for parallel computing architectures within the GeantV project. In order to exploit the potential of vectorization and accelerators and to make the physics model effectively parallelizable, advanced sampling techniques have been implemented and tested. In this paper we introduce a set of automated statistical tests in order to verify the vectorized models by checking their consistency with the corresponding Geant4 models and to validate them against experimental data.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

A k-NN METHOD TO CLASSIFY RARE ASTRONOMICAL SOURCES: PHOTOMETRIC SEARCH OF BROWN DWARFS WITH SPITZER/IRAC

We present a statistical method for the photometric search of rare astronomical sources based on the weighted k-Nearest Neighbors method. A metric is defined in a multidimensional color-magnitude space based only on the photometric properties of template sources and the photometric uncertainties of both templates and data, without the need to define ad hoc color and magnitude cuts which could bias the search. The metric is defined as a function of two parameters, the number of neighbors k and a threshold distance D {sub th} that can be optimized for maximum selection efficiency and completeness. We apply the method to the search of L and T dwarfs in the Spitzer Extragalactic First Look Survey and the Booetes field of the Spitzer Shallow Survey, as well as to the search of substellar mass companions around nearby stars. With high level of completeness, we confirm the absence of late-T dwarfs detected in at least two bands in the First Look Survey, and only one in the Shallow Survey (previously discovered by Stern et al.). This result is in agreement with the expected statistics for late-T dwarfs. One L/early-T candidate is found in the First Look Survey, and three in the Shallow Surveys, currently undergoing follow-up spectroscopic verification. Finally, we discuss the potential for brown dwarf searches with this method in the Spitzer warm mission Exploration Science programs.

79 ASTRONOMY AND ASTROPHYSICS↗

ASC CSSE Level 2 Milestone #6362: Resilient Asynchronous Many Task Programming Model

This report is an outcome of the ASC CSSE Level 2 Milestone 6362: Analysis of Re- silient Asynchronous Many-Task (AMT) Programming Model. It comprises a summary and in-depth analysis of resilience schemes adapted to the AMT programming model. Herein, performance trade-offs of a resilient-AMT prograrnming model are assessed through two ap- proaches: (1) an analytical model realized by discrete event simulations and (2) empirical evaluation of benchmark programs representing regular and irregular workloads of explicit partial differential equation solvers. As part of this effort, an AMT execution simulator and a prototype resilient-AMT programming framework have been developed. The former permits us to hypothesize the performance behavior of a resilient-AMT model, and has undergone a verification and validation (V&V) process. The latter allows empirical evaluation of the perfor- mance of resilience schemes under emulated program failures and enabled the aforementioned V&V process. The outcome indicates that (1) resilience techniques implemented within an AMT framework allow efficient and scalable recovery under frequent failures, that (2) the abstraction of task and data instances in the AMT programming model enables readily us- able Application Program Interfaces (APIs) for resilience, and that (3) this abstraction enables predicting the performance of resilient-AMT applications with a simple simulation infrastruc- ture. This outcome will provide guidance for the design of the AMT programming model and runtime systems, user-level resilience support, and application development for ASC's next generation platforms (NGPs).

97 MATHEMATICS AND COMPUTING↗

Applying Human-performance Models to Designing and Evaluating Nuclear Power Plants: Review Guidance and Technical Basis

Human performance models (HPMs) are simulations of human behavior with which we can predict human performance. Designers use them to support their human factors engineering (HFE) programs for a wide range of complex systems, including commercial nuclear power plants. Applicants to U.S. Nuclear Regulatory Commission (NRC) can use HPMs for design certifications, operating licenses, and license amendments. In the context of nuclear-plant safety, it is important to assure that HPMs are verified and validated, and their usage is consistent with their intended purpose. Using HPMs improperly may generate misleading or incorrect information, entailing safety concerns. The objective of this research was to develop guidance to support the NRC staff's reviews of an applicant's use of HPMs in an HFE program. The guidance is divided into three topical areas: (1) HPM Verification, (2) HPM Validation, and (3) User Interface Verification. Following this guidance will help ensure the benefits of HPMs are achieved in a technically sound, defensible manner. During the course of developing this guidance, I identified several issues that could not be addressed; they also are discussed.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

International comparison of product certification and verification methods for appliances

Enforcement of appliance standards and consumer trust in appliance labeling are important foundations of growing a more energy efficient economy. Product certification and verification increase compliance rates which in turn increase both energy savings and consumer trust. This paper will serve two purposes: 1) to review international practices for product certification and verification as they relate to the enforcement of standards and labeling programs in the U.S., E.U., Australia, Japan, Canada, and China; and 2) to make recommendations for China to implement improved certification processes related to their mandatory standards and labeling program such as to increase compliance rates and energy savings potential.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

International Comparison of Product Certification and Verification Methods for Appliances

Enforcement of appliance standards and consumer trust in appliance labeling are important foundations of growing a more energy efficient economy. Product certification and verification increase compliance rates which in turn increase both energy savings and consumer trust. This paper will serve two purposes: 1) to review international practices for product certification and verification as they relate to the enforcement of standards and labeling programs in the U.S., E.U., Australia, Japan, Canada, and China; and 2) to make recommendations for China to implement improved certification processes related to their mandatory standards and labeling program such as to increase compliance rates and energy savings potential.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Baseline Human Factors and Ergonomics in Support of Control Room Modernization at Nuclear Power Plants

As part of control room modernization at a nuclear power plant, a utility should carefully follow the four phases prescribed by the U.S. Nuclear Regulatory Commission in NUREG-0711, Human Factors Engineering Program Review Model . These four phases include Planning and Analysis, Design, Verification and Validation, and Implementation and Operation. While NUREG-0711 is a useful guideline, it is written primarily from the perspective of regulatory review, and it therefore does not provide a nuanced account of many of the steps the utility might undertake as part of control room modernization. The guideline is largely summative—meant to catalog final products—rather than formative—meant to guide the overall modernization process. In this report, we highlight two crucial formative subelements of the Planning and Analysis phase specific to control room modernization that are not covered in NUREG-0711. These two subelements are the usability and ergonomics baseline evaluations. A baseline evaluation entails evaluating the system as-built and currently in use. The usability baseline evaluation provides key insights into operator performance using the control system currently in place. The ergonomic baseline evaluation identifies possible deficiencies in the physical configuration of the control system. Both baseline evaluations feed into the design of the replacement system and help ensure that control room modernization represents the successful evolution of the control system.

99 GENERAL AND MISCELLANEOUS↗