Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PrIMe”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

From Prime to Extended Mission: Evolution of the MER Tactical Uplink Process

To support a 90-day surface mission for two robotic rovers, the Mars Exploration Rover mission designed and implemented an intensive tactical operations process, enabling daily commanding of each rover. Using a combination of new processes, custom software tools, a Mars-time staffing schedule, and seven-day-a-week operations, the MER team was able to compress the traditional weeks-long command-turnaround for a deep space robotic mission to about 18 hours. However, the pace of this process was never intended to be continued indefinitely. Even before the end of the three-month prime mission, MER operations began evolving towards greater sustainability. A combination of continued software tool development, increasing team experience, and availability of reusable sequences first reduced the mean process duration to approximately 11 hours. The number of workshifts required to perform the process dropped, and the team returned to a modified 'Earth-time' schedule. Additional process and tool adaptation eventually provided the option of planning multiple Martian days of activity within a single workshift, making 5-day-a-week operations possible. The vast majority of the science team returned to their home institutions, continuing to participate fully in the tactical operations process remotely. MER has continued to operate for over two Earth-years as many of its key personnel have moved on to other projects, the operations team and budget have shrunk, and the rovers have begun to exhibit symptoms of aging.

mission operations↗

From Prime to Extended Mission: Evolution of the MER Tactical Uplink Process

To support a 90-day surface mission for two robotic rovers, the Mars Exploration Rover mission designed and implemented an intensive tactical operations process, enabling daily commanding of each rover. Using a combination of new processes, custom software tools, a Mars-time staffing schedule, and seven-day-a-week operations, the MER team was able to compress the traditional weeks-long command-turnaround for a deep space robotic mission to about 18 hours. However, there was never an intention of maintaining the pace of this process indefinitely. Even before the end of the three-month prime mission, MER operations began evolving towards greater sustainability. A combination of continued software tool development, increasing team experience, and availability of reusable sequences first reduced the mean process duration to approximately 11 hours. The number of workshifts required to perform the process dropped, and the team returned to a modified 'Earth-time' schedule. Additional process and tool adaptation eventually provided the option of planning multiple Martian days of activity within a single workshift, making 5- day-a-week operations possible. The vast majority of the science team returned to their home institutions, continuing to participate fully in the tactical operations process remotely. MER has continued to operate for over two Earth-years as many of its key personnel have moved on to other projects, the operations team and budget have shrunk, and the rovers have begun to exhibit symptoms of aging.

Mars exploration↗

Space Place Prime

Space Place Prime is public engagement and education software for use on iPad. It targets a multi-generational audience with news, images, videos, and educational articles from the Space Place Web site and other NASA sources. New content is downloaded daily (or whenever the user accesses the app) via the wireless connection. In addition to the Space Place Web site, several NASA RSS feeds are tapped to provide new content. Content is retained for the previous several days, or some number of editions of each feed. All content is controlled on the server side, so features about the latest news, or changes to any content, can be made without updating the app in the Apple Store. It gathers many popular NASA features into one app. The interface is a boundless, slidable- in-any-direction grid of images, unique for each feature, and iconized as image, video, or article. A tap opens the feature. An alternate list mode presents menus of images, videos, and articles separately. Favorites can be tagged for permanent archive. Face - book, Twitter, and e-mail connections make any feature shareable.

Fitzpatrick, Austin J.↗

The U.S. Rosetta Project: Preparations for Prime Mission, 2014

In 2014, the International Rosetta mission will place a spacecraft in orbit around comet 67P/Churyumov-Gerasimenko and deliver a lander to the comet's surface. The National Aeronautics and Space Administration's (NASA) contribution to the International Rosetta mission, designated the U.S. Rosetta Project, includes several instruments, tracking support, and science support for some non-US payloads. In July 2011 the spacecraft was placed in a long-duration hibernation mode planned to last approximately 37 months to conserve electrical power. Rosetta will rendezvous with 67P/Churyumov-Gerasimenko in 2014. On the eve of the mission's arrival at its target, this paper highlights three issues related to Rosetta's looming prime mission: (A) measures taken in 2009 to prepare the US Rosetta Project for the long-duration hibernation mode; (B) risk reviews conducted in 2013 to prepare the US Rosetta Project for exit from hibernation; (C) ESA and NASA preparations for use of NASA Deep Space Network (DSN) assets related to keyword files.

hibernation↗

Cassini Orbit Determination Results: January 2006 - End of Prime Mission

After the forty-fifth flyby of Titan, the Cassini spacecraft has successfully completed the planned four-year prime mission tour of the Saturnian system. This paper reports on the orbit determination performance of the Cassini spacecraft over two years spanning 2006 - 2008. In this time span, Cassini's orbit progressed through the magnetotail and pi-transfer phases of the mission. Thirty-four accurate close encounters of Titan, one close flyby of Iapetus and one 50 km flyby of Enceladus were performed during this period. The Iapetus and Enceladus flybys were especially challenging and so the orbit determination supporting these encounters will be discussed in more detail. This paper will show that in most cases orbit determination has exceeded the navigation requirements for targeting flybys and predicting science instrument pointing during these encounters.

Lapetus↗

Completion of the Cassini-Huygens Prime Mission

The Cassini-Huygens mission is a joint endeavor between the United States and Europe to conduct an in-depth investigation of the Saturnian system. The agreement between the parties called for conducting operations in orbit at Saturn for a period of four years, and this was completed on July 1, 2008. The mission has been an unqualified success by any measure, and at the time of the completion of the four years, the spacecraft remained in excellent health and with sufficient consumables remaining that a decision has been reached to continue the endeavor for another two years at the same rate of data collection as in the four-year prime mission. This paper provides a high level overview of the mission's accomplishments in the four years, summarizes the current state of the spacecraft, and gives a summary of the plans and expectations for the two additional years of operations at Saturn.

Mitchell, Robert T.↗

NASA/ORNL/AFRL Project Work on EBM LSHR: Additive Manufacturing of High-Temperature Gamma-Prime Strengthened Ni-Based Superalloys

Powder-bed fabrication of aerospace alloys may revolutionize production by eliminating the need for extensive machining and expensive tooling. Heated-bed electron-beam melting (EBM) offers advantages over non-heated laser additive manufacturing (AM) methods, including lower residual stress, reduced risk of contamination, slower cooling rates, and faster build times. NASA Glenn Research Center has joint project work with Oak Ridge National Lab and the Air Force Research Laboratory to explore the feasibility of fabricating advanced Ni-based gamma-prime superalloys with EBM AM.

additive manufacturing↗

Development of Advanced Environmental Barrier Coatings for SiC/SiC Composites at NASA GRC: Prime-Reliant Design and Durability Perspectives

Environmental barrier coatings (EBCs) are considered technologically important because of the critical needs and their ability to effectively protect the turbine hot-section SiC/SiC ceramic matrix composite (CMC) components in harsh engine combustion environments. The development of NASA's advanced environmental barrier coatings have been aimed at significantly improved the coating system temperature capability, stability, erosion-impact, and CMAS resistance for SiC/SiC turbine airfoil and combustors component applications. The NASA environmental barrier coating developments have also emphasized thermo-mechanical creep and fatigue resistance in simulated engine heat flux and environments. Experimental results and models for advanced EBC systems will be presented to help establishing advanced EBC composition design methodologies, performance modeling and life predictions, for achieving prime-reliant, durable environmental coating systems for 2700-3000 F engine component applications. Major technical barriers in developing environmental barrier coating systems and the coating integration with next generation composites having further improved temperature capability, environmental stability, EBC-CMC fatigue-environment system durability will be discussed.

Environmental barrier coatings (EBCs)↗

PRIME ISS Ground Prototype

In Additive Manufacturing (AM) with metal powders, layers of material are deposited and fused to form metal 3D parts. However, in most cases, remnant powder still must be removed from interior cavities and channels to fully clean the part before use. Ground demonstrations such as ultrasonic cleaning have been proven to work during ground testing at MSFC and Florida State University. However, manufacturing in the low gravity environment of space introduces challenges to this powder removal. Therefore, if this concept could be demonstrated in microgravity, the ability to clean AM parts or contaminated parts can bring new advancements to in-space manufacturing (ISM). The goal of this work was to make significant progress on developing an ISS payload using the ultrasonic technology called Powder Removal in Microgravity Environments (PRIME). This would also create new opportunities for in-space manufacturing (ISM) and the additive manufacturing community to develop new standards and practices for powder removal and the cleaning of contaminated parts in space.

Microgravity↗

Refrigerator with variable capacity compressor and cycle priming action through capacity control and associated methods

A refrigerator appliance (and associated method) that includes a condenser, evaporator and a multi-capacity compressor. The appliance also includes a pressure reducing device arranged within an evaporator-condenser refrigerant circuit, and a valve system for directing or restricting refrigerant flow through the device. The appliance further includes a controller for operating the compressor upon the initiation of a compressor ON-cycle at a priming capacity above a nominal capacity for a predetermined or calculated duration.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Dual capillary tube / heat exchanger in combination with cycle priming for reducing charge migration

A refrigerator appliance including a multi-capacity compressor and a refrigerant circuit with two conduits and pressure reducing devices arranged in parallel between an evaporator and a condenser. Refrigerant can flow through one, both or none of the conduits and pressure reducing devices. The appliance also has a heat exchanger in contact with either one pressure reducing device, or one conduit between the pressure reducing device and the valve system. The appliance also includes a controller for priming the compressor above a nominal capacity for a predetermined or calculated duration at the beginning of an ON-cycle.

42 ENGINEERING↗

A Joint Search for the Electromagnetic Counterpart to the Gravitational-Wave Binary Black-Hole Merger Candidate S250328ae with the Dark Energy Camera and the Prime Focus Spectrograph

The first detection of an optical counterpart to a gravitational wave signal revealed that collaborative efforts between instruments with different specializations provide a unique opportunity to acquire impactful multi-messenger data. We present results of such a joint search with the Dark Energy Camera (DECam) and Prime Focus Spectrograph (PFS) for the optical counterpart of the LIGO-Virgo-KAGRA event S250328ae, a binary black hole merger candidate of high significance detected at a distance of 511$\pm$82 Mpc and localized within an area of 3 (15) square degrees at 50% (90%) confidence. We observed the 90% confidence area with DECam and identified 36 high-confidence transient candidates after image processing, candidate selection, and candidate vetting. We observed with PFS to obtain optical spectra of DECam candidates, Swift-XRT candidates, and potential host galaxies of S250328ae. In total, 3897 targets were observed by seven pointings covering ~50% of the 90% confidence area. After template fitting and visual inspection, we identified 12 SNe, 159 QSOs, 2975 galaxies, and 131 stars. With the joint observations of DECam and PFS, we found variability in 12 SNe, 139 QSOs, 37 galaxies, and 2 stars. We do not identify any confident optical counterparts, though the association is not ruled out for three variable candidates that are not observed by PFS and 6 QSO candidates without clear variability if the optical counterpart of S250328ae is faint. Despite the lack of confident optical counterparts, this paper serves as a framework for future collaborations between wide-field imagers and multi-object spectrographs to maximize multi-messenger analyses.

Zhang, Haibin [Natl. Astron. Observ. of Japan] (OR↗

Influences of superalloy composition and Pt content on the oxidation behavior of gamma–gamma prime NiPtAl bond coatings

Here, the effects of superalloy composition and Pt content on the high-temperature oxidation behavior of γ–γ’ NiPtAl diffusion coatings were investigated over the temperature range of 1050–1150 °C. Simple NiPtAl diffusion coatings with 7 or 12 µm electroplated Pt thickness were evaluated in 1-h cycles in dry O 2 for up to 2500 cycles on four superalloys: directionally solidified (DS) alloy 142, 1st generation single-crystal (SX) alloy 1483, and 2nd generation SX alloys X4 and N5. Coatings on high-Hf alloy 142 experienced severe internal oxidation of Hf at all temperatures. Coatings on ~5 at.% Ti alloy 1483 were protective at 1050 °C, but exhibited severe scale spallation at 1100 °C, with extensive formation of Ti- and Ni-rich oxides at the gas interface. Coatings with 7-µm Pt on X 4 were extremely protective at 1100 °C, but failed rapidly at 1150 °C, which also was associated with the formation of Ti-rich oxides. Increasing the coating Pt content on X 4 improved the 1150 °C oxidation behavior. Coatings on Ti-free N 5 showed the best performance at 1150 °C, especially with 12-µm Pt. Although γ–γ’ coatings can exhibit outstanding cyclic oxidation resistance with minimal Al depletion, they appear to be sensitive to substrate composition, as well as eventual Pt depletion due to interdiffusion.

36 MATERIALS SCIENCE↗

Priming mechanisms providing plants and microbes access to mineral-associated organic matter

Mineral-associated organic matter (MAOM) is considered a stable reservoir for soil nutrients that influences long-term soil carbon (C) and nitrogen (N) dynamics. However, recent experimental and theoretical evidence shows that root exudates may mobilize MAOM, thereby providing plants and microbes access to a large and N-rich pool. Given the mechanisms underlying MAOM C and N mobilization remain largely untested, we examined direct and indirect pathways by which root exudates destabilize this nutrient pool in laboratory mesocosms. We simulated root exudation with 13 C-labeled oxalic acid to test whether root exudates are directly capable of mobilizing MAOM from mineral surfaces; and with 13 C-labeled glucose to test whether indirect stimulation of microbial and extracellular enzyme activity leads to MAOM decomposition. We also tested the potential for oxalic acid and glucose to mobilize MAOM in an additional subset of sterilized soils to clarify the potential for non-microbial pathways of MAOM destabilization. Over the course of the 12-day MAOM incubation with and without simulated exudates, we measured C cycling (CO 2 respiration rates, 13 C–CO 2 efflux), N cycling (inorganic N pools, gross N mineralization) and related microbial processes (enzyme activities and microbial community composition via phospholipid fatty acid analysis). Both of the simulated root exudates enhanced MAOM-C mineralization, with cumulative respiration increasing 35–89% relative to the water-only control. Likewise, glucose additions enhanced the production of an exo-cellulase and a chitinase by up to 130% and 39%, respectively, while oxalic acid enhanced oxidative enzyme activities up to 91% greater than control rates. We observed a positive association between glucose-induced shifts in enzyme activities, MAOM-C mineralization, and gross ammonification. Oxalic acid additions were associated with initial increases in fungal relative abundance and in sterile soils appeared to stimulate the release of metals and dissolved organic nitrogen into exchangeable pools. Our results indicate that common root exudates, like glucose and oxalic acid, can significantly increase the turnover and potential release of C and N from MAOM through indirect (e.g., enzyme induction) and direct (e.g., mobilization of metal oxides) mechanisms.

54 ENVIRONMENTAL SCIENCES↗