Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Power Take Off”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Fast Charging of Li-Ion Cells: Part V. Design and Demonstration of Protocols to Avoid Li-Plating

Fast charging of Li-ion batteries would make “fueling” of electric vehicles comparable in time to fueling of gasoline-powered cars, increasing consumer appeal of the new technology. Taking the US Department of Energy goal of safe 6 C charging to 80% capacity as a guide, we describe approaches that can mitigate Li plating on the graphite anode. To make this possible, a variable-rate anode potential charging protocol has been implemented by using a microprobe reference electrode to continuously monitor and adjust the current, in this way avoiding low anode potentials that favor Li deposition. Various implementations of the anode potential control are considered using electrochemical modeling and compared with the experimental data. For charge to 80% capacity at 30 °C, an average C-rate of 4.97 C was obtained for an NCM523/graphite cell with 70 μ m thick graphite electrode and 7.40 C for a cell with 47 μ m thick graphite electrode. Our electrochemical model accounts for these observations and provides a means to extrapolate the approach to other cell designs and operation regimes, drawing the maximum average fast charging rates that can still avoid Li plating.

25 ENERGY STORAGE↗

Seismic Contingency Auto Generator

This code takes in premade earthquake scenario XML files from USGS, power grid data, and converts them into a contingency file (.con file) that can be used by power grid solvers. Within the .con file are a number (Specified by the user) of contingencies that have randomly failed power transformers based on their likelihood of failure and peak ground acceleration (PGA) value around the transformer. The transformers' likelihood of failure was calculated based on a variety of finite element modeling on various transformer designed for specific transformer voltage classes. Parameters from these FEM were used to create generic fragility curves for transformers within a specific voltage class, which correspond with earthquake PGA values to produced a probability of failure for a given earthquake scenario. More refined versions of this process, such as specifying specific transformer design categories within a voltage class, could also be applied in future iterations of the software.

Vaagensmith, Bjorn [Idaho National Laboratory (INL↗

Study of reference burnup steps optimization in fuel segment data file generation for NEXUS/ANC9 code system

For any two-step core design code system, the cross-section files are the primary factor to determine the accuracy of the system prediction. For a once-through cross-section system to cover all potential applicable conditions, the system may need to perform tens of thousands state points of lattice calculations. These calculations take a significant amount of CPU times and computing power, especially when a fine or ultra-fine energy group library is used. As computer power increases, so does the calculational complexity. Therefore, it is important to make the lattice calculations effective and efficient. Based on the Westinghouse core design code system NEXUS/ANC9, this work focuses on the reference burnup steps used by the lattice code when performing the calculations. Following the fundamental cross-section methodology and analyzing the contribution of each individual terms, this study provides an applicable solution of the optimized reference burnup steps. The test results show that, with the existing cross-section methodology, it is possible to significantly reduce the lattice calculation cases and cross-section file generation time without sacrificing the accuracy of system prediction. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Hydrogen Plant Hazards and Risk Analysis Supporting Hydrogen Plant Siting near Nuclear Power Plants. Final report

Nuclear power plants (NPPs) are considering flexible plant operations to take advantage of excess thermal and electrical energy. One option for NPPs is to pursue hydrogen production through high temperature electrolysis as an alternate revenue stream to remain economically viable. The intent of this study is to investigate the risk of a high temperature steam electrolysis hydrogen production facility (HTEF) in close proximity to an NPP. This analysis evaluates a postulated HTEF located 1 km from an NPP, including the likelihood of an accident and the associated consequence to critical NPP targets. This analysis shows that although the likelihood of a leak in an HTEF is not negligible, the consequence to critical NPP targets is not expected to lead to a failure at a distance of 1 km. Furthermore, the minimum separation distance of the HTEF is calculated based on the target fragility criteria of 1 psi defined in Regulatory Guide 1.91.

08 HYDROGEN↗

Applying Multi-Frequency AC LOCO for Finding Sextupole Errors

A fast and precise technique of multi-frequency AC LOCO has been developed and tested for finding the sextupole alignment and field-offset errors at NSLS-II. This technique is based on sine-wave beam excitation simultaneously at multiple frequencies via different fast correctors. The unique combination of the fast speed and high measurement accuracy opens the door for two different types of potential applications: finding the sextupole alignment and field-offset errors. Beam excitation via fast correctors results in the elimination of the systematic error caused by the hysteresis effect. Systematic errors of the sextupole alignment caused by orbit drift and power supply calibration are also eliminated because the measurement takes only two minutes and does not depend on the current-to-field conversion of sextupole magnets. Furthermore, the simulation studies indicate that multi-frequency AC LOCO together with an orbit bump bigger than 0.5 mm can be applied to measure the relative field offset of a sextupole magnet with a precision better than 10%. The measurement technique is described and the results of two proof-of-principle experiments carried out at NSLS-II are presented.

43 PARTICLE ACCELERATORS↗

Hydrogen Plant Hazards and Risk Analysis Supporting Hydrogen Plant Siting near Nuclear Power Plants (Final Report)

Nuclear power plants (NPPs) are considering flexible plant operations to take advantage of excess thermal and electrical energy. One option for NPPs is to pursue hydrogen production through high temperature electrolysis as an alternate revenue stream to remain economically viable. The intent of this study is to investigate the risk of a high temperature steam electrolysis hydrogen production facility (HTEF) in close proximity to an NPP. This analysis evaluates a postulated HTEF located 1 km from an NPP, including the likelihood of an accident and the associated consequence to critical NPP targets. This analysis shows that although the likelihood of a leak in an HTEF is not negligible, the consequence to critical NPP targets is not expected to lead to a failure at a distance of 1 km. Furthermore, the minimum separation distance of the HTEF is calculated based on the target fragility criteria of 1 psi defined in Regulatory Guide 1.91.

08 HYDROGEN↗

Risk Analysis of a Hydrogen Generation Facility near a Nuclear Power Plant

Nuclear power plants (NPPs) are considering flexible plant operations to take advantage of excess thermal and electrical energy. One option for NPPs is to pursue hydrogen production through high temperature electrolysis as an alternate revenue stream to remain economically viable. The intent of this study is to investigate the risk of a hydrogen production facility in close proximity to an NPP. A 100 MW, 500 MW, and 1,000 MW facility are evaluated herein. Previous analyses have evaluated preliminary designs of a hydrogen production facility in a conservative manner to determine if it is feasible to co-locate the facility within 1 km of an NPP. This analysis specifically evaluates the risk components of different hydrogen production facility designs, including the likelihood of a leak within the system and the associated consequence to critical NPP targets. This analysis shows that although the likelihood of a leak in an HTEF is not negligible, the consequence to critical NPP targets is not expected to lead to a failure given adequate distance from the plant.

08 HYDROGEN↗

Risk Analysis of a 100 MW Hydrogen Generation Facility near a Nuclear Power Plant

Nuclear power plants (NPPs) are considering flexible plant operations to take advantage of excess thermal and electrical energy. One option for NPPs is to pursue hydrogen production through high temperature electrolysis as an alternate revenue stream to remain economically viable. The intent of this study is to investigate the risk of a 100 MW hydrogen production facility in close proximity to an NPP. Previous analyses have evaluated preliminary designs of a hydrogen production facility in a conservative manner to determine if it is feasible to co-locate the facility within 1 km of an NPP. This analysis specifically evaluates the risk components of a 100 MW hydrogen production facility design, including the likelihood of a leak within the system and the associated consequence to critical NPP targets. This analysis shows that although the likelihood of a leak in an HTEF is not negligible, the consequence to critical NPP targets is not expected to lead to a failure given adequate distance from the plant.

08 HYDROGEN↗

SRF Cavity Emulator for PIP-II LLRF Lab and Field Testing

There are many stages in the LLRF and RF system development process for any new accelerator that can take advantage of hardware emulation of the high-power RF system and RF cavities. LLRF development, bench testing, control system development and testing of installed systems must happen well before SRF cavities are available for test. The PIP-II Linac has three frequencies of SRF cavities, 162.5 MHz, 325 MHz and 650 MHz and a simple analog emulator design has been chosen that can meet the cavity bandwidth requirements, provide tuning errors to emulate Lorentz force detuning and microphonics for all cavity types. This emulator design utilizes a quartz crystal with a bandwidth of 65Hz at an IF of ~ 4 MHz, providing a Q of ~ 1.3 x 10^7 at 650MHz. This paper will discuss the design and test results of this emulator.

43 PARTICLE ACCELERATORS↗

Enhancement of ECCD by the current condensation effect for stabilizing large magnetic islands caused by neoclassical tearing modes in tokamak plasmas

The radio frequency current condensation effect reported in Reiman and Fisch (2018 Phys. Rev. Lett. 121 225001) is modeled in the nonlinear resistive magnetohydrodynamic code. A series of numerical investigations have been performed to investigate the enhancement of electron cyclotron current drive (ECCD) by the current condensation effect during the control of neoclassical tearing mode (NTM) in tokamak plasmas. In the numerical model, both the parallel transport and the perpendicular transport of electron temperature are considered. The EC driven current and driven perturbed electron temperature can nonlinearly evolve within the given magnetic configuration and eventually reach saturation states. The input power threshold of ECCD and the fold bifurcation phenomenon are numerically verified via nonlinear simulations. The numerical results show good agreements with the analytical results. Moreover, spatial distributions of EC current for the two solutions at different condensed level are displayed. The control effectiveness of ECCD for large NTM islands has been evaluated while considering the current condensation effect. While taking into account current condensation effect, for a sufficiently large input power, a larger island can be more effectively stabilized than a smaller one, which suggests a reassessment of the previous idea that the ECCD should always be turned on as early as possible. The potential physics mechanism behind the ECCD control have all been discussed in detail. Furthermore, the condensation effect is found to have favorable effects on the radial misalignment of ECCD. In the consideration of the situation for extremely localized control needs, a highly peaked heating profile is adopted to verify that the fold bifurcation phenomenon still exists and the current condensation effect can still take effect in this extreme condition.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Operational space for lower hybrid heating scenarios in the full tungsten environment of WEST

In tungsten—W—Environment in Steady-state Tokamak (WEST), the lower hybrid current drive (LHCD) system is key for achieving long pulse operation by providing most of the non-inductive plasma current, as well as a crucial source of electron heating. Therefore, determining the operational space for its application is fundamental. In the present study, the LHCD operational space is deeply analyzed for 0.5 MA pulses. This space is bounded by three limits: (i) the ratio of the LHCD power over density must be above a threshold to compensate tungsten radiation with enough core heating, (ii) the line-averaged density must be high enough to allow good coupling of the hybrid wave with the plasma, and (iii) fast electron ripple losses must be below a limit to avoid reaching a thermal threshold on plasma-facing components. If the tungsten radiation peak or burn-through phase is not safely overcome, a maximum electron temperature of 1.5 keV is obtained, confinement is degraded, and magnetohydrodynamic activity is frequently triggered, potentially causing a disruption. From experimental measurements and interpretative simulations, we highlight the main mechanisms that prevent the plasma from heating up during LHCD power ramp-up. Three parameters play a major role: plasma density, tungsten concentration and LHCD power deposition. A strategy to overcome this limitation is found: a precise density ramp-up performed simultaneously with the increase in LHCD power. Additionally, we show that boronization greatly facilitates the burn-through of tungsten by lowering its content during the heating phase. Finally, taking into account the three constraints given above, the LHCD operational space is determined at power ramp-up and during constant heating phases.

lower hybrid heating and current drive↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Model-Agnostic Algorithm for Real-Time Attack Identification in Power Grid using Koopman Modes

Malicious activities on measurements from sensors like Phasor Measurement Units (PMUs) can mislead the control center operator into taking wrong control actions resulting in disruption of operation, financial losses, and equipment damage. In particular, false data attacks initiated during power systems transients caused due to abrupt changes in load and generation can fool the conventional model-based detection methods relying on thresholds comparison to trigger an anomaly. In this paper, we propose a Koopman mode decomposition (KMD) based algorithm to detect and identify false data attacks in real-time. The Koopman modes (KMs) are capable of capturing the nonlinear modes of oscillation in the transient dynamics of the power networks and reveal the spatial embedding of both natural and anomalous modes of oscillations in the sensor measurements. The Koopman-based spatio-temporal nonlinear modal analysis is used to filter out the false data injected by an attacker. The performance of the algorithm is illustrated on the IEEE 68-bus test system using synthetic attack scenarios generated on GridSTAGE, a recently developed multivariate spatio-temporal data generation framework for simulation of adversarial scenarios in cyber-physical power systems.

Nandanoori, Sai Pushpak↗

Concentrating Solar Power (CSP) Plant Optimization Study for the California Power Market (CalCSP)

In the United States, many states are implementing goals to achieve 100% carbon free power generation by 2050 or sooner. California has one of the more aggressive goals to achieve 100% carbon free generation of its retail power sales by 2045. California has excellent solar resources, but to accomplish this goal, California’s power utilities will need new zero carbon resources that can replace the natural gas units that they currently rely on for suppling power at night. Appropriately configured concentrating solar power plants with thermal energy storage are an option to serve this nighttime load. These plants would be designed to take advantage of CSP’s low-cost thermal energy storage and collect and store energy during the day and then be dispatched to produce power at night. The U.S. Department of Energy has funded a study to identify the design of a CSP plant that optimally meets the evolving CA grid needs. This will be done by taking a fresh look at how CSP technologies can best be designed to meet the emerging nighttime market for carbon free power generation or zero-carbon firm resources. The paper provides an overview of the study and present preliminary findings on the California power market requirements, CSP configurations, technoeconomic analysis, siting opportunities, and key issues for CSP deployment in this market.

Price, Hank (ORCID:0000000267049197)↗

Simulations of divertor designs that spatially separate power and particle exhaust using mid-leg divertor particle pumping

Predictive design modeling of a Dissipation-Focused Divertor for future operation in DIII-D reveals that increasing the poloidal distance of the pump duct entrance from the target surface along the low-field side divertor baffle increases neutral compression and modifies the spatial distribution of power dissipation. With a divertor pump located mid-leg between the target and the X-point, SOLPS-ITER boundary plasma simulations without drifts predict the formation of a dense neutral cloud near the target with > 30x higher neutral compression in detachment, a more stable detachment front located further from the target, and ~25% lower outer midplane separatrix density required for detachment onset, compared to a pump located in the scrape-off layer at the target surface. Up to 19 MW of power flowing into the divertors is modeled using the following two numerical implementations for particle pumping: a specified fraction of particles incident on variable wall sections of the plasma grid is removed from the computational domain (so-called albedo pumping), and a pump duct is modeled which includes dynamics of kinetic neutrals in the duct. The simulations show that the detachment front is located between the divertor target and the X-point and is relatively stable near the pump entrance, without a strong dependence on gas puff rate or injected power. The mid-leg pump design spatially separates the two primary functions of a divertor (power handling and particle exhaust), with the majority of power dissipation occurring near the target plate and particle exhaust taking place further upstream. The benefit of enhanced dissipation using mid-leg pumping comes at the cost of a higher outer midplane separatrix density for a given amount of particle injection.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Preliminary Component Design and Cost Estimation of a Novel Electric-Thermal Energy Storage System Using Solid Particles

Energy storage will become indispensable to complement the uncertainty of intermittent renewable resources and to firm the electricity supply as renewable power generation becomes the mainstream new-built energy source and fossil fuel power plants are phased out to meet carbon-neutral utility targets. Current energy storage methods based on pumped storage hydropower or batteries have many limitations. Thermal energy storage (TES) has unique advantages in scale and siting flexibility to provide grid-scale storage capacity. A particle-based TES system is projected to have promising cost and performance characteristics to meet the future growing energy storage needs. This paper introduces the system and components required for particle TES to become technically and economically competitive. The system integrates electric particle heaters, particle TES within insulated concrete silos, and an efficient air-Brayton combined-cycle power system to provide power for storage durations up to several days via low-cost, high-performance storage cycles. Design specifications and cost estimation of major components in a commercial-scale system are presented in this paper. A techno-economic analysis based on preliminary component designs and performance indicates that particle TES integrated with an air-Brayton combined-cycle power system has a path to achieve the targeted levelized cost of storage of 5 ¢/kWh-cycle at a round-trip efficiency of 50% when taking low-cost energy-specific components and leveraging basic assets from existing thermal power plants. The cost model provides insights for further development and economic potentials for long-duration energy storage.

14 SOLAR ENERGY↗

Application of Flex-QA Arrays in HTS Magnet Testing

Flexible PCB quench antennas have been very useful in providing high-quality high-resolution data in low temperature superconducting magnet tests. Similar multi-sensor arrays have been employed recently to cover a high temperature superconductor magnet tested at FNAL. In the present work, data taking conditions and magnet features to support the analysis framework are discussed. Then observations made during complete magnet powering cycles are described and analysis of quench antenna data are presented. Based on results, improvements to instrumentation and data taking are debated. Views on the future of flexible quench antenna sensors for HTS magnet diagnostics and operational support are shared.

43 PARTICLE ACCELERATORS↗

Application of Flex-QA Arrays in HTS Magnet Testing

Flexible PCB quench antennas have been very useful in providing high-quality high-resolution data in low temperature superconducting magnet tests. Similar multi-sensor arrays have been employed recently to cover a high temperature superconductor magnet tested at FNAL. In the present work, data taking conditions and magnet features to support the analysis framework are discussed. Then observations made during complete magnet powering cycles are described and analysis of quench antenna data are presented. Based on results, improvements to instrumentation and data taking are debated. Views on the future of flexible quench antenna sensors for HTS magnet diagnostics and operational support are shared.

Stoynev, S.↗