Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Pilot Plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Shear Behavior of Artificial Clay Seams within Bedded Salt Structures

Bedded salt contains thin layers of clay, also known as clay seams, in-between far thicker layers of salt. These inhomogeneities are thought to have first-order effects on the closure of nearby drifts and potential roof collapses. Despite their importance, characterizations of the peak shear strength and residual shear strength of clay seams in salt are extremely rare in the published literature. A previous paper reported results from laboratory direct shear experiments on clay seam samples from the Permian Basin in New Mexico. These clay seams behaved similar to intact salt, which was attributed to the abundance of salt crystals intersecting the clay seams. None of those specimens contained a distinct ¼" - ½" (6 -12 mm) thick clay seam, as has been observed in drifts at the Waste Isolation Pilot Plant (WIPP). Due to the difficulty in obtaining WIPP samples with these types of clay seams, artificial seams of bentonite and brine sandwiched between sections of salt were created and shear tested. Eight 4" diameter samples were created with either a ¼" or ½" a thick seam and then consolidated at 3000 psi prior to shear testing. The direct shear tests on these samples were performed at nominal normal stresses representative of expected WIPP in-situ conditions (500 to 1500 psi). The resulting shear stress vs. shear displacement curves exhibited a peak followed by a gradual decay of shear strength. The shear stress never transitioned to a true residual shear stress plateau, so the final shear strength at the end of each test (0.75" of shear displacement) was analyzed instead. Both the peak shear strength and the final shear strength conformed to Mohr- Coulomb behavior with friction angles and cohesion strengths consistent with a saturated, highly consolidated, clay. These new artificial clay seam results and the previous clay-interspersed-with-salt results likely bound the expected shear behavior of WIPP clay seams.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Geology and Design of Major Spent Fuel Repositories

This report summarizes the geology and design concepts of four major spent fuel repositories from around the world. The crystalline rock with bentonite backfill is currently implemented in Finland with another repository being constructed in Sweden. The salt formation design focuses on the Waste Isolation Pilot Plant (WIPP) repository in the United States. The volcanic tuff open air design is based on the Yucca Mountain location. The volcanic tuff open air design at Yucca Mountain is only a concept as this repository has not been approved for operations. The last spent fuel repository design, clay/shale formation with backfill, focuses on the Cigeo Project in France, which is also pending.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Computational and Experimental Characterization of Intermediate Amorphous Phases in Geological Materials

In the subsurface, MgO engineered barriers are employed at the Waste Isolation Pilot Plant (WIPP), a transuranic waste repository near Carlsbad, NM. During service, the MgO will be exposed to high concentration brine environments and may form stable intermediate phases that can alter the barriers effectiveness. Here, MgO was aged in water and three different brine solutions. X-ray diffraction (XRD) and 1 H nuclear magnetic resonance (NMR) analysis were performed to identify the formation of secondary phases. After aging, ~4% of the MgO was hydrated and fine-grained powders resulted in greater loss of crystallinity than hard granular grains. 1 H magic angle spinning (MAS) NMR spectra resolved minor phases not visible in XRD, indicating that diverse 1 H environments are present along with Mg(OH) 2 . Density functional theory (DFT) simulations for several proposed Mg-O-H, Mg-CI-O-H, and Na-O-H containing phases were performed to index peaks in the experimental 1 H MAS NMR spectra. While proposed intermediate crystal structures exhibited overlapping 1 H NMR peaks, Mg-O-H intermediates were attributed to the growth of the 1.0-0.0ppm peak while the Mg-CI-O-H structures contributed to the 2.5- 5.0ppm peak in the chloride containing brines. Overall, NMR analysis of aged MgO indicates the formation of a range of possible intermediate structures that cannot be resolved with XRD analysis alone.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Systematic Calculation of Pu Pourbaix Diagrams: Modelling Support for the LANL ACRSP Team

The report enclosed entitled “Systematic Calculation of Pu Pourbaix Diagrams: Modelling Support of the LANL ACRSP Team” was prepared by Amphos21 under contract to the Los Alamos National Laboratory Actinide Chemistry and Repository Science Program (ACRSP) team to support an enhanced understanding of the actinide and brine chemistry in the Waste Isolation Pilot Plant (WIPP) transuranic repository. In this report, the ThermoChimie chemistry model and database, with some slight modifications, were used to calculate Pourbaix diagrams to investigate the effects of ionic strength, organic complexation, and metal competition on the predominance diagrams for aqueous and solid plutonium species under the anoxic and reducing conditions expected in the repository. These diagrams were connected to iron chemistry phase diagrams since this iron chemistry is expected to define and control redox properties in the WIPP repository concept.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

G3P3 Phase 3 Project Execution Plan. Issue 1

The National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories New Mexico (SNL/NM) developed this Project Execution Plan (PEP) to document its process for executing, monitoring, controlling and closing-out Phase 3 of the Gen 3 Particle Pilot Plant G3P3. This plan serves as a resource for stakeholders who wish to be knowledgeable of project objectives and how they will be accomplished. The plan is intended to be used by the development partners, principal investigator, and the federal project director. Project objectives are derived from the mission needs statement, and an integrated project team assists in development of the PEP. This plan is a living document and will be updated throughout the project to describe current and future processes and procedures. The scope of the PEP covers: Cost, schedule, and scope Project reporting Staffing plan Quality assurance plan Environment, safety, security, and health This document is a tailored approach for the Facilities Management and Operations Center (FMOC) to meet the project management principles of DOE Order 413.3B, Program and Project Management for the Acquisition of Capital Assets , and DOE G 413.3-15, DOE Guide for Project Execution Plans. This document will elaborate on content as knowledge of the project is gained or refined.

14 SOLAR ENERGY↗

Evaluation of the Volatile Species Associated with the K-Area Complex Blend Cans (D5043)

In the K-Area Complex (KAC), blend cans are used to down blend plutonium oxide for future disposal at the Waste Isolation Pilot Plant (WIPP). The blend can is a thin walled screw lid container that is used to down blend a measured amount of plutonium oxide with adulterant to reduce the attractiveness of the plutonium. The oxide and adulterant are mixed within the blend can and the blend can is packaged into a thick walled outer container. The blend cans are procured from an offsite vendor that uses a lubricant in the can manufacturing process. A thin coating of the lubricant adheres to the outer surface of the blend can and both inner and outer surfaces of the blend can cap.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Brine Availability Test in Salt (BATS) FY21 Update

This report summarizes the 2021 fiscal year (FY21) status of ongoing borehole heater tests in salt funded by the disposal research and development (R&D) program of the Office of Spent Fuel & Waste Science and Technology (SFWST) of the US Department of Energy’s Office of Nuclear Energy’s (DOE-NE) Office of Spent Fuel and Waste Disposition (SFWD). This report satisfies SFWST milestone M2SF- 21SN010303052 by summarizing test activities and data collected during FY21. The Brine Availability Test in Salt (BATS) is fielded in a pair of similar arrays of horizontal boreholes in an experimental area at the Waste Isolation Pilot Plant (WIPP). One array is heated, the other unheated. Each array consists of 14 boreholes, including a central borehole with gas circulation to measure water production, a cement seal exposure test, thermocouples to measure temperature, electrodes to infer resistivity, a packer-isolated borehole to add tracers, fiber optics to measure temperature and strain, and piezoelectric transducers to measure acoustic emissions. The key new data collected during FY21 include a series of gas tracer tests (BATS phase 1b), a pair of liquid tracer tests (BATS phase 1c), and data collected under ambient conditions (including a period with limited access due to the ongoing pandemic) since BATS phase 1a in 2020. A comparison of heated and unheated gas tracer test results clearly shows a decrease in permeability of the salt upon heating (i.e., thermal expansion closes fractures, which reduces permeability).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

CO 2 and Renewable Electricity into Chemicals: Formic Acid Production from Coal Flue Gas

Formic acid (FA) is an industrial chemical. It is used as a preservative for silage, as a digestive aid for animals, as a fluid for fracking, as a pharmaceutical intermediate and in leather tanning. The global formic acid market is valued at 777.4 million USD in 2020 and is expected to reach 851.8 million USD by the end of 2026. A new major formic acid application is the use of formic acid as a key feedstock for the bioprocessing industry. It has the potential to grow tremendously if we can lower the cost of formic acid production compared with the current fossil-fuel one. Recently, Dioxide Materials has developed a technology that can directly convert CO 2 to pure formic acid with a three-compartment CO 2 electrolyzer. However, the electrolyzer performance needs further improvement for the technology to be commercially viable. The major objective of this project is to develop the electrolyzer technology to enable formic acid as a feedstock for the bioprocessing industry to be economically manufactured from flue gas from a coal fired pilot plant. In particular, the project is to understand how to run the electrolyzer for the conversion of CO 2 into formic acid using flue gas from a coal fired power plant as a source of CO 2 . The work will include characterizing how the performance of the electrolyzer changes with low CO 2 concentration and impurities, developing new cell designs that can still operate with feedstocks with low CO 2 concentrations, testing simulated flue gas in the electrolyzer system and developing filters to remove any impurities that arise.

01 COAL, LIGNITE, AND PEAT↗

Plasma Wall Interaction with 3-D Plasma Boundaries

The interaction of the edge plasma and the material surfaces is one of the most critical challenges on the path to harness fusion power as new, fundamental energy source. This challenge typically combines the thrust to reach high density, low temperature (detached) plasmas in front of the divertor target plates as well as understanding the plasma material interaction (PMI) in particular in this regime. The combination of both research thrusts represents an extraordinarily challenging subject encompassing spatial scales spanning nanometers to meters in all states of matter and across a broad energy range. Modeling capabilities, which help to interpret data from nowadays experiments and enable extrapolation to future devices are urgently required. This is in particular true for toroidal magnetic confinement devices with three-dimensional (3D) plasma boundaries. Such plasma boundary geometries occur in tokamaks, when small amplitude magnetic perturbations are used to stabilize the unruly edge plasma or in stellarators, that are inherently 3D plasma confinement devices. In this project, the impact of 3D plasma boundaries on the plasma material interaction (PMI) was assessed. This work focused on plasma boundary conditions, in which high-density conditions at the material surfaces yield mitigation of the otherwise immense heat and particle loads that these materials would see. These so-called high recycling and eventually detached plasma regimes are of great interest for future reactor operation. In the project, key features that are unique to 3D boundaries were explored in comparison to canonically assumed axisymmetric plasma edge situations in tokamaks. In particular, the relevance of the 3D boundary situation in the extrapolation to the plasma boundary solution at ITER, the next step fusion energy experiment under construction as a multi-national, world-wide large-science experiment in southern France, has been explored. The EMC3-EIRENE plasma edge fluid and kinetic neutral transport code has been advanced to cope with the challenging and unprecedented conditions in the ITER boundary plasma including 3D fields that are planned to be used to suppress harmful edge instabilities, the so-called edge localized modes. This is a vital integration challenge for ITER and the results from this grant have provide a leading capability for this assessment. It was shown that the detachment process in a 3D edge solution for ITER follows the recycling regimes that are known from axisymmetric solutions, but that multiple plasma exhaust channels connected to the material surfaces are established which feature individual recycling characteristics. Because these channels touch the material surfaces in the divertor in a 3D geometry, the compatibility with the plasma material interaction (PMI), including erosion and impurity generation has been found to be an important part of the integration challenge. To address this, the fully 3D plasma material interaction code ERO2 has been adapted to these ITER specific geometries and a homogeneous mixing model was implemented, that allows to consider the mixing of Be and Was used at ITER in the PMI modeling. This model enhancement has been used to study non-local migration of Be in the JET ITER like wall configuration and it has been shown that with this model such complex migration processes in ITER relevant plasma shapes and with ITER relevant plasma boundary conditions can be addressed. The combined modeling approach using EMC3-EIRENE as a plasma boundary transport code and the ERO2 specialized PMI model will be an asset for the continued preparations of ITER operation as well as for Fusion Pilot Plant efforts that have emerged in the U.S. during the evolution of this grant. The predictive capability of this numerical tool has been validated at the DIII-D US national fusion facility. Here, dedicated plasma edge diagnostics were implemented to measure the impurity household around a 3D edge plasma during ELM suppression by 3D fields. Dedicated experiments with local material probes using these diagnostics and the state-of-the-art suite of boundary measurements at DIII-D have shown that the 3D perturbation of the plasma edge that is excreted by such 3D control fields yield a perturbation of the plasma boundary flux structure and hence also of the resulting PMI. The 3D boundary plasma is composed out of helical magnetic flux channels that intersect the divertor targets at an angle relative to the main guiding field, i.e., the toroidal magnetic field component of the tokamak. A similar effect has been measured as well on limiter surfaces during the startup campaign at the new stellarator experiment Wendelstein 7-X. These experiments ad initial analysis with the ERO plasma material interaction model, suggested that the place of erosion for a given particle from the surface and its re-deposition can be different in such 3D field geometries yielding potentially a significant level of net-erosion. This is not the case for axisymmetric solutions, where it was shown in the past that the eroded particles are effectively re-deposited into gaps produced by erosion at the same position and hence the net-erosion levels are small. For ITER, the quest to suppress the ELMs and at the same time maintain the integrity of the divertor is an issue, which these fundamental findings will help to resolve. The coupling of this work to the extrapolation in the ITER program has been addressed by both the PI and the lead numerical scientist being ITER Science Fellows in the duration of the contract and forward. A second focus in the exploration of 3D boundary effects on tokamaks and stellarators has been set on the measurement of helium exhaust features with such 3D fields. This is important because He represents the ash of the fusion process and needs to be exhausted. It was shown that 3D field application compatible with suppression of ELMs yields an increase of the helium exhaust performance. The ratio of the effective helium confinement time over the energy confinement time was reduced by almost 50% which demonstrated that the impact of helium accumulation in the plasma core with respect to the confinement of energy to sustain the fusion reaction is significantly improved with such 3D control fields. It was shown that this is the case for tokamaks as well as stellarators. At the Large helical Device in Japan, a similar enhancement of the helium exhaust features when small amplitude additional 3D fields were applied was measured. This is an important additional function of 3D field application and its impact on ITER is presently being studied in combination with investigations of helium exhaust in 3D field geometries of stellarator devices.

3D plasma edge transport↗

Effect of the Addition of a Low Equivalent Stress Mechanism to the Analysis of Geomechanical Behavior of the SPR West Hackberry Site

Sandia National Laboratories has long used the Munson-Dawson (M-D) model to predict the geomechanical behavior of salt caverns used to store oil at the Strategic Petroleum Reserve (SPR). Salt creep causes storage caverns to deform inward, thus losing volume. This loss of volume affects the salt above and around the caverns, puts stresses and strains on borehole casings, and creates surface subsidence which affects surface infrastructure. Therefore, accurate evaluation of salt creep behavior drives decisions about cavern operations. Parameters for the M-D model are typically fit against laboratory creep tests, but nearly all historic creep tests have been performed at equivalent stresses of 8 MPa or higher. Creep rates at lower equivalent stresses are very slow, such that tests take months or years to run, and the tests are sensitive to small temperature perturbations (<0.1°C). A recent collaboration between US and German researchers, recently characterized the creep behavior at low equivalent (deviatoric) stresses (<8 MPa) of salt from the Waste Isolation Pilot Plant. In addition, the M-D model was recently extended to include a low stress creep “mechanism”. This paper details new simulations of SPR caverns that use this extended M-D model, called the M-D Viscoplastic model. The results show that the inclusion of low stress creep significantly alters the prediction of steady-state cavern closure behavior and indicate that low stress creep is the dominant displacement mechanism at the dome scale. The implications for evaluating cavern and well integrity are demonstrated by investigating three phenomena: the extent of stress changes around the cavern; the predicted vertical strains applied to wellbore casings; and the evaluation of oscillating stress changes around the cavern due to oil sale cycles and their potential effect on salt fatigue.

58 GEOSCIENCES↗

Oak Ridge National Laboratory Fission Product Hydrochlorination

This work supports the recovery of high-assay low-enriched uranium (HALEU, uranium enriched in 235 U to >5% and <20%) from used nuclear fuel through a process based on the zirconium extraction (ZIRCEX) process. The ZIRCEX process starts with the dry head-end removal of zirconium or aluminum cladding from the nuclear fuel via chlorination or hydrochlorination, which results in the separation of cladding from the fuel as the metal chloride (e.g., aluminum trichloride or zirconium tetrachloride). The hydrochlorination process is included in the Material Recovery Pilot Plant (MRPP), a ZIRCEX-based demonstration plant at Idaho National Laboratory (INL). The experiments outlined in this report assessed fission product (FP) volatility and transport under the hydrochlorination conditions used to separate cladding from used nuclear fuel.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An Open-Source Framework for the Computational Analysis and Design of Autothermal Chemical Processes

The main project object was to develop software tools for simulating non-equilibrium autothermal processes, improving the prospects for identifying and designing such systems. The project demonstrates the use of these tools to simulate autothermal pyrolysis, a process recently developed at the pilot-plant scale at Iowa State University. In such process, instead of externally heating a reactor to pro-vide the enthalpy of pyrolysis, sufficient oxygen in the form of air is introduced into the reactor to support partial oxidation of reactants and products with the exothermic energy released supporting endothermic pyrolysis reactions. A fluidized bed is used to assure good mixing of biomass and oxidant and provide an isothermal reaction environment. The amount of oxygen required depends upon the kind of biomass being pyrolyzed and parasitic heat losses from the reactor. For example, for woody biomass pyrolyzed under conditions that simulate adiabatic operation, equivalence ratios can be as low as 0.06, compared to 0.20 or higher for autothermal gasifiers. By removing the heat transfer bottleneck of conventional pyrolysis, operation in autothermal mode allowed a significant increase in reactor throughput process, approaching five times the throughput of the conventionally operated pyrolyzer. Different simulation strategies were considered and developed: a zero-dimensional chemistry model was used to verify the applicability of kinetic schemes to predict biomass fast pyrolysis in autothermal conditions. Conventional chemical reactor models such as the plug flow reactor and the partially stirred reactor were used to investigate the role of mixing in the fluidized bed pyrolyzer and to establish the impact of mixing time on the gas-phase reactions. A comprehensive multiphase computational fluid dynamics (mCFD) framework, including polydisperse granular phase modeling and detailed chemical kinetics was formulated and used to model the experimental setup for autothermal biomass fast pyrolysis at ISU. Multiphase CFD was also used to investigate the role of biomass feed positioning on the mixing of biomass in the pyrolizer. Finally, a reduced order model (ROM), suitable to be implemented in process simulators was obtained. Both the mCFD and the ROM were validated against experiments.

09 BIOMASS FUELS↗

A Novel Process for Converting Coal to High-Value Polyurethane Products

Battelle has demonstrated a patented process for making high-value, polyurethane (PU) foam from coal, based on preparing liquefied coal via direct liquefaction, converting it to polyols as an intermediate via ozonation, and then making PU foams from these polyols. This process represents a breakthrough in innovative utilization of U.S. coals, and is applicable to bituminous as well as sub-bituminous coals. The resulting PU foam products are projected to have an extremely high value (i.e., over $\$5,000$ /ton), with nearly 100% of carbon utilization from coalderived liquid feedstock, and 31.5% to 43.5% of the carbon in the PU foam polyol product being bio-based. The targeted products represent an extremely large (i.e., over $80 billion/year), existing PU foam market, which could expand into making coatings and adhesives. The process can further help reduce petroleum imports, while improving the economics of PU foam production. This work was completed with funding from the National Energy Technology Laboratory (NETL), with cost share from the State of Ohio’s Ohio Development Services Agency (ODSA) and others, and has advanced the process to 10 kg/day continuous scale and thus to Technology Readiness Level (TRL) 5. A total of 48 coal-based polyols were prepared and evaluated. The initial 28 polyols focused on range finding for ideal conditions. The later 20 polyols were produced as part of process optimizations. These optimizations were targeted around a continuous ozonolysis process to evaluate extended time reactions and to create the necessary intermediate for production of 1-gallon samples of polyol. The most unique attribute of Battelle’s polyol is in the utilization of coal’s aromaticity to gain final foam rigidity. Typically, polyols depend on the isocyanate fraction and cross-linking to gain rigidity. By utilizing coal, we were able to maintain rigidity while reducing the overall hydroxyl value of the polyol. This is important as lower hydroxyl value leads to greater percent weight of the coal-based polyol because less isocyanate is required for foaming. This leads to greater foam cost savings. This report provides the details, process, and process cost models of the conversion of coal to polyols and further to PU foams. Battelle’s process begins with coal liquids. These liquids can be obtained by two processes: coal coking or pyrolysis to produce coal tar, and Battelle’s biobased coal-to-liquids (CTL) process to produce heavy syncrude after liquifying >85% coal. After liquification, Battelle utilizes ozonolysis to create functionalization on the polyaromatic coal structure. The functionalization is then converted to the final polyester polyol through transesterification, or to hydroxyamide polyol through amidification. Equivalent or better standard properties have been obtained for 2 lb/ft 3 density rigid, water and freon-alternative blown foams, including compressive strength, density, R-value, and dimensional stability. Target applications for these foams are insulation, packaging, and energy-absorbing foams. Some exploratory testing also showed promise for adhesives applications. A detailed economic analysis showed that Battelle’s polyol process is economical, at a 140 metric tons per day (MTD) polyol production scale. An attractive return on investment (ROI) at competitive pricing validates the process is ready for a pilot-plant demonstration. A scale-up plan is provided.

01 COAL, LIGNITE, AND PEAT↗

Thermal Ratcheting Analysis of TEDS Packed-bed Thermocline Energy Storage Tank - Modeling Methodology and Data Validation

This report investigates numerical modeling methods for thermal ratcheting analysis of packed-bed thermal energy storage (TES) tank and discusses the validation results via comparison with experimental data. The experimental data obtained from various design characteristics of packed-bed thermocline tanks, including the Thermal Energy Distribution System (TEDS) TES tank at Idaho National Laboratory (INL), were used to validate thermal and mechanical models developed in this study to evaluate the thermal ratcheting potential. The thermal model was shown to predict the transient thermal propagation through the packed-bed thermocline tanks generally well. However, a larger discrepancy was observed during the comparison with the data from TEDS, presumably due to the uncertainty of boundary conditions given from the experiment. Based on the comparative study between the thermal model predictions and experimental data of various packed-bed thermocline tanks, potential improvements were suggested for the future TEDS experiments for more precise validation study. For mechanical (thermally induced stress) analysis, two different modeling approaches were tested to evaluate hoop stress applied to the packed-bed TES tank wall, which is a major cause of thermal ratcheting process: (i) infinite rigidity model and (ii) Drucker-Prager (DP) model. The ‘model (i)’ is a conservative method with infinite rigidity assumption of granular filler inside a TES tank, whereas the ‘model (ii)’ is a method that takes into account more realistic processes such as thermal expansion of filler and tank wall as well as inter-particle interactions during the cyclic operation of a packed-bed TES tank. The validity of each modeling method was examined by comparing the numerical simulation with the experimental data obtained from the packed-bed TES tank for Solar One pilot plant. Then, the effects of various model parameters were discussed to evaluate the thermal ratcheting potential of the TEDS TES tank. The preliminary thermal ratcheting analysis implies that the TEDS TES tank will hold its structural integrity during the normal operation cycles.

25 ENERGY STORAGE↗

Combined Cycle Integrated Thermal Energy Storage “CiTES” (Final Scientific/Technical Report)

The Phase I of this project confirmed the technical feasibility of a Combined Cycle integrated Thermal Energy Storage “CiTES” system, calculated the key performance parameters like power efficiency and costs, and proved its commercial value with full-year simulations for several US electricity markets with high degree of variable renewable generation and volatile hourly electricity prices. The core element of this project is the Electro Thermal Energy Storage (ETES) technology from Siemens Gamesa Renewable Energy GmbH, using thermally stable and inexpensive volcanic rocks as storage material and air as heat transfer medium. This technology is backed by more than 10 years of experience and a 440MMBTU (130MWh-th) pilot plant in Hamburg, Germany, which is in operation since 2019. The integration of this thermal storage in an existing combined cycle power plant (CCPP) is typical power plant technology without any major technology risks. It allows the storage of inexpensive renewable energy during times of surplus renewable generation and the discharge of this energy in times of high energy demand when the fossil plant is in operation. This supplements the fossil power generation with CO2-emission-free energy. The secondary effect of the CiTES system is that a small part of the stored thermal energy is used to keep the heat recovery steam generator (HRSG) and steam turbine (ST) of the combined cycle power plant in hot and ready-to-start condition. This enables the plant to start rapidly when fossil generation is required to satisfy demand as soon variable generation drops off in the evenings or during cloud cover and calm wind periods. Without pre-warming of the HRSG and ST, the CCPP would need several hours for a cold or warm start, burn a lot of gas and release high NOx emissions during start and wouldn’t be able to use the short times of high energy prices in an efficient or economical manner. The economic parameters of CiTES were determined by a full year “8760” simulation using a data set calculation for each of the hours of the year, and historical electricity and gas prices. For consistency, the simulations were focused on the pre-COVID year 2019. The financially most attractive markets were in the Energy Reliability Council of Texas (ERCOT) region, which allowed substantial value generation with arbitrage (charge with cheap energy during renewable surplus times and discharge when energy is needed and expensive). The improvement of flexibility with the CiTES system by pre-heating and warm-keeping of the CCPP allowed for additional power generation during short time periods when demand is high but renewable generation is down; when the hourly energy prices are highest in these markets. The simulations are based on 2019 data, when ERCOT had 27GW of installed photovoltaic (PV) and wind generation. They showed that the created revenue with the prototypically sized CiTES system of 1,000MMBTU (300MWh-th) falls a little bit short of what is expected from a commercially viable investment. The system has optimization opportunities for cost reduction and increased effectiveness which will be realized during a potential Phase II Pre-FEED study following this project. Furthermore, it is safe to assume that a lot of renewable generation capacity will be added all over the US in the coming years. As an example, ERCOT is predicting to more than double its renewable generation from 27GW in 2019 to a forecasted 63GW in 2023. This will increase the amount of renewable overproduction exponentially. This rapid increase of local overproduction and the need to curtail renewable generation is well documented by the California ISO (www.CAISO.com / managing oversupply). However, the simulations also revealed a weakness in the structure of the electricity markets in the US. More specifically, when electricity prices are very low and approaching negative levels, the owners of Variable Renewable Energy (VRE) will curtail a part of their facility to stabilize the price by reducing supply. This results in a situation in which storage facilities, which are integrated in existing fossil assets and don’t have the behind-the-meter benefit of a VRE, won’t be able to purchase low cost – otherwise curtailed – renewable energy off the grid. A special tariff, which motivates VRE owners to sell otherwise curtailed renewable energy to storage facilities (Hydrogen, thermal, pumped hydro, etc.) can solve this issue. The implementation of such a regulating tariff by Independent System Operators, thus avoiding renewable curtailment, is a pre condition for successful commercialization for renewable energy storage technologies. With this advancement of design and technology and improvements in the market environment, it can be expected that the Combined Cycle integrated Thermal Energy Storage proves itself as an important innovation to keep highly efficient, natural gas-based power generation economically successful and relevant for the power industry in the United States of America.

Wolf, Thorsten↗

Uranium Oxide Elutriation at Higher Flow Rates and Longer Times

This work supports the recovery of high-assay low-enriched uranium (i.e., U enriched in 235 U to >5% and <20%) from used nuclear fuel. One step includes elutriating triuranium octoxide (U 3 O 8 ) from a fluidized bed of alumina (Al 2 O 3 ) that fills the main reaction chamber. The experiments outlined in this report assessed the effects of the time and flow rate on the elutriation of U 3 O 8 powder from the reaction vessel. Testing at Oak Ridge National Laboratory (ORNL) was performed in a one-fourth scale experimental apparatus based on a pilot-scale system, which is the Material Recovery Pilot Plant (MRPP) at Idaho National Laboratory (INL). The experimental system comprises a supply of pressurized nitrogen (N 2 ), a gas heater, the reaction vessel, a knock-out pot, and a water trap where elutriated particles are collected for sampling. An Al 2 O 3 fluidized bed is contained within the reaction vessel. A bed of Al 2 O 3 with a nominal size of 180 µm and U 3 O 8 with a nominal size of 7 µm was fluidized at 2 different flow rates so the U 3 O 8 physically separated from the bed. The apparatus was simple and had no valves or sharp bends downstream from the reactor. The flow exited the reactor through a side port at the top. The flow passed through a knock-out vessel before the flow was passed through a bubbler to capture the U 3 O 8 . Seven tests were completed with U 3 O 8 using an elutriating gas of N 2 heated to 200°C. Tests were performed with bed loadings that comprise 25.0 g of U 3 O 8 , or 3.6 wt% of the bed mass. Except for one test performed at 12 SLPM, the gas flow rate through the bed for the other experiments was set at 10 SLPM as measured by the mass flow meter. Linear velocities through the bed were calculated as 28 and 34 cm/s, or 0.9 and 1.1 ft·s -1 . The duration of the tests ranged from 20 to 180 min, and one test had a flow cycled between 0 and 5 SLPM every 5 min for 40 min. The testing successfully demonstrated elutriation of U 3 O 8 from the fluidized bed as up to a 100% of the U 3 O 8 was transferred out of the bed. The removal of U 3 O 8 had a logarithmic dependence on flow rate. The design changes made the apparatus easier to clean, and the mass balances were better than those used in previous studies. Some elutriated Al 2 O 3 collected in the tubing that connected the reactor to the knock-out pot, but the amount of Al 2 O 3 was minimal for 10 SLPM. The flow at 12 SLPM showed considerable transport of Al 2 O 3 bed material into the reaction-vessel headspace and the transfer line to the knock-out pot.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Analysis Report for Determination of pH Correction Factors for Brines under AP-157 Rev.1

This Analysis Report (AR) documents the determination of pH correction factors for the observed pH readings. The correction factor converts the observed pH reading recorded from the brines used in geochemical studies in support of the Waste Isolation Pilot Plant (WIPP) to a corrected pH value. The data analysis in this AR falls under AP-157 Rev. 1 Analysis Plan for Determination of pH Correction Factors in Brines (Kirkes et al, 2021). Measurement of pH in some solutions can be challenging due to numerous factors such as high ionic strength, elevated or lowered temperature, complex matrix composition, etc. (Knauss et al., 1990; and Rai et al., 1995). The measured pH can be corrected by applying the correction factor, empirically obtained from a specific test solution.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Actinide (III/IV) - Silica Colloids in the WIPP

During the completeness process for the 2019 Compliance Recertification Application (CRA) for the Waste Isolation Pilot Plant (WIPP), the US Environmental Protection Agency (EPA) raised concerns about the possible presence of actinide-silica colloids in the WIPP. Several publications that studied the An(IV)- silica system indicated that these colloids could form under conditions similar to WIPP. Colloids are important for WIPP Performance Assessment (PA) as these are a mobile fraction of actinides that contribute to release. As the previously published papers did not explore the formation of actinide-silica colloids under the high ionic strength environment expected in WIPP, an experimental strategy to study these systems was developed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗