Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Perseverance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Mars Sample Recovery Helicopter: Rotorcraft to Retrieve the First Samples from the Martian Surface

The Mars Sample Return Mission (MSR) will carry the next set of Mars helicopters, Sample Recovery Helicopters (SRHs), to the Martian surface. After successfully demonstrating extraterrestrial flight in 2021, Ingenuity has acted as a “scout” for the Perseverance rover while the rover gathers samples of Martian soil. In 2028, the MSR mission will launch a lander and two Ingenuity-sized SRHs to retrieve these samples. These will be the first samples of the Martian surface delivered to Earth. The SRH project will maintain heritage from Ingenuity’s design when possible. However, several key changes must be made, including a ground mobility system, a robotic arm for tube manipulation, and the ability to carry the weight of a science payload (the sample tubes). In addition, the onboard software and cameras will be upgraded, and the rotor radius will be increased. Furthermore, new rotor performance and flight dynamics models and thorough characterization of vehicle limits will be required. The new vehicle design will be described, as well as validation and verification efforts to date.

Rotorcraft↗

NASA Capture, Containment, and Return System: Bringing Mars Samples to Earth

The Capture, Containment, and Return System (CCRS) project is NASA’s last step in bringing back Mars samples. CCRS will close a decades-long multi-mission and multi-agency effort to bring Mars surface samples back to Earth for scientific studies. CCRS will launch in 2027 on the European Earth Return Orbiter (ERO) spacecraft, which will provide communications relay for the Mars Sample Return ground missions, Perseverance rover and the Sample Retrieval Lander (SRL) (to be launched in 2028). The main mission for CCRS begins when the first-ever orbital planetary capture operation occurs with CCRS catching and securing the Orbiting Sample (OS)in low Mars orbit. From this point, the system will perform additional "firsts": it will autonomously contain the OS with heat-shrink-fit, sterilize the outside surface, and assemble the Earth entry capsule, named Earth Entry System (EES), in orbit around Mars using a gantry mechanism. At approximately 2.8 Lunar distances from Earth, or 3-days from entry into Earth’s atmosphere, CCRS will open its micrometeoroid shield and release the EES on a ballistic trajectory to Earth. The EES is designed to be a fully passive system that will enter the atmosphere and land without parachute at the Utah Test and Training Range (UTTR).

Mars mission, Sample return, Mission design↗

Optical Design of the Mastcam-Z Lenses

The rover Perseverance includes two Mastcam-Z cameras that use the first zoom lenses to be placed on an outer planet. We discuss the design of these zoom lenses. We explain their features and imaging capability.

Maki, Justin N.↗

Maneuver Design Implementation and Verification for the Mars 2020 Mission

On February 18, 2021, the Perseverance rover landed in Jezero Crater on Mars, transported by the Mars 2020 spacecraft on a nearly seven-month journey to the Red Planet. The execution of three propulsive maneuvers during the interplanetary cruise phase was required to remove the launch-injection bias and deliver the spacecraft to the Mars atmospheric entry point. This paper focuses on the maneuver implementation and verification process between the navigation and spacecraft teams. Additionally, this paper discusses the execution error models that were used to determine maneuver performance and delivery accuracy at the atmospheric entry interface point.

Kruizinga, Gerhard↗

Low Temperature Brazing: A Candidate Method for Preventing Interplanetary Contamination During the Mars Sample Return Mission

NASA and the European Space Agency are planning a joint Mars Sample Return campaign, scheduled to launch in 2026, with a very specific objective: return to Earth the rock and regolith samples that have been collected on Mars by NASA’s Perseverance rover. This is a very complex, multi-step process intended to culminate in the safe return of Mars samples to Earth. The term “safe return” implies use of a robust containment vessel designed to prevent any uncontained or unsterilized material from Mars from being returned to Earth. Hence, any technology chosen for sealing this vessel has to meet stringent contamination requirements, but also to withstand impact forces upon landing. This paper describes the development of a primary candidate for the sealing approach: brazing.

Schein, Mike↗

Mars 2020 Trajectory Correction Maneuver Design

The Mars 2020 mission launched on 30 July 2020 and arrived at Mars on 18 February 2021. Delivering the mission’s Perseverance rover to Jezero Crater required adjusting the postlaunch trajectory to remove the launch injection bias and to target the atmospheric entry conditions, while also satisfying requirements on the propellant usage and non-nominal impact probability at Mars. The Mars 2020 maneuver design team achieved these goals by designing and executing three propulsive maneuvers in flight. The accurate on-board execution of those maneuvers delivered the spacecraft into the Martian atmosphere in a state that allowed for a successful entry, descent, and landing on the surface. This paper details the maneuver design process and describes the design and execution of the three in-flight propulsive maneuvers.

Kruizinga, Gerhard↗

Mars 2020 Navigation Performance

On February 18, 2021, the Perseverance rover and Ingenuity helicopter demonstration landed at Jezero Crater. The Entry, Descent, and Landing (EDL) architecture, largely the same used to land Curiosity at Gale Crater on August 6, 2012, required high-fidelity flight dynamics simulation with two independent tools to verify performance. The process for creating the EDL simulation using the Dynamics Simulator for Entry, Descent and Surface landing (DSENDS) tool will be discussed, along with its use for for independent verification of the EDL statistical analysis results and reference trajectory simulation. Analysis and usage details both in development and cruise, along with post-landing assessment of the prediction performance of the simulation, will also be discussed.

Wagner, Sean↗

Post-flight Analysis of Atmospheric Properties from Mars 2020 Entry, Descent, and Landing

The Mars 2020 spacecraft landed the Perseverance rover and Ingenuity helicopter successfully in Jezero crater on Feb. 18, 2021. The entry, descent, and landing (EDL) sequence of the spacecraft largely leveraged the previous 2012 Mars Science Laboratory (MSL) mission. The atmospheric modeling approach for Mars 2020 was also borrowed from MSL. It consisted of two mesoscale atmospheric models of the target site during the Martian season of landing, and a statistical model of the pressure, density, temperature, and winds based on the mesoscale model data. This paper briefly describes the pre-flight atmospheric models used for Mars 2020, but focuses on the post-flight assessment of these models and comparison to near-landing day orbiter sounder and other onboard atmospheric measurements. Observations from post-flight analysis showed that density was under-predicted in the upper atmosphere, but within the altitudes covered by the mesoscale models, the pre-flight modeling matched post-flight results, including for quantities like wind velocities. Potential improvements to address the upper atmosphere and other deficiencies of the Mars 2020 pre-flight model are also discussed.

Villar, Gregorio↗

Test Facilities for SHERLOC Laser Development

The Scanning Habitable Environments with Raman and Luminescence for Organics and Chemicals (SHERLOC) instrument is a deep UV laser based spectrometer that is part of NASA’s Mars Perseverance rover. The laser is a pulsed 248.6 nm NeCu hollow cathode gas discharge laser. The design, development, and testing of lasers and laser power supplies (LPS) were performed by scientists and engineers at the Jet Propulsion Laboratory (JPL) and Photon Systems Inc. (PSI). While these lasers had been used previously in extreme terrestrial environments, before they had to be qualified for operation and functionality over the expected range of environmental situations (temperature cycling, vibration, mechanical shock, low pressure corona emission testing) over the course of mission life time. The SHERLOC laser/LPS testing facilities consisted of custom-tailored environmental test chambers with metrology/control electronics. A custom LabVIEW software package was developed to autonomously operate all test facilities using a multi-threaded, object-oriented programming architecture, tasked with interfacing with many instruments simultaneously for operation and data acquisition.

Houck, Andrew↗

The Containment Assurance Risk Framework of the Mars Sample Return Program

The Mars Sample Return campaign aims at bringing rock and atmospheric samples from Mars to Earth through a series of robotic missions. These missions would collect the samples being cached and deposited on Martian soil by the Perseverance rover, place them in a container, and launch them into Martian orbit for subsequent capture by an orbiter that would bring them back. Given there exists a non-zero probability that the samples contain biological material, precautions are being taken to design systems that would break the chain of contact between Mars and Earth. These include techniques such as sterilization of Martian particles, redundant containment vessels, and a robust reentry capsule capable of accurate landings without a parachute. Requirements exist that the probability of containment not assured of Martian-contaminated material into Earth’s biosphere be less than one in a million. To demonstrate compliance with this strict requirement, a statistical framework was developed to assess the likelihood of containment loss during each sample return phase and make a statement about the total combined mission probability of containment not assured. The work presented here describes this framework, which considers failure modes or fault conditions that can initiate failure sequences ultimately leading to containment not assured. Reliability estimates are generated from databases, design heritage, component specifications, or expert opinion in the form of probability density functions or point estimates and provided as inputs to the mathematical models that simulate the different failure sequences. The probabilistic outputs are then combined following the logic of several fault trees to compute the ultimate probability of containment not assured. Given the multidisciplinary nature of the problem and the different types of mathematical models used, the statistical tools needed for analysis are required to be computationally efficient. While standard Monte Carlo approaches are used for fast models, a multi-fidelity approach to rare event probabilities is proposed for expensive models. In this paradigm, inexpensive low-fidelity models are developed for computational acceleration purposes while the expensive high-fidelity model is kept in the loop to retain accuracy in the results. This work presents an example of end-to-end application of this framework highlighting the computational benefits of a multi-fidelity approach.

Giuseppe Cataldo↗

Real-World Testing of LiDAR-Inertial Based Navigation and Mapping for Precision Landing

The fusion of LiDAR and inertial measurements duringspacecraft descent and landing can be used to estimate alander’s navigation state and map the terrain below. Together,these data products can be used to enable safe and preciselanding on celestial bodies for which a priori orbital reconnaissanceis insufficient for hazard detection and avoidance.Unlike camera images used in visual terrain relative navigation,LiDAR scans are insensitive to changes in illumination; as aresult, the technique can be used to land in poorly lit areas,or at times of day when the lighting conditions are incongruentwith existing orbital imagery. In this paper, we extend previouswork in which we introduced a factor graph based smoothingapproach for LiDAR-inertial navigation and mapping. Whereasthe algorithms were previously tested on simulated data, thispaper presents testing on real-world data. Data from theAutonomous Landing Hazard Avoidance Technology (ALHAT)airplane flight tests in the Yucca Flats and Death Valley in2009 (FT3), the Morpheus vertical take off and landing flighttests at Kennedy Space Center in 2014 (FT6), and the landingof Perseverance and Ingenuity on Mars in 2021 (M2020) wereused to evaluate algorithm performance. In this paper, weextend our LiDAR-inertial technique to work with a variety ofranging technologies: single point laser altimetry (FT3), denseflash LiDAR (FT6), and six-beam radar (M2020). A thoroughperformance analysis for all three datasets is presented. Datasetpreparation, improvements in algorithm robustness, and outlierrejection, which were necessitated by the transition to realworlddata, are discussed.

Trawny, Nikolas↗

Testing Mars 2020 Flight Software and Hardware in the Surface System Development Environment

The Mars 2020 (M2020) Perseverance Rover is NASA's most advanced planetary rover mission to date. It includes a novel Sample Caching Subsystem (SCS) which will collect rock cores for possible future return to Earth, as well as an improved mobility system with enhanced autonomous navigation which will enable it to traverse faster and farther than prior rovers. The development of both systems required extensive flight software and flight hardware testing. To support this testing, we developed the Surface System Development Environment (SSDEV) and used it for a wide variety of testing. SSDEV is a bundled subset of M2020 Flight Software which runs on commercially available Linux computers and can be combined with multiple backend options for simulation and hardware control. The SSDEV architecture enabled our teams to perform much more testing of flight software and flight hardware than would have otherwise been possible. As a secondary benefit, the SSDEV-based test campaigns also helped our teams enter the operations phase of the mission with greater readiness of operations products and tools. In this paper, we summarize the motivation for SSDEV, provide an overview of the SSDEV architecture, list several examples of how SSDEV was used, and summarize lessons learned. SSDEV is not a substitute for integrated testing with flight-like avionics, but it enabled substantially more testing than would have otherwise been possible and also provided some unique benefits. We recommend architectures like SSDEV to future projects that need to perform extensive hardware and software testing using a limited set of flight-like avionics.

Wai, Dennis↗

Mars 2020 Entry, Descent, and Landing System Software Implementation

On February 18th, 2021, the Mars 2020 project's Perseverance Rover successfully touched down on the Martian surface after nearly eight years of development. The Mars 2020 Entry, Descent, and Landing (EDL) System largely leveraged heritage from the Mars Science Laboratory (MSL) EDL System while employing targeted technological advancements. The landing process is autonomously directed by a software behavior implemented in the rover's primary flight computer called the EDL Timeline that assumes control of the vehicle six days before atmospheric entry. This paper first walks through the basics of the EDL Timeline mechanics and how the behavior is designed to account for internal system variations and environmental unknowns. It then summarizes the interactions between the EDL timeline and other high-level system behaviors like spacecraft mode transitions and system fault protection, focusing on the complications that arise when passing spacecraft control between executive functions. Although the MSL-inherited EDL System is reliable and capable, targeted updates and a thorough verification and validation program were required for Mars 2020. This paper discusses changes made to close vulnerabilities discovered during both MSL and Mars 2020 development cycles, landing system capability enhancements that were enabling for Mars 2020's mission, and how these updates were integrated with the heritage system. It then describes how both analysis and testing campaigns were utilized to verify and validate all aspects of EDL and system behaviors that run during the six days before landing, as well as the operational workarounds that were needed to address problems found during the development and commissioning process. Finally, this paper imparts lessons learned from Mars 2020 EDL development, implementation, and operations, emphasizing how systems designed to conduct time-critical mission events with low margin of error can be improved in the future.

Stehura, Aaron↗

Development of the Sample Fetch Rover Locomotion Subsystem

A novel system for planetary surface mobility is being designed in response to the challenging requirements of the Sample Fetch Rover (SFR) mission, part of the NASA/ESA Mars Sample Return campaign (MSR). The rover will retrieve tubes with rock and soil samples, previously acquired and cached by NASA’s Perseverance rover in depots on the Martian surface. SFR will have to acquire, transport and deliver the tubes to a lander in a tight time window. This will require significant mobility capabilities, unprecedented for Mars rovers. The highly time-constrained traverse needs, together with the strictly limited mass and volume imposed by the accommodation on the lander, have pushed the design of the SFR locomotion to seek innovative solutions. In response to that, a four-wheel drive system is being developed, integrated with a deployable pitch-averaging suspension. This will be the first time that four-wheel locomotion is used on Mars and on robotic planetary rovers in general. The system, relying on high-efficiency drive actuators designed to operate in Mars environment, shows potential for terrain and obstacle negotiation performance comparable with that of larger vehicles. The implementation also takes advantage of the superelastic Spring-Tyre technology currently being developed by NASA Glenn Research Center, which, thanks to its traction and obstacle compliance properties, will allow SFR to navigate difficult ground and achieve its mission objectives.

Rehmatullah, Faizan↗

Actuator and Motor Control End-to-End V&V on the Mars 2020 Rover

The Mars 2020 Perseverance rover is the most advanced robotic exploration system ever sent to another planet. To support the complex scientific and mobility needs of the mission, the rover utilizes 33 actuators, three multi-degree-of-freedom force-torque sensors, fifteen single or dual-speed resolvers, two solenoid valves, and twelve contact switches. The control for these actuators and sensors is achieved by several levels of flight software, coordinated between two computers with varying bandwidth control loops. Furthermore, the actuators and sensors were integrated into multiple larger robotic mechanisms that were delivered by different organizations at various points in the Integration and Test (I&T) timeline. All of this created a very complex Verification and Validation (V&V) scenario involving multiple subsystems and teams, several hardware and software testbeds with varying levels of fidelity, and significant systems engineering to ensure the overall I&T schedule could be maintained while ensuring system hardware safety.This paper details the integrated V&V effort across multiple teams and venues to provide full coverage of all necessary functionality, performance, and fault protection. First, it provides an overview of how the V&V campaign was subdivided among teams and venues and provides descriptions of the various hardware configurations used to support the testing. The Mars 2020 implementation of the plan incorporates many of the lessons learned from Mars Science Laboratory’s test campaign, and these value-added modifications are discussed here. Also included in this section is the system-level environmental testing approach used for mechanisms. Second, the paper describes the phased approach used by the teams to support new hardware and software deliveries to testbed and Systems I&T. In this approach the test campaign was built upon higher-level mechanism needs for performance, functionality, and safety at specific times in the campaign. Finally, the paper discusses lessons learned from the V&V campaign that should be applied to future large-scale motion control testing efforts.

Borne, Davis↗

Mars 2020 Entry, Descent, and Landing as Observed by Radio Science Techniques at UHF and X-band Frequencies

On February 18, 2021, NASA’s Mars 2020 Rover “Perseverance” conducted the Entry, Descent, and Landing (EDL) sequence to land safely on the surface of Mars at Jezero Crater. Due to the criticality of the EDL sequence, redundant telecommunications strategies were utilized to observe the event. The rover transmitted an X-band (8.4 GHz) signal encoded with Multiple Frequency Shift Keying tones direct-to-Earth and a UHF (401.5 MHz) signal with 8 kbps encoded telemetry to orbiters, which relayed the signal back to Earth at X-band. NASA’s Deep Space Network complexes at Goldstone, California and Madrid, Spain received the direct-to-Earth X-band signal. Two of the largest steerable radio telescopes in the world, the 100-meter Green Bank Telescope in West Virginia and the Effelsberg 100-meter Radio Telescope in Germany also received the UHF carrier signal on Earth. During the EDL event, full spectrum recordings of the UHF and X-band signals were captured at these observatories using open-loop receivers. Real-time and post-processing signal analysis to determine power level, received frequency, and Doppler shift allowed determination of the spacecraft’s health and safety state during critical sequences, including event detection such as atmospheric entry, plasma blackouts, and parachute deployment. Simultaneous observations of the UHF and X-band radio links allow for redundancy in the event of a fault and greatly improve confidence in Doppler event detection.

Gladden, Roy↗

Mars 2020 Entry, Descent, and Landing Software Implementation

On February 18th, 2021, the Mars 2020 project's Perseverance Rover successfully touched down on the Martian surface after nearly eight years of development. The Mars 2020 Entry, Descent, and Landing (EDL) System largely leveraged heritage from the Mars Science Laboratory (MSL) EDL System while employing targeted technological advancements. The landing process is autonomously directed by a software behavior implemented in the rover's primary flight computer called the EDL Timeline that assumes control of the vehicle six days before atmospheric entry. In addition to performing the critical function of landing the rover on the Martian surface, the EDL timeline behavior must co-exist in a non-partitioned software and system environment with other high-level functions that accomplish the goals for the rest of the mission. Due to the criticality of EDL, the potential for loss of mission, and a need for complete system autonomy, the standard for how the EDL Timeline interacts with other functions in the system is highly constrained. This paper first walks through the basics of the EDL Timeline mechanics and how the behavior is designed to account for internal system variations and environmental unknowns. It then summarizes the interactions between the EDL timeline and other high-level system behaviors like spacecraft mode transitions and system fault protection, focusing on the complications that arise when passing spacecraft control between executive functions. Although the MSL-inherited EDL System is reliable and capable, targeted updates and a thorough verification and validation program were required for Mars 2020. This paper discusses changes made to close vulnerabilities discovered during both MSL and Mars 2020 development cycles, landing system capability enhancements that were enabling for Mars 2020's mission, and how these updates were integrated with the heritage system. It then describes how both analysis and testing campaigns were utilized to verify and validate all aspects of EDL and system behaviors that run during the six days before landing, as well as the operational workarounds that were needed to address problems found during the development and commissioning process. Finally, this paper imparts lessons learned from Mars 2020 EDL development, implementation, and operations, emphasizing how systems designed to conduct time-critical mission events with low margin of error can be improved in the future.

Stehura, Aaron↗

Mars 2020 Lander Vision System Flight Performance 1

The Mars 2020 Entry Descent and Landing (EDL) system delivered the Perseverance rover to the surface of Mars on February 18th, 2021. A large fraction of the Jezero Crater landing site was covered with landing hazards including cliffs, inescapable dune fields and rocks. These hazards were identified or inferred using orbital imagery before launch so that they could be avoided using Terrain Relative Navigation (TRN) which was composed of two parts: the Lander Vision System (LVS) and Safe Target Selection (STS). During EDL, the LVS successfully estimated map relative position by fusing landmarks matched between descent imagery and a map of the landing site with Inertial Measurement Unit (IMU) data. This position estimate was used by STS to identify the safest target for landing that was also reachable given fuel and other constraints. The EDL system then used the powered descent phase to retarget to this location and land safely. The overall error between the targeted location and actual landing location was 5m which was an order of magnitude less than the 60m touchdown error requirement. This paper will describe the final tests of the LVS before launch, the checkout of the LVS during operations and the LVS performance during EDL.

Zheng, Jason↗