Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operations coordination plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Design of the American Wake Experiment (AWAKEN) field campaign

The American WAKE experimeNt (AWAKEN) is a multi-institutional collaborative field campaign, starting in March 2022, that will gather an unprecedented data set including both atmospheric observations and wind plant operational data. This comprehensive data set will be used to characterize the wind plant performance and turbine loading in different operational and atmospheric conditions and validate the use of different wind plant control strategies and simulation frameworks. An extensive field campaign like AWAKEN requires proper coordination and long-term planning to be successful. In this paper, we review the major activities planned during AWAKEN to provide information for current and future project partners. Specifically, we provide information about the project sites, their planned instruments, and how these will relate to the scientific objectives of the overall AWAKEN project.

17 WIND ENERGY↗

Pretest information for a test to validate plume simulation procedures (FA-17)

The results of an effort to plan a final verification wind tunnel test to validate the recommended correlation parameters and application techniques were presented. The test planning effort was complete except for test site finalization and the associated coordination. Two suitable test sites were identified. Desired test conditions were shown. Subsequent sections of this report present the selected model and test site, instrumentation of this model, planned test operations, and some concluding remarks.

Hair, L. M.↗

Automated Derivation of Complex System Constraints from User Requirements

International Space Station (ISS) payload developers submit their payload science requirements for the development of on-board execution timelines. The ISS systems required to execute the payload science operations must be represented as constraints for the execution timeline. Payload developers use a software application, User Requirements Collection (URC), to submit their requirements by selecting a simplified representation of ISS system constraints. To fully represent the complex ISS systems, the constraints require a level of detail that is beyond the insight of the payload developer. To provide the complex representation of the ISS system constraints, HOSC operations personnel, specifically the Payload Activity Requirements Coordinators (PARC), manually translate the payload developers simplified constraints into detailed ISS system constraints used for scheduling the payload activities in the Consolidated Planning System (CPS). This paper describes the implementation for a software application, User Requirements Integration (URI), developed to automate the manual ISS constraint translation process.

Muery, Kim↗

Issue focused stakeholder collaboration: reaching consensus on spent nuclear fuel transportation operational practices - 15465

This paper examines stakeholder and issue-focused approaches used by Department of Energy (DOE) programs to collaborate with key stakeholders on transportation practices to ship radioactive material, particularly used nuclear fuel (UNF) and transuranic waste (TRU). In accordance with the Administration's Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste, the current effort by DOE to plan for the development of a future transportation system to ship UNF from commercial reactors, with an initial focus on shutdown reactors, is using approaches similar to those used in other successful shipping campaigns to collaborate with stakeholders about sustainable transportation practices. As part of a coordinated approach to stakeholder outreach and collaboration, DOE is currently developing a draft Transportation Planning Framework to provide a template for future shipments of UNF from commercial reactors and is engaged with states and tribes and other stakeholders in discussions on the institutional and operational components of that Framework. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Microgrid to enable optimal distributed energy retail and end-user demand response

In the face of unprecedented challenges in environmental sustainability and grid resilience, there is an increasingly held consensus regarding the adoption of distributed and renewable energy resources such as microgrids (MGs), and the utilization of flexible electric loads by demand response (DR) to potentially drive a necessary paradigm shift in energy production and consumption patterns. However, the potential value of distributed generation and demand flexibility has not yet been fully realized in the operation of MGs. This study investigates the pricing and operation strategy with DR for a MG retailer in an integrated energy system (IES). Based on co-optimizing retail rates and MG dispatch formulated as a mixed integer quadratic programming (MIQP) problem, our model devises a dynamic pricing scheme that reflects the cost of generation and promotes DR, in tandem with an optimal dispatch plan that exploits spark spread and facilitates the integration of renewables, resulting in improved retailer profits and system stability. Main issues like integrated energy coupling and customer bill reduction are addressed during pricing to ensure rates competitiveness and customer protection. By evaluating on real datasets, the system is demonstrated to optimally coordinate storage, renewables, and combined heat and power (CHP), reduce carbon dioxide emission while maintaining profits, and effectively alleviate the PV curtailment problem. Finally, the model can be used by retailers and MG operators to optimize their operations, as well as regulators to design new utility rates in support of the ongoing transformation of energy systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Deploying Intra-hour Uncertainty Analysis Tools to ABB’s GridView - CRADA 445

The quickly-changing generation resource mix in the US grid, with large additions of variable resources, retirements of traditional thermal generation, distributed generation and demand response, are creating new challenges on the traditional operation of both the generation and transmission systems. The ability to perform intra-hour high fidelity production cost modeling (PCM) is needed to allow grid operators and grid planners to integrate high penetration (more than 50%) of variable energy resources, and to make prompt well informed decisions in market operations and planning. In the last decade, PNNL has developed several stand-alone tools to enable grid operators and planners to understand the impact of high variable generation on their systems. These tools have been used is studies such as: (1) Evaluation the benefits of WECC balancing authorities coordination under high variable generation penetration , (2) Benefits of Energy Imbalance Market in the North West Power Pool and (3) Duke Energy and NV Energy solar integration studies. ABB’s GridView is a widely used commercial PCM tool. It is the tool used by WECC and their stakeholders to develop the WECC PCM planning model on bi-annual basis. This proposal is focused on the integrating of PNNL intra-hour uncertainty analysis tools to GridView.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NASA Strategy for Technology Development

The National Aeronautics and Space Administration (NASA) Office of the Chief Technologist (OCT) provides the strategy and leadership that integrates NASA’s technology development and open innovation activities to advance American aeronautic, science, and space exploration objectives. OCT performs an agency-level technology coordination role, coordinating with the NASA Mission Directorates, field centers, and other government agencies to align the agency’s technology investments to meet mission requirements while filling gaps, anticipating future needs, and minimizing duplication of effort. OCT provides the strategy and coordination that guide NASA's technology and innovation activities through Strategic Technology Integration, Digital Transformation, the Science and Technology Partnership Forum, and Innovation. The Strategic Technology Integration team informs policy, requirements, and strategy for NASA’s technology development activities in support of the Chief Technologist by coordinating with NASA mission directorates, other government agencies, and external organizations. As part of these efforts, OCT develops the NASA Technology Taxonomy and the NASA Strategic Space Technology Investment Plan. Digital Transformation will increasingly change the way NASA operates and will enable the agency’s missions to be completed more efficiently and effectively. It will allow current and future employees to use their talents in more innovative ways. The Science and Technology Partnership Forum is a strategic forum, with principal partners at the United States Space Force and the National Reconnaissance Office. It was established to identify synergistic efforts and technologies in order to leverage those synergies and influence portfolios across space agencies in areas deemed pervasive and ready for collaboration. NASA's Innovation efforts are designed to transform diverse ideas into value and are guided by a framework that is focused on the agency’s people, processes, partnerships and portfolio. The innovation framework is used to connect the workforce to tools, strategies and activities to increase the pace of innovation. OCT translates National space policies into NASA technology strategies and coordination across the agency and interagency communities to guide NASA's technology and innovation activities to achieve capabilities needed for future missions. This chapter provides insight into the value of analyzing future states to inform technology developments to plot the strategic direction of NASA’s space technology program.

Erica Rodgers↗

Optimal mitigation and control over power system dynamics for stochastic grid resilience

Optimal mitigation planning for highly disruptive contingencies to a transmission-level power system requires optimization with dynamic power system constraints, due to the key role of dynamics in system stability to major perturbations. We formulate a generalized disjunctive program to determine optimal grid component hardening choices for protecting against major failures, with differential algebraic constraints representing system dynamics (specifically, differential equations representing generator and load behavior and algebraic equations representing instantaneous power balance over the transmission system). We optionally allow stochastic optimal pre-positioning across all considered failure scenarios, and optimal emergency control within each scenario. This novel formulation allows, for the first time, analyzing the resilience interdependencies of mitigation planning, preventive control, and emergency control. Using all three strategies in concert is particularly effective at maintaining robust power system operation under severe contingencies, as we demonstrate on the western system coordinating council 9-bus test system using synthetic multi-device outage scenarios.

30 DIRECT ENERGY CONVERSION↗

Dynamics Informed Optimization for Resilient Energy Systems

Optimal mitigation planning for highly disruptive contingencies to a transmission-level power system requires optimization with dynamic power system constraints, due to the key role of dynamics in system stability to major perturbations. We formulate a generalized disjunctive program to determine optimal grid component hardening choices for protecting against major failures, with differential algebraic constraints representing system dynamics (specifically, differential equations representing generator and load behavior and algebraic equations representing instantaneous power balance over the transmission system). We optionally allow stochastic optimal pre-positioning across all considered failure scenarios, and optimal emergency control within each scenario. This novel formulation allows, for the first time, analyzing the resilience interdependencies of mitigation planning, preventive control, and emergency control. Using all three strategies in concert is particularly effective at maintaining robust power system operation under severe contingencies, as we demonstrate on the Western System Coordinating Council (WSCC) 9-bus test system using synthetic multi-device outage scenarios. Towards integrating our modeling framework with real threats and more realistic power systems, we explore applying hybrid dynamics to power systems. Our work is applied to basic RL circuits with the ultimate goal of using the methodology to model protective tripping schemes in the grid. Finally, we survey mitigation techniques for HEMP threats and describe a GIS application developed to create threat scenarios in a grid with geographic detail.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Climate-Water Impacts on Interconnection-Scale Electricity System Planning

A growing literature emphasizes the importance of integrating climate change impacts into electricity system planning. Rising average temperatures can increase and shift electricity demand while reducing generator and transmission efficiency. Changes to water availability and quality can reduce the output of thermally cooled generators and hydropower. Electric power grids across the US and globally are undergoing transformational changes that present new opportunities and challenges to reliability assurance. However, electric utilities and system operators have limited internal capabilities to incorporate these effects into planning practices. This work addresses gaps in utility and system planner practices by integrating climate-water-electricity expertise from universities and U.S. Department of Energy National Laboratories with electricity system planners and stakeholders in the Western Electricity Coordinating Council (WECC). Using a highly collaborative approach, global climate model data, high-resolution hydrology models, and long-term electric sector capacity expansion tools are employed to analyze a range of climate outcomes for future electricity scenarios aligned with recent WECC planning studies. Doing so allows WECC to expand its climate-agnostic planning assessments to consider how future temperature and precipitation patterns could influence generation and transmission planning. We explore how changes to climate-water conditions can affect power plant investment and operation, system economics, and environmental impacts, providing an expanded perspective on interconnection-wide decision making under climate uncertainty.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Notional Airspace Operations Demonstration Plan

The airspace operations demonstration (AOD) is intended to show that the Access 5 Step 1 functional requirements can be met. The demonstration will occur in two phases. The initial on-range phase will be carried out in restricted airspace to demonstrate the cooperative collision avoidance (CCA) functional requirements and to provide risk-reduction for the AOD by allowing the test team to rehearse some elements of the demonstration mission. The CCA system to be used in these flights is based on Automatic Dependent Surveillance-Broadcast (ADS-B) which is a commercially-available system by which airplanes constantly broadcast their current position and altitude to other aircraft and ground resources over a dedicated radio datalink. The final phase will occur in the national airspace (NAS) and will be the formal demonstration of the remainder of the proposed functional requirements. The general objectives of the AOD are as follows: (1) Demonstrate that the UAS can aviate in the NAS (2) Demonstrate that the UAS can navigate in the NAS (3) Demonstrate that the UAS can communicate with the NAS (4) Demonstrate that the UAS can perform selected collision avoidance functions in the NAS (5) Demonstrate that the UAS can evaluate and avoid weather conflicts in the NAS (6) Demonstrate that the UAS can provide adequate command and control in the NAS In addition to the stated objectives, there are a number of goals for the flight demonstration. The demo can be accomplished successfully without achieving these goals, but these goals are to be used as a guideline for preparing for the mission. The goals are: (1) Mission duration of at least 24 hours (2) Loiter over heavy traffic to evaluate the data block issue identified during the Access 5 Airspace Operations Simulations (3) Document the contingency management process and lessons learned (4) Document the coordination process for Ground Control Stations (GCS) handoff (5) Document lessons learned regarding the process of flying in the NAS Preliminary planning for a notional mission to achieve the objectives and goals has been prepared. The planning is intended to serve as a guide for detailed planning of the AOD.

Trongale, Nicholas A.↗

Integration and Testing Challenges of Small, Multiple Satellite Missions: Experiences from the Space Technology 5 Project

The ST5 technology demonstration mission led by GSFC of NASA's New Millennium Program managed by JPL consisted of three micro satellites (approximately 30 kg each) deployed into orbit from the Pegasus XL launch vehicle. In order to meet the launch date schedule of ST5, a different approach was required rather than the standard I&T approach used for single, room-sized satellites. The three spacecraft were designed, integrated, and tested at NASA Goddard Space Flight Center. It was determined that there was insufficient time in the schedule to perform three spacecraft I&T activities in series using standard approaches. The solution was for spacecraft #1 to undergo integration and test first, followed by spacecraft #2 and #3 simultaneously. This simultaneous integration was successful for several reasons. Each spacecraft had a Lead Test Conductor who planned and coordinated their spacecraft through its integration and test activities. One team of engineers and technicians executed the integration of all three spacecraft, learning and gaining knowledge and efficiency as spacecraft #1 integration and testing progressed. They became acutely familiar with the hardware, operation and processes for I&T, thus had the experience and knowledge to safely execute I&T for spacecraft #2 and #3. The integration team was extremely versatile; each member could perform many different activities or work any spacecraft, when needed. ST5 was successfully integrated, tested and shipped to the launch site per the I&T schedule that was planned three years previously. The I&T campaign was completed with ST5's successful launch on March 22, 2006.

Sauerwein, Timothy A.↗

Integration and Testing Challenges of Small Satellite Missions: Experiences from the Space Technology 5 Project

The Space Technology 5(ST5) payload was successfully carried into orbit on an OSC Pegasus XL launch vehicle, which was carried aloft and dropped from the OSC Lockheed L-1011 from Vandenberg Air Force Base March 22,2006, at 9:03 am Eastern time, 6:03 am Pacific time. In order to reach the completion of the development and successful launch of ST 5, the systems integration and test(I&T) team determined that a different approach was required to meet the project requirements rather than the standard I&T approach used for single, room-sized satellites. The ST5 payload, part of NASA's New Millennium Program headquartered at JPL, consisted of three micro satellites (approximately 30 kg each) and the Pegasus Support Structure (PSS), the system that connected the spacecrafts to the launch vehicle and deployed the spacecrafts into orbit from the Pegasus XL launch vehicle. ST5 was a technology demonstration payload, intended to test six (6) new technologies for potential use for future space flights along with demonstrating the ability of small satellites to perform quality science. The main technology was a science grade magnetometer designed to take measurements of the earth's magnetic field. The three spacecraft were designed, integrated, and tested at NASA Goddard Space Flight Center with integration and environmental testing occurring in the Bldg. 7-1 0-15-29. The three spacecraft were integrated and tested by the same I&T team. The I&T Manager determined that there was insufficient time in the schedule to perform the three I&T spacecraft activities in series used standard approaches. The solution was for spacecraft #1 to undergo integration and test first, followed by spacecraft #2 and #3 simultaneously. This simultaneous integration was successful for several reasons. Each spacecraft had a Lead Test Conductor who planned and coordinated their spacecraft through its integration and test activities. One team of engineers and technicians executed the integration of all three spacecraft, learning and gaining knowledge and efficiency as spacecraft #1 integration and testing progressed. They became acutely familiar with the hardware, operation and processes for I&T, thus each team member had the experience and knowledge to safely execute I&T for spacecraft #2 and #3 together. The integration team was very versatile and each member could perform many different activities or work any spacecraft, when needed. Daily meetings between the three Lead TCs and technician team allowed the team to plan and implement activities efficiently. The three (3) spacecraft and PSS were successfully integrated and tested, shipped to the launch site, and ready for launch per the I&T schedule that was planned three years previously.

Sauerwein, Timothy A.↗

Collaborative Distribution System Restoration Planning and Real-Time Dispatch Considering Behind-the-Meter DERs

Modern distribution systems are becoming more resilient against power outages thanks to the flexible generation capacity provided by the increasing integration of distributed energy resources (DERs). Compared to utility-scale DERs, which can be directly controlled by system operators, small-scale, behind-the-meter DERs are much more difficult to coordinate despite being the vast majority. Two major obstacles to the implementation of DERs for service restoration are the coordination of behind-the-meter DERs and the management of uncertainty. In this paper, a novel distribution system restoration strategy is proposed to overcome these two obstacles. The flexibility of be-hind-the-meter DERs is quantified and integrated into the restoration planning models within a hierarchical structure. The model predictive control technique is employed to enable adaptive restoration planning solution adjustments to accommodate fault scenarios and forecast errors. Besides, real-time power dispatch models are proposed to maintain power balance using available DER capability. Comprehensive integration of adaptive restoration planning schemes and real-time dispatch results are achieved through a collaborative restoration framework. Finally, the effectiveness of the proposed restoration strategy is verified through a modified IEEE 123-bus system and a real-world utility system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Light Water Reactor Sustainability Program — A Summary of Collaborative Research and Development Activities

This report describes the collaborative research and development projects in which the U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) Program is engaged with industry, regulatory agencies, and other organizations to achieve outcomes that are directed at sustaining the U.S. nuclear power industryduring Fiscal Year 2018. One way that this Program accomplishes its objectives—to develop technologies and other solutions that can improve the reliability, sustain the safety, enhance the economic performance, and extend the life of current reactors—is by conducting research together with industry and key organizations through cooperative arrangements and plans, through coordinated planning and management of resources and activities, through periodic technical exchanges of data and information, or by other means of interaction (i.e., contracts, memoranda of understanding, non-disclosure agreements, etc.). Broadly, these interactions represent different types of collaborations—formal or informal agreements between two or more organizations to work on something together that may be for a short or extended duration and may involve a single purpose or broad set of goals. DOE’s research, development, and demonstration role focuses on enhancing the safe, efficient, and economical performance of the nation’s nuclear fleet while studying and mitigating aging phenomena and issues that are applicable to the service environments of operating reactors and require unique DOE laboratory expertise. Often, research and development (R&D) and demonstration activities are cost-shared, coordinated, or otherwise jointly conducted with industry, regulatory agencies, or other organizations through the aforementioned or other collaborative mechanisms. Operation of the existing fleet of plants to 60 years, extending the operating lifetimes of those plants beyond 60 years and, where practical, making further improvements in their productivity are essential to support the nation’s energy needs. Recently, several utilities have submitted or announced plans to submit applications to the U.S. NRC to begin the subsequent license-renewal process, extending the operating license period beyond 60 years from the date of their initial licensing. This marks an important planned milestone in the history of commercial nuclear power operations in the U.S.—one that underscores the long-term dependability of these plant designs and the commitment to their long-term performance by the organizations that operate them. The LWRS Program will continue to work with owner-operators to address the key issues needed to support the technical bases for continued safe long-term operation of our nation’s nuclear power assets.

42 ENGINEERING↗

Near-Term Policy Considerations for Lunar Missions

Near-Term Policy Considerations for Lunar Missions. Therese Jones1, Gabriel Swiney,1 and Katie McBrayer,2 1NASA HQ, 300 Hidden Figures Way SW, Washington, D.C. 20546, 2NASA Langley Re-search Center, 1 NASA Drive, Hampton, VA, 23666. (Contact: therese.m.jones@nasa.gov) Introduction: More than two dozen lunar missions are planned prior to the Artemis III crewed lunar landing, from Russian, Chinese, Indian, Japanese and U.S. government orbiters and landers to Commercial Lunar Payload Ser-vices missions to commercial crewed flybys. While the Artemis Accords have established an international consortium of countries seeking to mitigate interference between operations on the Moon, a number of unaddressed policy issues remain that may be critical to lunar operations. In this lightning talk, we build upon NASA’s Of-fice of Technology, Policy, and Strategy’s Sep-tember 2022 Report “Lunar Landing and Oper-ations Policy Analysis” [1], to give an overview of policy questions that remain open, including: whether to prioritize certain landing locations or avoid certain scientifically valuable locations, design and coordination of safety zones, notifi-cation of other actors of potential dangers posed by landing, whether to avoid placing equipment in operationally valuable locations, and end-of-life disposal. We will also discuss how these policy implications could apply to planned missions.. References: [1] Swiney, G., and Hernandez, A. Lunar Landing and Operations Policy Analy-sis, NASA Office of Technology, Policy, and Strategy, September 30, 2022 https://www.nasa.gov/sites/default/files/atoms/files/nasa-otps-lunar-landing-and-operations-policy-analysis-final-report_2.pdf

Therese Jones↗

Bioenergy Technologies Office Multi-Year Program Plan. March 2016

The Bioenergy Technologies Office is one of the 10 technology development offices within the Office of Energy Efficiency and Renewable Energy at the U.S. Department of Energy. This Multi-Year Program Plan (MYPP) sets forth the goals and structure of the Bioenergy Technologies Office (the Office). It identifies the research, development, and demonstration (RD&D), and market transformation and crosscutting activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation. This MYPP is intended for use as an operational guide to help the Office manage and coordinate its activities, as well as a resource to help communicate its mission and goals to stakeholders and the public.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Optimal Managed Fast-Charging Model for Electric Vehicle Fleets with High Utilization and Multiple Charge-Acceptance Curves

A predictive control/scheduling optimization model is proposed for managed charging of an electric vehicle (EV) fleet - under time-of-use energy and demand prices, high vehicle utilization frequency (short dwell times), multiple charge- acceptance curves (configurable charging rates), and flexible vehicle demand. This context is particularly relevant for flight schools (small electric aircraft) or other commercial facilities where an EV fleet performs multiple operating and fast-charging sessions on the same day. The proposed model performs both the operational and charging scheduling of the vehicles, which is not typically done for residential managed charging and significantly increases problem complexity. The problem is formulated as a MILP model and a case study of a small fast-charging station is presented. Results demonstrate a significant reduction in operating cost, mainly from peak shaving during high demand price periods, achieved by coordinating the operation of different vehicles, chargers and charging rates.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗