Integrated Risk-Informed Condition Based Maintenance Capability and Automated Platform: Technical Report 3

This project is a collaborative research effort between PKMJ Technical Services LLC, Idaho National Laboratory, and Public Service Enterprise Group (PSEG) Nuclear, LLC. The collaboration, led by PKMJ Technical Services LLC, is part of the industry Funding Opportunity Announcement (FOA) award under Advanced Nuclear Technology Development FOA #DE-FOA-0001817. The pilot demonstration focuses on the Circulating Water System (CWS), an important non-safety-related system that impacts the power generation capability of the plant site. Achieving riskinformed condition-based Predictive Maintenance (PdM) on the CWS will result in significant economic benefits, and the developed methodologies can also be applied to other plant systems. This approach supports an industry goal of ensuring that nuclear power generation remains a viable, economically competitive option in the energy market. Operation and Maintenance (O&M) costs include labor-intensive Preventive Maintenance (PM) programs that involve manually performed inspection, calibration, testing, and maintenance of plant assets at periodic frequencies as well as time-based replacement of assets, irrespective of condition. This project offers an alternative by focusing on riskinformed condition-based maintenance to reduce O&M costs while still maintaining plant health and safety. This report summarizes the progress made toward achieving a risk-informed condition-based maintenance approach. The research and development (R&D) activities presented in this report are associated with development of a nuclear digital platform application, integration of fault signature models, and automated work management processes. The fault signatures and Machine Learning (ML) models are key components in predictive analytics and are heavily leveraged to improve the insights received by existing plant process data sources. Availability of the analysis results within a centralized digital platform enhances efficiency by enabling automation of activities otherwise performed manually. Personnel are presented with enhanced information that can be used to evaluate plant status and risks. Utilizing the enhancements to data analytics supports automated responses, (i.e. issuance of work orders) to address developing equipment faults and thus preventing forced, unplanned shutdowns of components or systems. The R&D activities described within this report lay the foundation for developing and demonstrating a digital automated platform to centralize the implementation of condition monitoring and response to equipment faults. The digital automated platform is cloud-based and designed to enable improved efficiency of plant processes. The digital platform includes content related to maintenance optimization, fault signature analysis, and plant records, which can all be used to support efficiencies when located within a centralized digital platform. These efficiencies could be further enhanced when deployed through industry-wide deployment of the technology to improve insights and processes based upon economies of scale.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A Tool for Performing Link Analysis, Operational Sequence Analysis, and Workload Analysis to Support Nuclear Power Plant Control Room Modernization

Nuclear power continues to have an imperative role for the U.S.’s electricity generation. However, for these nuclear power plants (NPPs) to remain economically viable, new strategies for reducing operations and maintenance costs must be explored. The U.S. Department of Energy Light Water Reactor Sustainability Program is researching how to digitally transform existing analog and hybrid main control rooms into a fully integrated control room that addresses this challenge. The transformation will fundamentally change the conduct of operations for these U.S. NPPs. Human factors engineering has a vital role in this effort, where traditional task analysis methods are important in informing the design of advanced human-system interface displays. This work describes a preliminary tool to support task analysis for the development of these advanced displays. Details on the use of this tool, including the specific task analysis methods offered, are presented in this paper.

99 GENERAL AND MISCELLANEOUS↗

Hydropower Capital and O&M Costs: An Exploration of the FERC Form 1 Data

This report explores the potential for using responses from the Federal Energy Regulatory Commission’s (FERC’s) “Electric Utility Annual Report,” also known as FERC Form 1, as a cost database for conventional and pumped storage hydropower (PSH). The report outlines the process used to compile an easy-to-access database from the original FERC Form 1 data and discusses the historical cost/performance data. The steps for developing the database include downloading the annual FoxPro files from the FERC website (FERC, 2020), reading them into an Excel format, and reconciling naming issues across years, repeated entries, and shared assets, among others. The cleaned and compiled Form 1 database is available on Oak Ridge National Laboratory’s (ORNL’s) HydroSource website. For this report, the compiled Form 1 database was linked to two other hydropower databases, the National Inventory of Dams and the ORNL Existing Hydropower Assets, that provide additional information on the characteristics and other features of plants in the Form 1 data. Explorations of the plant characteristics, performance, capital costs, and operation and maintenance (O&M) cost data in the combined database were presented separately for conventional hydropower and PSH projects. Form 1 has several advantages as a hydropower cost database. First, the cost data is reported directly by plant owners. Second, Form 1 provides cost breakdowns of capital and operating costs for large conventional and PSH plants enabling more detailed tracking of hydropower costs compared with typical total cost estimates. Third, although the Form 1 data is not reported by all operational hydropower plants in the United States, the available data represents a wide range of plant characteristics and a sizable proportion of the hydropower fleet (61% of PSH plants and 22% of conventional hydropower plants by capacity). The lower proportion of the conventional hydropower fleet is because Form 1 reporting requirements apply only to private utilities that meet given size thresholds, leaving out federally owned facilities and many smaller hydropower plants. Overall, the Form 1 cost database represents a unique, publicly available database on hydropower asset capital and O&M costs. This report leads to a compiled database for the reporting years 1994 to 2020 that helps resolve issues with accessibility and use of the FERC Form 1 data by hydropower plant owners, project developers, technology developers, and regulators.

13 HYDRO ENERGY↗

Hydrogen Production, Grid Integration, and Scaling for the Future

The Hydrogen Production, Grid Integration, and Scaling for the Future project will inform clean hydrogen production deployment across the planning, procurement, and operation stages of hydrogen production on the grid. Hydrogen production from renewables is a clean source of fuel which is near zero for greenhouse gas emissions and criteria pollutants. The results from this project will inform entities looking to build clean energy projects that produce good paying jobs in manufacturing, installation, maintenance and operation of these facilities. This project provides system characterization examples, multiple configurations, optimizations, and suggested metering and custody transfer points through multiple scenarios and hardware testing of NREL's state-of-the-art 1.25 MW polymer electrolyte membrane (PEM) electrolyzer system to characterize system performance in relevant scenarios. This work also creates a digital twin for emulation in the Advanced Research on Integrated Systems (ARIES) virtual environment and performs hardware-in-the-loop (HIL) testing of pilot-scale, decentralized, and centralized hydrogen systems.

centralized hydrogen production↗

Four-Stage Multi-Physics Simulations to Assist Temperature Sensor Design for Industrial-Scale Coal-Fired Boiler

The growth of renewable energy sources presents a pressing challenge to the operation and maintenance of existing fossil fuel power plants, given that fossil fuel remains the predominant fuel source, responsible for over 60% of electricity generation in the United States. One of the main concerns within these fossil fuel power plants is the unpredictable failure of boiler tubes, resulting in emergency maintenance with significant economic and societal consequences. A reliable high-temperature sensor is necessary for in situ monitoring of boiler tubes and the safety of fossil fuel power plants. In this study, a comprehensive four-stage multi-physics computational framework is developed to assist the design, optimization installation, and operation of the high-temperature stainless-steel and quartz coaxial cable sensor (SSQ-CCS) for coal-fired boiler applications. With the consideration of various operation conditions, we predict the distributions of flue gas temperatures within coal-fired boilers, the temperature correlation between the boiler tube and SSQ-CCS, and the safety of SSQ-CCS. With the simulation-guided sensor installation plan, the newly designed SSQ-CCSs have been employed for field testing for more than 430 days. The computational framework developed in this work can guide the future operation of coal-fired plants and other power plants for the safety prediction of boiler operations.

42 ENGINEERING↗

Report on the Use and Function of the Integrated Operations Capability Analysis Platform (ICAP) and the LWRS Innovation Portal (IP)

The commercial nuclear power industry has achieved excellent safety and reliability performance but is struggling to survive in an electricity market that is increasingly dominated by subsidized renewables and cheap natural gas. These challenges have forced utilities to explore previously uncharted avenues to drastically reduce the operations and maintenance costs of their plants which are the primary drivers of the total cost to produce electricity. The petrochemical industry faced similar challenges some years ago as the costs of extraction and processing were rising while their reservoirs were being depleted along with a drop-in commodity prices that resulted in unsustainable operations. In this challenging climate, they developed a business model called Integrated Operations (IO) that sought to utilize technology to enable news ways of working through the integration of people, technology, process and governance changes. The Light Water Reactor Sustainability (LWRS) program, working with IFE have developed an operating model via transferable learnings from the North Sea O&G industry. This framework is termed “Integrated Operations for Nuclear” (ION). ION is a transformation model that integrates the benefits and features of four principal factors: People, Technology, Process and Governance. The purpose of this report is to describe how to generate an ION business process analysis and utilize this information to reduce O&M costs. In order to make this job easier, DOE LWRS has created a suite of tools that will allow a person who is involved in a transformation effort at their company to build a solid documented business case for embarking on a major transformation effort. These tools, the Integrated Operations Capability Analysis Model (ICAP) and the LWRS Innovation Portal (IP) are described herein with instructions on their use. Instructions on how the interface with the EPRI Business Case Analysis Method (BCAM) are also provided.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Building the Efficiency Workforce: Preprint

Demand for high-performance homes and buildings is growing due to their marketability, environmental benefits, and increasing affordability. Growth for energy efficient technologies and building upgrades has driven expansion across many traditional industries including construction trades (which added almost 21,000 jobs) and professional services (which added 35,000 employees) in 2018, according to the 2019 U.S. Energy Employment Report (USEER). As buildings become more automated, digitized and interconnected, the workforce that supports the design, build, operations and maintenance of these buildings must evolve. The U.S. Department of Energy’s Building Technologies Office (BTO) has engaged NREL to provide a framework upon which BTO can develop their next generation workforce development strategy. The strategy will be designed to increase quantity of workers with the skills to adequately design, install, maintain and operate high- performance buildings across all building sectors (residential, commercial, industrial). This paper will summarize past BTO workforce development efforts, identify current skills gaps and hiring challenges, and present anticipated future workforce needs based on new technologies currently being developed by labs and industry. Through a literature review and a series of industry and academic workshops, NREL will present a framework that includes multiple options to best prepare the next generation workforce.

buildings↗

Air quality impacts from the development of unconventional oil and gas well pads: Air toxics and other volatile organic compounds

Unconventional oil and natural gas development (UOGD) has expanded rapidly across the United States in recent decades and raised concerns about associated air quality impacts. While significant effort has been made to quantify methane emissions, relatively few observations have been made of Volatile Organic Compounds (VOCs), especially during drilling and completion of new wells. Extensive air monitoring during development of several large, multi-well pads in Broomfield, Colorado, in the Denver-Julesburg Basin, provides a novel opportunity to examine changes in local air toxics and other VOC concentrations during well drilling and completions and production. These operations offer an especially useful case to study as several management practices were implemented to reduce emissions (e.g., electrified, grid-powered drill rigs and closed loop fluid handling systems to reduce truck traffic and limit fluid handling on the pad). With simultaneous measurements of methane and 50 VOCs from October 2018 to December 2022 at as many as 19 sites near well pads, in adjacent neighborhoods, and at a more distant reference location, we identify impacts from each phase of well development and production. Use of weekly, time-integrated canisters, a Proton Transfer Reaction Mass Spectrometer (PTR-MS), continuous photoionization detectors (PID) to trigger canister collection upon detection of VOC-rich plumes, and an instrumented vehicle, provided a powerful suite of measurements to characterize both transient plumes and longer-term changes in air quality. Prior to the start of well development, VOC gradients were small across Broomfield. Once drilling commenced, concentrations of oil and gas (O&G) related VOCs, including alkanes and aromatics, increased around active well pads. Concentration increases were clearly apparent during certain operations, including drilling, coil tubing/millout operations, and production tubing installation. Emissions of C 8 –C 10 n-alkanes during drilling operations highlighted the importance of VOC emissions from synthetic drilling mud chosen to reduce odor impacts. More than 90 samples were collected of transient plumes. Using composition measurements, meteorological data, and information about well pad activities, these plumes were connected with specific UOGD operations including drilling, flowback, and production equipment maintenance. The chemical signatures of these plumes differed by operation type (e.g., C 8 –C 10 n-alkanes constituted a larger fraction of measured VOCs in drilling-related plumes). Concentrations of individual, oil and gas-related VOCs in these plumes were often several orders of magnitude higher than in background air, with maximum ethane and benzene concentrations of 79,600 and 819 ppbv, respectively. Because these plumes typically impact a monitoring site for just several minutes, they are easily missed by slower-responding instruments. Study measurements highlight future emission mitigation opportunities during UOGD operations, including better control of emissions from shakers that separate drill cuttings from drilling mud, production separator maintenance operations, and periodic emptying of sand cans during flowback operations.

54 ENVIRONMENTAL SCIENCES↗

Report of the Condition of a General Electric Transportation Systems Gearbox

Wind power plant operations and maintenance (O&M) costs remain an appreciable contributor to the overall cost of wind energy. Premature of wind turbine gearboxes failures are often a result of abrasive wear, micropitting, scuffing, white-etch cracks, and macropitting issues. Micropitting is a fatigue phenomenon that occurs in Hertzian contacts in both gears and rolling-element bearings that operate in mixed or micro elastohydrodynamic lubrication regimes. Micropitting is influenced by and manifests itself in many different ways depending on operating conditions such as load, speed and operating temperature, and on factors such as gear geometry and accuracy, tooth flank roughness, percentage of tooth sliding, and lubricant composition. Despite much research by many investigators, micropitting remains complex, unpredictable, and difficult to control and remains a problem in wind turbine gearboxes. The purpose of this report is to document and describe the micropitting damage observed in a wind turbine gearbox, thereby facilitating further analysis and examination in future reports.

17 WIND ENERGY↗

A Self-Organizing Nano Grid (SONG) for Energy Access Clusters

In this paper, a bottom-up dc Self-Organizing Nano Grid (SONG) for rural electrification at ultra-low-cost through a flexible and scalable topology is presented. The proposed nano grid requires no communication and uses dc-bus signaling to convey excess energy in the system through the bus voltage, allowing independent agents to conduct energy transactions based on their needs in a decentralized manner. Moreover, this article proposes a concept that uses a novel multi-source, multi-segment droop control strategy with demand coordination, allowing for dynamic self-balancing of the system under fluctuating operating conditions. The unique use of a surplus photovoltaic (PV) power droop mode precisely estimates energy availability to minimize load chattering that helps in stabilizing the dc-bus. In addition, this architecture uses standard dc/dc converters for a low-cost, modular, Plug and Play ( PnP ) solution with highly automated operation, enabling local assembly, operation, and maintenance by non-technical personnel. The proposed SONG concept was validated in simulation and with a 700W, laboratory-scale, custom made nano grid system. The simulation and experimental test cases show the feasibility of the SONG system by demonstrating the proposed multi-source, multi-segment droop control strategy without load chattering under varying operating conditions.

dc-dc converter↗

Summary Paper: An Initial Heliostat Supply Chain Analysis

This paper summarizes the prior analysis, key findings, and recommendations from the published report titled “Initial Heliostat Supply Chain Analysis” [1]. Globally, the growing demand for concentrating solar power (CSP) technologies, primarily for electricity generation plants has been met with supply chains primarily composed of plentiful commodity materials such as steel, aluminum, and glass. Often the commodity materials can be sourced in the domestic market where power plant will be constructed. Although specialty components are required for CSP solar fields —including mirror panels used for heliostat applications—these specialty components constitute about 30-50% of total system installed costs [2]. Only a few companies and countries, including the United States, have developed the capacity to supply such specialty components. The U.S. heliostat supply chain at present is comprised of few companies (e.g., CSP developers), component suppliers, and is its infancy. By 2035, with current and aggressive solar photovoltaic (PV) capacity expansions, there is the potential for 500,000–1,500,000 direct and indirect jobs in the areas of manufacturing, installation and development, and operations and maintenance (O&M) [3]. Utilizing the CSP capacity estimations the recent NREL report [4], the construction of 39 gigawatts (GW) of CSP (assuming mainly power tower) in the U.S. could lead to approximately 195,000 manufacturing, construction, and O&M jobs. This does not include the longer-term jobs and economic impact (e.g., taxes from plant operations staff) from operating the plants once constructed. It is recommended that further CSP component and system supply chain analysis and modelling be undertaken.

Kurup, Parthiv (ORCID:0000000217356703)↗

DEMONSTRATION OF A MULTI-STAGE TESTING AND EVALUATION APPROACH FOR A SAFETY-RELATED DIGITAL UPGRADE AT A NUCLEAR POWER PLANT

There is an imminent need for existing United States nuclear power plants to reduce their operating and maintenance costs to remain economically viable. Digital technology provides significant opportunity for the existing nuclear power plant fleet to transform that way in which work is accomplished to reduce costs and allow the fleet to remain economically competitive. However, a careful understanding of the human-technology integration is needed to ensure the continued safe and reliable operation of these existing plants with new digital capabilities. This work presents interim findings in applying human factors engineering to a safety-significant digital upgrade for a United States nuclear power plant, following the new Alternative Review Process in the recently revised Digital Instrumentation and Control Interim Staff Guidance Licensing Process, Revision 2. The interim results described in this work provides an industry perspective, based on ongoing work, to recent work published from Vazquez, Green, and Desaulniers (2022).

99 GENERAL AND MISCELLANEOUS↗

U.S. Efforts in Support of Examinations at Fukushima Daiichi - November 2022 Meeting Notes and Information Request Status

Information obtained from Fukushima Daiichi Nuclear Power Station (Daiichi) is required to inform future Decontamination and Decommissioning (D&D) activities, improving the ability of the Tokyo Electric Power Company Holdings, Incorporated (TEPCO Holdings) to characterize potential hazards and to ensure the safety of workers involved with cleanup activities. This information also has important implications for the safety and operation of U.S. commercial nuclear power plants. This document summarizes results from the Fiscal Year 2023 (FY2023) U.S. effort to review Daiichi information and extract insights to enhance the safety of existing and future nuclear power plant designs. This U.S. effort, which was initiated in 2014 by the Department of Energy Office of Nuclear Energy, is completed by a group of experts in reactor safety and plant operations that identify examination needs and evaluate recent Daiichi examination data to address these needs. Fukushima-related information and associated discussions during these meetings benefit operating, new, and advanced reactors. Significant safety insights have been and are continuing to be obtained in several areas: system and component performance, radionuclide surveys and sampling, debris end-state location, combustible gas effects, and plant operations and maintenance. In addition to reducing uncertainties related to severe accident modeling progression, these insights have and continue to be used to update guidance for severe accident prevention, mitigation, and emergency planning. Furthermore, Daiichi-related activities, such as code modeling improvements and analysis, testing, and new technology deployment efforts, have the potential to offer additional benefits to the operating fleet and new LWR and non-LWR designs. U.S. evaluations of obtained examination information and input regarding future Daiichi examinations are of interest to several organizations within Japan. Since its inception, the U.S. has provided consensus input for high priority time-sequenced examination tasks and supporting research activities. In their Mid-to-Long-term Examination Plan for 1F investigations, TEPCO included all remaining U.S. consensus information requests and additional information requests they identified. TEPCO periodically provides reports on the status of these requests (reflecting D&D priorities, new insights from investigations, and new technologies that become available). Hence, U.S. experts agreed that it was appropriate for TEPCO to track and prioritize these information requests as D&D progresses. U.S. experts will continue to review and comment on the information obtained from examinations and, as needed, provide additional details and relevant background material to support future examinations. As documented in this report, several other items, such as additional details on information requests pertaining to ex-vessel examinations, relevant references from prior research, additional documents to provide insights regarding recent investigation findings, and reviews of recently released documents, were agreed to during the FY2023 meeting.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Heliostat sizing methodology for concentrating solar thermal industrial process heat projects

This study presents a method to obtain a heliostat size that minimizes the levelized cost of heat (LCOH) of a heliostat-based concentrating solar thermal system for applications of solar heating for industrial processes at operating temperatures from 565 to 1550°C. The method extends prior work by embedding a routine for system design that obtains near-optimal subsystem sizes, increasing the fidelity of drive cost functions, and adding an optical performance model to supplement the previously developed cost models, which we update to reflect current pricing trends. An illustrative business case is developed for Daggett, California, targeting specified annual thermal energy outputs of 50 to 400 GWh th . Optical performance is modeled using verified estimates from the literature. A surrogate heliostat cost model, derived from commercial heliostat designs and scaled for production volume, installation, and operations and maintenance costs, is used to develop cost functions. Results show that heliostat size strongly affects the LCOH, producing a characteristic U-shaped trend with a robust near-optimal window of 7-20 m 2 ; the heliostat size producing the lowest project cost in our study grows slightly as the project size increases, and is reduced as the operating temperature increases. The findings in this study are consistent with the general trend of smaller heliostats being deployed at existing projects for high-temperature industrial process heat and reflect the significant reduction in power electronics and other per-heliostat costs. The methodology we propose is general and can be tailored to revised cost curves as the technology continues to evolve.

14 SOLAR ENERGY↗

An Evaluation of The Dynamic Physical Security Risk Assessment Methodology for Fleet-Wide Applications

The requirements for U.S. nuclear power plants to maintain a large onsite physical security force contribute to their high operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability (LWRS) program’s physical security pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. The conservatisms built into current security postures may be analyzed and minimized to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within LWRS program’s physical security pathway has successfully developed a dynamic force-on-force modeling framework using various computer simulation tools and integrating them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This integrated process for physical security analysis is named Modeling and Analysis for Safety Security using Dynamic EMRALD Framework (MASS-DEF). This document provides an update on the progress in applying the MASS-DEF process to an operating commercial nuclear power plant as well as additional industry feedback regarding use of the tool for other physical security risk-informed topics. This report is only a summary of the progress and does not contain specific modeling results as those contain sensitive security information. Previous reports described how a user could integrate their plant-specific force-on-force models with the dynamic simulation tool EMRALD, model operator actions, and integrate with probabilistic risk assessment tools, such as CAFTA (Computer Aided Fault Tree Analysis System) or SAPHIRE (Systems Analysis Programs for Hands-on Integrated Reliability Evaluations), and with thermal-hydraulic tools, such as RELAP-5 or MAAP. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report is an update the progress of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. This report also provides an update to the procedural guidance for the MASS-DEF process and an overview of the generic models available for use by utilities. This report does not contain any plant’s sensitive information and/or safeguards information. This study’s purpose was to verify that the results achieved using generic models are similar to actual plant results and refine our guidance on the use of the framework. This assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Heliostat Sizing Methodology for Solar Heat for Industrial Processes

This study presents a method to obtain a heliostat size that minimizes the levelized cost of a heliostat-based concentrating solar thermal system for industrial process heat (IPH) applications at operating temperatures from 565 to 1550 degrees Celsius. The method extends prior work by embedding a routine for system design that obtains near-optimal subsystem sizes, increasing the fidelity of drive cost functions, and adding an optical performance model. An illustrative business case is developed for Daggett, California, targeting specified annual thermal energy outputs of 50 to 400 GWhth. Optical performance is modeled using verified estimates from the literature. A surrogate heliostat cost model, derived from commercial heliostat designs and scaled for production volume, installation, and operations and maintenance costs, is used to develop cost functions. Results show that heliostat size strongly affects the levelized cost of heat (LCOH), producing a characteristic U-shaped trend with a robust near-optimal window of 8 - 12 m2; the heliostat size producing the lowest project cost in our study grows slightly as the project size increases, and is reduced as the operating temperature increases. The findings in this study are consistent with the general trend of smaller heliostats under deployment at existing projects for high-temperature industrial process heat and reflect the significant reduction in power electronics and other per-heliostat costs. The methodology we propose is general and can be tailored to revised cost curves as the technology continues to evolve.

14 SOLAR ENERGY↗

Evaluation of Physical Security Risk for Potential Implementation of FLEX using Dynamic Simulation Methods

The requirements for United States nuclear power plants to maintain a large onsite physical security force contribute to their large operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability Program Physical Security Pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. This pathway will analyze and minimize the conservatisms built into current security postures in order to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within this pathway has successfully developed a dynamic force-on-force (FOF) modeling framework using various computer simulation tools and integrated them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This document provides an overview of lessons learned in applying a dynamic computational framework that links results from a commercially available FOF simulation tool, a commercially available thermal-hydraulic tool, and EMRALD to an operating commercial nuclear power plant. This process of including plant procedures and multiple analysis results is being called Modeling and Analysis for Safety Security using Dynamic EMRALD Framework. Previous reports described how a user could integrate their plant-specific FOF models with the dynamic simulation tool EMRALD, model operator actions, integrate with probabilistic risk assessment tools, such as Computer Aided Fault Tree Analysis System or Systems Analysis Programs for Hands-on Integrated Reliability Evaluations, and with thermal-hydraulic tools, such as RELAP-5. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report documents the results of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. The purpose of this study was to verify that results achieved using generic models are similar to actual plant results and to refine our guidance of the use of the framework. Such an assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants. NOTE: The work performed in this report is based on a generic EMRALD model with actual plant data used for the analysis. However, only the generic model and general results of the analysis are in the report. No plant’s sensitive information is discussed in this report. The discussion shows examples of insights that can be obtained from the MASS-DEF methodology.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

LCOE reduction through proactively optimized monitoring of PV Systems (Final Technical Report)

The project demonstrates the value proposition for a high-resolution monitoring system (HRMS) with diagnostic-prognostic capability and determine its impact on LCOE. The HRMS differs from conventional monitoring systems in a number of ways. First it will include the capability to automatically measure IV curves at the string and module levels. This provides a much richer view into the DC performance of the PV system and allows classification of many typical failure and degradation modes. Second, it will incorporate software capable of quantifying power and energy losses in the field as well as define the location and mechanism of the power and energy loss. Moreover, we aimed to deliver a prognostic system that is capable of predicting certain failures before they occur and giving system operators the opportunity to more efficiently plan operations and maintenance (O&M) activity in order to lower costs and increase yield over the life of the system. The research identifies cost targets required for different monitoring stages, including at the string combiner, at the individual string, and at the module level, to lower the levelized cost of energy (LCOE). Finally, a comprehensive guide determines the value PV monitoring brings to PV field operations. The guide assists plant operators in maximizing value from existing plants and identify the trade-offs of different monitoring solutions for future plants depending on the size, location, and expected system lifetime.