Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mixed-integer optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Efficient Computation of Separation-Compliant Speed Advisories for Air Traffic Arriving in Terminal Airspace

A class of problems in air traffic management asks for a scheduling algorithm that supplies the air traffic services authority not only with a schedule of arrivals and departures, but also with speed advisories. Since advisories must be finite, a scheduling algorithm must ultimately produce a finite data set, hence must either start with a purely discrete model or involve a discretization of a continuous one. The former choice, often preferred for intuitive clarity, naturally leads to mixed-integer programs, hindering proofs of correctness and computational cost bounds (crucial for real-time operations). In this paper, a hybrid control system is used to model air traffic scheduling, capturing both the discrete and continuous aspects. This framework is applied to a class of problems, called the Fully Routed Nominal Problem. We prove a number of geometric results on feasible schedules and use these results to formulate an algorithm that attempts to compute a collective speed advisory, effectively finite, and has computational cost polynomial in the number of aircraft. This work is a first step toward optimization and models refined with more realistic detail.

Sadovsky, Alexander V.↗

Scalable Predictive Control and Optimization for Grid Integration of Large-Scale Distributed Energy Resources

Integrating a large number of distributed energy resources (DERs) into the power grid needs a scalable power balancing method. We formulate the power balancing problem as a look-ahead optimization problem to be solved sequentially by a power distribution system aggregator based on a model predictive control (MPC) framework. Solving large-scale look-ahead control problems requires proper configuration of the control steps. In this paper, to solve large-scale control problems, we propose a variable time granularity where control time steps nearby the current control step have finer resolutions. The aggregator objective includes maximization of power production revenue and minimization of power purchasing expense, renewable power curtailment, and mileage costs for energy storage and electric vehicle (EV) charging stations while satisfying system capacity and operational constraints. The control problem is formulated as a mixed-integer linear program (MILP) and solved using the XpressMP solver. We perform simulations considering a copper plate representation of a large distribution network consisting of 2507 devices (control-lable DERs), including curtailable photovoltaics (PVs), energy storage batteries, EV charging stations, and buildings with heating, ventilation, and air conditioning units (HVACs). We show the effectiveness of the proposed approach in managing DERs interactively for maximum energy trading profit and local supply-demand power balancing. Finally, we demonstrate that the proposed method outperforms other benchmark controllers regarding computation time without compromising operational performance.

DER↗

Scalable Predictive Control and Optimization for Grid Integration of Large-Scale Distributed Energy Resources: Preprint

Integration of a large number of distributed energy resources (DERs) into the power grid needs a scalable power balancing method. We formulate the power balancing problem as a look-ahead optimization problem to be solved sequentially by a power distribution system aggregator based on a model predictive control (MPC) framework. Solving large-scale look-ahead control problem requires proper configuration of the control steps. In this paper, to solve large-scale control problems, we propose a variable time granularity where control time steps nearby the current control step have finer resolutions. The aggregator objective includes maximization of power production revenue and minimization of power purchasing expense, renewable power curtailment, and mileage costs for energy storage and electric vehicle (EV) charging stations while satisfying system capacity and operational constraints. The control problem is formulated as a mixed-integer linear program (MILP) and solved using the XpressMP solver. We perform simulations considering a copper plate representation of a large distribution network consisting of 2507 devices (controllable DERs) including curtailable photovoltaics (PVs), energy storage batteries, EV charging stations, and buildings with heating, ventilation, and air conditioning units (HVACs). We show the effectiveness of the proposed approach in managing DERs interactively for maximum energy trading profit and local supply-demand power balancing. Finally, we demonstrate that the proposed method outperformed other benchmark controllers regarding computation time without compromising operational performance.

DER↗

Scalable Predictive Control and Optimization for Grid Integration of Large-Scale Distributed Energy Resources

Integrating a large number of distributed energy resources (DERs) into the power grid needs a scalable power balancing method. We formulate the power balancing problem as a look-ahead optimization problem to be solved sequentially by a power distribution system aggregator based on a model predictive control (MPC) framework. Solving large-scale look-ahead control problems requires proper configuration of the control steps. In this paper, to solve large-scale control problems, we propose a variable time granularity where control time steps nearby the current control step have finer resolutions. The aggregator objective includes maximization of power production revenue and minimization of power purchasing expense, renewable power curtailment, and mileage costs for energy storage and electric vehicle (EV) charging stations while satisfying system capacity and operational constraints. The control problem is formulated as a mixed-integer linear program (MILP) and solved using the XpressMP solver. We perform simulations considering a copper plate representation of a large distribution network consisting of 2507 devices (controllable DERs), including curtailable photovoltaics (PVs), energy storage batteries, EV charging stations, and buildings with heating, ventilation, and air conditioning units (HVACs). We show the effectiveness of the proposed approach in managing DERs interactively for maximum energy trading profit and local supply-demand power balancing. Finally, we demonstrate that the proposed method outperforms other benchmark controllers regarding computation time without compromising operational performance.

DER↗

Assessing the Reliability Benefits of Energy Storage as a Transmission Asset

Utilizing energy storage solutions to reduce the need for traditional transmission investments has been recognized by system planners and supported by federal policies in recent years. This work demonstrates the need for detailed reliability assessment for quantitative comparison of the reliability benefits of energy storage and traditional transmission investments. First, a mixed-integer linear programming expansion planning model considering candidate transmission lines and storage technologies is solved to find the least-cost investment decisions. Next, operations under the resulting system configuration are simulated in a probabilistic reliability assessment which accounts for weather-dependent forced outages. The outcome of this work, when applied to TPPs, is to further equalize the consideration of energy storage compared to traditional transmission assets by capturing the value of storage for system reliability.

co-optimization↗

Piecewise polyhedral formulations for a multilinear term

Herein, we present a mixed-integer linear programming (MILP) formulation of a piecewise, polyhedral relaxation (PPR) of a multilinear term using its convex-hull representation. Based on the PPR’s solution, we also present a MILP formulation whose solutions are feasible for nonconvex, multilinear equations. We then present computational results showing the effectiveness of proposed formulations on standard benchmark nonlinear programs (NLPs) with multilinear terms and compare with a traditional formulation that is built using recursive bilinear groupings of multilinear terms.

42 ENGINEERING↗

Improving operational flexibility of integrated energy system with uncertain renewable generations considering thermal inertia of buildings

Insufficient flexibility in system operation caused by traditional "heat-set" operating modes of combined heat and power (CHP) units in winter heating periods is a key issue that limits renewable energy consumption. In order to reduce the curtailment of renewable energy resources through improving the operational flexibility, a novel optimal scheduling model based on chance-constrained programming (CCP), aiming at minimizing the lowest generation cost, is proposed for a small-scale integrated energy system (IES) with CHP units, thermal power units, renewable generations and representative auxiliary equipments. In this model, due to the uncertainties of renewable generations including wind turbines and photovoltaic units, the probabilistic spinning reserves are supplied in the form of chance-constrained; from the perspective of user experience, a heating load model is built with consideration of heat comfort and inertia in buildings. To solve the model, a solution approach based on sequence operation theory (SOT) is developed, where the original CCP-based scheduling model is tackled into a solvable mixed-integer linear programming (MILP) formulation by converting a chance constraint into its deterministic equivalence class, and thereby is solved via the CPLEX solver. We report the simulation results on the modified IEEE 30-bus system demonstrate that the presented method manages to improve operational flexibility of the IES with uncertain renewable generations by comprehensively leveraging thermal inertia of buildings and different kinds of auxiliary equipments, which provides a fundamental way for promoting renewable energy consumption.

30 DIRECT ENERGY CONVERSION↗

An optimization model for energy generation and distribution in a dynamic facility

An analytical model is described using linear programming for the optimum generation and distribution of energy demands among competing energy resources and different economic criteria. The model, which will be used as a general engineering tool in the analysis of the Deep Space Network ground facility, considers several essential decisions for better design and operation. The decisions sought for the particular energy application include: the optimum time to build an assembly of elements, inclusion of a storage medium of some type, and the size or capacity of the elements that will minimize the total life-cycle cost over a given number of years. The model, which is structured in multiple time divisions, employ the decomposition principle for large-size matrices, the branch-and-bound method in mixed-integer programming, and the revised simplex technique for efficient and economic computer use.

Lansing, F. L.↗

Electric vehicle fast charging infrastructure planning in urban networks considering daily travel and charging behavior

Electric vehicles are a sustainable substitution to conventional vehicles. This work introduces an integrated framework for urban fast charging infrastructure to address the range anxiety issue. A mesoscopic simulation tool is developed to generate trip trajectories, and simulate charging behavior based on various trip attributes. The resulting charging demand is the key input to a mixed-integer nonlinear program that seeks charging station configuration. The model minimizes the total system cost including charging station and charger installation costs, and charging, queuing, and detouring delays. The problem is solved using a decomposition technique incorporating a commercial solver for small networks, and a heuristic algorithm for large-scale networks, in addition to the Golden Section method. The solution quality and significant superiority in the computational efficiency of the decomposition approach are confirmed in comparison with the implicit enumeration approach. Furthermore, the required infrastructure to support urban trips is explored for future market shares and technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Security-Constrained Unit Commitment for Electricity Market: Modeling, Solution Methods, and Future Challenges

This paper summarizes the technical activities of the IEEE Task Force on Solving Large Scale Optimization Problems in Electricity Market and Power System Applications. This Task Force was established by the IEEE Technology and Innovation Subcommittee to first review the state-of-the-art of the security-constrained unit commitment (SCUC) business model, its mathematical formulation, and solution techniques in solving electricity market clearing problems. The Task Force then investigated the emerging challenges of future market clearing problems and presented efforts in building benchmark mathematical and business models.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Stochastic Unit Commitment: Model Reduction via Learning

As weather-dependent renewable generation increases its share in the generation mix of most electric energy systems, a stochastic unit commitment becomes the natural day-ahead scheduling tool. However, such a tool is generally computationally intractable if a detailed uncertainty description is considered. Taking this into account, we proposed a learning method to make the stochastic unit commitment problem tractable. Here, recent advances in statistical learning and machine learning to address optimization problems can be advantageously applied to the rather intractable stochastic unit commitment problem. Considering these advances, we explore simple learning techniques to drastically reduce the size of a stochastic unit commitment problem without significantly altering its optimal solution. The considered stochastic unit commitment problem is formulated as a two-stage stochastic programming problem. The first stage represents commitment decisions, while the second one represents the operation conditions under different scenarios. Taking into account historical solved instances (or proxies for them), we reduce the size (measured by numbers of constraints and variables) of the stochastic unit commitment problem by (i) fixing unchanged binary variables and by (ii) eliminating inactive inequality constraints. Our numerical results show that the reduced problem generally requires significantly less time to solve while obtaining high-quality solutions, which are very close to or indistinguishable from the one obtained by solving the original problem. We use an Illinois 200-bus system to illustrate and characterize the performance of the proposed problem-reduction method.

42 ENGINEERING↗

The value of concentrating solar power in ancillary services markets

Ancillary services, such as spinning reserves, can provide grid reliability and contribute to profitability of an energy resource. We exercise an existing dispatch optimization model to estimate the profitability of a concentrating solar power plant by incorporating the sale of spinning reserves in the ancillary service market using the National Renewable Energy Laboratory's System Advisor Model to simulate operations within a 72-h rolling horizon framework. Assuming a price-taker approach with day-ahead energy and spinning reserve prices from both the California Independent System Operator and the Electricity Reliability Council of Texas, we find that selling spinning reserves in addition to electric energy increases plant profitability by up to 7% with perfect knowledge of day-ahead pricing and solar resource availability. Here, this finding suggests that spinning reserve markets provide significant value streams to concentrating solar power plants that can leverage thermal energy storage to offer reliable production in the short-to-medium term.

14 SOLAR ENERGY↗

A Decomposition-Based Learn-To-Optimize Approach with Feasibility Layer Assistance for Sub-Hourly Unit Commitment

Sub-hourly unit commitment (UC) with 15-min intervals is gaining significant attention as a way to respond rapidly to the fluctuations in electricity supply and demand introduced by renewable resources. However, the increased temporal resolution and complex inter-temporal dependencies pose substantial computational challenges for traditional optimization methods. To this end, this paper explores a decomposition-based learn-to-optimize approach. Building on recent advances in machine learning, our method revisits the long- overlooked Lagrangian relaxation framework, which is a classical decomposition technique that enables tractable subproblem solving. These smaller subproblems are inherently well-suited for machine learning, as their reduced dimensionality and structural regularity allow predictive models to efficiently learn and generalize solution patterns. We thus propose a generic predictive model, which embeds Gated Recurrent Units (GRUs) and Attention in the encoder-decoder structure, and integrate a rule-based feasibility layer to capture temporal dependencies, reduce training effort, and improve feasibility w.r.t. unit-level constraints. Our method has been validated on the IEEE 118-bus system, demonstrating promising performance in solving sub-hourly UC problems efficiently and feasibly.

97 MATHEMATICS AND COMPUTING↗

Localization of Ad-Hoc Lunar Constellations in Communication Failure Modes for Distributed Spacecraft Autonomy

As lunar missions increase in complexity inspired by NASA’s Artemis Program, they will require reliable and sufficient capability of the Position, Navigation, and Timing (PNT) system to support their scientific objectives. In addition, NASA's Commercial Lunar Payload Services (CLPS) program initiates the proliferation of public and private exploration partnerships using small satellites from commercial and private organizations, expanding traditionally confined low Earth orbit to be used for missions beyond geosynchronous orbit (Zucherman et al., 2022). Therefore, the Lunar PNT system is also required to provide navigation services compatible with the smaller platforms being sent by the public and private sectors, like CubeSats. However, traditional approaches to deep space missions’ navigation based on ground radio facilities have difficulties in providing sufficient support for the increasing number of users and communication at a distance from the Earth (Kaplev et al., 2022). In particular, the existing Lunar navigation technologies such as weak signal global positioning system (GPS) and deep space network (DSN) are not able to ensure operations of the upcoming small-scale Lunar missions due to their limitations in localization performance as well as capacity aspects. Another way to provide Lunar PNT service is to create a dedicated Lunar global navigation satellite system (GNSS) constellation, like GNSS systems on Earth. Space agencies like NASA, ESA, and JAXA are now developing the lunar communications relay and navigation systems (LCRNS) and Lunar navigation satellite systems (LNSS). In their systems, satellites will be deployed in moon orbits to provide the communication, positioning, navigation, and timing (CPNT) service at the lunar south pole region where the Artemis base camp will be expected (Murata et al., 2022). Meanwhile, common challenges considered in lunar PNT research arise from poor geometry of the terrestrial GNSS satellites when seen from the lunar user, highly perturbed lunar orbits, and limitations in power, size, and cost of the equipment on lunar satellites (Iiyama et al., 2023). It is also not clear if there will be enough Lunar users to support the cost and resources this would require as the Low-cost surface missions may not be able to support the large power, mass, and weight requirements that these navigation solutions entail (Niemoeller et al., 2022). As an alternative, existing Lunar science and exploration assets could be used to create a low-cost, autonomous, ad-hoc, and on-demand mission-centric Lunar PNT swarm capable of providing PNT services to these low-cost lunar missions (Hagenau et al., 2021). Introducing the non-dedicated and ad-hoc Lunar navigation constellation gives a way to provide PNT services on-demand. The non-dedicated swarm assets of Lunar constellations are designed to localize themselves with minimal interaction with Earth by adding cooperative autonomous localization to lunar missions, freeing up valuable bandwidth and ground segment resources. An autonomous localization of Lunar constellations is based on the concept of the decentralized PNT system with a distributed extended Kalman filter (DEKF) approach to state estimation for minimal onboard operating costs. In the distributed data processing algorithm, computation is broken down and assigned to each satellite, resulting in a considerably decreased computational amount while maintaining the accuracy of the orbit ephemeris and clock offsets as the result of centralized data processing (Wen et al., 2019). The DEKF requires spacecraft to perform two-way ranging operations with each other to communicate simultaneously, leveraging neighbor two-way intersatellite link (ISL) measurements such as pseudoranges to, and relative velocities between, visible satellites as sensor values (Frank et al., 2021). The Lunar autonomous PNT simulation (LAPS) demonstrated the feasibility of orbital asset localization among ad-hoc Lunar small-sat constellations based on the DEKF in Hagenau et al. (2021) and evaluated the matching algorithm proposed by Frank et al. (2021) in scheduling position estimation updates. In previous papers, all assets and measurements are assumed to be always available without consideration of the impact of intermittent and permanent communication failure. This study presents localization performance with increasing levels of network degradation for swarm assets and users to demonstrate the robustness of the decentralized Lunar PNT service in more realistic scenarios. Main issues arising from communication failure include spacecraft permanent or transient loss, antenna failures, message delays, etc. We tested four possible reasons for network degradation for 7 days in 21 satellites frozen with an altitude of 5500 km, evenly spaced around 3 circular, 40 inclination orbital planes where each spacecraft has two directional antennas. As anchor nodes with an independent estimate of their position are required in the DEKF approach, two ground nodes in each pole and one node in the gateway were implemented in the simulation. First, the most probable failure scenario involves the loss of a single spacecraft due to solar interference and technical malfunctions of the assets. Losing the availability of a single spacecraft means losing the two-way ISL measurement of the asset in the DEKF update. In order to provide the best possible quality of PNT service with limited time and resources, the distributed Lunar constellations must schedule the communication activities. The scheduler leverages mixed-integer linear programming (MILP) for the coordination and scheduling of the desired “as-needed” localization service (Niemoeller et al., 2022). We assume the scheduler has completely excluded the spacecraft information before the DEKF update in the failure scenario. When a random spacecraft has been turned off at a specific time, the robustness of the autonomous Lunar PNT system is evaluated. The simulation results give an 11.5% degradation in median position accuracy compared to the idealized performance excluding the asset loss. Second, a large number of assets may vanish due to major hardware problems or meteor strikes around the moon. A multiple spacecraft loss can degrade the localization performance very fast by losing the communication ability to do cross-plane measurements and in-plane measurements in a 3-plane constellation. When the matching-based scheduler is aware of ISL availability, we investigate a large number of in-plane and cross-plane asset vanishments both in close proximity and equally spaced throughout the orbital plane. According to the simulations, the loss of in-plane measurements gives 40.2% degradation while cross-plane measurements degrade 50.5% of asset localization performance among available assets. Therefore, it is concluded that cross-plane measurements are more important in improving the position estimation accuracy. Third, spacecraft failure information can be lost due to the internal message delay, resulting in the DEKF update scheduler to solve the matching problem with unavailable assets. The DEKF update cycle is comprised of network setup, communication, and computations where a global broadcast network and a 2-way ISL network setup take 6 minutes in total (Frank et al., 2021). Once the broadcast network successfully transmits and receives information, a random spacecraft may lose its availability right before solving the matching problem. This means the matching solution is no longer optimal, resulting in degradation in the localization performance. A numerical assessment shows the matching-based scheduler with knowing failure holds 11.5% of position accuracy degradation, whereas the scheduler without knowing failure gives 34% degraded localization performance without asset loss. Fourth, a transient loss of a single or multiple spacecraft may occur due to their antenna outages. After losing the two-way ISL availability for a few DEKF update cycles, the availability of spacecraft can easily be recovered as their states have been independently updated using measurements from anchor nodes. It is likely that the longer failure will result in worse localization performance. We have tested the transient failure of a random single asset for 30 min in the simulation, which is losing 3 update cycles in the DEKF system. From the simulation results, the position accuracy has been degraded to 4.84% which is better than the degraded localization performance of 11.5% from the permanent loss scenario among available assets. In conclusion, the autonomous Lunar PNT system based on the DEKF approach shows the ability to maintain resilience and robustness in the possible communication failure scenarios, ensuring that localization accuracy is preserved across various network degradation and outages. Future studies on investigating user localization performance near the South Pole and the broadcast network system will be continued in the following months.

Yeji Kim↗

Deterministic symbolic regression with derivative information: General methodology and application to equations of state

Symbolic regression methods simultaneously determine the model functional form and the regression parameter values by generating expression trees. Symbolic regression can capture the complexity of real–world phenomena but the use of deterministic optimization for symbolic regression has been limited due to the complexity of the search space of existing formulations. Herein we present a novel deterministic mixed–integer nonlinear programming formulation for symbolic regression that incorporates derivative constraints through auxiliary expression trees. By applying the chain rule to mathematical operations, binary expression trees are capable of representing the calculation of first and second derivatives. We apply this formulation to illustrative examples using derivative information to show increased model discrimination capability. In addition, we perform a case study of a thermodynamic equation of state to gain insight on valid functional forms with thermodynamics–based constraints on the first and second derivatives.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

A bilevel multistage stochastic self-scheduling model with indivisibilities for trading in the continuous intraday electricity market

In this paper, we study the profit maximization problem of a virtual power plant trading in the continuous intraday electricity market. Our virtual power plant model is compatible with renewable, and thermal assets, covering a range of virtual power plants currently participating in energy markets. We model the trading problem as a bilevel multistage stochastic program. The upper level of the problem accounts for the profit maximization of the virtual power plant with explicit modeling of the technical constraints of the operational status of the thermal power plant including minimum start-up and shut-down times, ramp-up and ramp-down rates, and minimum generation level. The upper level also decides which continuous and indivisible (fill-or-kill) orders are submitted to the market. The lower-level problem accounts for the clearing of the continuous intraday market, i.e., matching of buy and sell orders. Because of the presence of fill-or-kill orders, the lower-level problem is mixed-integer, which prevents its direct conversion to a single-level problem using duality. In order to solve this challenging problem, we develop a convex-hull extended formulation for the lower-level problem, apply duality theory to obtain a single-level stochastic equivalent formulation, and employ McCormick envelopes to turn the problem into a multistage stochastic mixed-integer linear problem, which we solve using the stochastic dual dynamic integer programming algorithm. We conduct numerical experiments and analyze the optimal trading behavior of a virtual power plant trading in an ideal continuous market without arbitrage.

Bilevel multistage stochastic programming problem↗

Modeling the AC Power Flow Equations with Optimally Compact Neural Networks: Application to Unit Commitment

Nonlinear power flow constraints render a variety of power system optimization problems computationally intractable. Emerging research shows, however, that the nonlinear AC power flow equations can be successfully modeled using neural networks. These neural networks can be exactly transformed into mixed integer linear programs and embedded inside challenging optimization problems, thus replacing nonlinearities that are intractable for many applications with tractable piecewise linear approximations. Such approaches, though, suffer from an explosion of the number of binary variables needed to represent the neural network. Accordingly, this paper develops a technique for training an "optimally compact'' neural network, i.e., one that can represent the power flow equations with a sufficiently high degree of accuracy while still maintaining a tractable number of binary variables. We demonstrate the use of this neural network as an approximator of the nonlinear power flow equations by embedding it in the AC unit commitment problem, transforming the problem from a mixed integer nonlinear program into a more manageable mixed integer linear program. We use the 14-, 57-, and 89-bus networks as test cases and compare the AC-feasibility of commitment decisions resulting from the neural network, DC, and linearized power flow approximations. Our results show that the neural network model outperforms both the DC and linearized power flow approximations when embedded in the unit commitment problem. The neural network formulation most often selects a feasible unit commitment schedule, and furthermore, it only s

AC power flow↗

Approximate Mixed-Integer Programming Solution with Machine Learning Technique and Linear Programming Relaxation

Security constrained unit commitment (SCUC) is solved in the day-ahead electricity market to determine electricity generation schedule for the following date. The associated mixed integer programming (MIP) problem is known computationally hard. Heuristics like rounding can be computationally efficient for solving large MIP problems however often produces lower quality solutions due to discrepancy between MIP solution and linear programming relaxation (LPR) solution, i.e., variables taking different discrete values between MIP and LPR solutions. In this work, we applied the machine learning-based algorithms—Classification and Regression Tree (CART) model and random forest (RF) model—to obtain an LPR-based approximation that close to an MIP solution without actually solving the MIP problem. By computing feature importance derived from the CART and RF models, we assessed the link between coefficients in the MIP model, the LPR solution, and the optimal solution of the MIP problem. We applied the CART and RF approaches to solve SCUC problems using day-ahead energy market cases from Midcontinent Independent System Operator. The results show that our method is computationally efficient and could achieve an approximation sufficiently close to the SCUC solution with <0.15% error and ~78% reduction in the discrepancies between LPR and MIP solutions.

Lin, Xinming↗