Surveyor II mission report. Mission description and performance
Surveyor II mission and failure analysis
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Surveyor II mission and failure analysis
We have developed a technique that allows SIM to measure relative stellar positions with an accuracy of 1 micro-arcsecond at any time during its 5-yr mission. Unlike SIM's standard narrow-angle approach, Gridless Narrow Angle Astrometry (GNAA) does not rely on the global reference frame of grid stars that reaches full accuracy after 5 years. GNAA is simply the application of traditional single-telescope narrow angle techniques to SIM's narrow angle optical path delay measurements. In GNAA, a set of reference stars and a target star are observed at several baseline orientations. A linearized model uses delay measurements to solve for star positions and baseline orientations. A conformal transformation maps observations at different epochs to a common reference frame. The technique works on short period signals (P=days to months), allowing it to be applied to many of the known extra-solar planets, intriguing radio/X- ray binaries, and other periodic sources. The technique's accuracy is limited in the long-term by false acceleration due to a combination of reference star and target star proper motion. The science capability 1 micro-arcsecond astrometric precision - is unique to SIM.
This presentation is for a knowledge exchange between NASA, JAXA, and ESA on System Safety and Mission Assurance Cubesat developments and challenges.
This will be presented at the Earth Science Constellation Mission Operations Work Group meeting June 13-15, 2017 to discuss EOS Aqua status.
These missions are made possible with the use of the MEGA process, which will be discussed here in some detail.
Future space missions are required to deliver significant results with new technolgy and substantially reduced dvelopment cost and schedule.
Deep Space 1 (DS1), scheduled for launch in July 1998, is the first mission of NASA's New Millennium program, chartered to flight validate high-risk, advanced technologies important for future space and Earth Science programs.
Launch to mission completion targeting techniques, computer programming for lunar and interplanetary flight programs - ranger/mariner program
Mission description and performance of Surveyor I systems
Miniaturizing automatic amino acid analyzer for Apollo and Voyager missions
Mission description and performance evaluation of Surveyor III lunar soft landing
Surveyor 4 lunar probe mission description and performance
Performance requirements common to manned mission objectives and modes for Mercury, Venus, Mars, Jupiter/Ganymede, and asteroids Ceres and Vesta
Surveyor 5 mission description and performance
Biochemical, physiological, and metabolic effects of simulated Apollo mission with space diet on humans
Mission description and postflight performance analysis of Surveyor 6 spacecraft
Direct flight and Jupiter swingby heliocentric trajectory modes of elliptic capture orbits compared for unmanned missions to outer planets
Surveyor 1 mission discription and performance for preflight and flight phases