Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “March 2007”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Waste Treatment Plant Support Program: Summaries of Reports Produced During Fiscal Years 1999-2010

The Waste Treatment Plant (WTP) being built on the U.S. Department of Energy (DOE) Hanford Site will be the largest chemical processing plant in the United States. Bechtel National Inc. (BNI) is the designer and constructor for the WTP. The Pacific Northwest National Laboratory (PNNL) has provided significant research and testing support to the WTP. This report provides a summary of reports developed initially under PNNL’s “1831” use agreement and later PNNL’s “1830” prime contract with DOE in support of the WTP. In March 2001, PNNL under its “1831” use agreement entered into a contract with BNI to support their research and testing activities. However, PNNL support to the WTP predates BNI involvement. Prior to March 2001, PNNL supported British Nuclear Fuels Ltd. in its role as overall designer and constructor. In February 2007, execution of PNNL’s support to the WTP was moved under its “1830” prime contract with DOE.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Multi-Scale Mass Transfer Processes Controlling Natural Attenuation and Engineered Remediation: An IFRC Focused on Hanford’s 300 Area Uranium Plume

The Integrated Field Research Challenge (IFRC) at the Hanford Site 300 Area uranium (U) plume addresses multi-scale mass transfer processes in a complex subsurface biogeochemical setting where groundwater and riverwater interact. A series of forefront science questions on reactive mass transfer motivates research. These questions relate to the effect of spatial heterogeneities; the importance of scale; coupled interactions between biogeochemical, hydrologic, and mass transfer processes; and measurements and approaches needed to characterize and model a mass-transfer dominated biogeochemical system. The project was initiated in February 2007, with CY 2007, CY 2008, CY 2009, and CY 2010 progress summarized in preceding reports. A project peer review was held in March 2010, and the IFRC project acted upon all suggestions and recommendations made in consequence by reviewers and SBR/DOE. These responses have included the development of 'Modeling' and 'Well-Field Mitigation' plans that are now posted on the Hanford IFRC web-site, and modifications to the IFRC well-field completed in CY 2011. The site has 35 instrumented wells, and an extensive monitoring system. It includes a deep borehole for microbiologic and biogeochemical research that sampled the entire thickness of the unconfined 300 A aquifer. Significant, impactful progress has been made in CY 2011 including: (i) well modifications to eliminate well-bore flows, (ii) hydrologic testing of the modified well-field and upper aquifer, (iii) geophysical monitoring of winter precipitation infiltration through the U-contaminated vadose zone and spring river water intrusion to the IFRC, (iv) injection experimentation to probe the lower vadose zone and to evaluate the transport behavior of high U concentrations, (v) extended passive monitoring during the period of water table rise and fall, and (vi) collaborative down-hole experimentation with the PNNL SFA on the biogeochemistry of the 300 A Hanford-Ringold contact and the underlying redox transition zone. The modified well-field has functioned superbly without any evidence for well-bore flows. Beyond these experimental efforts, our site-wide reactive transport models (PFLOTRAN and eSTOMP) have been updated to include site geostatistical models of both hydrologic properties and adsorbed U distribution; and new hydrologic characterization measurements of the upper aquifer. These increasingly robust models are being used to simulate past and recent U desorption-adsorption experiments performed under different hydrologic conditions, and heuristic modeling to understand the complex functioning of the smear zone. We continued efforts to assimilate geophysical logging and 3D ERT characterization data into our site wide geophysical model, with significant and positive progress in 2011 that will enable publication in 2012. Our increasingly comprehensive field experimental results and robust reactive transport simulators, along with the field and laboratory characterization, are leading to a new conceptual model of U(VI) flow and transport in the IFRC footprint and the 300 Area in general, and insights on the microbiological community and associated biogeochemical processes influencing N, S, C, Mn, and Fe. Collectively these findings and higher scale models are providing a unique and unparalleled system-scale understanding of the biogeochemical function of the groundwater-river interaction zone.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

National Fuel Cell Bus Program: Accelerated Testing Evaluation Report and Appendices, Alameda-Contra Costa Transit District (AC Transit)

This is an evaluation of hydrogen fuel cell transit buses operating at AC Transit in revenue service since March 20, 2006 compared to similar diesel buses operating from the same depot. This evaluation report includes results from November 2007 through October 2008. Evaluation results include implementation experience, fueling station operation, fuel cell bus operations at Golden Gate Transit, and evaluation results at AC Transit (bus usage, availability, fuel economy, maintenance costs, and roadcalls).

02 PETROLEUM↗

March 2008 monitoring results for Barnes, Kansas.

The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility at Barnes, Kansas, during most of the interval 1949-1974. Carbon tetrachloride contamination was initially detected in 1986 in the town's public water supply wells. In 2006-2007, the CCC/USDA conducted a comprehensive targeted investigation at and near its former property in Barnes to characterize this contamination. Those results were reported previously (Argonne 2007). In November 2007, the CCC/USDA began quarterly groundwater monitoring at Barnes. The monitoring is being conducted on behalf of the CCC/USDA by Argonne National Laboratory, in accord with the recommendations made in the report for the 2006-2007 targeted investigation (Argonne 2007). The objective is to monitor the carbon tetrachloride contamination identified in the groundwater at Barnes. The sampling is presently conducted in a network of 28 individual monitoring wells (at 19 distinct locations), 2 public water supply wells, and 1 private well (Figure 1.1). The results of the 2006-2007 targeted investigation (Argonne 2007) and the initial monitoring in November 2007 (Argonne 2008) demonstrated the presence of carbon tetrachloride contamination in groundwater at levels slightly exceeding the Kansas Department of Health and Environment (KDHE) Tier 2 risk-based screening level (RBSL) of 5.0 {micro}g/L for this compound. The contaminant plume appears to extend from the former CCC/USDA property northwestward, toward the Barnes public water supply wells. Information obtained during the 2006-2007 investigation indicates that at least one other potential source might have contributed to the groundwater contaminant plume (Argonne 2007). In particular, the local school district (USD 223) handled, stored, and disposed of chemicals including carbon tetrachloride. This current report presents the results of the second quarterly monitoring event, conducted in March 2008. During this second monitoring event, low-flow sampling methods were used to purge and sample all wells. This was the initial use of these sampling methods at Barnes.

54 ENVIRONMENTAL SCIENCES↗

Japanese Structure Survey of Radiation Oncology in 2007 Based on Institutional Stratification of Patterns of Care Study

Purpose: To evaluate the ongoing structure of radiation oncology in Japan in terms of equipment, personnel, patient load, and geographic distribution to identify and improve any deficiencies. Methods and Materials: A questionnaire-based national structure survey was conducted from March to December 2008 by the Japanese Society of Therapeutic Radiology and Oncology (JASTRO). These data were analyzed in terms of the institutional stratification of the Patterns of Care Study. Results: The total numbers of new cancer patients and total cancer patients (new and repeat) treated with radiation in 2007 were estimated at 181,000 and 218,000, respectively. There were 807 linear accelerator, 15 telecobalt, 46 Gamma Knife, 45 {sup 60}Co remote-controlled after-loading, and 123 {sup 192}Ir remote-controlled after-loading systems in actual use. The linear accelerator systems used dual-energy function in 539 units (66.8%), three-dimensional conformal radiation therapy in 555 (68.8%), and intensity-modulated radiation therapy in 235 (29.1%). There were 477 JASTRO-certified radiation oncologists, 826.3 full-time equivalent (FTE) radiation oncologists, 68.4 FTE medical physicists, and 1,634 FTE radiation therapists. The number of interstitial radiotherapy (RT) administrations for prostate, stereotactic body radiotherapy, and intensity-modulated radiation therapy increased significantly. Patterns of Care Study stratification can clearly identify the maturity of structures based on their academic nature and caseload. Geographically, the more JASTRO-certified physicians there were in a given area, the more RT tended to be used for cancer patients. Conclusions: The Japanese structure has clearly improved during the past 17 years in terms of equipment and its use, although a shortage of personnel and variations in maturity disclosed by Patterns of Care Study stratification were still problematic in 2007.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Novel Technique for Hepatic Fiducial Marker Placement for Stereotactic Body Radiation Therapy

Purpose: To report experience with fiducial marker insertion and describe an advantageous, novel technique for fiducial placement in the liver for stereotactic body radiation therapy with respiratory tracking. Methods and Materials: We implanted 1444 fiducials (single: 834; linked: 610) in 328 patients with 424 hepatic lesions. Two methods of implantation were compared: the standard method (631 single fiducials) performed on 153 patients from May 2007 to May 2010, and the cube method (813 fiducials: 610 linked/203 single) applied to 175 patients from April 2010 to March 2013. The standard method involved implanting a single marker at a time. The novel technique entailed implanting 2 pairs of linked markers when possible in a way to occupy the perpendicular edges of a cube containing the tumor inside. Results: Mean duration of the cube method was shorter than the standard method (46 vs 61 minutes; P<.0001). Median numbers of skin and subcapsular entries were significantly smaller with the cube method (2 vs 4, P<.0001, and 2 vs 4, P<.0001, respectively). The rate of overall complications (total, major, and minor) was significantly lower in the cube method group compared with the standard method group (5.7% vs 13.7%; P=.013). Major complications occurred while using single markers only. The success rate was 98.9% for the cube method and 99.3% for the standard method. Conclusions: We propose a new technique of hepatic fiducial implantation that makes use of linked fiducials and involves fewer skin entries and shorter time of implantation. The technique is less complication-prone and is migration-resistant.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Manipulator Report for Pacific Northwest 2016

An initial ergonomic evaluation of the manipulators in was performed in 2007 and again in 2008. Discussion and solution development was performed with the new management team, FLM, and the employee on March 23, 2009. The purpose of this evaluation was to identify improvements to reduce stress and risk of injury to the employees. The primary ergonomic related risk factors identified include static and awkward postures especially for the wrist, and repetitive motion of fine motor musculature of the hand and forearm depending on the work load. This memorandum is intended as a starting point to reduce the ergonomic-related risk factors present in this process. All risk factors were probably not identified during this initial evaluation due to limited task demonstrations. The solution development and implementation process is a team effort. The Ergonomics Team provides technical support and guidance; employees demonstrate tasks, provide ideas, and test and provide feedback on potential solutions; and management provides the resources and encourages participation in the process.

42 ENGINEERING↗

Quarkonium physics at the dawn of the LHC era.

More than a hundred experimentalists and theorists met at DESY in October to discuss the latest advances in quarkonium physics. The Quarkonium Working Group (QWG) formed in 2002 to further research in all aspects of quarkonium physics and to bridge communication between theory and experiment in the field. The group has since sponsored a series of workshops on quarkonium physics, starting at CERN in November 2002 (CERN Courier March 2003 p6 and CERN Courier September 2006 p46). The latest meeting took place at DESY, Hamburg, on 17-20 October 2007. Hot topics included recent advances in the theory of quarkonium production at the Tevatron and the B-factories; quarkonium production and in-medium behaviour in heavy-ion collisions; the new narrow-resonance states discovered by the Belle, BaBar and CLEO experiments; applications of quarkonium physics to the search for physics beyond the Standard Model; and quarkonium experiments in the LHC era. Quarkonium physics has played an important role in establishing QCD as the accepted theory of strong interactions. It has decisively contributed to the development of the quark model of hadrons and to the understanding of the properties of QCD. It also provides a unique window into the interplay between perturbative and nonperturbative QCD. As such, quarkonium physics remains at the forefront of QCD research and is an important testing ground for state-of-the-art computational tools for QCD, such as effective field theories, factorization theorems, higher-order perturbative calculations and lattice QCD. The insights gained from quarkonium studies build greater confidence in predictions for Standard Model processes and, consequently, in predictions of new physics backgrounds at the LHC. The recent discovery of remarkable new resonance states in the charmonium region of the spectrum - exciting in its own right - provides further opportunities to test the theoretical framework of quarkonium physics.

43 PARTICLE ACCELERATORS↗

X-RAY AND NEAR-INFRARED OBSERVATIONS OF THE OBSCURED ACCRETING PULSAR IGR J18179-1621

IGR J18179-1621 is an obscured accreting X-ray pulsar discovered by INTEGRAL on 2012 February 29. We report on our 20 ks Chandra-High Energy Transmission Gratings Spectrometer observation of the source performed on 2012 March 17, on two short contemporaneous Swift observations, and on our two near-infrared (K{sub s} , H{sub n} , and J{sub n} ) observations performed on 2012 March 13 and 26. We determine the most accurate X-ray position of IGR J18179-1621, {alpha}{sub J2000} = 18{sup h}17{sup m}52.{sup s}18, {delta}{sub J2000} = -16 Degree-Sign 21'31.''68 (90% uncertainty of 0.''6). A strong periodic variability at 11.82 s is clearly detected in the Chandra data, confirming the pulsating nature of the source, with the light-curve softening at the pulse peak. The quasi-simultaneous Chandra-Swift spectra of IGR J18179-1621 can be well fit by a heavily absorbed hard power law (N{sub H} = 2.2 {+-} 0.3 Multiplication-Sign 10{sup 23} cm{sup -2} and photon index {Gamma} = 0.4 {+-} 0.1) with an average absorbed 2-8 keV flux of 1.4 Multiplication-Sign 10{sup -11} erg cm{sup -2} s{sup -1}. At the Chandra-based position, a source is detected in our near-infrared (NIR) maps with K{sub s} 13.14 {+-} 0.04 mag, H{sub n} = 16 {+-} 0.1 mag, and no J{sub n} -band counterpart down to {approx}18 mag. The NIR source, compatible with 2MASS J18175218-1621316, shows no variability between 2012 March 13 and 26. Searches of the UKIDSS database show similar NIR flux levels at epochs six months prior to and after a 2007 February 11 archival Chandra observation where the source's X-ray flux was at least 87 times fainter. In many ways IGR J18179-1621 is unusual: its combination of a several week long outburst (without evidence of repeated outbursts in the historical record), high absorption column (a large fraction of which is likely local to the system), and 11.82 s period does not fit neatly into existing X-ray binary categories.

79 ASTRONOMY AND ASTROPHYSICS↗

Remotely Searching for Noctiluca Miliaris in the Arabian Sea

Reversing monsoonal winds in the Arabian Sea result in two seasons with elevated biological activity, namely the annual summer Southwest Monsoon (SWM; June to September) and winter Northeast Monsoon (NEM; November to March) [Wiggert et al., 2005]. Generally speaking, the SWM and NEM create two geographically distinct blooms [Banse and English, 2000; Levy et al., 2007]. In the summer, winds from the southwest drive offshore Ekman transport and coastal upwelling along the northwestern coast of Africa, which brings nutrient-rich water to the surface from below the permanent thermocline [Bauer et al., 1991]. In the winter, cooling of the northern Arabian Sea causes surface waters to sink, which generates convective mixing that injects nutrients throughout the upper mixed layer [Madhupratap et al., 1996]. This fertilization of otherwise nutrient-deplete surface waters produces one of the most substantial seasonal extremes of phytoplankton biomass and carbon flux anywhere in the world [Smith, 2005].

Arabian Sea↗

Swift Mission Gyro Patch and Re-Calibration Without A Calibration Campaign

The Swift spacecraft has three Two-Axis-Rate-Assemblies (TARAs) (designated as TARA 1, TARA 2, and TARA 3, and generically referred to as gyros) which until March of 2024 were all used in rate estimation as an operational workaround (dubbed “corrector-gyro”) of a software defect discovered in 2007. TARA 1 performance degraded throughout 2023 and 2024, making it an unreliable rate source. It was determined that shifting TARA 1 to be the corrector-gyro and using mainly TARAs 2 and 3, with the existing flight software (FSW) defect, would not meet performance requirements for science operations. Rather the FSW was patched to remove the defect found in 2007. This patch was delivered by the vendor in 2009, but was not fully tested or installed at that time. A decision was made in 2024 to install the patch despite limited simulation and testing capabilities. The problem facing the team was to come up with a set of alignment parameters that would work with the new patch, using data from the spacecraft operating normally in the old configuration. Calibration activities would have been possible in either the old or new FSW configuration, but were ultimately deemed unnecessary, saving staff time and pre-serving time on the spacecraft for science data collection. This paper describes the old and new FSW configurations related to gyro processing and alignment, and how the raw gyro and star tracker data from normal operation were used with a multidimensional unconstrained nonlinear minimization in MATLAB (Nelder-Mead1) to produce a fully calibrated set of gyro alignment parameters compatible with the patched FSW. Flight data is presented showing that not only did the process work, it improved performance significantly, rivaling the best slew performance of the mission to date.

MATLAB↗

Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2007.

The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.

13 HYDRO ENERGY↗

Preliminary Plan for Evaluation of Reactor Pressure Vessel Surveillance Materials from Palisades Nuclear Generating Station

The Palisades Nuclear Generating Station (PNGS), located in Michigan, is owned and operated by Entergy. It is a Combustion Engineering 2-loop pressurized water reactor (PWR) producing 805 MWe (2,565 MWth). The PNGS was built between 1967 and 1970, with approval to operate at full power in 1973; the plant’s original license was due to expire on March 24, 2011. An application for 20-year extension was filed in 2005 with the Nuclear Regulatory Commission and was granted on January 18, 2007. Although the plant was scheduled for decommissioning by 2031, Entergy currently plans to close the PNGS in 2022. The PNGS included in its reactor pressure vessel (RPV) surveillance program a capsule, designated A-60, containing specimens of one of the vessel plates and a weld metal with nickel content of about 1.36 wt% and copper content of about 0.20 wt%. This capsule was irradiated to a fluence of 1.8 x 10 20 n/cm 2 . The capsule was removed from its surveillance position in 1995 and has been resident in the spent fuel pool since that time. The material is also of special interest because of its very high nickel content and because of the potential for development of NiMnSi (nickel-manganese-silicon) precipitates, dubbed “late blooming phases.” The surveillance program also includes a capsule, designated T-150, dedicated specifically for thermal aging, which would provide results for at least 33 effective full power years, which is beyond the current thermal-aging database for such materials. Given that license extensions to 60 years of operation have been approved by the US Nuclear Regulatory Commission for most of the currently operating light water reactors in the United States, and that the first extension to 80 years was recently approved, there exists the probability that some RPVs will reach and possibly exceed a fast neutron fluence (> 1 MeV) of 1 x 10 20 n/cm 2 . This is a fluence regime with no US surveillance data and very little test reactor data, except for the Light Water Reactor Sustainability Program–sponsored University of California Santa Barbara Advanced Test Reactor (ATR) ATR-2 project. Thus, the materials in the A-60 capsule represent a valuable resource for directly exploring the effects of commercial surveillance irradiation on a typical plate and a high-nickel weld with similar materials irradiated in the ATR-2 test reactor project. This report provides background information for the surveillance program, previous results of surveillance materials testing, the preliminary plan for capsule retrieval and disassembly, and the plan for testing and microstructural examination of the mechanical test specimens of these unique materials to assess the features induced by very high irradiation fluence or very long thermal aging time

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Opportunity Microscopic Imager Results from the Western Rim of Endeavour Crater

The Athena science payload on the Mars Exploration Rovers (MER Spirit and Opportunity) includes the Microscopic Imager (MI), a fixed focus close-up camera mounted on the instrument arm. The MI acquires images at a scale of 31 micrometers/pixel over a broad spectral range (400 to 700 nm) using only natural illumination of target surfaces. Radio signals from Spirit have not been received since March 2010, so attempts to communicate with that rover ceased in mid-2011. The Opportunity MI optics were contaminated by a global dust storm in 2007. That contamination continues to reduce the contrast of MI images, and is being monitored by occasionally imaging the sky.

Herkenhoff, K. E.↗

Temperature and Water Depth Monitoring Within Chum Salmon Spawning Habitat Below Bonneville Dam : Annual Report October 2007-September 2008

The overall goal of the project described in this report is to provide a sound scientific basis for operation of the Federal Columbia River Power System (FCRPS) in ways that will effectively protect and enhance chum salmon populations - a species listed in March 1999 as threatened under the Endangered Species Act of 1973 (ESA). The study objective during fiscal year 2008 was to provide real-time data on Ives Island area water temperature and water surface elevations from the onset of chum salmon spawning through the end of chum salmon emergence. Sampling locations included areas where riverbed temperatures were elevated, potentially influencing alevin development and emergence timing. In these locations, hydrosystem operation caused large, frequent changes in river discharge that affected salmon habitat by dewatering redds and altering egg pocket temperatures. The 2008 objective was accomplished using temperature and water-level sensors deployed inside piezometers. Sensors were integrated with a radio telemetry system such that real-time data could be downloaded remotely and posted hourly on the Internet. During our overall monitoring period (October 2007 through June 2008), mean temperature in chum spawning areas was nearly 2 C warmer within the riverbed than in the overlying river. During chum salmon spawning (mid-November 2007 through December2007), mean riverbed temperature in the Ives Island area was 14.5 C, more than 5 C higher than in the river, where mean temperature was 9.4 C. During the incubation period (January 2008 through mid-May 2008), riverbed temperature was approximately 3 C greater than in the overlying river (10.5 C and 7.2 C, respectively). Chum salmon preferentially select spawning locations where riverbed temperatures are elevated; consequently the incubation time of alevin is shortened before they emerge in the spring.

13 HYDRO ENERGY↗

Cle Elum Supplementation and Research Facility : Monthly Progress Report November 2008.

FISH PRODUCTION: Final shocking of eggs was finished in the incubation. Egg enumeration for the 2008 brood was completed and the eggs are being incubated in 38 degree Fahrenheit chilled water. Don Larsen of NOAA made a request of eggs for research purposes and was able to acquire supplemental line eggs 10,555. Estimated density at the time of ponding in Mid-March of 2009 is approximately 43,869 fry per raceway after calculating an average fry loss of 2%. The end of the month totals for the 2007 brood reports 773,807 juveniles on hand with an overall average of 31.4 fish per pound. Tagging continues on the 2007 brood and is on pace to wrap up in early December. FISH CULTURE: Ponds are cleaned as needed and due to the colder water temperatures, the feeding frequency has been changed to three days a week. All ponds are sampled at the end of the month. Growth for production fish are adjusted accordingly as temperature dictates feeding levels. Torrential rain on the 12th turned the Yakima River extremely turbid. Fish tagging operations were halted and the ensuing conditions at the facility intake screens became a concern. Water flow to the wet well became restricted so the decision was made to shut the surface water (river) pumps down and turn on well pumps No.1, No.4 and No.6 to run water to the facility head box. This operation continued for twenty-four hours at which point normal operations were optimal and fish tagging resumed, although the river didn't clear up enough to feed the fish until the 17th. WATER PRODUCTION: The current combined well and river water supply to the complex is 14,822 gallons/minute. Well No.2 is pumping water at a rate of 530 gallons per minute. All four river pumps are in operation and pumping 14,292 gallons/minute. ACCLIMATION SITES: Cle Elum staff has been working to prep the acclimation sites for the upcoming fish transfer before the snow falls. Thermographs at each site are changed weekly. AMB Tools performed routine maintenance on the compressor and Brown and Jackson pumped out the septic tank at the Jack Creek acclimation site. VEHICLE MAINTENANCE: Snow tires are now on all vehicles and snow blowers were installed on the John Deere tractor and lawn tractor. The snowplow was also installed on the Ford one ton. The four Snowmobiles were serviced by Yamaha Jacks of Ellensburg. MAINTENANCE BUILDING MAINTENANCE: Clean up occurs on Fridays of each week. HATCHERY BUILDING MAINTENANCE: Water has been turned on to vertical incubator islands one and two. After eggs were transferred to vertical stacks cleaning of troughs began. WDFW crew inventoried eggs from isolettes and then transferred them to the vertical incubators. RIVER PUMP STATION MAINTENANCE: All four pumps are in operation and supplying the facility with 14,292 gallons/minute of water to rearing ponds. WELL FIELD MAINTENANCE: Well pumps No.1, No.4 and No.6 were turned on to supplement water flow to the facility as mentioned previously. Well No.5 was powered up but a winterizing valve malfunction wouldn't allow operation, we are currently working on it at this time. Well No.2 is pumping 530 gallons per minute and supplies well water to incubation and chiller. The pumps meter is recorded weekly. Test holes are monitored weekly and results are faxed to CH2MHILL afterward. SAFETY AND TRAINING: Ice melt and sand bags are popular items at the facility this month as freezing temperatures cause ground to become slippery and hazardous. GROUNDS: Van Alden's Plumbing installed a new commode in resident house No.411 and also inspected a plumbing problem at resident No.1131. Cle Elum staff along with WDFW staff worked to locate the spawning channel building back to the position it was at to have Greg Wallace of Wallace Electric hook electricity back up to the spawning shed. MEETINGS AND TOURS: Charlie attended a policy meeting at Cle Elum on the 18th. The Internal projects annual review took place at Cle Elum on the 19th and 20th. Bill Bosch continues to visit monthly to incorporate data into the YKFP data base. PERSONNEL: IHS employees traveled to Cle Elum to administer flu shots to YN staffers and families as well as WDFW staffers.

13 HYDRO ENERGY↗

Expanding Geothermal Resource Utilization through Directed Research, Education, and Public Outreach

The Great Basin Center for Geothermal Energy (GBCGE or the Center) was established at the University of Nevada, Reno (UNR) in May 2000 to promote research and utilization of geothermal resources. The Center received funding through this grant to promote increased geothermal development in the Great Basin, with most of the funding used for peer-reviewed research. Funding to the Center and work under the contract were initiated in March 2002, with supplemental funding in subsequent years. The Center monitored the research projects that were competitively awarded in a series of proposal calls between 2002 and 2007. Peer-reviewed research promoted identification and utilization of geothermal resources in Nevada. Projects used geology, geochemistry, geophysics, remote sensing, and the synthesis of multi-disciplinary information to produce new models of geothermal systems in the Western U.S. and worldwide. Funds were also used to support graduate student research and training. Part of the grant was used to support public outreach activities, including webpages, online maps and data resources, and informational workshops for stakeholders.

15 GEOTHERMAL ENERGY↗

Durable Airtightness in Single-Family Dwellings - Field Measurementsand Analysis

Here, durability of the building envelope is important to new homes that are increasingly built with improved levels of airtightness. It is also important to weatherized homes such that energy savings from retrofit measures, such as air sealing, are persistent. This paper presents a comparison of air leakage measurements collected in November 2013 through March 2014, with two sets of prior data collected between 2001-2003 from 17 new homes located near Atlanta, GA, and 17 homes near Boise, ID that were weatherized in 2007- 2008. The purpose of the comparison is to determine if there are changes to the airtightness of building envelopes over time. The air leakage increased in all but one of the new homes, with a mean increase of about 25%. The weatherized homes also showed an increase in the mean air leakage (12%). A regression analysis was performed to describe the relationship between prior and current measurements in terms of normalized leakage (NL). The best estimate of the ageing factor predicts a 15% increase in NL over ten years. Further analysis using ResDB data (LBNL’s Residential Diagnostic Database) showed the expected changes in air leakage if ageing were modelled. These results imply the need to examine the causes of increased leakage and methods to avoid them. This increase in leakage with time should be accounted for in long-term population-wide energy savings estimates, such as those used in ratings or energy savings programs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗