Disposing of High-Level Radioactive Waste in Germany - A Note from the Licensing Authority - 12530

Following the national German consensus on the termination of utilisation of nuclear energy in the summer of 2011, the Federal and Laender Governments have declared their intention to work together on a national consensus on the disposal of radioactive waste as well. Projected in the early 1970's the Federal Government had started exploring the possibility to establish a repository for HLW at the Gorleben site in 1977. However, there is still no repository available in Germany today. The delay results mainly from the national conflict over the suitability of the designated Gorleben site, considerably disrupting German society along the crevice that runs between supporters and opponents of nuclear energy. The Gorleben salt dome is situated in Lower Saxony, the German state that also hosts the infamous Asse mine repository for LLW and ILW and the Konrad repository project designated to receive LLW and ILW as well. With the fourth German project, the Morsleben L/ILW repository only 20 km away across the state border, the state of Lower Saxony carries the main load for the disposal of radioactive waste in Germany. After more than 25 years of exploration and a 10 year moratorium the Gorleben project has now reached a cross-road. Current plans for setting up a new site selection procedure in Germany call for the selection and exploration of up to four alternative sites, depending only on suitable geology. In the meantime the discussion is still open on whether the Gorleben project should be terminated in order to pacify the societal conflict or being kept in the selection process on account of its promising geology. The Lower Saxony Ministry for Environment and Climate Protection proposes to follow a twelve-step-program for finding the appropriate site, including the Gorleben site in the process. With its long history of exploration the site is the benchmark that alternative sites will have to compare with. Following the national consensus of 2011 on the termination of nuclear energy utilisation, it is now the time to reach a national consensus on the disposal of radioactive waste as well. This is a task that the country and society, federal and state governments, political parties and the citizens will have to jointly master within the current generation and within German territory. The basis for the consensus will be a reset to the beginning of this process. It has to start with a new site selection procedure that will take into account and compare up to four alternative sites. This procedure will have to follow the principle of highest possible security. It should be based on a stepwise approach, strictly following scientific criteria. Public confidence in the process and trust can only be achieved by a transparent procedure allowing for the participation of the public and the stakeholders. It is therefore mandatory to consult, both on a national and regional level, all involved parties (public authority, scientist and citizen). The national consensus must also include a decision on the future of the Gorleben exploratory site. The site selection procedure must therefore take this site into account as well. Furthermore, the final decision on safe disposal of German radioactive wastes must be made by sovereign rule by Federal Parliament and Federal Council. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Water Security Toolkit User Manual Version 1.2.

The Water Security Toolkit (WST) is a suite of open source software tools that can be used by water utilities to create response strategies to reduce the impact of contamination in a water distribution network . WST includes hydraulic and water quality modeling software , optimizati on methodologies , and visualization tools to identify: (1) sensor locations to detect contamination, (2) locations in the network in which the contamination was introduced, (3) hydrants to remove contaminated water from the distribution system, (4) locations in the network to inject decontamination agents to inactivate, remove, or destroy contaminants, (5) locations in the network to take grab sample s to help identify the source of contamination and (6) valves to close in order to isolate contaminate d areas of the network. This user manual describes the different components of WST , along w ith examples and case studies. License Notice The Water Security Toolkit (WST) v.1.2 Copyright c 2012 Sandia Corporation. Under the terms of Contract DE-AC04-94AL85000, there is a non-exclusive license for use of this work by or on behalf of the U.S. government. This software is distributed under the Revised BSD License (see below). In addition, WST leverages a variety of third-party software packages, which have separate licensing policies: Acro Revised BSD License argparse Python Software Foundation License Boost Boost Software License Coopr Revised BSD License Coverage BSD License Distribute Python Software Foundation License / Zope Public License EPANET Public Domain EPANET-ERD Revised BSD License EPANET-MSX GNU Lesser General Public License (LGPL) v.3 gcovr Revised BSD License GRASP AT&T Commercial License for noncommercial use; includes randomsample and sideconstraints executable files LZMA SDK Public Domain nose GNU Lesser General Public License (LGPL) v.2.1 ordereddict MIT License pip MIT License PLY BSD License PyEPANET Revised BSD License Pyro MIT License PyUtilib Revised BSD License PyYAML MIT License runpy2 Python Software Foundation License setuptools Python Software Foundation License / Zope Public License six MIT License TinyXML zlib License unittest2 BSD License Utilib Revised BSD License virtualenv MIT License Vol Common Public License vpykit Revised BSD License Additionally, some precompiled WST binary distributions might bundle other third-party executables files: Coliny Revised BSD License (part of Acro project) Dakota GNU Lesser General Public License (LGPL) v.2.1 PICO Revised BSD License (part of Acro project) i Revised BSD License Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met: * Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer. * Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution. * Neither the name of Sandia National Laboratories nor Sandia Corporation nor the names of its con- tributors may be used to endorse or promote products derived from this software without specific prior written permission. THIS SOFTWARE IS PROVIDED BY THE COPYRIGHT HOLDERS AND CONTRIBUTORS "AS IS" AND ANY EXPRESS OR IMPLIED WARRANTIES, INCLUDING, BUT NOT LIMITED TO, THE IM- PLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE DISCLAIMED. IN NO EVENT SHALL SANDIA CORPORATION BE LIABLE FOR ANY DIRECT, INDIRECT, INCIDENTAL, SPECIAL, EXEMPLARY, OR CONSEQUENTIAL DAMAGES (INCLUD- ING, BUT NOT LIMITED TO, PROCUREMENT OF SUBSTITUTE GOODS OR SERVICES; LOSS OF USE, DATA, OR PROFITS; OR BUSINESS INTERRUPTION) HOWEVER CAUSED AND ON ANY THEORY OF LIABILITY, WHETHER IN CONTRACT, STRICT LIABILITY, OR TORT (INCLUDING NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY OUT OF THE USE OF THIS SOFTWARE, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGE. ii Acknowledgements This work was supported by the U.S. Environmental Protection Agency through its Office of Research and Development (Interagency Agreement # DW8992192801). The material in this document has been subject to technical and policy review by the U.S. EPA, and approved for publication. The views expressed by individual authors, however, are their own, and do not necessarily reflect those of the U.S. Environmental Protection Agency. Mention of trade names, products, or services does not convey official U.S. EPA approval, endorsement, or recommendation. The Water Security Toolkit is an extension of the Threat Ensemble Vulnerability Assessment-Sensor Place- ment Optimization Tool (TEVA-SPOT), which was also developed with funding from the U.S. Environ- mental Protection Agency through its Office of Research and Development (Interagency Agreement # DW8992192801). The authors acknowledge the following individuals for their contributions to the devel- opment of TEVA-SPOT: Jonathan Berry (Sandia National Laboratories), Erik Boman (Sandia National Laboratories), Lee Ann Riesen (Sandia National Laboratories), James Uber (University of Cincinnati), and Jean-Paul Watson (Sandia National Laboratories). iii Acronyms ATUS American Time-Use Survey BLAS Basic linear algebra sub-routines CFU Colony-forming unit CVAR Conditional value at risk CWS Contamination warning system EA Evolutionary algorithm EDS Event detection system EPA U.S. Environmental Protection Agency EC Extent of Contamination ERD EPANET results database file GLPK GNU Linear Programming Kit GRASP Greedy randomized adaptive sampling process HEX Hexadecimal HTML HyperText markup language INP EPANET input file LP Linear program MC Mass consumed MILP Mixed integer linear program MIP Mixed integer program MSX Multi-species extension for EPANET NFD Number of failed detections NS Number of sensors NZD Non-zero demand PD Population dosed PE Population exposed PK Population killed TAI Threat assessment input file TCE Tailed-conditioned expectation TD Time to detection TEC Timed extent of contamination TEVA Threat ensemble vulnerability assessment TSB Tryptic soy broth TSG Threat scenario generation file TSI Threat simulation input file VAR Value at risk VC Volume consumed WST Water Security Toolkit YML YAML configuration file format for WST iv Symbols Notation Definition Example { , } set brackets { 1,2,3 } means a set containing the values 1,2, and 3. [?] is an element of s [?] S means that s is an element of the set S . [?] for all s = 1 [?] s [?] S means that the statement s = 1 is true for all s in set S . P summation P n i =1 s i means s 1 + s 2 + * * * + s n . \ set minus S \ T means the set that contains all those elements of S that are not in set T . %7C given %7C is used to define conditional probability. P ( s %7C t ) means the prob- ability of s occurring given that t occurs. %7C ... %7C cardinality Cardinality of a set is the number of elements of the set. If set S = { 2,4,6 } , then %7C S %7C = 3. v

Klise, Katherine A.↗

Managing Aging Effects on Dry Cask Storage Systems for Extended Long-Term Storage and Transportation of Used Fuel

The cancellation of the Yucca Mountain repository program in the United States raises the prospect of extended long-term storage (i.e., >120 years) and deferred transportation of used fuel at operating and decommissioned nuclear power plant sites. Under U.S. federal regulations contained in Title 10 of the Code of Federal Regulations (CFR) 72.42, the initial license term for an Independent Spent Fuel Storage Installation (ISFSI) must not exceed 40 years from the date of issuance. Licenses may be renewed by the U.S. Nuclear Regulatory Commission (NRC) at the expiration of the license term upon application by the licensee for a period not to exceed 40 years. Application for ISFSI license renewals must include the following: (1) Time-limited aging analyses (TLAAs) that demonstrate that structures, systems, and components (SSCs) important to safety will continue to perform their intended function for the requested period of extended operation; and (2) a description of the aging management program (AMP) for management of issues associated with aging that could adversely affect SSCs important to safety. In addition, the application must also include design bases information as documented in the most recent updated final safety analysis report as required by 10 CFR 72.70. Information contained in previous applications, statements, or reports filed with the Commission under the license may be incorporated by reference provided that those references are clear and specific. The NRC has recently issued the Standard Review Plan (SRP) for renewal of used-fuel dry cask storage system (DCSS) licenses and Certificates of Compliance (CoCs), NUREG-1927, under which NRC may renew a specific license or a CoC for a term not to exceed 40 years. Both the license and the CoC renewal applications must contain revised technical requirements and operating conditions (fuel storage, surveillance and maintenance, and other requirements) for the ISFSI and DCSS that address aging effects that could affect the safe storage of the used fuel. The information contained in the license and CoC renewal applications will require NRC review to verify that the aging effects on the SSCs in DCSSs/ ISFSIs are adequately managed for the period of extended operation. To date, all of the ISFSIs located across the United States with more than 1,500 dry casks loaded with used fuel have initial license terms of 20 years; three ISFSIs (Surry, H.B. Robinson and Oconee) have received their renewed licenses for 20 years, and two other ISFSIs (Calvert Cliffs and Prairie Island) have applied for license renewal for 40 years. This report examines issues related to managing aging effects on the SSCs in DCSSs/ISFSIs for extended long-term storage and transportation of used fuels, following an approach similar to that of the Generic Aging Lessons Learned (GALL) report, NUREG-1801, for the aging management and license renewal of nuclear power plants. The report contains five chapters and an appendix on quality assurance for aging management programs for used-fuel dry storage systems. Chapter I of the report provides an overview of the ISFSI license renewal process based on 10 CFR 72 and the guidance provided in NUREG-1927. Chapter II contains definitions and terms for structures and components in DCSSs, materials, environments, aging effects, and aging mechanisms. Chapter III and Chapter IV contain generic TLAAs and AMPs, respectively, that have been developed for managing aging effects on the SSCs important to safety in the dry cask storage system designs described in Chapter V. The summary descriptions and tabulations of evaluations of AMPs and TLAAs for the SSCs that are important to safety in Chapter V include DCSS designs (i.e., NUHOMS{reg_sign}, HI-STORM 100, Transnuclear (TN) metal cask, NAC International S/T storage cask, ventilated storage cask (VSC-24), and the Westinghouse MC-10 metal dry storage cask) that have been and continue to be used by utilities across the country for dry storage of used fuel to date. The goal of this report is to help establish the technical basis for extended long-term storage and transportation of used fuel.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A New Consolidated Storage Facility for Used Nuclear Fuel in Andrews County, Texas - 16418

On February 6, 2015, Waste Control Specialists LLC (WCS) announced its plan to file a license application with the U.S. Nuclear Regulatory Commission (NRC) to construct and operate a Consolidated Interim Storage Facility (CISF). Upon issuance of the license, WCS would be authorized to receive Used Nuclear Fuel (UNF) and reactor related Greater Than Class C Low Level Radioactive Waste (referred hence forth as UNF) at the CISF in late 2020. WCS based its decision to license a CISF based on strong support from the State of Texas and the local community's willingness to host such a facility in Andrews County, Texas. WCS' decision to license a CISF in a supportive community is consistent with the consent-based licensing approach recommended by the Blue Ribbon Commission on America's Nuclear Future. WCS intends to use existing technology developed by AREVA and NAC International that have already been approved by the NRC to transport UNF from existing commercial nuclear reactors across the nation for interim storage at its 14,000 acre site in Andrew County, Texas. In the pre-application licensing meetings held with the NRC, WCS underscored that UNF would be removed first from the shutdown decommissioned reactor sites and transported to the CISF. Approximately eighty percent of the UNF currently residing at the shutdown decommissioned reactor sites can be safely placed into the storage systems developed by AREVA and NAC International that are currently licensed by the NRC. WCS plans to store up to 40,000 Metric Tons of Heavy Metal (MTHM) at the CISF that would be constructed in eight phases over the next 20 years. WCS intends to submit its license application for the CISF to the NRC by April 2016. The license application will request authorization to possess up to 5,000 MTHM of UNF for Phase One which can accommodate storing the fuel located at over ten shutdown decommissioned reactor sites. As discussed with the NRC, the license application will be developed following NRC regulatory guidance to comply with the technical requirements specified in Title 10 of the Code of Federal Regulations (CFR) Part 72, Licensing Requirements for the Independent Storage of Spent Nuclear Fuel, High-Level Radioactive Waste, and Reactor-Related Greater Than Class C Waste. In addition, to filing the license application, WCS is also seeking legislative changes to the Nuclear Waste Policy Act of 1982 requiring the U.S. Department of Energy (DOE) to take title of the UNF at the commercial nuclear reactor sites. Under such legislative changes, the DOE would also be responsible for the transport of UNF to the CISF. In addition to preparing the CISF License Application, WCS and its partners AREVA and NAC International are prepared to work with DOE to facilitate the development of the UNF transportation infrastructure in the timeframe needed to support CISF operations. The WCS site and technical approach give it several advantages which uniquely position it to become the first successful commercial CISF in the U.S. These advantages include: broad consent-based support at the local, state, and Congressional level; an operating waste disposal site with an existing transportation infrastructure; and the use of already licensed systems to address 80% of the UNF currently in dry storage at shutdown sites in the U.S. WCS firmly believes this initiative will provide an economically viable option for consolidated interim storage of UNF until a permanent geologic repository becomes available. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Reactor Technology -- Regulatory Technology Development Plan (RTDP)

This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a “critical path” for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However, it is also important to remember that certain “minimum” levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial “first step” in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by technology development studies, the anticipated regulatory importance of key DOE reactor research initiatives should be assessed early in the technology development process. Quality assurance requirements supportive of later licensing activities must also be attached to important research activities to ensure resulting data is usable in that context. Early regulatory analysis and licensing approach planning thus provides a significant benefit to the formulation of research plans and also enables the planning and development of a compatible AdvSMR licensing framework, should significant modification be required.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

New initiatives in materials security

NRC Mission: To license and regulate the Nation's civilian use of byproduct, source, and special nuclear materials to ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment. Scope of Responsibility: NRC's regulatory mission covers three main areas: - Reactors: commercial reactors for generating electric power and non-power reactors used for research, testing, and training; - Materials: uses of nuclear materials in medical, industrial, and academic settings and facilities that produce nuclear fuel; - Waste: transportation, storage, and disposal of nuclear materials and waste, and decommissioning of nuclear facilities from service. A Changing Environment: - National security is dominant concern; - Obtain appropriate balance between safety and Security initiatives and Operational activities; - Multiple layers of systems, infrastructures for various licensees. Effective Communication: Not easy; Sound bites galore; Nuclear 'phobia'; Acceptability of risk; Balance of cost and benefits; Responsibility of the regulator, licensees and radiation protection professionals. Prioritized Licensee Groups: - High priority: Panoramic irradiators; manufacturers/distributors; - Medium priority: medical and research facilities, radiography, well-logging, broad-scope licenses, self-shielded irradiators, open-field irradiators, and other licensees; - Low priority: Portable gauges. Increased Security Measures: Security Zone; Control Access; Monitor, Detect, Assess, and Respond; Transportation Security; Additional control to secure portable and mobile devices; Liaison with Local Law Enforcement Agencies; Background Investigations and Fingerprinting; License Verification; Document Retention; Information Protection; Orders/Legally binding requirements to more than 3000 licensees. Orders Issued: Large Panoramic Irradiators Security Measures (60 Orders issued 6/03, Inspections done); Manufacturing and Distribution Licensees Security Measures (61 Orders issued 1/04, Inspections done); Transportation of Radioactive Material Quantities of Concern (167 Orders Issued 07/05, Inspections done); Orders for Increased Control Measures for other types of sources by categories of licenses (1,098 NRC Orders and 1782 binding State requirements issued by 12/05, Implemented 06/06, Inspections done by NRC and States). Security Inspection Results: All first year Increased Control inspections completed; NRC Information Notice (IN) 2007-16 issued May 2007; Since IN 2007-16 was issued, {approx}50% of the NRC inspections performed resulted in violations; Licensees misinterpreted or incompletely implemented requirements; Common theme: failure to properly document actions or programs when implementing the Increased Controls. Energy Policy Act of 2005: Established Radiation Source Protection and Security Task Force: cooperative effort with 14 Federal agencies, 2 State organizations; Comprehensive analysis of the security of radiation sources in the U.S.; Directed NRC to contract with National Academy of Sciences to conduct a study on radiation source use and replacement; Report to the President and Congress issued 8/06 and every 4 years thereafter. Radiation Source Protection and Security Task Force: Need higher priority on international transport security; Evaluate feasibility of using new and existing technologies to detect and discourage theft during transport; Conduct a feasibility study on the possible phase out of CsCl in highly dispersible forms; Further evaluate potential alternative technologies; Expedite completion of fingerprint requirements in Act. National Source Tracking System: Joint NRC/DOE 2003 report on Radiological Dispersal Devices recommended development of a national source tracking system; IAEA Code of Conduct recommended establishment of a national registry; U.S. Energy Policy Act of 2005 placed requirements for NRC to issue regulations establishing a mandatory tracking system. New Fingerprinting Requirements: Orders were issued to NRC Increased Control licensees on Dec 5, 2007; Licensees have 60 days to notify the NRC if they are unable to comply or if compliance is unnecessary; Licensees have 90 days to fingerprint and approve a Trustworthiness and Reliability Official; Licensees will have 180 days to implement program; 34 Agreement Stated Increased Control Licensees will receive similar requirements within 180 days. 2007 GAO Investigation: Formed Bogus Company and Obtained NRC License; Altered NRC License; Two Suppliers Agreed to Sell Material; Parallel Attempt to Obtain Agreement State; License Aborted When Notified of Site Visit. Short-Term Actions Taken: Terminated the NRC License; Stopped issuance of new NRC licenses until Interim Guidance was issued; Mandatory pre-Licensing visits or meetings for new applicants; Performed consequence assessment; Coordinated with Federal and State Partners; Retrospective exam ensure licensees are legitimate. Action Plan: Independent, 120-day external review Issued 2/11/08 for comment; National Source Tracking System - Jan 2009; Web-Based Licensing; General Licenses and Outreach; Pre-Licensing and Materials Working Groups; Agreement State Partnership; Comprehensive Internal Assessment. Regulatory Issue Summary (RIS 2008-02): Issued February 1, 2008; Latest developments in materials security; Highlights Energy Policy Act 2005, GAO report and National Academy pending Feb 2008 report; New efforts with DHS, DOE/NNSA and manufacturers on additional security enhancements for Cs-137 irradiators; Low-cost, easily implemented physical security improvements. Enhanced State, Federal and International Partnerships: Federal, State and local interface; DHS' Domestic Nuclear Detection Office 'Securing the Cities' Initiative; DHS Protective Action Guides for RDDs and INDs; DOE/NNSA's Securing the Sources Initiative; International nuclear security outreach activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Reactor Technologies - Regulatory Technology Development Plan (RTDP)

This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a “critical path” for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However, it is also important to remember that certain “minimum” levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial “first step” in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by technology development studies, the anticipated regulatory importance of key DOE reactor research initiatives should be assessed early in the technology development process. Quality assurance requirements supportive of later licensing activities must also be attached to important research activities to ensure resulting data is usable in that context. Early regulatory analysis and licensing approach planning thus provides a significant benefit to the formulation of research plans and also enables the planning and development of a compatible AdvSMR licensing framework, should significant modification be required.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Managing Aging Effects on Dry Cask Storage Systems for Extended Long-Term Storage and Transportation of Used Fuel (Rev. 2)

At present, the United States does not have a designated disposal site for used nuclear fuel — the nation therefore faces the prospect of extended long‐term storage (i.e., >60 years) and deferred transportation of used fuel at operating and decommissioned nuclear power plant sites. Under current U.S. federal regulations contained in Title 10 of the Code of Federal Regulations (CFR) 72.42, the initial license term for an Independent Spent Fuel Storage Installation (ISFSI) must not exceed 40 years from the date of issuance (20 years before the rule change in 2010 that became effective in 2011). The U.S. Nuclear Regulatory Commission (NRC) may renew licenses at the expiration of the license term upon application by the licensee for a period not to exceed 40 years. Applications for ISFSI license renewals must include the following: 1. Time‐limited aging analyses (TLAAs) that demonstrate that structures, systems, and components (SSCs) important to safety will continue to perform their intended function for the requested period of extended operation and 2. A description of the aging management program (AMP) for the management of issues associated with aging that could adversely affect SSCs important to safety. In addition, the application must include design basis information as documented in the most recently updated final safety analysis report, as required by 10 CFR 72.70. Information contained in previous applications, statements, or reports filed with the Commission under the license may be incorporated by reference, provided that these references are clear and specific. The NRC has issued the “Standard Review Plan for Renewal of Spent Fuel Dry Cask Storage System Licenses and Certificates of Compliance,” NUREG‐1927, under which NRC may renew a specific license or a Certificate of Compliance (CoC) for a term not to exceed 40 years. Both the license and the CoC renewal applications must contain revised technical requirements and operating conditions (fuel storage, surveillance and maintenance, and other requirements) for the ISFSI and dry cask storage system (DCSS) that address aging effects that could affect the safe storage of the used fuel. The information contained in the license and CoC renewal applications will require NRC review to verify that the aging effects on the SSCs in DCSSs/ISFSIs are adequately managed for the requested period of extended operation. To date, all of the ISFSIs across the United States with more than 1,500 dry casks loaded with used fuel have initial license terms of 20 years — three ISFSIs (Surry, H.B. Robinson, and Oconee) have received their renewed licenses for 40 years, and two other ISFSIs (Calvert Cliffs and Prairie Island) have applied for license renewal for 40 years. In addition, renewal of the CoC for the VSC‐24 system is pending approval from NRC.

Chopra, O. K.↗

Regulatory Treatment of Non-Core Sources of Radioactivity for Advanced Reactor Designs

The recent resurgence in advance (non-light water) reactor development has been paralleled by the development of risk-informed performance-based (RIPB) licensing pathways. Specifically, the creation of the RIPB Licensing Modernization Project (LMP) approach and subsequent endorsement by the U.S. Nuclear Regulatory Commission (NRC) now provides advanced reactor vendors with a defined RIPB method to develop an affirmative safety case for licensing. In addition, the Technology Inclusive Content of Applications Project (TICAP) has published guidance on developing a license application based on the LMP approach. To support the utilization of risk information as part of advanced reactor design and licensing efforts, the American Society of Mechanical Engineers (ASME)/American Nuclear Society (ANS) Joint Committee on Nuclear Risk Management (JCNRM) has developed a probabilistic risk assessment (PRA) standard for advanced reactors. The standard, which was formerly approved by the American National Standards Institute (ANSI) in 2021 and recently endorsed by the NRC in trial use Regulatory Guide (RG) 1.247, is an integral standard, covering from initiating events to offsite consequence. A major feature of the standard is that it permits the inclusion of any source of radioactivity material at the site within the plant PRA. Therefore, non-core sources of radioactivity, such as fuel storage, fuel processing, and purification systems, can be included within a single comprehensive plant PRA. For those advanced reactor vendors utilizing a RIPB licensing approach, there is an opportunity to include the non-core sources of radioactivity within the RIPB framework for licensing decision-making, such as the categorization of events, classification of structures, systems, and components (SSCs), and evaluation of the adequacy of defense-in-depth (DID). For advanced reactor designs that contain multiple non-core sources of radioactivity, or for monolithic plant sites that include associated fuel facilities, this approach could potentially simplify licensing applications through the use of a single, uniform, and consistent decision-making framework across all radioactive sources at the site. In addition, a RIPB approach could provide additional insights regarding plant behavior, flexibility regarding licensing decision-making, and potentially allow the use of risk information as part of the plant oversight process. Risk-informing these aspects of advanced reactor licensing would also be consistent with the NRC’s risk policy statement. However, there is diverse regulation and guidance regarding the licensing of non-core sources of radioactivity and generally limited experience using RIPB approaches for the evaluation as part of licensing.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Developments in the Regulatory Framework of Interim Storage of Spent Nuclear Fuel (SNF) in Germany - 18137

According to article 6 of the German Atomic Energy Act, storage of nuclear fuel requires a license granted by the competent authority in this field, which is the Federal Office for Safety of Nuclear Waste Management (BfE). In 1995, a license for storage of spent nuclear fuel (SNF) and vitrified high level waste (HAW) was granted for the interim storage facility in Gorleben. Dry Interim storage at the NPP sites in its current form started in 2002 in the interim storage facility next to the nuclear power plant NPP Lingen. Since this time twelve NPPs erected their own storage facilities additionally to the three central storage facilities (Ahaus, Gorleben and Rubenow). In all of these facilities the concept of dry storage in metallic dual purpose casks (DPCs) is implemented. The actual storage licenses for SNF and the HAW (which is stored in Gorleben and Rubenow) are limited to 40 years after closing the transport and storage cask. The first license to expire will be the storage license for the interim storage facility in Gorleben in the year 2034. In Germany the decision about a repository site will be taken in the year 2031. To enable the utilities to hand over the SNF and HAW to the repository regime while the current licenses are still valid would require a very fast process licensing and construction of the required facilities at this location. As a delay cannot be excluded, necessary preparations have to be taken on the side of the regulator. In the German Atomic Energy Act precautions have already been taken and consulting the German parliament (Bundestag) is mandatory if inevitable events would require an extension of the currently licensed interim storage period. The new structure with the Federal Office BfE, and two companies for final disposal 'Bundesgesellschaft fuer Endlagerung' (BGE mbH) and interim storage 'Bundesgesellschaft fuer Zwischenlagerung' (BGZmbH) was established in 2017. The Federal Office for Safety of Nuclear Waste Management (BfE) is responsible for regulation in the field of nuclear disposal since 30.07.2016. So the package design approval for DPCs and the storage licenses for SNF will be granted by this office. Furthermore, it is the regulator for the repository and will finally grant a license for the German deep geological repository. Site selection and construction and operation of the repository will be the responsibility of BGE. On January 1, 2018, the BGZ will take over all remaining interim storage facilities operating under a license due to article six of the Atomic Energy Act. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Planning for Material Control and Accountancy at Liquid Fueled Molten Salt Reactors

The purpose of this report is to provide molten salt reactor (MSR) developers and future US Nuclear Regulatory Commission (NRC) license applicants with recommendations for developing an effective and practical material control and accounting (MC&A) plan, focused primarily on MSR designs that use circulating liquid fuel. Because of the breadth of MSR designs, there is no single, generic, detailed MC&A plan that will work for every design. The wide variation of fresh fuel salts, the method and frequency of loading fresh fuel, the reactor system design components (e.g., tanks, filtration systems, chemical processing streams), and waste streams will determine the specific measurement locations and instrumentation that can best meet MC&A objectives throughout an MSR facility. Additionally, MSR designs are rapidly evolving, and new design features and deployment scenarios that will affect MC&A are being explored and pursued. This report defines a generic MC&A approach that was developed for terrestrial (as opposed to maritime) deployments to meet the intent of NRC domestic safeguards and MC&A. MSR license applicants should consider nuclear safeguards (both domestic and international) and security throughout the design, as early as the preconceptual design phase. MC&A of special nuclear material (SNM) is an aspect of the NRC’s domestic safeguards program, alongside physical protection. Because liquid-fueled MSRs are reactors with SNM in nondiscrete (or item) form, it is likely that the NRC may require liquid-fueled MSR license applicants to submit a formal MC&A plan as a part of their license application. Currently, the NRC licensing protocol presents a challenge because the NRC MC&A regulations have not been updated to accommodate advanced reactors, including types of MSRs. Because no liquid-fueled MSR has been licensed for operation at the time of this report, no template or precedence for a successfully licensed MSR MC&A plan exists. However, the MSR license applicant can take advantage of the NRC’s published commitments to performance-based regulations. The authors recommend that the license applicant, or MSR designers, develop an MC&A plan throughout the design lifecycle and plan to submit a detailed MC&A program description, or MC&A plan, to the NRC as a part of a license application. No MC&A plan template or guidance exists that is specific to liquid-fueled MSRs. The authors recommend that license applicants discuss the topic of MC&A during preapplication engagement. Because of the uniqueness of MC&A for liquid fueled MSRs, the authors recommend that liquid fueled MSR developers engage with the NRC on the topic of MC&A in the early phases of its design development and follow up any time there are significant modifications in design plans that would affect MC&A. For example, topics like modifications in fuel handling processes, changes in uranium enrichment, or additional chemical processing streams added to the design could be discussed with the NRC specifically on the topic of MC&A.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Regulatory Basis for Dry Spent Nuclear Fuel Storage Canister Inspections

Nuclear power plants in the United States began moving Spent Nuclear Fuel (SNF) from wet storage to dry storage in Independent Spent Fuel Storage Installations (ISFSIs) in 1986 at Surry station in Virginia. Dry storage represented an innovative solution to the problem created by the U.S. government's failure to fulfill its obligation to begin removing SNF from power plant sites. Today, about 70 ISFSIs have been placed into operation on the sites of current, or former nuclear power plants. There are currently over 2,200 SNF dry storage systems (DSSs) in service at these locations. Thirteen of these ISFSIs are located at sites with no operating reactor, and this number is due to increase in the coming years. Operating nuclear power stations use ISFSI storage to maintain wet storage capacity for recently discharged SNF. Permanently shutdown nuclear power plants use ISFSI storage to allow decommissioning and dismantlement of the power plant structures, systems, and components. The U.S. Nuclear Regulatory Commission (NRC) regulates the licensing, construction, and operation of ISFSIs under Title 10 of the U.S. Code of Federal Regulations, Energy, Part 72, Licensing Requirements for the Independent Storage of Spent Nuclear Fuel, High-Level Radioactive Waste, and Reactor-Related Greater than Class-C Waste (10 CFR 72). When the regulations in 10 CFR 72 were created around 1980, 20 years was chosen by the NRC as the license term for a specific ISFSI license and later, for a DSS Certificate of Compliance (CoC). Twenty years was, at the time, believed to be a sufficient time period for on-site interim dry storage of spent nuclear fuel before the U.S. government began moving the spent fuel away from the plant site for final disposal. Little, if any consideration was given to providing a regulatory framework for extending ISFSI licenses and DSS CoCs beyond 20 years at that time. However, shortly after the turn of the century, with still no federal program for removing SNF from reactor sites on the near-term horizon it became apparent that most DSSs would be required to remain in service at the ISFSIs beyond the initial 20-year license term. Operation beyond the original license term requires the specific license or the DSS CoC (used at a general license ISFSI) to be renewed. The requirements for renewal of a specific ISFSI license or a DSS CoC include addressing age-related degradation of structures, systems, and components that perform or support safety functions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Impacts of Closed-Loop Pumped Storage Hydropower

The goal of this report is to help license applicants, resource agencies, and other members of the hydropower community involved in closed-loop pumped storage hydropower permitting and licensing process, focus the scope of environmental reviews, and more quickly identify impacts with project nexus and potential mitigation measures for these impacts. Pumped storage hydropower (PSH) is an energy storage technology that uses energy to pump water up from a lower reservoir to an upper reservoir where water is stored until electricity is needed and the water is released to a lower reservoir passing through turbines. Closed-loop PSH—PSH that is not continuously connected to a naturally flowing water feature—is one of the lowest greenhouse gas emitting energy storage technologies and is therefore a critical part of the transition to renewable energy (Simon et al. 2023). Proposals for closed-loop PSH facilities in the United States currently account for more than 40% of original licenses and 99% of potential generation capacity in the Federal Energy Regulatory Commission (FERC) hydropower licensing pipeline (Johnson et al. 2023). While closed-loop PSH facilities can have lower environmental impacts than open-loop PSH facilities, no closed-loop facilities have been constructed in the United States to enable direct accounting of project impacts and efficacy of mitigations. Many proposals for closed-loop PSH submitted to FERC are abandoned early in the permitting and licensing process prior to license applications and environmental assessments, so there is little documentation describing potential project impacts and proposed mitigations. The newness of closed-loop PSH proposals in the United States may mean that tribal, federal, and state agencies with authorities for cultural and natural resources protection and management involved in the FERC licensing process may not have experience with closed-loop PSH regulation. Moreover, many proposed closed-loop PSH facilities are in areas that do not have high concentrations of conventional hydropower, so these agencies may also be unfamiliar with the FERC hydropower licensing process. The goal of this report is to help license applicants, resource agencies, and other members of the hydropower community focus the scope of environmental review for the closed-loop PSH development, licensing, and federal authorization process enabling quicker identification of potential impacts, mitigations, and situations where mitigation may not be possible. We found that environmental impacts of closed-loop PSH are highly site-specific, and generalizations about the types of environmental impacts across closed-loop PSH projects are difficult to make. Environmental impacts of closed-loop PSH are like those for open-loop PSH with a few exceptions including water sourcing, which can lead to delays and contention due to potential complexities with water rights, impacts to aquatic resources, and greenhouse gas emission potential. Cultural resource impacts were commonly reported in National Environmental Policy Act (NEPA) documents reviewed and discussed in interviews, but in many cases such impacts cannot be mitigated.

13 HYDRO ENERGY↗

Developments in the Regulatory Framework of Interim Storage of Spent Nuclear Fuel (SNF) in Germany - 17374

According to article 6 of the German Atomic Energy Act, storage of nuclear fuel requires a license, granted by the competent authority in this field, which has been the Federal Office of Radiation Protection (BfS) until July 2016 and currently is the Federal Office for the Safety of Nuclear Waste Management (BfE). A first license was granted in 1983 for storage of spent nuclear fuel (SNF) and vitrified high level waste (HAW) at the interim storage facility in Gorleben. This license was reviewed in 1995. Dry Interim storage at the NPP sites in its current form started in 2002 in the interim storage facility next to the NPP Lingen. Since that time at each site of an operational NPP storage facilities were licensed and erected. Thus additionally to the three central storage facilities (Ahaus, Gorleben and Rubenow) there are now 12 storage facilities onsite the NPPs. All of these facilities use dry storage in metallic dual purpose casks (DPCs). The actual storage licenses for SNF and the HAW (which is stored in Gorleben and Rubenow) are limited to 40 years after closing the transport and storage cask. The first license to expire will be the storage license for the interim storage facility in Gorleben in the year 2034. The German 'Programme for the safe and responsible management of spent fuel and radioactive waste' expects to take the disposal facility into operation in the year 2050. Thus necessary preparations for interim storage till that time have to be taken on the side of the regulator. In the German Atomic Energy Act precautions have already been taken and a consulting of the German parliament (Bundestag) is mandatory if inevitable events would require an extension of currently licensed interim storage period. In the year 2016, the regulatory body in Germany was given a new structure. The BfS was formerly competent authority in the field of radiation protection since 1989. It had competencies for ionizing and non-ionizing radiation protection (e.g. mobile phone radiation, high voltage power lines and the effects of electric fields), licensing storage of spent nuclear fuel and as the operator of facilities for final disposal. Now there is a new structure with two Federal Offices (BfS and BfE) and a federal company for final disposal (BGE). The BfE is responsible for regulation in the field of nuclear disposal since 30.07.2016. So the package design approval for DPCs and the storage licenses for SNF are now granted by this office. The search for a repository site will be coordinated there as well. The site selection, construction and operation of the repository will be in the responsibility of BGE. The parts of the former BfS dealing with recovery of the waste from Asse (a former salt mine used for disposal research) and the construction of the repository Konrad (for low and medium level radioactive waste) will be transferred into that company. It is planned to incorporate the German company for construction and management of waste disposal facilities (DBE) which is owned by the German utilities as well. The BfS will focus on the scientific foundations and further advancement of radiation protection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Code Qualification of Structural Materials for AFCI Advanced Recycling Reactors

This report summarizes the further findings from the assessments of current status and future needs in code qualification and licensing of reference structural materials and new advanced alloys for advanced recycling reactors (ARRs) in support of Advanced Fuel Cycle Initiative (AFCI). The work is a combined effort between Argonne National Laboratory (ANL) and Oak Ridge National Laboratory (ORNL) with ANL as the technical lead, as part of Advanced Structural Materials Program for AFCI Reactor Campaign. The report is the second deliverable in FY08 (M505011401) under the work package 'Advanced Materials Code Qualification'. The overall objective of the Advanced Materials Code Qualification project is to evaluate key requirements for the ASME Code qualification and the Nuclear Regulatory Commission (NRC) approval of structural materials in support of the design and licensing of the ARR. Advanced materials are a critical element in the development of sodium reactor technologies. Enhanced materials performance not only improves safety margins and provides design flexibility, but also is essential for the economics of future advanced sodium reactors. Code qualification and licensing of advanced materials are prominent needs for developing and implementing advanced sodium reactor technologies. Nuclear structural component design in the U.S. must comply with the ASME Boiler and Pressure Vessel Code Section III (Rules for Construction of Nuclear Facility Components) and the NRC grants the operational license. As the ARR will operate at higher temperatures than the current light water reactors (LWRs), the design of elevated-temperature components must comply with ASME Subsection NH (Class 1 Components in Elevated Temperature Service). However, the NRC has not approved the use of Subsection NH for reactor components, and this puts additional burdens on materials qualification of the ARR. In the past licensing review for the Clinch River Breeder Reactor Project (CRBRP) and the Power Reactor Innovative Small Module (PRISM), the NRC/Advisory Committee on Reactor Safeguards (ACRS) raised numerous safety-related issues regarding elevated-temperature structural integrity criteria. Most of these issues remained unresolved today. These critical licensing reviews provide a basis for the evaluation of underlying technical issues for future advanced sodium-cooled reactors. Major materials performance issues and high temperature design methodology issues pertinent to the ARR are addressed in the report. The report is organized as follows: the ARR reference design concepts proposed by the Argonne National Laboratory and four industrial consortia were reviewed first, followed by a summary of the major code qualification and licensing issues for the ARR structural materials. The available database is presented for the ASME Code-qualified structural alloys (e.g. 304, 316 stainless steels, 2.25Cr-1Mo, and mod.9Cr-1Mo), including physical properties, tensile properties, impact properties and fracture toughness, creep, fatigue, creep-fatigue interaction, microstructural stability during long-term thermal aging, material degradation in sodium environments and effects of neutron irradiation for both base metals and weld metals. An assessment of modified versions of Type 316 SS, i.e. Type 316LN and its Japanese version, 316FR, was conducted to provide a perspective for codification of 316LN or 316FR in Subsection NH. Current status and data availability of four new advanced alloys, i.e. NF616, NF616+TMT, NF709, and HT-UPS, are also addressed to identify the R&D needs for their code qualification for ARR applications. For both conventional and new alloys, issues related to high temperature design methodology are described to address the needs for improvements for the ARR design and licensing. Assessments have shown that there are significant data gaps for the full qualification and licensing of the ARR structural materials. Development and evaluation of structural materials require a variety of experimental facilities that have been seriously degraded in the past. The availability and additional needs for the key experimental facilities are summarized at the end of the report. Detailed information covered in each Chapter is given.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Negotiating Terms and Conditions: An Overview of the Federal Energy Regulatory Commission Hydropower Settlement Agreement Process

The process for obtaining, transferring, or surrendering a Federal Energy Regulatory Commission (FERC) hydropower license or exemption from licensing can be a series of complex negotiations. In many instances, the process may include stakeholders with different and/or competing perspectives or objectives related to the original license, new license (i.e., relicense), transfer of a license, or surrender of a license. Divergent perspectives and objectives can lead to disputes among project participants, which may impact the development of FERC license terms and conditions. One mechanism to resolve disputes between project participants involving a FERC authorization is informal and formal settlement agreement conferences, which often result in settlement agreements addressing the disputed issues. This report provides hydropower stakeholders with a better understanding of the FERC settlement agreement process, including information on: How to initiate a settlement agreement. The procedural steps associated with the settlement agreement process. The legal standards the Commission must adhere to when determining whether settlement agreement provisions can become lawful and enforceable terms or conditions of a FERC authorization. Examples of settlement agreement provisions included as license terms and conditions or in off-license agreements from a collection of settlement agreements and Commission orders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Chemical Process Safety at TRISO-Based, Metal-Based, and Salt-Based Fuel Fabrication Facilities: Technical Assessment and Guidance Assessment

As part of efforts to prepare for potential and ongoing safety reviews for licensing of advanced non-light-water reactor fuel cycles, the U.S. Nuclear Regulatory Commission (NRC) tasked Pacific Northwest National Laboratory to prepare an assessment on the state of knowledge of potential chemical processes at fuel cycle facilities supporting the front end of these fuel cycles, and to assess the associated regulatory guidance. This report provides a technical assessment of chemical process safety considerations to support NRC licensing reviews of fabrication processes for tri-structural isotropic (TRISO) based, metallic-based, and salt-based fuels. The assessments involved collecting publicly available information on the fuel fabrication processes to (i) identify the operational process steps, characteristics and chemicals involved, (ii) identify the physical safety considerations and health safety considerations during licensing reviews of the various process steps, and (iii) collect information to support assessments of severity of accidents and potential mitigative measures to be implemented. The assessment provides a foundational basis on chemical process safety considerations for advanced fuel fabrication activities, although it is recognized that licensing reviews may necessitate design-specific considerations. The specific conditions under which chemical hazards emerge will require process-specific considerations, highlighting the importance of process-informed interpretation. The assessment also determined that exposure guidelines and limits to assess the consequences of acute exposures are limited for some chemicals, although alternative limits and supplementary information from databases or safety data sheets provide sufficient information to evaluate consequences of acute exposures. In addition, it was identified that metallic and salt fuel fabrication processes may involve beryllium, which is an exposure hazard. The regulatory framework for the licensing of advanced fuel cycle facilities, per 10 CFR Part 70 Domestic Licensing of Special Nuclear Material, is deemed robust and flexible to address the chemical safety considerations in this report. A review was conducted on various regulatory guidance and technical basis documents. This included reviewing NUREG-1520, Revision 2, Standard Review Plan for Fuel Cycle Facilities License Applications – Final Report and the process descriptions in Appendix A of NUREG/CR-6410, Nuclear Fuel Cycle Facility Accident Analysis Handbook, to address advanced fuel types. As new fuels will involve process-specific chemical uses, process-specific considerations are provided in this report. Additionally, it is noted that the U.S. Department of Energy protective action criteria database includes Temporary Emergency Exposure Limits (TEELs) for process-specific chemicals. This report provides technical information to support chemical safety assessments of new advanced fuel cycle facilities and identifies technical and safety information to support licensing reviews. No regulatory barriers were identified for the licensing of advanced fuel cycle facilities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗