Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LANDING SYSTEM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Analysis and design of a capsule landing system and surface vehicle control system for Mars exploration

Problems related to an unmanned exploration of the planet Mars by means of an autonomous roving planetary vehicle are investigated. These problems include: design, construction and evaluation of the vehicle itself and its control and operating systems. More specifically, vehicle configuration, dynamics, control, propulsion, hazard detection systems, terrain sensing and modelling, obstacle detection concepts, path selection, decision-making systems, and chemical analyses of samples are studied. Emphasis is placed on development of a vehicle capable of gathering specimens and data for an Augmented Viking Mission or to provide the basis for a Sample Return Mission.

Gisser, D. G.↗

Analysis and design of a capsule landing system and surface vehicle control system for Mars exploration

Problems related to the design and control of an autonomous rover for the purpose of unmanned exploration of the planets were considered. Building on the basis of prior studies, a four wheeled rover of unusual mobility and maneuverability was further refined and tested under both laboratory and field conditions. A second major effort was made to develop autonomous guidance. Path selection systems capable of dealing with relatively formidable hazard and terrains involving various short range (1.0-3.0 meters), hazard detection systems using a triangulation detection concept were simulated and evaluated. The mechanical/electronic systems required to implement such a scheme were constructed and tested. These systems include: laser transmitter, photodetectors, the necessary data handling/controlling systems and a scanning mast. In addition, a telemetry system to interface the vehicle, the off-board computer and a remote control module for operator intervention were developed. Software for the autonomous control concept was written. All of the systems required for complete autonomous control were shown to be satisfactory except for that portion of the software relating to the handling of interrupt commands.

Gisser, D. G.↗

Analysis and design of a capsule landing system and surface vehicle control system for Mars exploration

A number of problems related to unmanned exploration of planets or other extraterrestrial bodies with Mars as a case in point were investigated. The design and evaluation of a prototype rover concept with emphasis on mobility, maneuverability, stability, control and propulsion is described along with the development of terrain sensor concepts and associated software for the autonomous control of any planetary rover. Results are applicable not only to the design of a mission rover but the vehicle is used as a test bed for the rigorous evaluation of alternative autonomous control systems.

Gisser, D. G.↗

Definition of Tire Properties Required for Landing System Analysis

The data bank constructed provided two basic advantages for the user of aircraft tire information. First, computerization of the data bank allowed mechanical property data to be stored, corrected, updated, and revised quickly and easily as more reliable tests and measurements were carried out. Secondly, the format of the book which can be printed from the computerized data bank can be easily adjusted to suit the needs of the users without the great expense normally associated with reprinting and editing books set by ordinary typography.

Clark, S. K.↗

Perpetual factors involved in performance of air traffic controllers using a microwave landing system

The task involved the control of two simulated aircraft targets per trial, in a 37.0 -km radius terminal area, by means of conventional radar vectoring and/or speed control. The goal was to insure that the two targets crossed the Missed Approach Point (MAP) at the runway threshold exactly 60 sec apart. The effects on controller performance of the MLS configuration under wind and no-wind conditions were examined. The data for mean separation time between targets at the MAP and the range about that mean were analyzed by appropriate analyses of variance. Significant effects were found for mean separation times as a result of the configuration of the MLS and for interaction between the configuration and wind conditions. The analysis of variance for range indicated significantly poorer performance under the wind condition. These findings are believed to be a result of certain perceptual factors involved in radar air traffic control (ATC) using the MLS with separation of targets in time.

Gershzohn, G.↗

Flying NASA's Terminal Configured Vehicle against the Microwave Landing System

A prototype Boeing 737 aircraft has been received for use in the Terminal Configured Vehicle (TCV) Program, the aim of which is to develop technology for advanced airborne systems and flight procedures to improve terminal area operations in the future ATC environment. The paper discusses the TCV aircraft, its integrated digital electronic displays and flight controls, and the means by which the pilot interfaces with the aircraft to fly precise curved descending approaches under MLS guidance.

Person, L. H., Jr.↗

Evaluation of Microwave Landing System (MLS) effect on the delivery performance of a fixed-path metering and spacing system

Metering and spacing (M & S) system's algorithms described assume an aircraft two dimensional are navigation capability. The three navigation systems compared were: very high frequency omnidirectional range/distance measuring equipment (VOR/DME) and ILS, VOR/DME and + or - 40 MLS, and VOR/DME and + or - 60 MLS. Other factors studied were M & S tentative schedule point location, route geometry effects, and approach gate location effects. Summarized results are: the MLS offers some improvement over VOR/DME and ILS if all approach routes contain computer assisted turns; pilot reaction to moving the gate closer to the runway threshold may adversely affect M & S performance; and coupling en route metering to terminal scheduling transfers most of the terminal holding to more full efficient, higher altitude en route delay.

Credeur, L.↗

Terminal area automatic navigation, guidance, and control research using the Microwave Landing System (MLS). Part 3: A comparison of waypoint guidance algorithms for RNAV/MLS transition

The results of an investigation carried out for the Langley Research Center Terminal Configured Vehicle Program are presented. The investigation generated and compared three path update algorithms designed to provide smooth transition for an aircraft guidance system from DME, VORTAC, and barometric navaids to the more precise MLS by modifying the desired 3-D flight path. The first, called the Zero Cross Track, eliminates the discontinuity in cross track and altitude error by designating the first valid MLS aircraft position as the desired first waypoint, while retaining all subsequent waypoints. The discontinuity in track angle is left unaltered. The second, called the Tangent Path also eliminates the discontinuity in cross track and altitude and choose a new desired heading to be tangent to the next oncoming circular arc turn. The third, called the Continued Track eliminates the discontinuity in cross track, altitude and track angle by accepting the current MLS position and track angle as the desired ones and recomputes the location of the next waypoint. A method is presented for providing a waypoint guidance path reconstruction which treats turns of less than, and greater than, 180 degrees in a uniform manner to construct the desired path.

Pines, S.↗

Terminal area automatic navigation, guidance, and control research using the Microwave Landing System (MLS). Part 4: Transition path reconstruction along a straight line path containing a glideslope change waypoint

The necessary algorithms to reconstruct the glideslope change waypoint along a straight line in the event the aircraft encounters a valid MLS update and transition in the terminal approach area are presented. Results of a simulation of the Langley B737 aircraft utilizing these algorithms are presented. The method is shown to reconstruct the necessary flight path during MLS transition resulting in zero cross track error, zero track angle error, and zero altitude error, thus requiring minimal aircraft response.

Pines, S.↗

Guidance law simulation studies for complex approaches using the Microwave Landing System (MLS)

This report documents results for MLS guidance algorithm development conducted by DAC for NASA under the Advance Transport Operating Systems (ATOPS) Technology Studies program (NAS1-18028). The study consisted of evaluating guidance laws for vertical and lateral path control, as well as speed control, by simulating an MLS approach for the Washington National Airport. This work is an extension and generalization of a previous ATOPS contract (NAS1-16202) completed by DAC in 1985. The Washington river approach was simulated by six waypoints and one glideslope change and consisted of an eleven nautical mile approach path. Tracking performance was generated for 10 cases representing several different conditions, which included MLS noise, steady wind, turbulence, and windshear. Results of this simulation phase are suitable for use in future fixed-base simulator evaluations employing actual hardware (autopilot and a performance management system), as well as crew procedures and information requirements for MLS.

Feather, J. B.↗

Simulation of automatic precision departures and missed approaches using the microwave landing system

Results of simulated precision departures and missed approaches using MLS guidance concepts are presented. The study was conducted under the Terminal Configured Vehicle (TCV) Program, and is an extension of previous work by DAC under the Advanced Transport Operating System (ATOPS) Technology Studies Program. The study model included simulation of an MD-80 aircraft, an autopilot, and a MLS guidance computer that provided lateral and vertical steering commands. Precision departures were evaluated using a noise abatement procedure. Several curved path departures were simulated with MLS noise and under various environmental conditions. Missed approaches were considered for the same runway, where lateral MLS guidance maintained the aircraft along the extended runway centerline. In both the departures and the missed approach cases, pitch autopilot takeoff and go-around modes of operation were used in conjunction with MLS lateral guidance.

Feather, J. B.↗

Flight tests of three-dimensional path-redefinition algorithms for transition from Radio Navigation (RNAV) to Microwave Landing System (MLS) navigation when flying an aircraft on autopilot

This report contains results of flight tests for three path update algorithms designed to provide smooth transition for an aircraft guidance system from DME, VORTAC, and barometric navaids to the more precise MLS by modifying the desired 3-D flight path. The first algorithm, called Zero Cross Track, eliminates the discontinuity in cross-track and altitude error at transition by designating the first valid MLS aircraft position as the desired first waypoint, while retaining all subsequent waypoints. The discontinuity in track angle is left unaltered. The second, called Tangent Path, also eliminates the discontinuity in cross-track and altitude errors and chooses a new desired heading to be tangent to the next oncoming circular arc turn. The third, called Continued Track, eliminates the discontinuity in cross-track, altitude, and track angle errors by accepting the current MLS position and track angle as the desired ones and recomputes the location of the next waypoint. The flight tests were conducted on the Transportation Systems Research Vehicle, a small twin-jet transport aircraft modified for research under the Advanced Transport Operating Systems program at Langley Research Center. The flight tests showed that the algorithms provided a smooth transition to MLS.

Hueschen, Richard M.↗

Aerocapture, Entry, Descent and Landing (AEDL) Human Planetary Landing Systems. Section 10: AEDL Analysis, Test and Validation Infrastructure

Contents include the following: 3 Listing of critical capabilities (knowledge, procedures, training, facilities) and metrics for validating that they are mission ready. Examples of critical capabilities and validation metrics: ground test and simulations. Flight testing to prove capabilities are mission ready. Issues and recommendations.

Arnold, J.↗