Interconnection, Integration, and Interactive Impact Analysis of Microgrids and Distribution Systems

Distribution management systems (DMSs) are increasingly used by distribution system operators (DSOs) to manage the distribution grid and to monitor the status of both power imported from the transmission grid and power generated locally by a distributed energy resource (DER), to ensure that power flows and voltages along the feeders are maintained within designed limits and that appropriate measures are taken to guarantee service continuity and energy security. When microgrids are deployed and interconnected to the distribution grids, they will have an impact on the operation of the distribution grid. The challenge is to design this interconnection in such a way that it enhances the reliability and security of the distribution grid and the loads embedded in the microgrid, while providing economic benefits to all stakeholders, including the microgrid owner and operator and the distribution system operator.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High Density Chip Interconnect Technology Using High Density Glass Interposers

Demands for high density and high speed interconnect solutions are not satisfied by current technology offerings. Platforms such as printed circuit boards (PCBs), ceramic substrates and silicon interposers don’t provide the small form factor nor the I/O density to support 5G or 1Tbps gigabit ethernet solutions. Current solutions also don’t support die to die assembly with integrated tiled solutions for wide area and fanout solutions for lager data and signal processing. A solution with through vias provides an order of magnitude or smaller density supporting much higher density attach and assembly By fabricating a very fine pitch metal filled through glass via solution it’s possible to deliver the necessary improvements in performance, reliability, even higher data speed rates with smaller area and much denser geometries. There are a number of opportunities across a wide variety of industries for through glass interposers as they become the replacement for printed circuit boards (PCBs) and ceramic substrates. The broad array of opportunities include renewable energy, medical electronics (ME), defense electronics (DE)/space and consumer electronics (CE), but likely will impact every industry and market segment. Compared to PCBs, through glass via (TGV) solutions provide the next generation platform for semiconductor assembly improvements. The ability to generate lines, spaces, trenches and vias similar to wafer level geometries delivers wired solutions one to two orders of magnitude smaller than traditional organic PCB and ceramic substrate offerings. Higher density connections also include the thru vias that connect multiple metal layers, fanout. It’s possible to deliver filled metal vias that are 20um diameter with much tighter pitch than can be offered with PCB. Our goal is to provide 20um diameter and smaller via, 50um and smaller pitch, and aspect ratios at 25:1 and greater with hermetically metal filled vias. The goal of CVI is to replace or eliminate PCBs, ceramic substrate and through silicon vias (TSV) providing a glass interposer with metal filled, fiber plugged and/or optional wireless interconnectivity. The end plan is to deliver a glass substrate platform that provides improved electrical performance, versatility, inertness, and much improved cost and cycle time (development, drawing, and delivery) to performance in the form of small millimeter sized substrates or full 8” wafer substrates. Glass delivers an improvement over silicon thru vias (TSV) in the number of processing steps, cost, reliability and cycle time. In addition to metal plugged vias, our glass interposers are capable of fiber and antennae solutions providing two additional very high density and ultra-high speed data transfer capabilities.

36 MATERIALS SCIENCE↗

Evaluating Trade-offs in Potential Exascale Interconnect Topologies

This study looks at the high-level trade-offs for interconnect architectures that are likely to be available in HPC machines in the 2021-2022 timeframe. The study uses multiple simulation models to look at the effects of varying machine size, injection bandwidth and topology for a selected set of benchmark communication patterns. The studies show the sensitivity of various applications to these network parameters. This study can help inform decisions on node size versus number of nodes, which topology is most efficient for our applications, how much injection bandwidth to provision, etc. These simulations only look at interconnects with maximally configured global bandwidth, and studies of networks configured with less will be the subject of future milestones.

97 MATHEMATICS AND COMPUTING↗

Supporting the Nation's Electric Interconnections through Integration of Water into their Long-Term Transmission Planning.

Water is a critical resource in the production of electric power. The purpose of this plan is to extend support to the nation's three electric interconnections toward integrating water issues into their long-range transmission planning. This continued support is at the request of the interconnections. The proposed program leverages prior support as well as that of other similarly focused efforts funded across the Department of Energy (DOE). The effort will utilize a project team lead by Sandia National Laboratories and supported by Argonne National Laboratory, National Renewable Energy Laboratory, and Pacific Northwest National Laboratory. The activities recorded here are meant to provide a menu of potential projects that could be implemented as available resources permit.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Frequency Response Assessment and Improvement of Three Major North American Interconnections due to High Penetrations of Photovoltaic Generation

As photovoltaic (PV) generation penetration increases, the inertial and primary frequency response of North American electric grids after a generation loss disturbance will decrease. This change could negatively influence North American power grids frequency stability. This project produced a series of high PV penetration models from detailed, validated base models of all three U.S. interconnections (Eastern Interconnection, Western Electricity Coordinating Council, and Electric Reliability Council of Texas) so that the effects of increased PV generation on their frequency responses can be fully quantified. Mitigation strategies were also developed and validated using both software and hardware test beds.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evaluating Trade-offs in Potential Exascale Interconnect Technologies

This report details work to study trade-offs in topology and network bandwidth for potential interconnects in the exascale (2021-2022) timeframe. The work was done using multiple interconnect models across two parallel discrete event simulators. Results from each independent simulator are shown and discussed and the areas of agreement and disagreement are explored.

97 MATHEMATICS AND COMPUTING↗

Interconnections Seam Study [Slides]

The Interconnections Seam Study analyzes the grid impacts of increased connections between the Eastern and Western Interconnections in North America.

17 WIND ENERGY↗

An Overview of Inverter-based Resource Interconnection Standards

For the past century, electric power systems have primarily been bulk power systems consisting of generation, transmission, and distribution networks. Now the rapid expansion of distributed renewable power sources (RESs) and the shift from large, conventional synchronous machine resources to smaller-sized resources with diverse generation characteristics become the most significant change in modern power systems. With the increasing penetration of RESs, which are inverter-based resources (IBRs), it is important to develop interconnection standards that define performance and capability criteria for these IBRs. This is necessary to ensure the stable and reliable operation of power systems. This report summarizes the standards for IBRs interconnection in North America.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: 2024 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2023 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require projects seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. The amount of new electric capacity in these queues is growing dramatically, with nearly 2,600 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). However, most projects that apply for interconnection are ultimately withdrawn, and those that are built are taking longer on average to complete the required studies and become operational. Data from these queues nonetheless provide a general indicator for mid-term trends in developer interest.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Western Interconnection Baseline Study

The purpose of the baseline study is to evaluate the degree to which current industry planning processes meet the national 2035 decarbonization goals for the Western Interconnection. This analysis serves as a comparative baseline for the scenario analysis conducted in the NTP Study using a Western Interconnection dataset that is readily available to industry. This baseline analysis differs from the production cost modeling analysis and power flow analysis in the main NTP Study report (forthcoming). In particular, the analysis presented in this report reflects a business-as-usual future with an optimistic build out of specific planned transmission projects and foreseeable generation. In contrast, the NTP Study models a future generation and transmission expansion based on optimization from a capacity expansion model. The analysis presented herein also reflects a 2030 timeframe, whereas the main NTP Study production cost modeling analysis and power flow analysis reflect a 2035 time frame. This baseline analysis utilizes industry’s most reliable data to account for future transmission projects across various stages of development, with a particular focus on those in the permitting stage. Additionally, it incorporates projections for changes in generation capacity (both additions and retirements). This baseline analysis outlines a probable trajectory, given current process and practice, for the future of the bulk power system with a horizon extending to 2030.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Review of Distributed Wind Interconnection Technology and Standards

The objectives of this report are to discuss the uniqueness of power converters in distributed wind (DW), identify challenges in complying with existing standards, prioritize technological innovations to facilitate interconnection of DW energy systems, and, where necessary, propose potential clarifications or revisions to standards. This report evaluates IEEE 1547-2018, IEEE 1547.1-2020, and UL 1741 SB standards and their implications for DW. A standards review and interviews of DW industry stakeholders were conducted to identify challenges in the application of current standards to DW. The study concludes with a combination of recommendations of pathways towards facilitating DW product commercialization and DW interconnection, which draws on participation from multiple stakeholders in the space. These solutions can continue to be explored to improve DW standards compliance, improve the applicability of the standards to DW, reduce certification testing barriers, and ensure the safe and reliable operation of DW energy resources and electric power systems.

17 WIND ENERGY↗

Queued Up: 2026 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2025 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with https://www.interconnection.fyi. Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 50 non-ISO balancing areas), which collectively represent ~98% of currently installed U.S. electric generating capacity.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Solar permitting, inspection, and interconnection cycletimes and requirements

Twenty three small-to-large residential, commercial, and industrial PV installers submitted project-level data for analysis, which included timestamps for major components of the permitting, inspection, and interconnection process as well as contract and installation dates. NREL calculated median timelines for these processes across the authorities having jurisdiction (AHJs) and utilities represented in the data. Also included are relevant permitting requirements for AHJs and interconnection process requirements for utilities. This dataset represents the underlying results shown in the Solar Time-based Residential Analytics and Cycle time Estimator (SolarTRACE) viewer. This dataset has been reviewed but errors may exist, and it may not be comprehensive. Errors in the sources (e.g., AHJ permitting requirements lists from data partners) may be duplicated in the dataset.

14 SOLAR ENERGY↗

Interconnections for fluidic circuits

Circuit elements are grouped on functional basis in rectangular two-dimensional planar arrays or modules. Another interconnection method brings all connections out to module edge. For smaller fluidic circuits, manifold and interconnections are fabricated as single blocks. Advantages of methods are given.

Mangion, C.↗

Manufacture and quality control of interconnecting wire hardnesses, Volume 1

A standard is presented for manufacture, installation, and quality control of eight types of interconnecting wire harnesses. The processes, process controls, and inspection and test requirements reflected are based on acknowledgment of harness design requirements, acknowledgment of harness installation requirements, identification of the various parts, materials, etc., utilized in harness manufacture, and formulation of a typical manufacturing flow diagram for identification of each manufacturing and quality control process, operation, inspection, and test. The document covers interconnecting wire harnesses defined in the design standard, including type 1, enclosed in fluorocarbon elastomer convolute, tubing; type 2, enclosed in TFE convolute tubing lines with fiberglass braid; type 3, enclosed in TFE convolute tubing; and type 5, combination of types 3 and 4. Knowledge gained through experience on the Saturn 5 program coupled with recent advances in techniques, materials, and processes was incorporated.

Source record↗

Development of automatic through-insulation welding for microelectric interconnections

The capability to automatically route, remove insulation from, and weld small-diameter solid conductor wire is presented. This would facilitate the economical small-quantity production of complex miniature electronic assemblies. An engineering model of equipment having this capability was developed and evaluated. Whereas early work in the use of welded magnet wire interconnections was concentrated on opposed electrode systems, and generally used heat to melt the wire insulation, the present method is based on a concentric electrode system and a wire feed system which splits the insulation by application of pressure prior to welding. The work deals with the design, fabrication, and evaluation testing of an improved version of this concentric electrode system. Two different approaches to feeding the wire to the concentric electrodes were investigated. It was concluded that the process is feasible for the interconnection of complex miniature electronic assemblies.

Arnett, J. C.↗

Solar cell welded interconnection development program

Parallel gap welding and ultrasonic bonding techniques were developed for joining selected interconnect materials (silver, aluminum, copper, silver plated molybdenum and Kovar) to silver-titanium and aluminum contact cells. All process variables have been evaluated leading to establishment of optimum solar cell, interconnect, electrodes and equipment criteria for obtainment of consistent high quality welds. Applicability of nondestructive testing of solar cell welds has been studied. A pre-weld monitoring system is being built and will be utilized in the numerically controlled parallel gap weld station.

Katzeff, J. S.↗