Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “INL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Idaho National Laboratory Water Assessment

Established in 1949, Idaho National Laboratory (INL) is part of the U.S. Department of Energy’s (DOE) complex of national laboratories. INL performs work in each of the strategic goal areas of the department: energy, national security, science, and environment, and is the nation’s center for nuclear energy research and development. Located in southeastern Idaho, its physical footprint includes 569,180 acres of federally owned land. A water balance for the fiscal year (FY) 2022 year was conducted for INL to identify major water using equipment and calculate the end-use categories. FY 2022 was selected as the evaluation year per the DOE Sustainability Performance Office. This report provides an analysis of facilities on the INL Site operated by Battelle Energy Alliance, LLC (BEA). This water balance report focused on the Advanced Test Reactor (ATR) Complex, Materials and Fuels Complex, Idaho Falls campus, and Central Facilities Area campuses, which consumed 98% of the 540,611 thousand gallons (kGal) of water used by INL in FY 2022. The resulting water balance identified the use categories for 75.3% of the FY 2022 water consumption.

99 GENERAL AND MISCELLANEOUS↗

Energy Technology Proving Ground Program Plan

New methods of energy production and distribution are required to meet clean energy goals and demands across all U.S. energy sectors. Idaho National Laboratory’s (INL) Integrated Energy Systems (IES) initiative is enabling clean energy research, development, and demonstration (RD&D) activities. To date, IES demonstration programs have been limited by distributed infrastructure and a lack of large-scale facilities to accommodate industry-scale research of Technical Readiness Level (TRL) 6-8 technologies. The IES initiative plans to eliminate these constraints by establishing a new research complex at INL known as the Energy Technology Proving Ground (Proving Ground) to be led by the Energy and Environment Science and Technology Directorate. The Energy and Environment Science and Technology (EES&T) directorate, one of five Idaho National Laboratory (INL) RD&D organizations, focuses on clean energy technologies that anchor the industry-enabling research of the Proving Ground. The Proving Ground will combine diverse clean energy systems into lean integrated test bed of independent multiscale capabilities available to the government and commercial industries to perform research; and will enable INL’s goal of becoming a Net-Zero entity by 2031. This program encompasses existing and new research space at both the in-town Research and Education Campus (REC) and the Arco desert site (the Site). The Proving Ground will support the maturation of IES technologies from TRL 1 through 8 by providing the infrastructure and capabilities needed to sustain a continuum of RD&D from basic science to industry-scale. To establish The Proving Ground and meet INL’s net-zero goals by 2031, nine research program areas have been identified within the IES initiative that require expanded and new capital infrastructure. This program plan provides guidance for establishing the Proving Ground at the Site for plug-and-play pilot testing and proofing of integrated energy system functionality including fission and renewable energy sources for industry driven application platforms.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy Storage Grand Challenge - RFI response

Idaho National Laboratory (INL) is operated by Battelle Energy Alliance LLC for the U.S. Department of Energy (DOE). INL conducts research in energy storage (ES) and ancillary fields for several DOE offices including, EERE, NE, FE, and OE. In addition, INL conducts related research for DOD, DHS, state agencies, utilities, and technology developers. INL has developed significant expertise in ES. In July 2020, DOE released the Energy Storage Grand Challenge (ESGC) Roadmap and in conjunction, a Request for Information (RFI) regarding the content of the roadmap. INL is qualified to provide a response to the RFI.

13 HYDRO ENERGY↗

Nevada National Security Site V3XA Spherical Explosive Confinement Vessel Awareness Package

This report summarizes the plans and activities that will facilitate shipment of the V3XA experimental spheres (a.k.a., Nevada Spheres) from the Nevada National Security Site (NNSS) to the Idaho National Laboratory’s (INL) Advanced Mixed Waste Treatment Project (AMWTP). The spheres require shipment to INL to be segmented, characterized, and repackaged for ultimate disposal at the Waste Isolation Pilot Plant (WIPP). The NNSS does not currently have the facilities or safety basis to perform these activities. The INL has the facilities, the INL M&O contractor owns an 8-120B cask, and AMWTP has a WIPP Waste Acceptance Criteria approved characterization program. The NNSS has shipped other legacy transuranic waste to INL for WIPP certified characterization in the past.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effects of Neutron Irradiation on the Micro/Nano Scale Structure and Fission Product Distribution of TRISO Coated Particle Fuel Kernels from AGR Experiments

The Advanced Reactor Technologies (ART) Program at Idaho National Laboratory (INL) includes the Advanced Gas Reactor (AGR) fuel development and qualification program that consists of fuel fabrication, experiment irradiations, post-irradiation examination (PIE) and safety testing to assess tristructural isotropic (TRISO) fuel performance during normal irradiation and under potential accident conditions. Advanced microscopy work on selected AGR-1 and AGR-2 unirradiated and irradiated fuel specimens is performed as part of the PIE effort. PIE work on fuel from the first experiment irradiation, AGR-1, began at INL in April 2010, and AGR-2 PIE began at INL in July 2014. This work scope includes University of Florida (UF) performing advanced electron microscopy examination and analysis using facilities at the Center for Advanced Energy Studies (CAES), INL or UF’s electron microscopy facilities. Electron microscopic examination and analysis may include scanning transmission electron microscopy (STEM), transmission electron microscopy (TEM), selected area diffraction (SAD), electron energy loss spectroscopy (EELS), electron dispersive spectroscopy (EDS) and atom probe tomography (APT) on the fuel kernels of TRISO-coated fuel particles. The electron microscopy lamellae will be provided by INL and will be available at CAES or Irradiated Materials Characterization Laboratory (IMCL).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Nuclear Science User Facilities High Performance Computing: Provide a Science Gateway for HPC Users

Idaho National Laboratory (INL), supported by the Department of Energy Office of Nuclear Energy (DOE-NE) through the Nuclear Science User Facilities (NSUF), provides direct access to the Barracuda Virtual Reactor and 18 Multiphysics Object-Oriented Simulation Environment (MOOSE) applications via a web-based science gateway developed using Open Ondemand on the INL high performance computing (HPC) systems. This gateway features the computational tools of the Nuclear Computational Resource Center (NCRC) and the computing resources of the INL high performance computing systems. These computational tools are a key foundation of collaboration and innovation in nuclear energy systems research. High performance computing resources and INL staff directly support the mission and objectives of DOE-NE. The Barracuda Virtual Reactor was the first science gateway deployed in Jan 2021 to support NSUF users. In July 2021, the science gateway was expanded to support access to NCRC codes for use across all supported INL HPC systems. The HPC science gateway currently supports 20 total applications. The gateway also includes access to training resources specific to NCRC tools.

99 GENERAL AND MISCELLANEOUS↗

Development of Remote Cutting Tools for use at ATR - 20438

As a result of years of operations of the Advanced Test Reactor (ATR) at the Idaho National Lab (INL), the ATR canal has become congested due to the storage of materials including waste consisting of highly irradiated remote handled (RH) metals. In order to support its continuing nuclear mission the ATR requires canal space to support fuel storage and future core internal change out (CIC) components. INL staff determined that the canal must be cleaned out and waste removed to efficiently utilize the valuable canal floor space. It was determined that a methodology for processing, packaging, characterizing, and removing current and future irradiated hardware from the ATR canal is needed. Orano Federal Services (OFS) and its subcontractor Babcock Services Inc. (BSI) were selected to provide remote tooling in order to safely and efficiently size reduce the material currently stored in the ATR canal. INL developed detailed requirements that established the design and performance requirements for the tooling. Orano TN and BSI had recently successfully completed similar tasks in clearing highly activated materials from spent fuel pools and canals at commercial nuclear plants. That experience directly translated into a proven approach that could be used at the ATR thereby saving time and money and lowering risks. Based on BSI's demonstrated proficiency in the design and deployment of remote size reduction specialty tooling at comparable commercial facilities, Orano Federal Services was confident that a solution to INL's requirements could be delivered. The tooling had to be designed to be compatible with the operational requirements of the ATR canal as well as the functionality needed by the facility operators that will use the equipment. Some of the major design requirements and functions of the equipment included remote operations, capability to shear highly irradiated sections of aluminum and steel tubing, pipe, and components ranging in size from 0.6 cm to 16.5 cm diameter into 1.5 m -1.8 m lengths, utilizing buoyancy compensation to assist with underwater operations, and use commercially available existing technology and components as much as practical. The design team evaluated and selected commercially available equipment that could be modified to meet the design and performance specifications. In addition, a waste sizing table (WST) was designed and fabricated to further ensure the size reduction equipment would perform as expected and give the facility operators a stable and usable remote, underwater work platform. After successful development of the tooling, a mock up test and operator training was conducted to ensure the tooling performed as expected and met the requirements of INL. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Drop Analysis of a Department of Energy Standard Canister Containing Fort Saint Vrain SNF– 24138

DOE manages over 300 types of SNF, many of which are located at the INL site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage (RRDS) is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in on-site storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale RRDS program at the INL site. One critical aspect of RRDS is the ability to certify the DOE Standard Canister and its associated transportation package in accordance with 10 CFR 71 for offsite transportation. Depending on the SNF type and transportation strategy, DOE Standard Canisters may be required to maintain structural integrity under hypothetical accident scenarios (e.g., drop events). The DOE Standard Canisters have been tested and analyzed under various SNF loading configurations and accident drop events in support of the Idaho Spent Fuel Facility and other DOE programs; however, no analysis has yet been completed in support of the recently initiated Road-Ready Demonstration. This paper presents preliminary results from a finite element analysis of the Ø45.7 cm × 4.6 m (Ø18 in. × 15 ft) DOE Standard Canister under the 9 m drop at 80 degrees off-vertical drop scenario considered in previous INL tests and analyses. It considers the Fort St. Vrain spent nuclear fuel loading configuration proposed for the Road-Ready Demonstration, uses updated material properties, and applies the strain-based acceptance criteria established in ASME Boiler and Pressure Vessel Code’s Section III, Division 3 rules for storage and transportation spent nuclear fuel containments. This updated analysis is compared to previous DOE Standard Canister drop analyses. Preliminary results from the updated analysis show that certain regions of the containment exceed the allowable limits during the accidental drop event. However, these regions are limited to components performing a non-structural function. While further work on this analysis will be pursued, this analysis serves as the foundation for formal calculations used to support applicable certification efforts of the RRDS system at INL.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Drop Analysis of a Department of Energy Standard Canister Containing Fort Saint Vrain SNF

DOE manages over 300 types of SNF, many of which are located at the INL site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage (RRDS) is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in on-site storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale RRDS program at the INL site. One critical aspect of RRDS is the ability to certify the DOE Standard Canister and its associated transportation package in accordance with 10 CFR 71 for offsite transportation. Depending on the SNF type and transportation strategy, DOE Standard Canisters may be required to maintain structural integrity under hypothetical accident scenarios (e.g., drop events). The DOE Standard Canisters have been tested and analyzed under various SNF loading configurations and accident drop events in support of the Idaho Spent Fuel Facility and other DOE programs; however, no analysis has yet been completed in support of the recently initiated Road-Ready Demonstration. This paper presents preliminary results from a finite element analysis of the Ø45.7 cm × 4.6 m (Ø18 in. × 15 ft) DOE Standard Canister under the 9 m drop at 80 degrees off-vertical drop scenario considered in previous INL tests and analyses. It considers the Fort St. Vrain spent nuclear fuel loading configuration proposed for the Road-Ready Demonstration, uses updated material properties, and applies the strain-based acceptance criteria established in ASME Boiler and Pressure Vessel Code’s Section III, Division 3 rules for storage and transportation spent nuclear fuel containments. This updated analysis is compared to previous DOE Standard Canister drop analyses. Preliminary results from the updated analysis show that certain regions of the containment exceed the allowable limits during the accidental drop event. However, these regions are limited to components performing a non-structural function. While further work on this analysis will be pursued, this analysis serves as the foundation for formal calculations used to support applicable certification efforts of the RRDS system at INL.

42 ENGINEERING↗

Special Considerations for the Removal and Disposal of Micro-Reactor Experiments

Idaho National Laboratory (INL) is preparing to host several microreactor experiments through 2030 and beyond. Two new test beds currently under development will operate as microreactor or nuclear system experiment user facilities. Test bed experiments will be performed in series, with each nuclear experiment installed, operated, and removed before installation of the subsequent experiment. The necessarily brief transition period between experiments introduces unique equipment removal and radioactive waste disposal challenges. This paper evaluates equipment removal and radioactive waste management topics associated with tight sequencing of nuclear experiments and presents some of the solutions and approaches currently planned to meet these special considerations for one such experiment, the Molten Chloride Reactor Experiment (MCRE), slated for operation at INL’s Laboratory for Operation and Testing in the United States (LOTUS). The MCRE project is a collaboration between Southern Company Services, TerraPower, and INL, among others, to provide integral nuclear data that will advance molten salt fast reactor technology. MCRE will be the first critical fast-spectrum circulating fuel system ever operated and the first experiment operated in the LOTUS test bed. The experiment will nominally operate at zero power with planned low power excursions as part of operational planning for MCRE has been to minimize at-power operations to limit fission product formation while still achieving experimental objectives. After the experiment is complete, MCRE will be allowed to radioactively decay for a short period (nominally 90 days) prior to system defueling, flushing, removal, and disposal of all MCRE equipment, readying the test bed for the next nuclear experiment. Equipment removal and radioactive waste disposal have been integral to MCRE project planning since the Cooperative Research and Development Agreement was formalized in 2021. Due to requirements for future use of the test bed, the MCRE system, of necessity, must be removed in a much shorter time frame than typical for historic reactor decommissioning projects at INL. This results in minimal time for radioactive decay, resulting in not only elevated radiation dose rates but also the presence of short-to-medium-lived isotopes not typically encountered in the reactor decommissioning and radioactive waste management space. Additional unique constraints placed on the project include lack of intrinsic remote-operations capabilities in the test bed, space constraints in the test bed once MCRE has been installed, and contamination minimization requirements to return the test bed to as-found conditions to enable future use. This paper discusses planned solutions to these challenges. Approaches for implementing remote or semi-remote technologies in a non-hot cell environment with limited space availability are discussed. The paper also summarizes the systems engineering approach for concept development and design of equipment removal systems, which are being implemented concurrent with the MCRE design phase, providing feedback to system designers to incorporate features enabling efficient and safe equipment removal approaches. The timing of this paper at a relatively early phase of the project is meant to highlight the importance of early planning for nuclear system decommissioning while reactor design is ongoing to allow design feedback on componentry driven from decommissioning system needs. As new, innovative nuclear reactor technologies enter the nuclear market sector, reactor experiments are crucial for providing new integral nuclear data that establish safe operational margins for technology advancement. Microreactor experiments at INL will require safe, effective, and timely decommissioning approaches, which in turn require nuclear systems designed to expedite decommissioning. In addition to the advancement of nuclear reactor technologies, these nuclear experiments provide an opportunity to demonstrate, deploy, and test new removal and disposal capabilities to support the next generation of nuclear reactor technology.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High Performance Heat Pipe Power Transient Testing at SPHERE Facility

Microreactors are being researched, designed, and built at Idaho National Laboratory (INL). Microreactors are small reactors defined at less than 20MW of power. These reactor concepts are also being looked at throughout industry for various applications. An important aspect of these reactor designs is economic feasibility i.e. lower overnight capital cost. The driving factors for implementing microreactors are quick setup and takedown, minimal operators, and the ability to manufacture them readily and to fit in mid-sized containers for transport. A specific area of research to aid in successful integration of these factors within the designs is passive heat removal of the core’s thermal power. Interest in heat pipes to achieve this passive heat removal has been shown across multiple industry partners. Because of this interest, INL has developed a test facility to facilitate experimental tests for sodium filled heat pipes. INL has developed the Single Primary Heat Extraction and Removal Emulator (SPHERE) facility to run experiments on high performance, sodium filled heat pipes. As mentioned above, heat pipes are passive heat transfer devices. Radially, heat pipes are broken up into an outer wall, a small annular gap, a wick structure, and a centerline gap. They function by utilizing latent heat transfer. Heat pipes are traditionally separated into three regions, an evaporator (heat input), an adiabatic region, and finally a condenser region (heat removal). As heat is being applied to the evaporator, the working fluid undergoes a phase change to a vapor. This phase change causes a differential pressure across the axial length of the pipe driving flow down the center gap of the heat pipe. The vapor flows down past the adiabatic region to the condenser where the heat is removed. This heat removal forces the working fluid to phase change back to a liquid. The wick structure is then utilized to drive the flow back towards the evaporator by capillary forces. This backflow is aided by the annular gap. Because this heat transfer mechanism functions with latent heat transfer, the heat pipe is close to isothermal down the axial length. Heat pipes can operate under a wide range of working fluids. Considerations for these working fluids are primarily driven by operating temperatures amongst other important factors based around overall performance. Sodium filled heat pipes operate from 450°C up to 900°C. This temperature range works well for the current microreactor designs. In conjunction with this experimental capability, INL has developed a modeling software to simulate heat pipe physics within reactor cores. This modeling software is called Sockeye and functions under the established INL Multiphysics Object Oriented Simulation Environment (MOOSE). SPHERE also supports Sockeye development by providing the modeling team with experimental data on an array of setups and operating parameters to support validation efforts. A power transient experiment was performed utilizing the SPHERE facility to continue to aid with Sockeye development. The testing followed a proposed test plan to ramp up and down the temperature of the heat pipe. Sockeye models steady state heat pipe operation with high accuracy, the data provided by the power transient testing aims to assist with the validation efforts and further enhance transient modeling capability of the tool [2].

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An Integrated ML/AI Framework for Digitizing, Structuring and Searching DOE U-TRU-Fuels Data with Gap Analysis of Non-DOE Records

The U.S. Department of Energy (DOE) Advanced Fuels Campaign (AFC) is advancing transmutation fuel technologies to reduce long-lived radioactive waste by converting minor actinides into shorter-lived or stable elements through irradiation in sodium-cooled fast reactors. Key experiments such as AFC-1, AFC-2, FUels for the transmutation of Trans-URanium elements In phéniX (FUTURIX)-Fortes Teneurs en Actinides (FTA), and Experimental Breeder Reactor-II (EBR-II) X501 have provided fuel fabrication, irradiation, and performance data on various transuranic-bearing fuel forms. This report documents the creation of an artificial-intelligence assisted database, which has consolidated all DOE-owned data related to Transuranic (TRU)-bearing fuel experiments and stored across it across both the Idaho National Laboratory (INL) Nuclear Data Management and Analysis System and the INL high performance computing (HPC) infrastructure. A dedicated webpage, hosted on the INL HPC system, has been developed to support role-based access and data interaction. The database architecture allows researchers to navigate large, heterogeneous archives with far greater speed and accuracy than manual search and lays the foundation for future expansion into multimodal nuclear materials analysis environments. The database represents a major step towards a nationally integrated fuels database utilizing artificial intelligence tools.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Air Dispersion Modeling for the Idaho National Laboratory Permit to Construct P-2020.0045 Facility Emission Cap Revision Request

The U.S. Department of Energy Idaho Operations Office (DOE-ID) is seeking to modify permit to construct (PTC) P-2020.0045 issued to U S Dept. of Energy – Idaho National Laboratory (INL) on January 29, 2021 by the Idaho Department of Environmental Quality (DEQ). This PTC allowed the INL to become a synthetic minor source of air pollutants using a facility emission cap (FEC). Air dispersion modeling was performed as part of the permit revision application process to demonstrate that the modifications will comply with the National Ambient Air Quality Standards (NAAQS). This report documents the modeling methodology and complete results for the air dispersion impact analysis and is supplied as an appendix to the permit revision request, Idaho National Laboratory Permit to Construct P-2020.0045 (INL 2025). All criteria air pollutants (CAPs) regulated under Section 109 of the Clean Air Act were modeled with the exception of lead (Pb) and ozone which are not required to be modeled by DEQ. Consistent with the original permit application, modeling was not performed for toxic air pollutants (TAPs) as uncontrolled emissions did not exceed screening emission levels for carcinogenic and non-carcinogenic TAPs. Acceptable model design values (concentrations) for each CAP and averaging period were summed with average background concentrations and compared to NAAQS. The results demonstrate the impacts of requested FEC limits for CAPs are less than applicable standards and demonstrate emissions up to FEC limits will not cause a violation of ambient air quality standards.

54 ENVIRONMENTAL SCIENCES↗

3D Modeling of Safety-Related Upgrade Pilot Project

Constellation Energy and the United States Department of Energy (DOE) have established a public/private partnership to implement a pilot digital upgrade to replace legacy analog, safety-related reactor protection and emergency safety feature actuation systems (RPS/ESFAS) with modern digital systems. This effort is occurring at Constellation’s Limerick Generating Station. This project is being performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process, NISP-EN-04, Standard Digital Engineering Process and Electric Power Research Institute Report 3002011816, Digital Engineering Guide. The Light Water Reactor Sustainability (LWRS) Program at the Idaho National Laboratory (INL) has been supporting this effort. Latest INL HFE efforts in support of this project have focused on definition and implementation of the Human Factors Engineering (HFE) Program in support of Constellation design and related licensing efforts. This paper will present the development of the HFE 3D modeling execution of the Main Control Room safety upgrades. New equipment and modifications are planned for upgrading the new safety systems. 3D modeling allows for visualization of the new equipment and modifications to be shared with engineering and design teams for evaluation and review. Anthropometric considerations such as sight lines and functional reach can be evaluated directly using the 3D model. This effort has helped to provide visualizations for additional review with operations personnel and project stakeholders.

3D Modeling↗

Oak Ridge Response to Versatile Test Reactor Environmental Impact Statement Data Request

The Versatile Test Reactor (VTR) is a fast-spectrum test reactor being developed in the United States under the direction of the US Department of Energy Office of Nuclear Energy (DOE-NE). The VTR mission is to enable accelerated testing of advanced reactor fuels and materials required for advanced reactor technologies. The conceptual design of the 300 MWth sodium-cooled metallic-fueled pool-type fast reactor has been led by the US National Laboratories in collaboration with General Electric–Hitachi and Bechtel National, Inc. In support of the VTR project, DOE issued a Notice of Intent (NOI) in the Federal Register on August 5, 2019, announcing the intent to prepare an Environmental Impact Statement (EIS) in accordance with the National Environmental Policy Act (NEPA) and its implementing regulations. The EIS will evaluate alternatives for a versatile reactor–based fast-neutron source facility and associated facilities for the preparation, irradiation, and post-irradiation examination (PIE) of test/experimental fuels and materials. Specifically, the NOI identified two siting alternatives for the VTR reactor facility: Idaho National Laboratory (INL) or Oak Ridge National Laboratory (ORNL). In addition, the NOI also specified two siting alternatives for VTR fuel fabrication: INL and the Savannah River Site (SRS). This report provides information in response to data requests made to ORNL to fill in site-specific knowledge gaps to develop a high-quality EIS. The responses provided are not required to provide full details in every aspect; instead, they adequately bound possible environmental impacts or provide sufficient information to adequately assess likely environmental impacts. This work is being performed under a subcontract from INL to ORNL using DOE-NE funds and is directed by DOE-NE and DOE-ID. Leidos has been contracted by DOE-NE to write the VTR EIS, so most data requests have come from Leidos but were often routed through INL or DOE-ID. DOE-ID is overseeing the NEPA and EIS processes for the VTR project. Leidos will use the information provided in this report to inform the VTR EIS and will also cite this document to establish a clear, publicly available source of the information. Section 2 of this report briefly describes the proposed ORNL VTR Alternative and illustrates the location of the proposed site for the ORNL VTR Alternative. Sections 3 through 7 provide direct responses to data requests received by ORNL. These sections use a tabular format in which data requests are divided into separate items to be addressed; the items are numbered, the data requests are restated with more topical information included, and then the responses are provided. Initial data requests and follow-on requests for additional information (RAIs) are combined under the original data request fields. Finally, Section 8 presents summarized conclusions and describes future work.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

FY 2021 Mid-Year HPC Utilization Report M3UF-21IN0701018

Idaho National Laboratory (INL), supported by the Department of Energy Office of Nuclear Energy (DOE-NE) through the Nuclear Science User Facilities, provides access to supercomputer systems and data storage along with support staff for system management, software installation, cybersecurity and user support to the broader DOE-NE user community. Users include individuals at universities, industry, and government laboratories enabling a wide range of research and development and mission-supporting activities. The availability of high-performance computing (HPC) capabilities is a key foundation of collaboration and innovation in nuclear energy systems research. HPC resources and INL directly support the mission and objectives of DOE-NE. From October 2020 through March 2021, INL HPC capabilities were utilized by a diverse set of computing and applied researchers, for a wide range of research and engineering activities. This report focuses on current INL HPC systems and utilization from October 1, 2020 through March 31, 2021.

99 GENERAL AND MISCELLANEOUS↗

Organic Iodide Sorption from Dilute Gas Streams

Reprocessing used nuclear fuel releases volatile radionuclides, including 129 iodine (I), into the off-gas of a processing plant. Volatile radioiodine could be present in several forms, depending on the chemistry of the process used and the off-gas stream. Inorganic I 2 is expected to be the predominant I species in the dissolver off-gas (DOG), with minor organic iodides present. The bulk of the I is expected to volatilize into the DOG in parts-per-million-level (ppm) concentrations. In contrast, in the vessel off-gas (VOG), most of the volatile I is expected to be found as organic iodides, such as CH 3 I, C 4 H 9 I, and C 12 H 25 I. These species are expected to be present in parts-per-billion-level (ppb) concentrations but require abatement, even at low expected concentrations, to meet regulatory emissions limits in the United States. Historically, studies of I abatement by Ag-functionalized sorbents have focused on inorganic I in the DOG, but in the last few years, more research attention has been given to organic iodides, especially longer chain species, such as C 4 H 9 I, and C 12 H 25 I. This report has three main goals: (1) to present new data generated at Oak Ridge National Laboratory (ORNL) in FY21 on the sorption behavior of organic iodides on AgZ, (2) to summarize and synthesize organic iodide data produced by ORNL and Idaho National Laboratory (INL) over the last 4 years to answer questions on organic iodides behavior outlined in the 2018 joint test plan (Jubin et al. 2018), and (3) to propose a VOG abatement system design that can provide the capture efficiencies required to meet I emission limits. The 2021 ORNL experimental campaign tested the effects of organic iodide speciation and concentration in the off-gas, superficial velocity of the off-gas, and effects of aging on AgZ sorbent capacity. These studies found that the sorption rate of organic iodides by AgZ depends on the hydrocarbon chain length and the concentration in the off-gas. Higher molecular weight organic iodides adsorb to AgZ more slowly than I. At a concentration of 50 ppm concentration in the off-gas, CH 3 I loads 8% slower, C 4 H 9 I loads 20% slower, and C 12 H 25 I loads 40% slower than I. The lowest concentration loading rates calculated were in 5 ppm organic iodide gas streams in which AgZ gained on average 0.14 mg I/g sorbent/hour in the bench scale test system. Thus, longer sorbent beds might be needed to accommodate slower loading rates onto AgZ in lower concentration gas streams. Although sorption rate varies as a function of hydrocarbon chain length, the saturation concentration of the sorbent for these I-bearing species does not vary. Aging AgZ in a humid air stream for 9 months drops the overall sorbent capacity by ~35% for CH 3 I, ~50% for C 4 H 9 I, and ~40% for C 12 H 25 I. This results in a saturation capacity between 35 and 70 mg I/g sorbent for the aged AgZ. In conjunction with recent data produced by INL, these data are used to estimate the mass transfer zone (MTZ) and decontamination factor (DF) for sorbent beds of AgZ. Sorption tests performed with iodide gas concentrations of about 1 ppm and higher at a superficial gas velocity of 10 m/min, indicate that MTZ depths for these conditions tend to range between about 8-20 cm. Tests performed at lower concentrations between 50-90 ppb and at gas superficial velocities of 1, 10, and 20 m/min indicate that the MTZ depth increases with increasing superficial gas velocity. The 20 m/min test indicates that the MTZ for those conditions was at least 22 cm, and doubling the superficial gas velocity from 10 to 20 m/min could roughly double or triple the MTZ depth. Doubling and tripling the bounding MTZ depth of 20 cm for the body of MTZ estimates made at with 10 m/min superficial velocity would extend the MTZ for a superficial velocity of 20 m/min to 40-60 cm. This bounding limit applies to all of the organic iodides that have been tested. These results also indicate that the sorption rate-limiting step is not sensitive to the superficial gas velocity; otherwise the MTZ depth would not have increased approximately in proportion to the increase in the gas superficial velocity. This further suggests that the rate limiting step is not associated with mass transfer of the sorbate to the sorbent surface, or mass transfer of the reaction byproducts from the sorbent surface, but is associated with sorption or chemical reactions on the sorbent surface or in sorbent pores. Deep bed testing at INL has established DFs of >2,000 for I, CH 3 I, and C 4 H 9 I under a range of conditions (Soelberg et al. 2021, Bruffey et al. 2019). DF does not seem to be affected by the concentration of the organic iodide in the gas stream over the range of 1 to 50 ppm. Thus, if the MTZ is accommodated in sorbent bed design for the DOG and VOG, then regulatory DFs will be met. To meet the third objective outlined in this report, these experimental data were used to update an engineering evaluation of the VOG first completed in 2016. The updated VOG design can be found in an accompanying document (Welty et al., 2021; INL- LTD-21-64587). This report finds that the VOG will decrease in both size and complexity, relative to previous designs, and will still meet regulatory requirements for all iodine forms.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

High Temperature Steam Electrolysis Process Performance and Cost Estimates

Technology readiness levels (TRLs) of electrolysis systems have dramatically increased in recent years as the interest in clean hydrogen production and decarbonization of transportation, industrial and other sectors increases across the globe. This is especially true of high temperature steam electrolysis (HTSE) / solid oxide electrolysis cell (SOEC) systems which show promise of much higher system efficiencies than other more developed electrolysis technologies. This possibility of higher efficiencies of HTSE / SOEC systems has been previously assumed to be theoretically possible but in recent years it has become less theoretical and more realistic as an increasing amount of suppliers complete lab and pilot tests showing very promising results. Research in the areas of manufacturing techniques, material selection, electrode and electrolyte compositions, and balance of plant size and integration continues at a fast pace as an increasing number of suppliers both internationally and domestically become involved. The advantages of HTSE become more pronounced when HTSE is coupled with nuclear power plants (NPPs). This is because thermal energy produced by the nuclear reactor can be used in a series of heat transfer loops and heat exchangers to vaporize HTSE feedwater, which drastically improves the economics of the process. Idaho National Laboratory (INL) has been very involved in the research and modeling of HTSE systems for a number of years, in collaboration with other national laboratories, academia, and industry stakeholders both on the hydrogen production as well as the hydrogen demand side. The modeling completed over the years on a large variety of projects has led to a wealth of knowledge at INL including in the area of the technoeconomic assessment (TEA) of HTSE systems. TEAs include process modeling of the HTSE systems to calculate system energy requirements and equipment sizing, followed by estimation of capital and operating costs to enable calculation of the levelized cost of hydrogen (LCOH). The TEA work performed has produced incremental improvements and tuning of the methods, assumptions, models, and results of the analyses as well as providing some opportunities for validating these results. The purpose of this document is to record the current baseline HTSE analyses led by INL to show the current status of assumptions and costs of these systems. Given the rapid development of this technology, the variety of suppliers entering the space, and the increasing attention government and industry are giving to such systems, this document may be updated on a periodic basis with updated analysis and assumptions. This document compiles various analyses results and approaches completed over a period of years into a single document to be used as a baseline going forward. It represents what the INL HTSE analysis group assumes to be the internal best estimate of the current operation, costs, and landscape of the HTSE industry state of the art capability for current SOEC technology in an Nth-of-a-Kind (NOAK) plant, which in this study is defined as existence of the manufacturing capacity to support previous deployment of N = 100 count of 25 MWe modular HTSE blocks (with modular equipment component cost reductions specified as following a 95% learning curve). That said, This is a public document and as such so no proprietary data was used or included in this report. There may be HTSE suppliers that have performance specifications, and cost estimates, and test data that differ from the analysis presented in this document. This document is meant to be a best conservative estimate of the technology and not an absolute reference.

08 HYDROGEN↗