Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “First Quarter”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Interim Measures Work Plan: South Repeater Building: Solid Waste Management Unit 121: Hydraulic Containment and Groundwater Treatment System for Per- and Polyfluoroalkyl Substances: Kennedy Space Center, Florida

This document presents the design details of a granular activated carbon (GAC) hydraulic containment and groundwater treatment system Interim Measures Work Plan for the South Repeater Building site (South Repeater, Solid Waste Management Unit 121), located at John F. Kennedy Space Center (KSC), Florida. The interim measures (IM) treatment area includes the source area and downgradient property boundary, which have been impacted by per- and polyfluoroalkyl substances (PFAS). The objectives of the IM are to treat the source area and mitigate PFAS migration to areas outside of KSC boundaries. This document was prepared by AECOM Technical Services, Inc., for the National Aeronautics and Space Administration under Contract 80KSC019D0010, Task Order 80KSC021F0096. The IM consists of the installation and operation of 19 extraction wells and an associated groundwater treatment system. A total of 13 wells will be installed to a depth of 34 feet below land surface (bls) to target the upper medium-grained sand with shell layer. A total of six wells will be installed to a depth of 56 feet bls to target the lower layer of poorly graded sand with shell fragments. The system will be designed to operate each extraction well simultaneously using submersible pumps at flow rates of 5 or 10 gallons per minute (gpm), excluding one extraction well with a flow rate of 30 gpm. The extracted groundwater will be conveyed to a groundwater treatment system, where it will be treated via GAC prior to disposal via infiltration. To evaluate treatment system performance, baseline groundwater sampling will be conducted prior to treatment system startup. Performance monitoring will be completed quarterly for the first year. A total of eight performance monitoring wells will be installed to a depth of 12 feet bls, and eight performance monitoring wells will be installed to a depth of 30 feet bls. In addition to the installation of 16 performance monitoring wells, 12 existing monitoring wells will be incorporated into the performance monitoring program.

groundwater treatment↗

Accomplishments and Mid-Year Performance Report: Wind Energy Program Fiscal Year 2020

Through transformative science and innovation, the U.S. Department of Energy's (DOE's) National Wind Technology Center (NWTC) at the National Renewable Energy Laboratory's (NREL's) Flatirons Campus helps lead the way to a sustainable energy future that powers America with significant levels of reliable, low-cost, and accessible wind energy. Since 1976, NREL has provided an ideal environment for the research and development (R&D) of advanced energy technologies through: Wind energy resource assessments, World-class research facilities, High-performance computing and modeling, Data and technology analysis, Manufacturing breakthroughs, Environmental analysis and wildlife conservation efforts, Education and training programs for a future workforce. These activities enable the innovations needed to advance U.S. wind systems, address market and deployment barriers, and drive down the cost of wind energy with more efficient, more reliable, and more predictable wind energy systems. This report provides an overview of the achievements NREL delivered on behalf of DOE's Wind Energy Technologies Office (WETO) and other partners during the first and second quarters of Fiscal Year (FY) 2020.

49 EE - Wind and Water Power Program - Wind (EE-4W↗

Root damage analysis of aircraft engine blade subject to ice impact

The blade root response due to ice impact on an engine blade is simulated using the NASA in-house code BLASIM. The ice piece is modeled as an equivalent spherical object impacting on the leading edge of the blade and has the velocity opposite to that of the aircraft with direction parallel to the engine axis. The effect of ice impact is considered to be an impulse load on the blade with its amplitude computed based on the momentum transfer principle. The blade response due to the impact is carried out by modal superposition using the first three modes. The maximum dynamic stresses at the blade root are computed at the quarter cycle of the first natural frequency. A combined stress failure function based on modified distortion energy is used to study the spanwise bending damage response at the blade root. That damage function reaches maximum value for very low ice speeds and increases steeply with increases in engine speed.

Reddy, E. S.↗

Mixed Material Scintillator Systems Quarterly Report FY20Q4

This project aims to invent, model, and prototype architected multimaterial scintillator systems (AMSSs), a new class of radiation detectors that use heterogenous internal structures of different scintillating materials to detect additional properties of radiation. These internal structures can be produced using additive manufacture (AM, i.e. 3D printing) of scintillator, a currently emerging application of additive manufacture technology. AMSSs combine the low cost and complexity of conventional scintillation detectors with capabilities currently only available in more expensive and complex detectors. By identifying promising AMSS designs, this project will enable a new class of detectors to meet DNN’s mission needs for SNM detection. In past reporting, we have described this detector concept as “mixed material scintillator systems” (MMSS), but as part of preparing papers for publication we have concluded the term “architected multimaterial scintillator systems” (AMSS) better reflects the importance of structure in these detectors. We plan to use the AMSS acronym going forward. This quarter, we participated in an Independent Assessment of the work so far. The panelists on the review concluded that the AMSS concept has great potential and our work so far was effective at bringing that potential to light. They highly encouraged further work on this topic. The panelists also had several useful suggestions, which we took to heart. This review is described in more detail below. This quarter saw a resumption of work on the final task of this project, prototyping. In the first half of the quarter, this work focused on solving specific technical barriers to achieve 1x1x1 cm prints. In the second half, we focused on producing high-quality samples and making characterization measurements of those samples, with an eye on our deliverable report on the prototyping task. This report can be expected along with the end-of-year report on October 30. This project successfully spent the entirety of its remaining funds this quarter, except for $13k refunded to this project in the last days of the fiscal year due to LLNL cost adjustments. This project has captured the interest of many LLNL experts, and so we have been able to effectively use our budget to harness the available effort.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Report on Rocket Power Plants Based on T-Substance

In the search for an energy source independent of air for the propulsion of underwater craft, attention was early concentrated on T-substance. It was possible to convince the OKM [NACA comment: Navy High Command] very quickly of the importance of this material. In 1934, the first experiments were undertaken. A difficulty was at once presented by the limited concentration that had been attained. At first only 60 percent T-substance could be supplied; this amount was later increased to as much as 85 percent. Decomposition and combustion experiments conducted on the grounds of the CPVA in Kiel-Dietrichsdorf led to the first practical information as to the technical feasibility of the use of T-substance. New perspectives soon developed because a method of concentrated energy production had been found here, which was capable of many applications. The idea of using this energy for the propulsion of missiles either in guns or as rockets suggested itself and appropriate proposals, which quickly led to the construction of the first experimental devices, were made to the official quarters concerned. In January 1937, the first flight of a DVL aircraft with T-substance auxiliary propulsion took place at Alimbsmuhle in the presence of Colonel Udet, who piloted the third flight. In June 1937, the first T-substance rockets were fired (Altenwalde). Then in rapid succession take-off auxiliary, main propulsion, and other rocket drives were brought out in experimental versions. Hydrogen peroxide is a well known chemical, which is widely used in the textile industry. Its chemical and physical properties as well as the processes of manufacture and use are familiar and have been described in voluminous books and papers, Nevertheless, much developmental work was required to open the way for T-substance as a usable oxygen carrier. In fact the utilization of hydrogen peroxide as the oxygen carrier for energy production had hitherto been the subject only of isolated suggestions, which have never been developed beyond the stage of theoretical discussion.

Walter, Hellmuth↗

Orbital Debris Quarterly News

Inside - Fifty-first SOZ Unit Breaks Up - Russian Mystery Satellite Fragments - Debris Assessment Software Version 3.0 Release - ORDEM 3.1 Release - The 2019 U.S. Government Orbital Debris Mitigation Standard Practices - Meeting Reports - Conference Abstracts from the NASA HVIT Team - Conference Abstracts from the NASA ODPO - Space Missions/Satellite Box Score

Phillip Anz-Meador↗

International Space Station USOS Crew Quarters On-orbit vs Design Performance Comparison

The International Space Station (ISS) United States Operational Segment (USOS) received the first two permanent ISS Crew Quarters (CQ) on Utility Logistics Flight Two (ULF2) in November 2008. Up to four CQs can be installed into the Node 2 element to increase the ISS crewmember size to six. The CQs provide private crewmember space with enhanced acoustic noise mitigation, integrated radiation reduction material, communication equipment, redundant electrical systems, and redundant caution and warning systems. The racksized CQ is a system with multiple crewmember restraints, adjustable lighting, controllable ventilation, and interfaces that allow each crewmember to personalize their CQ workspace. The deployment and initial operational checkout during integration of the ISS CQ to the Node is described. Additionally, the comparison of on-orbit to original design performance is outlined for the following key operational parameters: interior acoustic performance, air flow rate, temperature rise, and crewmember feedback on provisioning and restraint layout.

Broyan, James Lee, Jr.↗

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

Enhancements to the IBM version of COSMIC/NASTRAN

Major improvements were made to the IBM version of COSMIC/NASTRAN by RPK Corporation under contract to IBM Corporation. These improvements will become part of COSMIC's IBM version and will be available in the second quarter of 1989. The first improvement is the inclusion of code to take advantage of IBM's new Vector Facility (VF) on its 3090 machines. The remaining improvements are modifications that will benefit all users as a result of the extended addressing capability provided by the MVS/XA operating system. These improvements include the availability of an in-memory data base that potentially eliminates the need for I/O to the PRIxx disk files. Another improvement is the elimination of multiple load modules that have to be loaded for every link switch within NASTRAN. The last improvement allows for NASTRAN to execute above the 16 mega-byte line. This improvement allows for NASTRAN to have access to 2 giga-bytes of memory for open core and the in-memory data base.

Brown, W. Keith↗

Space Station Quarterly, May 1992

This quarterly report discusses the First International Microgravity Laboratory, the building of space station truss structures at the Johnson Space Center, the building of the living and laboratory modules at the Marshall Space Flight Center, and the Lewis Research Center's work on power for the space station. The video includes a segment on the Japanese Experiment Module.

Source record↗

Advanced Passive Microwave Radiometer Technology for GPM Mission

An interferometer-type passive microwave radiometer based on MMIC receiver technology and a thinned array antenna design is being developed under the Instrument Incubator Program (TIP) on a project entitled the Lightweight Rainfall Radiometer (LRR). The prototype single channel aircraft instrument will be ready for first testing in 2nd quarter 2003, for deployment on the NASA DC-8 aircraft and in a ground configuration manner; this version measures at 10.7 GHz in a crosstrack imaging mode. The design for a two (2) frequency preliminary space flight model at 19 and 35 GHz (also in crosstrack imaging mode) has also been completed, in which the design features would enable it to fly in a bore-sighted configuration with a new dual-frequency space radar (DPR) under development at the Communications Research Laboratory (CRL) in Tokyo, Japan. The DPR will be flown as one of two primary instruments on the Global Precipitation Measurement (GPM) mission's core satellite in the 2007 time frame. The dual frequency space flight design of the ERR matches the APR frequencies and will be proposed as an ancillary instrument on the GPM core satellite to advance space-based precipitation measurement by enabling better microphysical characterization and coincident volume data gathering for exercising combined algorithm techniques which make use of both radar backscatter and radiometer attenuation information to constrain rainrate solutions within a physical algorithm context. This talk will discuss the design features, performance capabilities, applications plans, and conical/polarametric imaging possibilities for the LRR, as well as a brief summary of the project status and schedule.

Smith, Eric A.↗

First Results from Two Nb3Sn Cavities Assembled in a CEBAF Quarter Cryomodule

Two 1.5 GHz CEBAF C75-shape 5-cell accelerator cavities were coated with Nb3Sn film using the vapor diffusion technique at Fermilab and Jefferson Lab coating facilities. Both cavities were measured at 4 K and 2 K in the vertical cavity test facility (VCTF) in each lab, then assembled into a CEBAF quarter cryomodule at Jefferson Lab. The cryomodule was tested at 4 K and 2 K in the CryoModule Test Facility (CMTF) at Jefferson Lab. RF test results for both cavities in the cryomodule are similar to those in the qualification test in VTS, with one cavity reaching Eacc = 7.9 MV/m and the other - 13.3 MV/m at 4 K.

Eremeev, G.↗

First Results from two Nb3Sn Cavities Assembled in a CEBAF Quarter Cryomodule

Two 1.5 GHz CEBAF C75-shape 5-cell accelerator cavities were coated with Nb3Sn film using the vapor diffusion technique at Fermilab and Jefferson Labcoating facilities. Both cavities were measured at 4 K and 2 K in the vertical cavity test facility (VCTF) in each lab, then assembled into a CEBAF quartercryomodule at Jefferson Lab. The cryomodule was tested at 4 K and 2 K in the CryoModule Test Facility (CMTF) at Jefferson Lab. RF test results for bothcavities in the cryomodule are similar to those in the qualification test in VTS, with one cavity reaching Eacc =7.9 MV/m and the other - 13.3 MV/m at 4 K

Eremeev, G.↗

Full Field Photoelastic Stress Analysis

A structural specimen coated with or constructed of photoelastic material, when illuminated with circularly polarized light will, when stressed: reflect or transmit elliptically polarized light, the direction of the axes of the ellipse and variation of the elliptically light from illuminating circular light will correspond to and indicate the direction and magnitude of the shear stresses for each illuminated point on the specimen. The principles of this invention allow for several embodiments of stress analyzing apparatus, ranging from those involving multiple rotating optical elements, to those which require no moving parts at all. A simple polariscope may be constructed having two polarizing filters with a single one-quarter waveplate placed between the polarizing filters. Light is projected through the first polarizing filter and the one-quarter waveplate and is reflected from a sub-fringe birefringent coating on a structure under load. Reflected light from the structure is analyzed with a polarizing filter. The two polarizing filters and the one-quarter waveplate may be rotated together or the analyzer alone may be rotated. Computer analysis of the variation in light intensity yields shear stress magnitude and direction.

Lesniak, Jon R.↗

The Cassini/Huygens Mission to Saturn

The Cassini/Huygens mission is an international cooperative effort between NASA, the European Space Agency, and the Italian Space Agency to conduct a scientific investigation of the Saturnian system. The spacecraft, which was launched in October of 1997, will use a Venus-Venus-Earth-Jupiter gravity assisted trajectory to arrive at Saturn in July of 2004. The spacecraft, composed of an orbiter and an atmospheric entry probe, will be placed in orbit about Saturn, after which the Huygens probe will be released to enter the atmosphere of Titan, the largest moon of Saturn. The probe data is transmitted during its descent and possible survival on the surface to the orbiter overhead, where it is stored and later relayed to Earth. The orbiter then continues in a four-year mission about Saturn, conducting detailed studies of the atmosphere, the rings, the magnetosphere, Titan, and the icy satellites. The probe carries six instruments to explore the atmosphere and surface of Titan; the orbiter carries twelve instruments for its investigations. This paper characterizes the performance of the Cassini/Huygens spacecraft during its first year and three-quarters of flight, up through the second of the two Venus flybys. The flight system, including the 18 scientific instruments, is described, as well as the detailed overall objectives of the mission.

Mitchell, R.↗

Cassini / Huygens at Saturn and Titan

The Cassin/Huygens Project is a joint undertaking between NASA, the European Space Agency, and the Italian Space Agency to conduct an in-depth exploration of the Saturnian system. The spacecraft consists of an orbiter vehicle and an atmospheric probe which has completed its mission in the atmosphere and on the surface of Titan, the largest moon of Saturn. The spacecraft was launched on October 15, 1997, has completed its nearly seven years of interplanetary flight, and by the time of the 56th IAC, it will have completed 17 of its planned 75 orbits during its four-year prime orbital mission. This paper gives an overview of the mission, and describes in detail the accomplishments and events over the past year, including the spectacularly successful descent of the .European Space Agency's Huygens probe to the surface of Titan. Initial scientific results from both the Huygens mission as well as from the first one-and-a-quarter years of orbiting Saturn are summarized. The plans for the remainder of the orbiter's tour of the Saturn system and the many flybys of Titan and the smaller icy satellites are described.

Cassini↗