Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Fermilab”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Cryomodule Test Stand Reduced-Magnetic Support Design At Fermilab

In a partnership with SLAC National Accelerator Laboratory (SLAC) and Jefferson Lab, Fermilab will assemble and test 17 of the 35 total 1.3 GHz cryomodules for the Linac Coherent Light Source II (LCLS-II) Project. These devices will be tested at Fermilab's Cryomodule Test Facility (CMTF) within the Cryomodule Test Stand (CMTS-1) cave. The problem of magnetic pollution became one of major issues during design stage of the LCLS-II cryomodule as the average quality factor of the accelerating cavities is specified to be $2.7 \times 10^{10}$. One of the possible ways to mitigate the effect of stray magnetic fields and to keep it below the goal of 5 mGauss involves the application of low permeable materials. Initial permeability and magnetic measurement studies regarding the use of 316L stainless steel material indicated that cold work (machining) and heat affected zones from welding would be acceptable.

43 PARTICLE ACCELERATORS↗

Electron Lens Construction for the Integrable Optics Test Accelerator at Fermilab

The Integrable Optics Test Accelerator (IOTA) is proposed for operation at Fermilab. The goal of IOTA is to create practical nonlinear accelerator focusing systems with a large frequency spread and stable particle motion. The IOTA is a 40 m circumference, 150 MeV (e-), 2.5 MeV (p⁺) diagnostic test ring. Construction of an electron lens for IOTA is necessary for both electron and proton operation. Components required for the Electron Lens design include; a 0.8 T conventional water-cooled main solenoid, and magnetic bending and focusing elements. The foundation of the design relies on repurposing the Fermilab Tevatron Electron Lens II (TELII) gun and collector under ultra-high vacuum (UHV) conditions.

43 PARTICLE ACCELERATORS↗

Instrumentation and its Interaction with the Secondary Beam for the Fermilab Muon Campus

The Fermilab Muon Campus will host the Muon g-2 experiment - a world class experiment dedicated to the search for signals of new physics. Strict demands are placed on the beam diagnostics in order to ensure delivery of high quality beams to the storage ring with minimal losses. In this study, we briefly describe the available secondary beam diagnostics for the Fermilab Muon Campus. Then, with the aid of numerical simulations we detail their interaction with the secondary beam. Finally, we compare our results against theoretical findings.

43 PARTICLE ACCELERATORS↗

Passive Microphonics Mitigation during LCLS-II Cryomodule Testing at Fermilab

The LCLS-II project calls for cryomodule production and testing at both Fermilab and JLab. Due to low beam loading and high cavity quality factor, the designed peak detuning specification is 10 Hz. Initial testing showed peak detuning up to 150 Hz with a complex and varying time-structure, showing both fast (1-2 second) and slow (1-2 hour) drifts in amplitude and spectrum. Extensive warm and cold testing showed Thermoacoustic Oscillations in the cryogenic valves were the primary source of the microphonics. This was mitigated by valve wipers and valve re-plumbing, resulting in a greatly improved cavity detuning environment. Additional modifications were made to the cavity mechanical supports and Fermilab test stand to improve detuning performance. These modifications and testing results will be presented.

43 PARTICLE ACCELERATORS↗

Tuner Testing of a Dressed 3.9 GHz Cavity for LCLS-II at Fermilab

Fermilab is responsible for the design of the 3.9 GHz cryomodule for LCLS-II. Integrated acceptance testing of a dressed 3.9 GHz cavity for the LCLS-II project has been done at the Fermilab Horizontal Test Stand. This test included a slim blade tuner (based on INFN & XFEL designs) with integrated piezoelectric fast/fine tuner. This paper will present results of the mechanical setup, cold testing, and cold function of this tuner including fast and slow tuner range, sensitivity, and hysteresis.

43 PARTICLE ACCELERATORS↗

Measurements of Decay and Snapback in Nb₃Sn Accelerator Magnets at Fermilab

In recent years, Fermilab has been executing an inten-sive R&D program on Nb₃Sn accelerator magnets. This program has included dipole and quadrupole models and demonstrators for various programs and projects, including the HL-LHC accelerator upgrade project. A systematic study of the field decay and snapback during the injection portion of a simulated accelerator cycle was executed at the Fermilab Magnet Test Facility. This paper summarizes the recent measurements of the MQXFS1 short quadrupole model and discusses the results of some previously measured Nb₃Sn magnets at CERN

43 PARTICLE ACCELERATORS↗

Real-Time Edge AI for Distributed Systems (READS): Progress on Beam Loss De-Blending for the Fermilab Main Injector and Recycler

The Fermilab Main Injector enclosure houses two accelerators, the Main Injector and Recycler. During normal operation, high intensity proton beams exist simultaneously in both. The two accelerators share the same beam loss monitors (BLM) and monitoring system. Beam losses in the Main Injector enclosure are monitored for tuning the accelerators and machine protection. Losses are currently attributed to a specific machine based on timing. However, this method alone is insufficient and often inaccurate, resulting in more difficult machine tuning and unnecessary machine downtime. Machine experts can often distinguish the correct source of beam loss. This suggests a machine learning (ML) model may be producible to help de-blend losses between machines. Work is underway as part of the Fermilab Real-time Edge AI for Distributed Systems Project (READS) to develop a ML empowered system that collects streamed BLM data and additional machine readings to infer in real-time, which machine generated beam loss.

43 PARTICLE ACCELERATORS↗

Wire scanner assessment of transverse beam size in the Fermilab side-coupled linac

The Fermilab Side-Coupled Linac contains seven 805 MHz modules accelerating H- beam from 116 MeV to 400 MeV. Each module contains at least one wire scanner, yielding beam intensity at positions along a transverse direction. These wire scanners each contain three wires, mounted at different angles: "X", "Y", and 45° between "X" and "Y" to analyze coupling. Recently, a significant amount of transverse X-Y coupling was identified within wire scanner data from the Side-Coupled Linac, which has been present in data from the past decade. This realization has prompted an investigation into the wire scanner's utility as a diagnostic tool in the Fermilab Linac. This work presents efforts to better characterize the wire scanners' limitations and the phenomenon occurring in the Side-Coupled Linac.

43 PARTICLE ACCELERATORS↗

Low-energy muon and muonium beam source at Fermilab

We describe a high-efficiency source of muonium that can be transported as a beam in vacuum provides opportunities for fundamental muon and precision physics measurements such as sensitive searches for symmetry violation. Although PSI is currently the world leader, the intense 800-MeV PIP-II linac beam at Fermilab could provide world-class low-energy muon and muonium beams, with unparalleled intensity, driving the next generation of precision muon-based physics experiments at the intensity frontier. However, it is critical to initiate the prerequisite R&D now to prepare for the PIP-II era. A low-energy secondary muon line recently installed in an operating facility (the MeV Test Area, which utilizes the intense 400-MeV Fermilab Linac beam) could support the required R&D, and potentially compete for new physics in the immediate term, if approved. This beamline was developed for μ– and will need to be re-optimized for surface μ+ production and transport, making it also suitable for muon spin rotation physics––a unique research and industrial application for which no U.S. facility exists, and whose facilities are oversubscribed worldwide.

43 PARTICLE ACCELERATORS↗

Electron cloud simulations in the Fermilab booster

As part of Fermilab's Proton Improvement Plan-II (PIP-II),the Fermilab Booster synchrotron will operate at a higherintensity, increasing from 4.5 x 10^12 to 6.7 x 10^12 protons per pulse (ppp). A potential challenge for achievinghigh intensity performance arises from rapid transverse instabilities induced by electron cloud (EC). This researchpresents EC simulations using PyECLOUD, which is anadvanced computational tool that incorporates measurements of the secondary electron yield (SEY) from theBooster's combined function magnet material. By systematically varying beam parameters in PyECLOUD, such asbunch structure, SEY, bunch length, and intensity, it becomes possible to forecast the impact of EC effects on thebeam stability of the PIP-II era Booster.

43 PARTICLE ACCELERATORS↗

Commissioning And First Results From The Fermilab Cryomodule Test Stand

A new test stand dedicated to Superconducting Radiofrequency (SRF) cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overview of first test results, and survey future plans.

43 PARTICLE ACCELERATORS↗

Standardization and First Lessons Learned of the Prototype HB650 Cryomodule for PIP-II at Fermilab

The prototype High Beta 650 MHz cryomodule (pHB650 CM) has been designed by an integrated design team, consisting of Fermilab (USA), CEA (France), STFC UKRI (UK), and RRCAT (India). The manufacturing and assembly of this prototype cryomodule is being done at Fermilab, whereas the production cryomodules will be manufactured and assembled by STFC-UKRI. As the first PIP-II cryomodule for which standardization was applied, the design, manufacturing and assembly of this cryomodule led to significant lessons being learnt and experiences gathered. These were incorporated into the design of the pre-production Single Spoke Resonator Type 2 cryomodule (ppSSR2 CM) and the pre-production Low Beta 650 MHz cryomodule (ppLB650 CM). This paper presents the pHB650 CM lessons learned and experiences gathered from the design to the lower coldmass assembly and how this cryomodule has a positive impact on all the next Proton Improvement Plan-II (PIP-II) cryomodules due to the standardization set up among SSR and 650 cryomodules.

43 PARTICLE ACCELERATORS↗

Fermilab Switchyard Resonant Beam Position Monitor Electronics Upgrade Results

The readout electronics for the resonant beam position monitors (BPMs) in the Fermilab Switchyard (SY) have been upgraded, utilizing a low noise amplifier transition board and Fermilab designed digitizer boards. The stripline BPMs are estimated to have an average signal output of between -110 dBm and -80 dBm, with an esti-mated peak output of -70 dBm. The external resonant circuit is tuned to the SY machine frequency of 53.10348 MHz. Both the digitizer and transition boards have vari-able gain in order to accommodate the large dynamic range and irregularity of the resonant extraction spill. These BPMs will aid in auto-tuning of the SY beamline as well as enabling operators to monitor beam position through the spill.

43 PARTICLE ACCELERATORS↗

RFA Measurement of E-Cloud Generation Process at Fermilab Main Injector

Fermilab aims to provide greater beam power for the neutrino physics program. As the beam power increases, the unwanted production of secondary electrons in the beam pipe, known as ‘electron cloud’ or ‘E-cloud’ may become disruptive to high intensity operation. Instrumentation has been deployed in the Fermilab Main Injector (MI) to study E-cloud. One of these is a Retard Field Analyzer (RFA) that can be used to directly measure E-cloud generation at the location of the instrument. Studies of the dependence of E-cloud on beam intensity and bunch length have been carried out. The experimental results are compared to POSINST simulations. These simulations are guided by measurements from a Secondary Electron Yield (SEY) test stand installed in the MI to measure the SEY of materials such as the beam pipe stainless steel. The SEY has a strong influence on the E-cloud density. Results of these comprehensive studies comparing the RFA data with realistic MI simulations will be presented.

43 PARTICLE ACCELERATORS↗

Design Considerations and Operational Features of the Collimators for the Fermilab Main Injector and Recycler

The Fermilab Main Injector system delivers 700 kW of 120 GeV Proton beam for neutrino experiments. Since 2013 this has been achieved using slip stacking accumulation in the Recycler with up to 12 batches from the Fermilab Booster per Main Injector Ramp Cycle. To control activation from beam loss, collimation systems in the Booster to Recycler transfer line, in the Recycler and in the Main Injector are employed. Residual radiation measurements around the ring with detailed studies at the collimators are required to maintain adequate loss control. We will review design considerations, operational parameters and activation results for more than ten years of operation. Simulations with MARS15 are used to explore the activation rates and the isotopic composition of the resulting activation.

43 PARTICLE ACCELERATORS↗

Upgrade of the Fermilab Spoke Test Cryostat for Testing of PIP-II 650 MHz 5-Cell Elliptical Cavities

Design of the high beta 650 MHz prototype cryomodule for PIP-II is currently undergoing at Fermilab. The cryomodule includes six 5-cell elliptical SRF cavities with accelerating voltage up to 20 MV and low heat dissipation (Q₀ > 3·10^{z}EhNZeHn). Characterization of performance of fully integrated jacketed cavities with high power coupler and tuner is crucial for the project. Such a characterization of jacketed cavity requires a horizontal test cryostat. Existing horizontal testing facilities at Fermilab, Horizontal Test Stand (HTS) and Spoke Test Cryostat (STC), are not large enough to accommodate jacketed 650 MHz 5-cell cavity. An upgrade of the STC is proposed to install extension to the cryostat and modify cryogenic connections and RF infrastructure to provide testing of 650 MHz cavities. In this paper we describe STC upgrade and commissioning of the upgraded facility. We discuss mitigation of issues and problems specific for testing of high Q₀ 650 MHz cavities, which require low residual magnetic field and low acoustic and mechanical vibrations environment.

43 PARTICLE ACCELERATORS↗

Final Design of the Production SSR1 Cryomodule for PIP-II Project at Fermilab

This contribution reports the design of the production Single Spoke Resonator Type 1 Cryomodule (SSR1 CM) for the PIP-II project at Fermilab. The innovative design is based on a structure, the strongback, which supports the coldmass from the bottom, stays at room temperature during operations, and can slide longitudinally with respect to the vacuum vessel. The Fermilab style cryomodule developed for the prototype Single Spoke Resonator Type 1 (pSSR1), the prototype High Beta 650 MHz (pHB650), and preproduction Single Spoke Resonator Type 2 (ppSSR2) cryomodules is the baseline of the present design. The focus of this contribution is on the results of calculations and finite element analyses performed to optimize the critical components of the cryomodule: vacuum vessel, strongback, thermal shield, and magnetic shield.

43 PARTICLE ACCELERATORS↗

Lessons from commissioning and operations of the ICARUS cryogenic system at Fermilab

Results and lessons from three years of commissioning and operations of the cryogenic and purificationsystems of the ICARUS neutrino detector installed at the Fermilab are described. The detector uses liquid argon stored in two separate containers of about 275 m 3 each. The liquid argon must be kept in very stable thermal conditions, and the contamination of electronegative impurities must be consistently kept at small fractions of parts per billion. Since its fill in early 2020, the detector has been commissioned and then operated in neutrino beams at Fermilab for the search of sterile neutrinos and measurements of neutrino-argon cross sections. The results of operating the cryogenic and purification systems and lessons learned, including challenges in reaching the design electron lifetime in argon bath, operating and servicing liquid nitrogen and argon circulation pumps, argon condensers and purifiers, are described. Plans for future operations and list of recommendations are presented.

43 PARTICLE ACCELERATORS↗