Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Early Test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

BTMS Testing Section

Cell testing is an important part of understanding the performance and life capabilities of stateof- the art energy storage technologies, particularly with respect to the distinct technical and functional requirements posed by the BTMS program. The baseline requirements for BTMS are loosely defined as a 1MWh BTMS system supporting six 350kW DC fast charging stations with no load profile defined. In order to test energy storage components and systems against these requirements, test procedures must be created that begin to address fundamental questions concerning the balance between cell performance and lifetime to minimize BTMS station cost and maximize station life. System usage scenarios are concurrently being developed with testing of baseline cells intended to illustrate their capabilities relative to a broad set of initial system assumptions. The results from these early performance tests and aging procedures will produce both slow and accelerated cycle-life aging information through a mix of empirical observations and modeling.

25 ENERGY STORAGE↗

BTMS Testing Section

Cell testing is an important part of understanding the performance and life capabilities of state-of-the art energy storage technologies, particularly with respect to the distinct technical and functional requirements posed by the BTMS program. In order to test energy storage components and systems against these requirements, test procedures must be created. System usage scenarios are concurrently being developed with testing of baseline cells intended to illustrate their capabilities relative to a broad set of initial system assumptions. The results from these early performance tests and aging procedures, though only loosely framed by a baseline 1 MWh BTMS system supporting six 350kW DCFC units, will produce both slow and accelerated cycle-life aging information through a mix of empirical observations and modeling.

25 ENERGY STORAGE↗

The multiple junction edge illuminated solar cell

The multiple junction edge illuminated solar cell was devised for high voltage low current applications. Devices to be flight tested in early 1974 with 96 series connected PNN+ junctions in a 2 cm X 2.3 cm size deliver 36 volts at 1 milliampere. Test data of M-J cells fabricated with resistivities of 10, 50, 100, 200, 450, and 1000 ohm cm silicon are presented and problem areas are discussed. An additional potential application of the M-J cell lies in ultilization of its high intensity performance that has been demonstrated at levels in excess of 100 AMO suns.

Sater, B. I.↗

Ensuring Safe Exploration: Ares Launch Vehicle Integrated Vehicle Ground Vibration Testing

Ground vibration testing has been an integral tool for developing new launch vehicles throughout the space age. Several launch vehicles have been lost due to problems that would have been detected by early vibration testing, including Ariane 5, Delta III, and Falcon 1. NASA will leverage experience and testing hardware developed during the Saturn and Shuttle programs to perform ground vibration testing (GVT) on the Ares I crew launch vehicle and Ares V cargo launch vehicle stacks. NASA performed dynamic vehicle testing (DVT) for Saturn and mated vehicle ground vibration testing (MVGVT) for Shuttle at the Dynamic Test Stand (Test Stand 4550) at Marshall Space Flight Center (MSFC) in Huntsville, Alabama, and is now modifying that facility to support Ares I integrated vehicle ground vibration testing (IVGVT) beginning in 2012. The Ares IVGVT schedule shows most of its work being completed between 2010 and 2014. Integrated 2nd Stage Ares IVGVT will begin in 2012 and IVGVT of the entire Ares launch stack will begin in 2013. The IVGVT data is needed for the human-rated Orion launch vehicle's Design Certification Review (DCR) in early 2015. During the Apollo program, GVT detected several serious design concerns, which NASA was able to address before Saturn V flew, eliminating costly failures and potential losses of mission or crew. During the late 1970s, Test Stand 4550 was modified to support the four-body structure of the Space Shuttle. Vibration testing confirmed that the vehicle's mode shapes and frequencies were better than analytical models suggested, however, the testing also identified challenges with the rate gyro assemblies, which could have created flight instability and possibly resulted in loss of the vehicle. Today, NASA has begun modifying Test Stand 4550 to accommodate Ares I, including removing platforms needed for Shuttle testing and upgrading the dynamic test facilities to characterize the mode shapes and resonant frequencies of the vehicle. The IVGVT team expects to collect important information about the new launch vehicles, greatly increasing astronaut safety as NASA prepares to explore the Moon and beyond.

Tuma, M. L.↗

The multiple junction edge illuminated solar cell

The multiple junction edge illuminated solar cell (M-J Cell) was devised for high voltage, low current applications. Devices to be flight-tested in early 1974 with 96 series-connected PNN+ junctions in a 2 cm x 2.3 cm size deliver 36 volts at 1 milliampere. Test data of M-J Cells fabricated with resistivities of 10, 50, 100, 200, 450, and 1000 ohm-cm silicon are presented and problem areas are discussed. An additional potential application of the M-J Cell lies in utilization of its high-intensity performance that has been demonstrated at levels in excess of 100 AMO suns.

Sater, B. L.↗

The Design and Testing of the LSSIF Advanced Thermal Control System

The Life Support Systems Integration Facility (LSSIF) provides a platform to design and evaluate advanced manned space systems at NASA Johnson Space Center (JSC). The LSSIF Early Human Testing Initiative requires the integration of such subsystems to enable human occupancy of the 6 meter chamber for a 90 day closed volume test. The Advanced Thermal Control System (TCS) is an important component of the integrated system by supplying coolant to the subsystems within the chamber, such as the Air Revitalization System. The TCS incorporates an advanced high efficiency, heat pump to reject waste heat from the chamber to an external sink or 'lift' temperature that emulates a Lunar environment. The heat pump is the High Lift Heat Pump, developed by Foster-Miller, Inc., and is the main test article of the TCS. The heat pump prototype utilizes a non-CFC refrigerant in a design where the thermal requirements exceed existing terrestrial technology. These operating requirements provide a unique opportunity to design and test an advanced integrated thermal system and the associated controls. The design, control, and systems integration of the heat pump and the TCS also have terrestrial technology application. This paper addresses the design of the TCS and the heat pump, along with the control scheme to fully test the heat pump. Design approaches utilized in the LSSIF TCS are promoted for implementation in terrestrial thermal systems. The results of the preliminary thermal and fluid analyses used to develop the control of the thermal systems will also be discussed. The paper includes objectives for the 90 day human test and the test setup. Finally, conclusions will be drawn and recommendations for Earth design application are submitted.

Henson, Robert A.↗

Achieving Maximum Integration Utilizing Requirements Flow Down

A robust and experienced systems engineering team is essential for a successful program. It is often a challenge to build a core systems engineering team early enough in a program to maximize integration and assure a common path for all supporting teams in a project. Ares I was no exception. During the planning of IVGVT, the team had many challenges including lack of: early identification of stakeholders, team training in NASA s system engineering practices, solid requirements flow down and a top down documentation strategy. The IVGVT team started test planning early in the program before the systems engineering framework had been matured due to an aggressive schedule. Therefore the IVGVT team increased their involvement in the Constellation systems engineering effort. Program level requirements were established that flowed down to IVGVT aligning all stakeholders to a common set of goals. The IVGVT team utilized the APPEL REQ Development Management course providing the team a NASA focused model to follow. The IVGVT team engaged directly with the model verification and validation process to assure that a solid set of requirements drove the need for the test event. The IVGVT team looked at the initial planning state, analyzed the current state and then produced recommendations for the ideal future state of a wide range of systems engineering functions and processes. Based on this analysis, the IVGVT team was able to produce a set of lessons learned and to provide suggestions for future programs or tests to use in their initial planning phase.

Archiable, Wes↗

Overview of NASA's Solar Electric Propulsion Project

NASA is continuing to develop and qualify a state of the art 13 kW-class Advanced Electric Propulsion System (AEPS) for NASA exploration missions through a contract with Aerojet Rocketdyne (AR). An objective of the AEPS project is accelerate the adoption of high power electric propulsion technologies by reducing the risk and uncertainty of integrating Solar Electric Propulsion (SEP) technologies into space flight systems. NASA and AR have recently initiated testing of engineering hardware including the Hall Current Thruster (HCT), Power Processing Unit (PPU), and Xenon Flow Controller (XFC) at both the component and system levels. The successful completion of these tests will provide the required information to advance the AEPS system towards Critical Design Review. In support of the AEPS contract, NASA and JPL have been performing risk reduction activities to address specific concerns of this higher power Hall thruster propulsion system. These risk reduction activities have included long duration wear testing of the Technology Demonstration Unit (TDU) Hall thruster and cathode hardware, thermal cycling of TDU cathode heaters and coils, plasma plume measurements, and performed early circuit testing of the AEPS PPU design. In addition to the propulsion system development, the SEP project is developing the Plasma Diagnostic Package (PDP) and the SEP Testbed. The PDP is designed for use in conjunction with a high-powered electric propulsion (EP) system to characterize in-space operation. The SEP Testbed system is being developed to demonstrate integrated SEP system performance. The paper presents an overview of the NASA and the AEPS contract activities and a summary of the associated NASA in-house activities.

Plasma diagnostics package↗

Leveraging Large Eddy Simulations to Characterize Aeroacoustic Environments on Launch Vehicles

NASA's Space Launch System (SLS) program has relied on multiple wind tunnel campaigns to predict expected aeroacoustic environments. Time, cost, Reynolds number matching, contamination from test section acoustics, and limitations in spatial resolution are all factors that impact the use experimental data for development of launch vehicle environments. Methodological and computational advances over the last decade are enabling scale resolving computational fluid dynamics (CFD) simulations to be completed that can address some the challenges with conventional datasets, enabling more complete/accurate modeling of dynamic loading events on ascent. These simulations are classified as so-called "Large-Eddy Simulations" (LES). As the name implies, these simulations seek to directly resolve the turbulence in the largest, most-energetic turbulent structures, or eddies, and the dissipation of the smallest eddies in the flow field, is modeled. Like anything else, these simulations still must undergo rigorous testing and validation for the results to ultimately be trusted in the analysis of a launch vehicle. EV33 has begun to conduct some of this early-stage testing and validation to better support NASA missions in the future.

Jonathan Boustani↗

Maturing Pump Technology for EVA Applications in a Collaborative Environment

The transition from low earth orbit Extravehicular Activity (EVA) for construction and maintenance activities to planetary surface EVA on asteroids, moons, and, ultimately, Mars demands a new spacesuit system. NASA's development of that system has resulted in dramatically different pumping requirements from those in the current spacesuit system. Hamilton Sundstrand, Cascon, and NASA are collaborating to develop and mature a pump that will reliably meet those new requirements in space environments and within the design constraints imposed by spacesuit system integration. That collaboration, which began in the NASA purchase of a pump prototype for test evaluation, is now entering a new phase of development. A second generation pump reflecting the lessons learned in NASA's testing of the original prototype will be developed under Hamilton Sundstrand internal research funding and ultimately tested in an integrated Advanced Portable Life Support System (APLSS) in NASA laboratories at the Johnson Space Center. This partnership is providing benefit to both industry and NASA by supplying a custom component for EVA integrated testing at no cost to the government while providing test data for industry that would otherwise be difficult or impossible to duplicate in industry laboratories. This paper discusses the evolving collaborative process, component requirements and design development based on early NASA test experience, component stand alone test results, and near term plans for integrated testing at JSCs.

Hodgson, Edward↗

Orbit Determination Strategy and Simulation Performance for OSIRIS-REx Proximity Operations

The Origins Spectral Interpretation Resource Identification Security Regolith Explorer (OSIRISREx)is a NASA New Frontiers mission to the near-earth asteroid Bennu that will rendez vousin 2018, create a comprehensive and detailed set of observations over several years, collect a regolith sample, and return the sample to Earth in 2023. The Orbit Determination (OD) team isa sub-section of the Flight Dynamics System responsible for generating precise reconstructions and predictions of the spacecraft trajectory. The OD team processes radiometric data, LIDAR, as well as center-finding and landmark-based Optical Navigation images throughout the proximity operations phase to estimate and predict the spacecraft location within several meters. Stringent knowledge requirements stress the OD teams concept of operations and procedures to produce verified and consistent high quality solutions for observation planning, maneuver planning, and onboard sequencing. This paper will provide insight into the OD concept of operations and summarize the OD performance expected during the approach and early proximity operation phases,based on our pre-encounter knowledge of Bennu. Strategies and methods used to compare and evaluate predicted and reconstructed solutions are detailed. The use of high fidelity operational tests during early 2017 will stress the teams concept of operations and ability to produce precise OD solutions with minimal turn-around delay.

Leonard, Jason M.↗

Access to edge scenarios for testing a scraper element in early operation phases of Wendelstein 7-X

The edge topology of magnetic fusion devices is decisive for the control of the plasma exhaust. In Wendelstein 7-X, the island divertor concept will be used, for which the edge topology can change significantly as the internal currents in a plasma discharge evolve towards steady-state. Consequently, the device has been optimized to minimize such internal currents, in particular the bootstrap current [1]. Nonetheless, there are predicted pulse scenarios where effects of the remaining internal currents could potentially lead to overload of plasma-facing components. These internal currents are predicted to evolve on long time scales (tens of seconds) so their effects on the edge topology and the divertor heat loads may not be experimentally accessible in the first years of W7-X operation, where only relatively short pulses are possible. However, we show here that for at least one important long-pulse divertor operation issue, relevant physics experiments can be performed already in short-pulse operation, through judicious adjustment of the edge topology by the use of the existing coil sets. The specific issue studied here is a potential overload of the divertor element edges. This overload might be mitigated by the installation of an extra set of plasma-facing components, so-called scraper elements, as suggested in earlier publications. It is shown here that by a targeted control of edge topology, the effectiveness of such scraper elements can be tested already with uncooled test-scraper elements in short-pulse operation. Furthermore, this will allow an early and well-informed decision on whether long-pulse-capable (actively cooled) scraper elements should be built and installed.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The Low-Mass Limit: Dark Matter Detectors with eV-Scale Energy Resolution

The SuperCDMS SNOLAB experiment will be a 20-kg scale Si and Ge direct dark matter detection experiment designed to probe down to 300 MeV in dark matter (DM) mass through DM-nucleus scattering and 500 keV in DM electron scattering. In order to reach these low masses with appreciable sensitivity to dark matter, it needs to achieve very low energy resolution ($\le 10$ ev) for nuclear recoils in both detector materials, which will be achieved using a new detector design and operating mode, CDMS HV. This detector is designed to operate at a bias of 100V to convert charges liberated in our detector targets to into phonon energy in order to resolve individual electron-hole pairs. This has never before been achieved in a kg-scale detector. In this thesis, I cover three elements of the design of the CDMS HV detectors. I discuss the detector physics controlling how charges and phonons are generated in our detector crystals, comparing theory to results of recent experiments carried out at Stanford. I move on to describe the operating principles of our phonon-mediated charge readout, as well as the design of the CDMS HV detector. I then describe the performance tests of early CDMS HV prototypes in conjunction with the SuperCDMS SNOLAB electronics, and discuss the path towards achieving single electron-hole pair resolving detectors at the kg-scale given the performance obtained thus far. As a result of these tests, we were able to refine our noise and sensor dynamics models, and develop new metrics for diagnosing non-ideal sources of noise to aid in reducing coupling of the external environment to our detectors. In order to study the microphysics of phonon and charge production in our target crystals, we fabricated a number of gram-scale devices with various sensor designs in order to separate sensor and environmental effects from intrinsic crystal properties. These devices provided the first successful demonstrating of using voltage to amplify charge energ y by production of phonons (the Neganov-Trofimov-Luke effect! ) in order to resolve electron-hole pairs, and opened up a new regime of dark matter and photon science at the gram-scale that we are just beginning to explore. A first dark matter search was carried out with one of these gram-scale devices, producing world-leading limits on electron-recoiling dark matter between 0.5 and 5 MeV in dark matter mass for multiple form factors. This device achieved a phonon resolution of 10~eV, allowing a single gram-day of exposure to rival kg-days of exposure in the competing liquid-noble based electron-recoil search.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Thermoacoustic fatigue testing facility for space shuttle thermal protection system

The development of a reusable space shuttle by NASA in the next decade depends in part on the design of a satisfactory thermal protection system (TPS). The booster and orbiter parts of the shuttle require TPS panels which will withstand thermoacoustic fatigue. The Langley Research Center has begun tests on early panel designs in a new acoustic fatigue facility which is capable of simulating the combined elevated temperature and acoustic environments which these panels are expected to experience. The capabilities of the facility and computer system are outlined, and problems encountered in establishing the test methods are discussed. Tests of a Haynes 25 TPS panel are described, and representative data from tests of the panel at 650 C are included.

Rucker, C. E.↗

Lightweight Chambers for Thrust Assemblies

The Marshall Space Flight Center (MSFC) of the National Aeronautics and Space Administration (NASA) has successfully applied new materials and fabrication techniques to create actively cooled thrust chambers that operate 200-400 degrees hotter and weigh 50% lighter than conventional designs. In some vehicles, thrust assemblies account for as much as 20% of the engine weight. So, reducing the weight of these components and increasing their operating range will benefit many engines and vehicle designs, including Reusable Launch Vehicle (RLV) concepts. Obviously, copper and steel alloys have been used successfully for many years in the chamber components of thrust assemblies. Yet, by replacing the steel alloys with Polymer Matrix Composite (PMC) and/or Metal Matrix Composite (MMC) materials, design weights can be drastically reduced. In addition, replacing the traditional copper alloys with a Ceramic Matrix Composite (CMC) or an advanced copper alloy (Cu-8Cr-4Nb, also known as GRCop-84) significantly increases allowable operating temperatures. Several small MMC and PMC demonstration chambers have recently been fabricated with promising results. Each of these designs included GRCop-84 for the cooled chamber liner. These units successfully verified that designs over 50% lighter are feasible. New fabrication processes, including advanced casting technology and a low cost vacuum plasma spray (VPS) process, were also demonstrated with these units. Hot-fire testing at MSFC is currently being conducted on the chambers to verify increased operating temperatures available with the GRCop-84 liner. Unique CMC chamber liners were also successfully fabricated and prepared for hot-fire testing. Yet, early results indicate these CMC liners need significantly more development in order to use them in required chamber designs. Based on the successful efforts with the MMC and PMC concepts, two full size "lightweight" chambers are currently being designed and fabricated for hot-fire testing at MSFC in 2001. These "full size" chambers will be similar in size to those used on the X33 engine (RS2200). One will be fabricated with a MMC structural jacket, while the other uses a PMC jacket. Each will be designed for thrust levels of 15,000 pounds in an oxygen/hydrogen environment with liquid hydrogen coolant. Both chambers will use GRCop-84 for its channel wall liner. Each unit is expected to be at least 60% lighter than a conventional design with traditional materials. Hot-fire testing on the full size units in late 2001 will directly compare performance results between a conventional chamber design and these "lightweight" alternatives. The technology developed and demonstrated by this effort will not only benefit next generation RLV programs, but it can be applied to other existing and future engine programs, as well. Efforts were sponsored by the Advanced Space Transportation Program for RLV Focused Technologies. The task team was led by MSFC with additional members from NASA-Glenn Research Center and the Rocketdyne Division of The Boeing Company. Specific materials development and fabrication processes were provided by Aerojet, Lockheed Martin Astronautics, Composite Optics, Inc., Hyper-Therm, Ceramic Composites, Inc., MSE Technology Applications, and Plasma Processes, Inc.

Elam, Sandra K.↗

Shuttle Program Loads Integration: Going From Concept to Operations and Staying Successful

From the beginning of the Shuttle Program to its end, integrated loads and dynamics analyses and tests have been critical in shaping the vehicle design and operational decisions for NASA and its customers. Starting with scaled models and simple mathematical simulations of the structural dynamics, engineers defined the required structural stiffness and predicted the limit loads for each element of the system. Early structural tests provided reasonable confidence that the models and predictions were good. The first launch of the Space Shuttle brought surprises, though, when the ignition overpressure event caused a forward fuel tank support strut to buckle, among several unexpected effects. The launch pad and other ground equipment became an integral part of the system integration, especially where the acoustic and pressure environments of ignition and lift-off were concerned. Following the Challenger accident, operating limits were changed in response to new understandings of how the integrated system performed. Controlling loads while maximizing performance was a key tenet of the Performance Enhancement design process, which enabled construction of the International Space Station. During the return to flight after the Columbia accident, engineers grew to understand that loads during the roll maneuver were also important to the vehicle s structural margin and life. At this point the crawler transport from the Vehicle Assembly Building to the launch pad also became a part of the integrated loads analysis. Even in the last years of the Space Shuttle Program, new data still provided interesting insights into this complicated and fascinating spaceship. This paper will present some examples of the important findings by the team of specialists that supported the Integrated Loads and Dynamics Panel for the Space Shuttle Program.

Bernstein, Karen↗

Development of ARGOS (Active Response Gravity Offload System) Offloading Assessments and Methodology for Lunar EVA Simulations

The Active Response Gravity Offload System (ARGOS) at NASA Johnson Space Center (JSC) is an analog environment that can offload pressurized suited subjects for various reduced gravity simulations. The suit is suspended from a robotic overhead crane by a cable connected to the suit via a gimbal with an adjustable pivot point (i.e. offload attachment). There has been increased interest in providing planetary pressurized suited training at ARGOS in preparation for lunar missions. Determination of the appropriate gimbal pivot point location for a given subject is vital for a high-fidelity functional lunar simulation. Interactions between the pivot point location and human-spacesuit center of gravity (CG) can result in righting moments that may lead to artificially stable or unrealistically challenging configurations. Changing the pivot point location is time consuming and repeated adjustment can result in loss of valuable pressurized suited time. This paper aims to share knowledge obtained from the offloading characterization efforts during pressurized suited testing at ARGOS and document the ongoing process to define an appropriate pivot point location through iterative quantitative and qualitative assessments. Human-spacesuit CG locations for the ARGOS lunar simulation were estimated using a 3D body scan and density model combined with spacesuit hardware CAD and specifications. Early pilot testing of the gimbal revealed that setting the pivot point coincident with the modeled CG location was not always possible due to the current gimbal design, and small pivot point shifts had noticeable effects on subject stability. Fourteen subjects performed a series of CG-related tasks in the Exploration Extravehicular Mobility Unit (xEMU) to assess simulation characteristics. Through iterative testing, this task list evolved to streamline the process needed to efficiently identify a suitable pivot point for a given subject. The developed methodology will be critical for pivot point selection during astronaut training in the ARGOS environment.

Sarah L. Jarvis↗

Development of ARGOS Offloading Assessments and Methodology for Lunar EVA Simulations

The Active Response Gravity Offload System (ARGOS) at NASA Johnson Space Center (JSC) is an analog environment that can offload pressurized suited subjects at various gravity levels. The suit is suspended from a robotic overhead crane by a cable connected to the suit via a gimbal with an adjustable pivot point. There has been increased interest in providing lunar pressurized suited training at ARGOS in preparation for lunar missions. Determination of the appropriate gimbal pivot point location for a given subject is vital for a high-fidelity and functional lunar simulation. Interactions between the pivot point location and center of gravity (CG) can result in righting moments that may lead to artificially stable or unrealistically challenging configurations. Changing the pivot point location is time consuming and repeated adjustment can result in significant loss of valuable pressurized suited time. This paper aims to share the knowledge obtained from the offloading characterization efforts during pressurized suited testing at ARGOS and document the ongoing process to define an appropriate pivot point location through iterative quantitative and qualitative assessments. The human-spacesuit CG locations for the ARGOS lunar simulation were estimated using a 3D body scan and density model combined with spacesuit hardware CAD and specifications. Early pilot testing of the gimbal revealed that setting the pivot point coincident with the modeled CG location was not always possible due to the current gimbal design, and small shifts forward and aft had noticeable effects on subject stability. Fifteen subjects performed a series of CG-related tasks in the xEMU spacesuit to assess simulation acceptability. Through iterative testing, this task list evolved to streamline the process needed to efficiently identify a suitable pivot point for a given subject. The developed methodology will be critical to determine pivot point selection for astronaut training in the xEMU ARGOS environment.

Sarah L. Jarvis↗