Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Development assurance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Integrated Capture and Conversion of CO 2 to Methanol (ICCCM) Process Technology - CRADA 449 (Final Report)

The goal of this project is to develop a prototype system that integrates the capture and catalytic hydrogenation of CO 2 into methanol in the same solvent. Ultimately, this integrated approach could provide a technology with projected reductions to capital and operating costs by at least 20% relative to a benchmark methanol synthesis via gas-phase CO 2 hydrogenation. There were five primary objectives for the project: 1. Optimize the selections of both the catalysts and the CO 2 capture solvents to achieve high conversion (>80%) and high selectivity (>90%) toward methanol in the targeted processing ranges (100-180°C, 1-60 bar). 2. Design a reactor system that provides a fixed catalyst surface area and high-efficiency heat exchange to assure compact modular processing. 3. Build and test a reactor system and demonstrate in a bench scale continuous flow system, and use the operating data to refine the comparison to existing conversion technologies. 4. Refine techno economic (TEA) and Tech-to-Market (TTM) analyses using the experimental data obtained from the bench-scale system. 5. Use the experimental data and TEA/TTM projections to develop a conceptual design for a pre-commercial system that targets a specific market opportunity.

09 BIOMASS FUELS↗

Momentum informed muon scattering tomography for monitoring spent nuclear fuels in dry storage cask

Development of an effective monitoring method for spent nuclear fuel (SNF) in a dry storage cask (DSC) is important to meet the increasing demand for dry storage investigations. The DSC investigation should provide information about the quantity of stored SNF, and quality assurance of materials should be possible without opening the cask. However, traditional nondestructive examination (NDE) methods such as x-rays are difficult to deploy for DSC investigation because a typical DSC is intentionally designed to shield against radiation. To address this challenge, cosmic ray muons (CRMs) are used as an alternative NDE radiation probe because they can easily penetrate an entire DSC system; however, a wide application of muons is often hindered due to the naturally low CRM flux (~10 4 muons/m 2 /min). This paper introduces a newly proposed imaging algorithm, momentum-informed muon scattering tomography (MMST) , and presents how a limitation of the current muon scattering tomography technique has been addressed by measuring muon momentum. To demonstrate its functionality, a commercial DSC with 24 pressurized light water reactor fuel assemblies (FAs) and the MMST system were designed in GEANT4. Three noticeable improvements were observed for MMST system as a DSC investigation tool: (1) a signal stabilization, (2) an enhanced capability to differentiate various materials, and (3) statistically increased precision to identify and locate missing FAs. The results show that MMST improves the investigation accuracy from 79 to 98% when one FA is missing and 51% to 88% when one-half FA is missing. The advancement of the NDE technique using CRM for DSC verification is expected to resolve long-standing problems in increasing demand for DSC inspections and nuclear security.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Thermochemical Modeling in Molten Fluoride Salts for Radionuclide Speciation

An important aspect of the licensing process for nuclear reactors is providing a reasonable assurance of safety to the general public. This includes modeling potential radionuclide releases from the reactor during normal operations and accident scenarios, which is known as the reactor’s source term. A new class of advanced (non-LWR) reactors are being developed which use molten salts as the coolant fluid. Because the molten salt coolant represents a credited barrier for radionuclide transport between the fuel and the environment, a necessary aspect of mechanistic source term (MST) analysis for the KP-FHR is modeling the thermochemistry of molten salts. Provided here is a review of the theory of the thermodynamic principles governing multicomponent phase equilibria, the background of molten salt thermochemistry research, and a summary of the thermochemical data relevant to the KP-FHR coolant salt, Li 2 BeF 4 , commonly referred to as “FLiBe”. A review of literature is followed by a brief introduction to methods that can be used to model the thermochemical behavior of molten salt mixtures. The methodology outlined is based on the use of a commercial thermodynamic modeling software called FactSage, which is one of only a few available softwares based on the modified quasichemical model(MQM), which is the recommended solution model for molten salts.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Framework for Patient-Centered Pathways of Care for Radiopharmaceutical Therapy: An ASTRO Consensus Document

Radiopharmaceutical therapy (RPT) is an area of projected growth and importance with several agents in clinical use, new agents in late-phase clinical trials, and many others under testing and development. This article proposes a framework for developing pathways of care that can be broadly applied to all RPTs, representing the current status of RPT. It suggests foundational elements for many pathways of care for patients with cancer and concludes with areas in active development and the future horizon for RPT treatment centers. Developing a framework for patient-centered pathways of care is a critical step in establishing RPT as standard therapy for patients with a diverse spectrum of cancers. This expected increase in RPT treatment options will affect a much larger population of patients with complex cancer. It will also require enhanced coordination and collaboration among appropriately qualified personnel with diverse expertise in image acquisition, image interpretation, quantitative imaging, dosimetry calculation, radiation quality assurance and safety as well as oncology care and RPT-induced sequelae and response assessment. The essential role of this evolving RPT care team within multidisciplinary oncology care is a cornerstone of this framework for a patient-centered pathway of care for RPT. Given the status of current RPT practice and the horizon for future applications, this patient-centered pathway of care guidance is timely and should help inform future clinical RPT practice paradigms. A task force was recruited from the Theranostic Working Group of the American Society for Radiation Oncology (ASTRO) in May 2019 with equal representation from the nuclear medicine community. The task force expanded on a framework that was originally conceived by the Working Group for patient-centered care. This framework was developed to incorporate the strengths of both radiation oncologists and nuclear medicine physicians. The manuscript was then developed by the task force and posted on the ASTRO website for a 6-week public comment period ending in July 2020. Comments were adjudicated, and the draft was sent to external organizations for potential endorsement. This document was sent to the ASTRO Board of Directors in October 2020 for approval.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since.Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter for a given ECM taken in the performance period. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the estimated (and guaranteed) savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

M&V in ESPC: The U.S. Federal Experience and Implications for Developing ESPC Markets

The United States Federal Government has been conducting guaranteed savings energy savings performance contracts for over 20 years and now relies on ESPC for the majority of its energy efficiency work. Along with a related financed project type, these deals resulted in $4.2 billion of project investment in the five years ending in 2016, a pace that has even accelerated since. Measurement and verification (M&V) on the projects is the key to assuring savings realization and persistence. Perceived as a weakness or burdensome added cost in the early years of the program, M&V has become a strength. All energy conservation measures (ECMs) have some form of measurement – defined as a measured baseline establishment followed by at least one measurement of the main energy-saving parameter taken in the performance period for each ECM. The government’s in-house energy consulting office, the Federal Energy Management Program (FEMP), now recommends measurement of these “Option A” M&V ECMs throughout the contract term, usually annually. Moreover, a significantly higher percentage of projects are now characterized by more ambitious M&V, including Option B (all parameter measurement) for most generation (including renewable) and some efficiency measures, and more frequent Option C (whole facility utility bill analysis) for “deep retrofit” projects with multiple, interactive ECMs. Coincident with this progress in M&V has been a much greater embracing of ESPC by the federal agencies, resulting in the enormous rate of projects now executed. This paper traces the evolution of M&V in federal ESPC and argues that the heightened credibility of the savings has contributed significantly to the procurement vehicle’s long-term viability. This focus on savings integrity via M&V has been learned over two decades for U.S. federal ESPC, but countries with developing ESPC markets would be wise to emphasize it as their markets emerge, allowing them to avoid some of the “growing pains” experienced in the U.S.

Coleman, Philip↗

MARVEL 90% Final Design Report

This document provides documentation of the Microreactor Applications Research Validation and Evaluation Project’s (MARVEL) 90% Final Design, as required by U.S. Department of Energy (DOE) Standard-1189, “Integration of Safety into the Design Process." Per DOE-STD-1189-2016, the 90% Final Design documentation focuses on design completion, at a level capable of supporting procurement, construction, testing, and operation. At this phase, the design organization finalizes the hazards and accident analyses, Fire Hazard Analysis (FHA), security vulnerability assessments, and other supporting analyses for design completion. The objective of this report is to provide a high-level summary of the design thus far and provide references including, but not limited to, the following design deliverables: • Complete final drawings, specifications and commercial grade dedications that may be released for bid and/or construction. • Clearly defined testing plans for the safety and functionality of all subsystems. • Quality Assurance Program for Design, Testing and Procurement. • Software Quality Assurance Plan. • Code of Record (COR), applicable design requirements including codes and standards. • Final design that meets all the requirements stipulated in the COR. • Final design review, consisting of final validation of comment resolution from previous reviews, and a review of any additional developments since the last review. • Updated Safety Design Strategy. • Hazard Analysis. • Fire Hazard Analysis. • Accident analysis. • Security vulnerability assessment. • Current and detailed cost estimate. • Current construction schedule, and • Risk & Opportunities Assessment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Wyoming CarbonSAFE Phase III: Site Characterization and Permitting Commercial-Scale Carbon Storage Complex Feasibility Study at Dry Fork Station, Wyoming

This report presents the findings of the technical and non-technical site characterization and permitting activities (“Phase III”) conducted under the Wyoming CarbonSAFE: Accelerating CCUS Commercialization and Deployment at Dry Fork Power Station (DFS) and the Wyoming Integrated Test Center project (“Wyoming CarbonSAFE”). Wyoming CarbonSAFE is part of the U.S. Department of Energy’s (DOE) National Energy Technology Laboratory (NETL) Carbon Storage Assurance Facility Enterprise (“CarbonSAFE”) Initiative. The results of Phase III demonstrate that the Wyoming CarbonSAFE project - referred to as the Northern Powder River Basin Carbon Sequestration Hub (NPRB-CSH) - meets the technical, regulatory, and commercial feasibility requirements necessary to advance toward commercial development and construction. The activities completed under this project Phase make the NPRB-CSH one of the region’s most commercially ready carbon storage sites. Completion of this Phase included the finalization of all site surface and subsurface characterization activities, completion and testing of two Class VI standard wells, 10 draft Class VI permits-to construct to address the future needs of a storage complex, finalized NEPA assessments, transportation and capture FEED studies, and a full commercialization strategy with economic modeling, operation and site closure strategies. The NPRB-CSH meets all requirements to progress to a CarbonSAFE Phase IV program or advance to full commercial operations under the development of a business partner.

01 COAL, LIGNITE, AND PEAT↗

NRAP-open-IAM: A flexible open-source integrated-assessment-model for geologic carbon storage risk assessment and management

Large-scale implementation of geologic carbon storage (GCS) to help reduce atmospheric greenhouse gas emissions requires stakeholder confidence that injected CO2 will remain contained and that potential subsurface environmental risks are acceptably small and manageable. The U.S. Department of Energy’s National Risk Assessment Partnership (NRAP) has developed an open-source integrated assessment model (NRAP-Open-IAM) to help address questions about a potential GCS site’s ability to effectively contain injected CO 2 and protect groundwater and other overlying environmentally sensitive receptors. NRAP-Open-IAM allows a user to: (1) incorporate relevant site geologic and injection scenario data; (2) characterize important site features and events;(3) couple fast prediction models of various system components of the engineered geologic system; and (4) execute stochastic, dynamic simulation of whole GCS system performance, leakage risk assessment, and uncertainty quantification. NRAP-Open-IAM is available on GitLab (https://gitlab.com/NRAP/OpenIAM), and is accompanied by multiple application examples and detailed user and developer guides.

54 ENVIRONMENTAL SCIENCES↗

Magnetic Gears: The Key to Robust, Cost-Effective Hydropower Drivetrains

Based on previous demonstrated success at fabricating 5 and 10 kW scale magnetic gearbox (MGB) prototypes, Emrgy and its partners (the project team) proposed to design and construct a 100 kW scale MGB with a 30:1 gear ratio for the low-head hydro applications. The Statement of Project Objectives included tasks covering: 1) Market Applicability; 2) Technical Metrics; 3) Design (initial); 4) Electromagnetic (EM) Load and Structural Analysis; 5) Modal Analysis; 6) Sealing Design and 7) Final Design during Budget Period 1. Budget Period 2 included tasks covering: 1) Materials Procurement and Test Plan Development; 2) Assembly; and 3) Testing. The Market Applicability study (Task 1) led to a clear conclusion and recommendation toward “Low Head” technologies for maximum market share of both New Stream Reach development as well as powering Non-Powered Dams. The findings of this study also identified the opportunity for a larger scale magnetic gearbox-based drive train as a function of increased torque, as opposed to increased speed. The Technical Metrics Study (Task 2) concluded a horizontal orientation was preferred, examined potential loss mechanisms, concluded that a Halbach Array magnetic design was preferred, established a 30:1 gear ratio as optimal, and established a power rating of 100 kW as optimal. The subsequent initial and final detailed design process included electro-magnetic (EM) load and structural analysis (Task 4), a Modal analysis (for vibration) (Task 5), and a sealing design (Task 6) to assure water impermeability. The final design package (Task 7) included 729 individual parts, 117 unique part numbers, and 15 assemblies. In order to facilitate procurement, the full bill of materials was broken down into several sub-components: 1) custom magnetic parts; 2) custom machined parts; 3) custom casted parts; and 4) commercial off the shelf (COTS) parts. The casted parts were fabricated by Oak Ridge National Laboratory (ORNL) via a Cooperative Research and Development Agreement (CRADA) with Emrgy and funded by the Advanced Manufacturing Office (AMO). The procurement effort (Task 8) ultimately covered three time periods based on challenges encountered in meeting the budgeted cost for the prototype. Following the first effort in the early stages of Budget Period 2 in 2017, a no-cost time extension was granted to seek alternative fabrication and procurement options. The project was re-booted in 2020 based on the new ORNL CRADA that would focus on five (5) of the more difficult and expensive parts using their advanced manufacturing expertise. Procurement efforts for the other custom machined parts resulted in quotations that still exceeded the budget by more than $\$$100k. This was, in part, also due to the concurrent COVID-19 pandemic that caused both supply chain disruptions and labor shortages. As the project continued, pricing and availability degraded further. In Q2 FY’22, it was decided to not proceed with the fabrication of the prototype (Task 9) based on budgetary limitations. Outcomes included a full and detailed design of a 100 kW magnetic gearbox and associated indented bill of materials (BOM) and CAD drawings, a full assembly instruction manual with an associated BOM for materials necessary to support assembly, the fabrication of the double Halbach magnetic array for the rotor/stator system, fabrication of five (5) sand-casted/machined parts (via CRADA with ORNL) and an initial draft of a comprehensive testing plan. The most significant non-outcome was the actual fabrication and testing of the prototype gearbox based on budget limitations. Lessons learned included the need for an Application / Design / Cost trade analysis to better elucidate the cost potential of the MGB in the projected volumes anticipated for future demand. This would better establish the efficacy of the original cost target ($\$$0.80/Watt) and/or the need for reconsideration of designs and applications. Likewise, additional consideration of the prototype nature of the gearbox – single use, short lifetime, etc. - either as a separate exercise or in place of the design process completed, to reduce the cost of the demonstration prototype device. Additionally, project continuity was cited as a significant risk based on the loss of the primary design engineering firm after Budget Period 1. A design analysis exercise was conducted at the conclusion of the project to identify potential areas for cost reduction. One concept considered was the removal of the inner ring of magnets (with associated changes in the outer ring magnets) to enable a horizontal collapse of the design. It was estimated this could reduce cost by 10-25% without impacting performance.

13 HYDRO ENERGY↗

Templates for Risk Informed Assurance with Curvature Embeddings (TRACE)

We investigate recovery of geometric structure from networks embedded in manifolds with spatially varying curvature, extending the constant-curvature framework of Lubold et al. (2023). Our work supports cascade risk assessment in critical infrastructure through the Templates for Risk-informed Assurance with Curvature Embeddings (TRACE) framework. Simulations on a bi-modal Gaussian surface show that constant-curvature methods yield weighted averages shaped by clique patterns, while hierarchical clustering identifies distinct regimes. Localized estimation, however, reveals boundary contamination in transitional regions. To address heterogeneity, we develop distance metrics for graphs with edge and node features, proving their metric validity, and validate them via deterministic graph generation from canonical tilings. We further propose a diffusion-based anomaly detection approach that treats networks as glued manifolds, using curvature discontinuities to detect structural anomalies. Employing the carré-du-champ operator and scalar curvature, we achieve robust anomaly discrimination, demonstrated on the Singapore Water Treatment (SWaT) dataset with joint network-traffic and sensor features. Integration with TRACE reveals how curvature shapes cascade dynamics: positive curvature impedes, while negative curvature accelerates propagation. This geometric perspective provides interpretable risk metrics and visualization tools for critical infrastructure managers. While full validation remains ongoing, our contributions establish a rigorous foundation for geometric analysis of network resilience and cascade vulnerability.

97 MATHEMATICS AND COMPUTING↗

Advanced Transmission Technologies –GETs and HPCs Session 3: HPCs and Building Actions Plans to Digital Assurance Risks

The third session of the Idaho National Laboratory’s (INL) Technical Assistance for Digital Assurance (TADA) program, held on November 11, 2025, centered on High Performance Conductors (HPCs) and the formulation of action plans to address digital assurance risks associated with Grid-Enhancing Technologies (GETs). This session convened experts from utilities, vendors, and government agencies to examine the technical, operational, and cybersecurity aspects of HPC deployment. Discussions highlighted the benefits of HPCs, such as their ability to rapidly increase transmission capacity using existing corridors, improve grid resilience, reduce system losses, and align with FERC Orders 2023 and 1920. Participants evaluated supply chain and digital assurance risks, including reliance on imported materials, limited domestic manufacturing capacity, workforce shortages, and traceability issues. The session also emphasized the importance of digital trust, integration-layer cybersecurity, and unified risk frameworks, introducing tools like intrusion detection systems, encryption, zero trust networking, and firmware integrity. Recaps of earlier workshops on Dynamic Line Ratings (DLRs), Advanced Power Flow Control (APFC), and Transmission Topology Optimization (TTO) underscored institutional barriers and integration challenges. Action plans were proposed to mitigate issues such as inconsistent cybersecurity practices, SBOM usage, supply chain visibility, operator trust, and misaligned incentives. Additionally, INL presented its supply chain risk management tools and Cyber-Informed Engineering (CIE) principles to support secure procurement and system design. The session concluded with a commitment to share key takeaways, incorporate cohort feedback into future policy development, and continue collaborative engagement through upcoming pilot activities. Session 3 of 3.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Development of the IES Plug-and-Play Framework

This report discusses the status of the flexible plug-and-play framework development currently ongoing that aims to integrate Modelica/Dymola with the Risk Analysis and Virtual ENvironment (RAVEN) software in terms of both Functional Mock-Up Interface (FMI)/Functional Mock-Up Unit (FMU) construction and repository structures that aim to ease the sharing and simulation of complex dynamic models. This report aims to provide an overview of all the performed activities resolving around the deployment of methods, software infrastructures, guidelines and workflow for the construction and usage of models, encapsulated using the FMI/FMU protocols and standards. In particular, the report is organized in three main macro-subjects, which are connected to each other: - FMI/FMU adaptors for modelica models - HYBRID repository new structure and open-source deployment - RAVEN FMI/FMU exporting capabilities and Artificial Intelligence (AI)-based analysis acceleration. The first part of the report discusses the FMI/FMU adaptors that have been created within the HYBRID repository to allow users to quickly export models, such as FMUs. Several examples are shown that highlight the step-by-step process of converting an existing Modelica model into an FMU for use within the Dymola platform. Simulation results demonstrate that, while minor differences may occur, the overall control, trends, and solution integrity are maintained between standard Modelica simulation and FMU simulation results. However, it is worth noting that, for small systems, the FMU results have a slower simulation time than the Modelica only simulation. Using this process, a company can provide models that contain proprietary information to entities without disclosing any of the information about the model that could be considered business sensitive. Such an ability would allow institutions to bypass the necessity of “whitewashing” data. In the second part of the report, the new structure of the HYBRID repository is discussed with a major focus on the series of updates that has been completed. These updates include the addition of Modelica system-level regression tests and software quality assurance documentation that ensure that modifications to the Modelica models do not alter system-level model results. The third and final part of the report aims to report the work that has been performed for the deployment of methods and workflows for the construction of RAVEN AI-based models compliant with the FMI/FMU standard. Such development represents the key for the deployment of the concept of “Flexible ecosystem” since it allows for the replacement of high-fidelity modelica models (or any other FMI/FMU compliant model) with RAVEN generated AI surrogate models. Overall, extensive work has been completed on developing FMUs and FMIs from existing models, understanding the requirements and limitations of FMUs, and open-sourcing the HYBRID repository with an integrated regression system.

42 ENGINEERING↗

Development of the IES Plug-and-Play Framework

This report discusses the status of the flexible plug-and-play framework development currently ongoing that aims to integrate Modelica/Dymola with the Risk Analysis and Virtual ENvironment (RAVEN) software in terms of both Functional Mock-Up Interface (FMI)/Functional Mock-Up Unit (FMU) construction and repository structures that aim to ease the sharing and simulation of complex dynamic models. This report aims to provide an overview of all the performed activities resolving around the deployment of methods, software infrastructures, guidelines and workflow for the construction and usage of models, encapsulated using the FMI/FMU protocols and standards. In particular, the report is organized in three main macro-subjects, which are connected to each other: - FMI/FMU adaptors for modelica models - HYBRID repository new structure and open-source deployment - RAVEN FMI/FMU exporting capabilities and Artificial Intelligence (AI)-based analysis acceleration. The first part of the report discusses the FMI/FMU adaptors that have been created within the HYBRID repository to allow users to quickly export models, such as FMUs. Several examples are shown that highlight the step-by-step process of converting an existing Modelica model into an FMU for use within the Dymola platform. Simulation results demonstrate that, while minor differences may occur, the overall control, trends, and solution integrity are maintained between standard Modelica simulation and FMU simulation results. However, it is worth noting that, for small systems, the FMU results have a slower simulation time than the Modelica only simulation. Using this process, a company can provide models that contain proprietary information to entities without disclosing any of the information about the model that could be considered business sensitive. Such an ability would allow institutions to bypass the necessity of “whitewashing” data. In the second part of the report, the new structure of the HYBRID repository is discussed with a major focus on the series of updates that has been completed. These updates include the addition of Modelica system-level regression tests and software quality assurance documentation that ensure that modifications to the Modelica models do not alter system-level model results. The third and final part of the report aims to report the work that has been performed for the deployment of methods and workflows for the construction of RAVEN AI-based models compliant with the FMI/FMU standard. Such development represents the key for the deployment of the concept of “Flexible ecosystem” since it allows for the replacement of high-fidelity modelica models (or any other FMI/FMU compliant model) with RAVEN generated AI surrogate models. Overall, extensive work has been completed on developing FMUs and FMIs from existing models, understanding the requirements and limitations of FMUs, and open-sourcing the HYBRID repository with an integrated regression system.

14 SOLAR ENERGY↗

Methods for a blind analysis of isobar data collected by the STAR collaboration

In 2018, the STAR collaboration collected data from $_{44}^{96}{\mathrm{Ru}}+_{44}^{96}{\mathrm{Ru}}$ and $_{40}^{96}{\mathrm{Zr}}+_{40}^{96}{\mathrm{Zr}}$ at $\sqrt{s_\text {NN}}=200$ GeV to search for the presence of the chiral magnetic effect in collisions of nuclei. The isobar collision species alternated frequently between $_{44}^{96}{\mathrm{Ru}}+_{44}^{96}{\mathrm{Ru}}$ and $_{40}^{96}{\mathrm{Zr}}+_{40}^{96}{\mathrm{Zr}}$ . In order to conduct blind analyses of studies related to the chiral magnetic effect in these isobar data, STAR developed a three-step blind analysis procedure. Analysts are initially provided a “reference sample” of data, comprised of a mix of events from the two species, the order of which respects time-dependent changes in run conditions. After tuning analysis codes and performing time-dependent quality assurance on the reference sample, analysts are provided a species-blind sample suitable for calculating efficiencies and corrections for individual $\approx 30$-min data-taking runs. For this sample, species-specific information is disguised, but individual output files contain data from a single isobar species. Only run-by-run corrections and code alteration subsequent to these corrections are allowed at this stage. Following these modifications, the “frozen” code is passed over the fully un-blind data, completing the blind analysis. As a check of the feasibility of the blind analysis procedure, analysts completed a “mock data challenge,” analyzing data from Au + Au collisions at $\sqrt{s_\text {NN}}=27$ GeV, collected in 2018. The Au + Au data were prepared in the same manner intended for the isobar blind data. Finally, the details of the blind analysis procedure and results from the mock data challenge are presented.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Analysis of Respirator Cartridge Performance Testing on a Hanford AP Tank Farm Primary Exhauster Slipstream

Washington River Protection Solutions (WRPS) conducted tests on two types of chemical cartridges for use in air purifying respirators (APR) to determine the period of time that the cartridges would provide adequate performance1 for APRs used to protect workers when exposed to a mixture of Chemicals of Potential Concern (COPCs) from vapors exiting the exhauster for the Hanford AP tank farm. The Occupational Safety and Health Administration (OSHA) identifies cartridge testing as a valid approach for establishing a cartridge change schedules. Testing is commonly applied in situations where mixtures of COPCs exist, and where other approaches, such as manufacturer recommendations and modeling, are less reliable. The tests were designed and conducted to assure measurement and/or control of the key variables OSHA identified as important to estimate cartridge service life, including temperature, humidity, COPC concentration, breathing rate, and cartridge adsorption capacity. Testing was conducted from June 24-26, 2016, on a slipstream from the AP exhauster fed to a respirator cartridge test stand developed by WRPS in collaboration with HiLine Engineering (Richland, Washington). Multipurpose respirator cartridges, SCOTT 7422-SD1 and SCOTT 7422-SC1 (SCOTT Safety, Monroe, North Carolina) were assessed on separate days. Sample media (sorbent tubes) were used to collect samples of the vapor stream entering and exiting the respirator cartridge and were subsequently analyzed for COPC concentrations. Pacific Northwest National Laboratory was tasked with conducting an independent analysis of the analytical results and making recommendations based on the results for respiratory cartridge performance and service life.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

COnfirmation using Gamma-ray Non-Imaging Zero-knowledge ANti-mask Time-encoding (COGNIZANT) Final Summary Report

In potential future arms reduction treaties in which the numbers of nuclear warheads may approach small numbers, using delivery systems as a proxy for the warheads themselves may be insufficient. Therefore, a technical means of verifying the presence of a nuclear warhead may become necessary. Verifying that a declared item actually is a warhead is technically challenging within a verification regime: providing assurance to the monitoring party that a presented item is a warhead while protecting sensitive information about that warhead may be required. It is generally believed that strong assurance will require the confirmation of key attributes that may reveal closely-guarded critical design information. This provides high confidence to the monitoring party, but presents a risk of information loss to the host. A verification system must overcome this hurdle. Over the last several decades, systems have been developed that balance host and monitoring partner needs by using sensitive information to confirm treaty accountable items (TAI) as warheads while sequestering that information behind an information barrier (1). These are designed to meet the needs of the host but places the onus on the monitor to authenticate the hardware, firmware, and software. Authentication requires that the monitor confirm that all components of the system have not been modified and work as intended. In 2014, Glaser et al. proposed applying the concept of “zero knowledge protocols” (ZKP) from the field of cryptography to the problem of warhead verification (2). In mathematical cryptography, ZKP is accomplished by challenging one party to solve a problem that is only possible if that party possesses the information being authenticated. After repeated challenges, the party provides confidence that it possesses this information without revealing any details about the information itself. Systems have been in development based on this idea at both Princeton and MIT (2) (3) (4). The final measurement results produced by these systems can be viewed by both the host and the monitoring party without the worry of revealing sensitive information. However, in both of these physical implementations, there remains an information barrier within the system. The need for a digital information barrier to protect a measurement result is eliminated, but it has been replaced with the need to sequester physical components of the system, potentially obfuscating the measurement process itself. Both implementations physically insert information into the system that requires protection to prevent undesired disclosure of sensitive information: in the Princeton method, one must physically load the complement of the expected image of a true warhead into the system, and in the MIT technique, one loads a collection of spectator foils whose thicknesses physically encrypt a measured spectrum. This complicates authentication of the hardware and measurement process. The CONFIDANTE/COGNIZANT concept developed in this project do not load sensitive information into the system at any time, and could therefore open the possibility of allowing the inspector to not only view the final data but also the measurement as it is being performed and all associated equipment.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Battery Energy Storage System (BESS) End-of-Performance and Decommissioning Considerations [Slides]

This presentation provides a comprehensive overview of end-of-performance and decommissioning considerations for large-scale Battery Energy Storage Systems (BESS). It outlines expected system lifespans, midterm assessment needs, and pathways for extending operational life through augmentation or repowering. The presentation details regulatory requirements that govern decommissioning plans, cost estimates, financial assurance mechanisms, and performance obligations across multiple jurisdictions. It further examines end-of-life equipment management, including recycling, waste handling, transportation, and environmental compliance. Designed to support Malawi's electricity-sector institutions, the presentation highlights how planning for decommissioning and environmental stewardship can be integrated early in project development to ensure safe, financially accountable, and environmentally responsible BESS system retirement.

24 POWER TRANSMISSION AND DISTRIBUTION↗