Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine (Final Report)

As the nation continues to encourage, through market structures and financial incentives, the proliferation of intermittent renewable electricity, how to optimize the ever-changing electric grid and identify means to retain and improve resilience, while ensuring continued reductions in GHG emissions, will be critical. According to Bloomberg, wind & solar generated 10.5% of US electricity in 2020 and that percentage continues to grow. In support of expanding renewable energy use, and to address its intermittent nature, this project will develop the Hydrogen Storage for Flexible Fossil Fuel Power Generation platform that is dispatchable, reliable, repeatable and have the ability to produce zero or negative carbon power while interfacing with geology capable of CO2 and hydrogen storage. GTI Energy (GTIE) and team members Illinois State Geological Survey (ISGS), Mitsubishi Heavy Industries America (MHIA), Ameren Illinois, Hexagon Purus, and the Low Carbon Resources Initiative (LCRI) completed a Phase I Conceptual Study under contract DE-FE0032012 for Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine. The Hydrogen Storage for Flexible Fossil Fuel Power Generation platform addresses the intermittent nature of the expanding use of Variable Renewable Energy (VRE) generation. The low cost of the electricity (COE) generated results in greater dispatch and more operation at higher power levels (higher efficiency), fewer short intervals, and fewer start/stop cycles. The reliable, resilient system can produce zero carbon power and store hydrogen. It will demonstrate hydrogen storage in geologic formations like those used in natural gas underground storage thus enabling large scale storage of hydrogen in sedimentary strata across the United States rather than in geographically restricted salt caverns. The Phase I study confirmed the system is feasible and generates power at lower cost than other low carbon approaches. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production. The study advanced the maturity of the H 2 storage-based system with flexible power generation by completing a Pre-FEED study (Phase II). The Pre-FEED focused on the selected Energy Farm on the University of Illinois Urbana-Champaign (UIUC) site that includes above ground and underground hydrogen storage, low-carbon hydrogen production (GTI’s Compact Hydrogen Generator, CHG) with underground CO2 sequestration, and a 40-MW class gas turbine. The Pre-FEED addressed the entire system and its interconnection to the natural gas and electric grid and mitigation of key risks, such as storage behavior, load-following, and system operation. During Phase 1 of the project, the team completed key tasks, which moved the entire demonstration project, specific components and approaches closer to commercialization. These Phase I Accomplishments include: Completing System Requirements Review; Completing System Layout and Modeling - Heat & Mass Balance and Process Flow Diagram; Completing modelling of 9 turbine performance cases; Evaluating rock strata for underground storage of hydrogen and sequestration of carbon dioxide; Completing initial modelling of underground storage of hydrogen and withdrawal with evaluation of loss and water production; Identifying roadable storage for above ground hydrogen storage; Identifying existing electrical infrastructure for receiving/delivering electricity; Identifying existing gas supply infrastructure for receiving natural gas; Document concept design/development plans in required reports. Conclusions: The 12-month Feasibility study in Phase I study was completed and confirmed the system is feasible and generates power at lower cost than other low carbon approaches and even lower cost than the reference NGCC plant without carbon capture when taking advantage of 45Q carbon credits. The study enabled the fidelity of the concept to be improved and allowed identification of the requirements for the system. Defining the individual system and component requirements was performed via the system requirements review with the whole team. These requirements were then incorporated into and iterated with our Heat & Mass Balance process model and process flow diagrams were generated to reflect the overall system. This information was then used to complete the TEA and show economic feasibility. Large scale non-salt geologic storage of hydrogen is an enabling technology for a hydrogen-fired turbine that can be retrofitted into large-scale electric generating units (EGU). Our demonstration will include 428 MWh or ~4 hours full load of hydrogen storage (above and underground). Carbon capture inherent to the CHG process can capture 90% CO 2 (with upgrades to >98%). This system provides a COE of 23% savings relative to an NGCC with a post combustion amine system. Our proposed storage system decouples carbon capture and hydrogen production from power production; therefore, we expect our proposed system’s efficiency and variable COE to be superior resulting in overall higher dispatch and reduced deep cycling. Our demonstration will be full to multi-day hydrogen storage and has the potential for longer (seasonal) duration commercially. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production.

03 NATURAL GAS↗

Control system for multi-system coordination via a single reference governor

This report describes the improvements to the Feasible Actuator Range Modifier (FARM) component of the RAVEN-based HYBRID framework for analysis of Integrated Energy Systems (IES). FARM supports the HERON plug-in that solves the power dispatch problem. The solution involves economically optimal dispatches that satisfy the limits on production variables and corresponding rates of variation (explicit constraints) as well as the limits on the process variables tied to the service life of equipment (implicit constraints). The problem can be addressed as a two-stage process, i.e., HERON power dispatcher estimates a solution that meets explicit constraints (low-resolution physics), whereas FARM uses the simulation outcomes of HYBRID high-fidelity model to capture the system dynamic response and enforce implicit constraints (high-resolution physics). The initial version of the code (FARM-Alpha) was released by Argonne National Laboratory in January 2021 followed by FARM-Beta (January 2022) and FARM-Gamma (April 2022).

42 ENGINEERING↗

Application of FARM to an IES scenario within the FORCE ecosystem

The FARM (Feasible Actuator Range Modifier) software module is a component of the RAVEN-based FORCE framework for analysis of Integrated Energy Systems (IES). FARM supports the HERON software module in the evaluation of the optimal dispatch by evaluating feasible set-points for the different IES unit components. Set-points are required to satisfy limits on both production variables (i.e., the variables to be optimized such as the electrical power, the hydrogen production rate, etc.) and process variables tied to the service life of equipment (e.g., steam flowrate, vessel pressure, turbine firing temperature, etc.). This problem is addressed by adopting a two-stage approach. First, the HERON power dispatcher determines set-points that meet the constraints on the former variables (e.g., power levels and power ramp rate limits). These constraints are called explicit constraints. Then, FARM adjusts these set-points to ensure the respect of the limits on the latter variables given the knowledge of the system physics acquired through machine learning algorithms. These constraints are called implicit constraints. From this standpoint, FARM constitutes a bridge between the HERON power dispatcher that adopts a simplified description of the IES unit (low-resolution physics) and the HYBRID high-fidelity models (high-resolution physics). The original version of the FARM software module (FARM-Alpha) was released by Argonne National Laboratory in January 2021. In the latest version of the code released in July 2022 (FARM-Delta), the Reference Governor (RG) algorithm was upgraded to a Multi-Input Multi-Output version from its original Single-Input Single-Output form. The RG algorithm acts to enforce constraints. With this improvement an IES unit is now treated as a single dynamic system from the standpoint of control. The crosstalk among components in an IES unit is now fully considered thereby ensuring a true optimization is obtained for those units that have multiple set-points. In this report, the capabilities of FARM-Delta operating within the FORCE ecosystem are demonstrated for an IES test case. The specific configuration of IES unit for this case was selected by the IES team with consultation from the Advanced Reactor IES Expert Group. A full TEA analysis that invoked HERON, HYBRID, FARM, and RAVEN was performed and serves to demonstrate how the latest modification to FARM algorithms (i.e., state variable selection, state-space matrices derivation, set-point verification) can shape setpoints that might otherwise compromise the health of equipment through accelerated wear and tear. In this specific test case, it was demonstrated that these algorithms ensure a more efficient utilization of steam resources to be shared by two different subsystems, namely Balance of Plant (BOP) and High-Temperature Steam Electrolysis (HTSE). Finally, some code improvements that can further enhance the user-friendliness are suggested.

97 MATHEMATICS AND COMPUTING↗

Implementation of a feature selection algorithm in FARM to identify important state variables and time-invariant matrices

The FARM (Feasible Actuator Range Modifier) software module is a component of the RAVEN-based FORCE framework for analysis of Integrated Energy Systems (IES). FARM aids the HERON software module in the evaluation of the optimal dispatch for the different IES components. Set-point trajectories are required to meet limits on both production variables (i.e., the variables to be optimized such as the electrical power, the hydrogen production rate, etc.) and process variables tied to the service life of equipment (e.g., steam flowrate, vessel pressure, turbine firing temperature, etc.). To evaluate the feasibility of HERON generated set-points and to do so in an acceptable time, FARM employs reduced order models to represent the dynamic behavior of the systems to be dispatched. These surrogate models take the form of a linear dynamic system with sets of Linear Parameter Varying (LPV) matrices that are mapped to the system operating space. These matrices are derived from the trajectories of system state variables and system output variables during transients. The accuracy of LPV matrices depends on the selection of state variables. In previous reports, state variables were selected by adopting a complicated workflow requiring multiple software licenses and an advanced level of user expertise. In this report, a new workflow that automates the state variable selection process is presented. It significantly reduces the frequency of user interventions and does not require multiple software licenses. Each module in the new workflow is described in detail, and the input / output examples in each step of the workflow are provided. It was demonstrated that this workflow can greatly reduce the complexity of the state variable selection process, and that the updated FARM-Gamma and FARM-Delta validators can benefit from this workflow when solving the power dispatch problem of a representative IES test case. Finally, some code improvements that can further enhance the efficiency are suggested.

42 ENGINEERING↗

STOCHASTIC OPTIMAL POWER FLOW FOR REAL-TIME MANAGEMENT OF DISTRIBUTED RENEWABLE GENERATION AND DEMAND RESPONSE (Final Report)

To meet the grand challenge of a sustainable energy future, there has been a surge of interest in renewable energy. Today, the uncertainty associated with renewable resources is handled by using operating reserves. The high penetration of renewable resources, however, introduces difficult-to-control dynamics and challenges for power system operation. Decision support tools are necessary at the bulk system operational level to recognize and efficiently utilize renewable resources and distributed demand response products in concert with traditional grid resources. It is envisaged that responsive load can potentially have very significant cost advantages over either spinning or non-spinning ramping reserve. Critical decisions are made during hour(s)-ahead and real-time power system operation regarding the commitment and dispatch of generators to ensure power delivery is both reliable and economic. These decisions are typically made by a security constrained optimal flow, which determines future generator commitments, dispatches, and ensures adequate reserves are available in the event of a contingency (unexpected outage) or if future system conditions deviate from forecasts. However, security has been always based on a pre-specified subset of contingency constraints whose enforcement does not guarantee security under all possible future possibilities while also giving little or no weight to the likelihood of each contingent event or the severity of its consequences. Existing tools, which are based exclusively on deterministic optimization models, do not yield optimal operational decisions to address these new challenges, in terms of both reliability and cost-effectiveness. This project has focused on developing a stochastic optimal power flow (SOPF) framework, which integrates renewable resource uncertainty, load uncertainty, distributed storage (DS), demand response (DR) products, in a holistic manner to address the uncertainty associated with ever-increasing renewable resources, along with the inclusion of distributed demand response products in future power systems. A proof-of-concept problem was created using the Pennsylvania-Jersey-Maryland (PJM) power system network. Synthetic wind generation was added to the system to simulate 50% wind penetration. A 1-hour test of SOPF operation indicated more than 6% operational cost savings. The project continued by adding the Midwestern Independent System Operator (MISO) as a partner, with focus shifting from SOPF to Stochastic Look-Ahead Unit Commitment (SLAC). Unlike PJM, MISO is faced with significant renewable energy resources within its footprint and is challenged with substantial uncertainty in its operations. The SLAC distinguishes itself from existing tools that operators use. At best, today’s tools solve two to three cases independently, where one or two system parameters, such as forecasted load level (e.g., a low, base, and high forecast), are varied and the resulting scenarios are analyzed independently. The stochastic-based optimization of SLAC leverages statistical information from an ensemble of potential operational scenarios and their respective likelihood. The SLAC output can be translated into valuable information to the operator such as suggested commitments, optimal scheduling and dispatch of resources, reserve requirements at both locational and zonal resolutions, ramping availability and requirements, availability of demand response including operational guidance concerning the near-term and real-time coordination between distributed energy resources, and utilization of distributed storage resources. The developed SOPF/SLAC tool, a stand-alone tool compatible with existing EMSs, will provide system operators with unprecedented visibility, flexibility and predictability to these resources and operational guidance concerning the real-time coordination between DERs and DR/DS products. The game changing and practical impact of this disruptive technology will be dramatic and will usher in a new era in the electric power industry, wherein green energy concepts are fully embraced, and electric power costs are lowered throughout the nation.

42 ENGINEERING↗

Integrate FARM with PID controllers: IES Simulation Ecosystem Control System Development

The FARM (Feasible Actuator Range Modifier) software module is a component of the RAVEN-based FORCE framework for analysis of Integrated Energy Systems (IES). FARM was designed to support the HERON software module in the solution of the optimal dispatch problem for IES units. As the result of HERON-FARM dispatch simulation, the set-point trajectories are optimized to meet constraints on both the production variables (i.e., the variables to be optimized such as the electrical power, the hydrogen production rate, etc.) and the process variables tied to the service life of equipment (e.g., steam flowrate, vessel pressure, turbine firing temperature, etc.) at a coarse time resolution (every 10 or 100 seconds) over long time horizons (several days or weeks). In case the operational constraints need to be met at finer time resolution, the computational burden of HERON-FARM would linearly increase with the sampling rate, and sub-optimal solutions might be obtained. System responses characterized by overshoots and damped oscillations temporarily violating the imposed constraints might occur during abrupt power transients. In this report, a hierarchical control system architecture for the operation of the Dynamic Energy Technology and Integration Laboratory (DETAIL) facility constructed at INL was proposed. First, the preliminary studies on the proposed control strategy for operating the facility and the designed PI controllers were reviewed. In particular, the current approach for generating the set-point trajectories was studied, and its limits were identified. To this aim, the inclusion of a Supervisory Control layer embedding a modified version of the FARM algorithm for preserving the system safe operation over both long and real-time horizons was proposed. In this way, FARM would be applied twice, i.e., the original version (“FARM Validator”) aiding the solution of the power dispatch problem, and the modified version (“FARM Supervisory” coordinating the PI controllers to address the real-time control tasks. Despite the kernel of the two modules is the same algorithm, their roles, tasks, and capabilities are quite different. A detailed description of the role of FARM at addressing low-level control tasks is provided, along with tentative operational procedures for training the models embedded into the algorithm by using the collected experimental data.

42 ENGINEERING↗

Demonstrate FARM supervisory capabilities for a thermal energy storage problem for the DETAIL facility: IES Simulation Ecosystem Control System Development

The goal of the power dispatch problem for an Integrated Energy System (IES) is to adjust the power output and the heat flow of each component to maximize the profitability of the whole unit. Facilities that can integrate real-time digital signals, mock nuclear power, thermal energy storage and industrial heat use via high-temperature electrolysis were constructed at INL to support the research activities. The Dynamic Energy Technology and Integration Laboratory (DETAIL) houses the Microreactor Agile Non-nuclear Experimental Test Bed (MAGNET) and the Thermal Energy Distribution System (TEDS). In this report, the hierarchical control system architecture proposed in June 2023 milestone for the flexible operation of DETAIL facility is finalized and demonstrated. A brief description of the components and the corresponding Dymola models from the HYRBID repository is first provided. Then, the current control strategy is presented. In particular, the approach for generating the set-point trajectories to be fed to the PI controllers is analyzed, and its limits were identified. To preserve safe operation over both long-time and real-time horizons, the integration of a Supervisory Control layer embedding a modified version of FARM (Feasible Actuator Range Modifier) module is proposed. FARM is a component of the RAVEN-based FORCE framework designed to support HERON module at optimizing the operation of IES units. The proposed control system for DETAIL foresees FARM to be applied twice, i.e., the original version (“FARM-Validator”) aiding the solution of the power dispatch problem, and a modified version (“FARM-Supervisory”) coordinating the PID controllers. Despite the kernel of the two modules is the same, their tasks are quite different. The former intervenes at the beginning of each hour to prevent constraint violations over long time periods, the latter addresses real-time control tasks and monitors the response of constrained variables at a much finer time resolution. A tentative procedure for training the embedded Digital Twins with the experimental data is also proposed. Finally, the capabilities of the designed architecture and the impact of the added Supervisory Control layer are demonstrated by simulating a representative power dispatch scenario.

25 ENERGY STORAGE↗

Techno-Economic Analysis of Greenfield Geothermal Hybrid Power Plants using a Solar or Natural Gas Steam Topping Cycle

The relatively low generation costs associated with wind, solar photovoltaic (PV), and natural-gas power plants make it challenging for geothermal power plants to produce and sell the power that has the reliability and sustainability characteristics that are greatly needed in U.S. power markets. This is especially true for geothermal resources with low-to-medium temperatures, which results in relatively low-thermal efficiency and generation costs that are higher than those for wind, solar PV, and natural gas. This analysis evaluates solar thermal- and natural-gas combustion waste heat recovery-based topping cycle hybridization of geothermal binary power plants. This approach provides several benefits that may allow geothermal power plants to generate power at more competitive costs. First, the addition of solar thermal energy or natural-gas combustion waste heat input to a geothermal power plant provides additional heat input that can be converted to electrical power. Second, the temperature level of the heat obtained from concentrating solar collectors or natural-gas combustion exhaust is higher than that of geothermal heat, which provides opportunities for improving the efficiency of the conversion of thermal energy to electrical power. Third, the ease with which solar thermal systems integrate with energy storage and the flexibility of natural gas means power generation can occur during peak demand periods. The hybrid cycles are compared to equivalently sized, co-located, independent geothermal, concentrating solar, and/or natural-gas power plants. The hybrid cycle tends to produce slightly more power than the standalone plants combined. However, the hybrid plant Levelized Cost of Energy (LCOE) is slightly higher than the LCOE of the combined standalone power plants for each of the case study locations investigated. Using the steam-topping cycle, organic Rankine cycle (ORC)-bottoming cycle hybrid plant design to combine a solar thermal resource and low- temperature geothermal resource (<120 degrees C) leads to a hybrid plant with a lower LCOE than a standalone geothermal-only system. Thus, hybrid plants may enable the economic development of geothermal resources in locations with low geothermal resource temperatures. However, in areas with higher geothermal resource temperatures (>120 degrees C), the geothermal-only plant has a lower LCOE than the hybrid cycle and thus could be developed without the need for solar heat addition. iv A geothermal-natural-gas reciprocating engine hybrid plant was evaluated for an Elk Hills, California case study location. The Elk Hills case study analysis indicates that when the natural-gas engine operates for more than 12 hours per day the hybrid plant can produce power at an LCOE lower than a standalone geothermal plant, and comparable to that of the standalone natural-gas reciprocating engine, while also reducing the carbon intensity of the power generated relative to the standalone natural-gas engine. This may represent a scenario in which the hybrid plant provides an opportunity for the deployment of a low-temperature geothermal resource that otherwise may have an LCOE too high to develop and operate as a standalone resource, while also reducing the carbon intensity of natural-gas generation sources. A "triple-hybrid" plant that combines natural gas, solar thermal, thermal energy storage, and geothermal was also investigated. A natural-gas combustion turbine (NGCT) is added to the geothermal-solar hybrid such that the hot exhaust gas from the gas turbine provides an alternative source of heat to the steam turbine of the hybrid cycle. Analysis results suggest that the triple-hybrid plant has a significantly higher energy generation and revenue than a standalone NGCT or the original geothermal-solar hybrid. The triple-hybrid design benefits most from using a smaller solar field so that the solar energy can be dispatched at the most valuable times available. The triple-hybrid plant also has a lower LCOE than the standalone NGCT. The triple-hybrid plant was evaluated making simple assumptions about the dispatch profile of the gas cycle, and more nuanced and realistic dispatching schedules should be analyzed in future work.

15 GEOTHERMAL ENERGY↗

Economic Evaluation of a Coupled Nuclear Power Plant and Hydrogen Production Facility: A Case Study

This study optimized the design sizes and operation of a power-to-hydrogen-to-power integrated energy system to allow a baseload power plant to operate flexibly in the energy market. In collaboration with a utility industry partner, the system, consisting of an electrolyzer, compressors, storage tank, and fuel cell, was optimized under conditions specific to the proposed project at the site of a nuclear power plant. The Design Integration and Synthesis Platform to Advance Tightly Coupled Hybrid Energy Systems (DISPATCHES) maximized net present value by optimizing sizing of components and dispatch decisions. Revenues included sale of electricity, capacity payments typical of the New York Independent System Operator, and the section 45V hydrogen production tax credit of the Inflation Reduction Act of 2022 (the tax credit was assumed to be available to legacy plants in the absence of clear guidance at present). Under default assumptions which excluded many capital expenditures, the base case optimized solution had a net present value of $\$$1.4 million over a 30 year lifetime, with a 0.365 MW fuel cell operating nearly continuously and 85% of revenues supplied by the hydrogen production tax credit (which was counted as a revenue regardless of profit, thus assuming credit monetization or offset of taxes within the larger firm was possible in all years). Beyond the base case, a sensitivity study elucidated drivers of the economics as capacity payment rate and hydrogen production tax credit rate vary. Additional sensitivity studies also extended results to variation of other, previously fixed parameters, including the fuel cell capital cost, and to imposition of further constraints. Optimization was also repeated for the default assumptions but recognizing tax credits upon use of hydrogen rather than upon its production, producing no change in the optimal solution. Most notably, capacity payments above $\$$15/kW-month drove optimal fuel cells multiple times larger than those with the default estimated capacity payment of $\$$2.5/kW-month (approaching 11 vs. 0.365 MW), and these larger fuel cells operated rarely (capacity factors of ~0.03). Furthermore, when the hydrogen production tax credit was provided for only 10 years, under the specific assumptions of this study (e.g., neither site preparation costs nor electrolyzer capital cost counted), the optimal solution avoided economic loss by ceasing system operation after the 10th year. Viewed broadly, this study demonstrated the capabilities of DISPATCHES, which can be user-adapted to serve other industrial case studies.

08 HYDROGEN↗

Solar and Storage Integration in the Southeastern United States: Economics, Reliability, and Operations

Solar energy has the potential to be a core energy resource for the southeastern United States. To better understand the implications of higher levels of solar PV (27%-43% of total generation capacity) and electricity storage (13%-49% of peak load) would affect electricity system reliability, costs, and operations in the U.S. Southeast, this study sought to address two main questions. First, how would higher levels of solar PV and electricity storage impact the costs, reliability, and operations of electricity systems in the Southeast in 2035? Second, at different levels of solar PV and electricity storage, what are the benefits of operational coordination among utilities in the Southeast, through more efficient regional dispatch and sharing operating reserves? To answer these questions, the study used detailed capacity expansion and dispatch modeling to develop and examine 15 scenarios with different levels of solar PV, electricity storage, and operational coordination, focusing on the year 2035. The study also evaluates the benefits of operational coordination among utilities through more efficient regional dispatch and reserve sharing, at different levels of solar and storage. The study focuses on five balancing regions that cover Alabama, Georgia, Kentucky, North Carolina, South Carolina, Tennessee, and parts of Mississippi and Missouri.

14 SOLAR ENERGY↗

Solar and Storage Integration in the Southeastern United States: Economics, Reliability, and Operations

Solar energy has the potential to be a core energy resource for the southeastern United States. To better understand the implications of higher levels of solar PV (27%-43% of total generation capacity) and electricity storage (13%-49% of peak load) would affect electricity system reliability, costs, and operations in the U.S. Southeast, this study sought to address two main questions. First, how would higher levels of solar PV and electricity storage impact the costs, reliability, and operations of electricity systems in the Southeast in 2035? Second, at different levels of solar PV and electricity storage, what are the benefits of operational coordination among utilities in the Southeast, through more efficient regional dispatch and sharing operating reserves? To answer these questions, the study used detailed capacity expansion and dispatch modeling to develop and examine 15 scenarios with different levels of solar PV, electricity storage, and operational coordination, focusing on the year 2035. The study also evaluates the benefits of operational coordination among utilities through more efficient regional dispatch and reserve sharing, at different levels of solar and storage. The study focuses on five balancing regions that cover Alabama, Georgia, Kentucky, North Carolina, South Carolina, Tennessee, and parts of Mississippi and Missouri.

14 SOLAR ENERGY↗

Modeling and Analysis of Clean Energy and Storage Technologies (CRADA Final Report, Project 1)

The goal of this project is to provide Southern Company Services, Inc. ("Participant") with custom scripts that can be used to create an average PV energy production profile, calculate lifetime energy value, calculate capacity value, and calculate the resultant financial metrics considering those value streams. Secondly, a fuel-cell model will be added to the public version of System Advisor Model (SAM). This standalone technology will incorporate PV and battery storage, allowing the participant to model the interaction of these three technologies. By adding this capability to a public version of SAM, a broad audience will be able to consider the system performance and financial benefits of installing a fuel cell as a baseline generator with PV. Thirdly, automated dispatch algorithms will be developed and added to SAM. These algorithms will enable Southern Company to dispatch a DC-connected front-of-the-meter battery system while considering price signals and PV clipping behavior. By adding these capabilities to a public version of SAM, users will be able to consider more complex and realistic ways of dispatching a battery system.

14 SOLAR ENERGY↗

Flair-fleet location and information reporting

The FLAIR system, as now produced, automatically updates each vehicle's location and corresponding officer's status once each two seconds and presents this information to police dispatchers in the command and control center. The position of all vehicles available for assignment is displayed on a color video map at each dispatcher's console to an accuracy of 50 feet. This gives the dispatcher a continuous picture of the deployment of the total available force and thus complete command and control of all police under his responsibility.

Norman, E. R.↗

Innovative telecommunications for law enforcement

The operation of computer-aided dispatch, mobile digital communications, and automatic vehicle location systems used in law enforcement is discussed, and characteristics of systems used by different agencies are compared. With reference to computer-aided dispatch systems, the data base components, dispatcher work load, extent of usage, and design trends are surveyed. The capabilities, levels of communication, and traffic load of mobile digital communications systems are examined. Different automatic vehicle location systems are distinguished, and two systems are evaluated. Other aspects of the application of innovative technology to operational command, control, and communications systems for law enforcement agencies are described.

Sohn, R. L.↗

Technical assistance for law-enforcement communications: Case study report two

Two case histories are presented. In one study the feasibility of consolidating dispatch center operations for small agencies is considered. System load measurements were taken and queueing analysis applied to determine numbers of personnel required for each separate agency and for a consolidated dispatch center. Functional requirements were developed and a cost model was designed to compare relative costs of various alternatives including continuation of the present system, consolidation of a manual system, and consolidated computer-aided dispatching. The second case history deals with the consideration of a multi-regional, intrastate radio frequency for improved interregional communications. Sample standards and specifications for radio equipment are provided.

Reilly, N. B.↗

An empirical evaulation of computerized tools to aid in enroute flight planning

The paper describes an experiment using the Flight Planning Testbed (FPT) in which 27 airline dispatchers were studied. Five general questions was addresses in the study: Under what circumstances does the introduction of computer-generated suggestions (flight plans) influence the planning behavior of dispatchers; what is the nature of such influences; How beneficial are the general design concepts underlying FPT; How effective are the specific implementation decisions made in realizing these general design concepts; How effectively do dispatchers evaluate situations requiring replanning and how effectively do they identify appropriate solutions to these situations. The study leaves little doubt that the introduction of computer-generated suggestions for solving a flight planning problem can have a marked impact on the cognitive processes of the user and on the ultimate plan selected.

Smith, Philip J.↗

Weather Avoidance Using Route Optimization as a Decision Aid: An AWIN Topical Study

The aviation community is faced with reducing the fatal aircraft accident rate by 80 percent within 10 years. This must be achieved even with ever increasing, traffic and a changing National Airspace System. This is not just an altruistic goal, but a real necessity, if our growing level of commerce is to continue. Honeywell Technology Center's topical study, "Weather Avoidance Using Route Optimization as a Decision Aid", addresses these pressing needs. The goal of this program is to use route optimization and user interface technologies to develop a prototype decision aid for dispatchers and pilots. This decision aid will suggest possible diversions through single or multiple weather hazards and present weather information with a human-centered design. At the conclusion of the program, we will have a laptop prototype decision aid that will be used to demonstrate concepts to industry for integration into commercialized products for dispatchers and/or pilots. With weather a factor in 30% of aircraft accidents, our program will prevent accidents by strategically avoiding weather hazards in flight. By supplying more relevant weather information in a human-centered format along with the tools to generate flight plans around weather, aircraft exposure to weather hazards can be reduced. Our program directly addresses the NASA's five year investment areas of Strategic Weather Information and Weather Operations (simulation/hazard characterization and crew/dispatch/ATChazard monitoring, display, and decision support) (NASA Aeronautics Safety Investment Strategy: Weather Investment Recommendations, April 15, 1997). This program is comprised of two phases, Phase I concluded December 31, 1998. This first phase defined weather data requirements, lateral routing algorithms, an conceptual displays for a user-centered design. Phase II runs from January 1999 through September 1999. The second phase integrates vertical routing into the lateral optimizer and combines the user interface into a prototype software testbed. Phase II concludes with a dispatcher and pilot evaluation of the route optimizer decision aid. This document describes work completed in Phase I in contract with NASA Langley August 1998 - December 1998. This report includes: (1) Discuss how weather hazards were identified in partnership with experts, and how weather hazards were prioritized; (2) Static representations of display layouts for integrated planning function (3) Cost function for the 2D route optimizer; (4) Discussion of the method for obtaining, access to raw data of, and the results of the flight deck user information requirements definition; (5) Itemized display format requirements identified for representing weather hazards in a route planning aid.

Source record↗

Alternative Perspectives on Risk

The goal of the commercial air transport system is to provide air transportation to the flying public at an acceptable cost with minimal risk. in an ideal situation these three goals would support each other. In fact, it is sometimes the case that the goals conflict: getting passengers to their destinations on time may conflict with fixing a minor mechanical malfunction that may or may not impact safety; flying a route that will avoid turbulence, thereby providing passengers with a more comfortable ride, may consume more fuel; managing traffic density may mean aircraft are delayed or must use an approach that will result in a long taxi to their gates, costing time and fuel. Various players in the system--pilots, dispatchers, controllers, as well as managers in the airline carriers and traffic management system--make decisions every day that involve trade-offs of benefits and costs. The prospect of revisions in the air traffic management system, with shifts in responsibilities from controllers to users, including airline operations center personnel and pilots, means that individuals may be performing either new jobs or old jobs under new guidance. It will be essential to know how the various players (a) perceive the risks and benefits associated with the decisions they will make under the old and new control structures, and (b) how much risk they are willing to accept in making decisions. Risk is here defined as the probability and magnitude of negative events (after Slovic, 1987). Of primary interest are risks associated with traffic, weather, and operational factors such as schedule, fuel consumption, and passenger service. Previous research has documented differences between groups in perceptions of risks associated with both everyday and aviation related situations. Risk perception varies as a function of familiarity with the situation, degree to which one is potentially affected by the risk, the level of control one has over the situation, and one's level of experience and responsibility in the situation. In our presentation we will consider several factors that may influence differences in risk perception, risk tolerance and risk management among the three major categories of participants in the aviation system (pilots, dispatchers, and controllers). Primary factors that may affect risk attitudes (the collective term we will use for the three components of risk) include: expertise or job-specific knowledge or training, personal involvement or vulnerability to consequences, goals, time horizon (imminence of consequences), span of control and type of control, and information or technology support. These will be considered in the context of five different types of risk (physical threat, economic, social, legal, and ethical). A study designed to study differences between pilots and controllers in their perceptions and responses to traffic risks under the present and a user-preferred control situation will be described. Future studies involving dispatchers' risk perceptions regarding various types of risk will be discussed.

Davison, Jeannie↗