Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COST”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

Low cost silicon solar array project: Feasibility of low-cost, high-volume production of silane and pyrolysis of silane to semiconductor-grade silicon

Silicon epitaxy analysis of silane produced in the Process Development Unit operating in a completely integrated mode consuming only hydrogen and metallurgical silicon resulted in film resistivities of up to 120 ohms cm N type. Preliminary kinetic studies of dichlorosilane disproportionation in the liquid phase have shown that 11.59% SiH4 is formed at equilibrium after 12 minutes contact time at 56 C. The fluid-bed reactor was operated continuously for 48 hours with a mixture of one percent silane in helium as the fluidizing gas. A high silane pyrolysis efficiency was obtained without the generation of excessive fines. Gas flow conditions near the base of the reactor were unfavorable for maintaining a bubbling bed with good heat transfer characteristics. Consequently, a porous agglomerate formed in the lower portion of the reactor. Dense coherent plating was obtained on the silicon seed particles which had remained fluidizied throughout the experiment.

Breneman, W. C.↗

Low Cost Silicon Solar Array Project. Feasibility of Low-cost, High-volume Production of Silane and Pyrolysis of Silane to Semiconductor-grade Silicon

The presence of copper promotes a more rapid approach to the steady stete operating condition and results in a more consistent reactor effluent composition. The average kinetic and equilibrium yield are unchanged. Incoloy has been identified as the preferred choice of material of construction for the hydrogenation reactor although certain metallurgical changes were noted in samples exposed to the H2/HCl atmosphere at 500 C which indicate the need for more testing.

Breneman, W. C.↗

Comprehensive Total Cost of Ownership Quantification for Vehicles with Different Size Classes and Powertrains

In order to accurately compare the costs of two vehicles, the total cost of ownership (TCO) should consist of all costs related to both purchasing and operating the vehicle. This TCO analysis builds on previous work to provide a comprehensive perspective of all relevant vehicle costs of ownership. In this report, we present what we believe to be the most comprehensive explicit financial analysis of the costs that will be incurred by a vehicle owner. This study considers vehicle cost and depreciation, financing, fuel costs, insurance costs, maintenance and repair costs, taxes and fees, and other operational costs to formulate a holistic total cost of ownership and operation of multiple different vehicles. For each of these cost parameters that together constitute a comprehensive TCO, extensive literature review and data analysis were performed to find representative values in order to build a holistic TCO for vehicles of all size classes. The light- and heavy-duty vehicles selected for analysis in this report are representative of those that are on the road today and expected to be available in the future. Important additive analyses in this study include systematic analysis of vehicle depreciation, in-depth examination of insurance premium costs, comprehensive maintenance and repair estimates, analysis of all relevant taxes and fees, and considerations of specific costs applicable to commercial vehicles. We find that cars depreciate faster than light trucks and that older plug-in electric vehicles have a greater depreciation rate than newer electric vehicles. Light-duty vehicle (LDV) insurance costs show comparable costs for different powertrains, and lower costs for larger size classes. Medium- and heavy-duty vehicle (MHDV) insurance costs vary significantly by vocation. Electric and electrified powertrains have lower maintenance and repair costs than internal combustion engine (ICE) powertrains for all vehicle sizes, relative to vehicle price. MHDV maintenance and repair costs depend heavily on vocation and duty cycle. LDV taxes and fees are comparable across powertrain types and size classes, though marginally higher registration fees exist for alternative fuel vehicles. MHDV fees depend on the vocation, weight rating, and state. Many electric tractor trailers would be affected by additional battery weight, reducing the available payload capacity, and this cost can be substantial. Electric vehicle charging for commercial vehicles can be time-consuming; labor rates can cause this cost to dominate TCO. With improved knowledge of each of the cost components, we calculate a lifetime TCO for comparison across vehicles of different types and attributes. For a simulated small sport utility vehicle in 2025, modeled using Autonomie, the hybrid electric vehicle (HEV) has the lowest cost, followed by the conventional ICE vehicle. For MHDV, TCO can be drastically different depending on the vocation. Long-haul vehicles typically have the lowest per-mile costs. Excluding labor costs, the class 4 delivery has a comparable TCO to the day cab. Vocational trucks, refuse trucks, and transit buses have a high per-mile cost of ownership due to maintenance and insurance. For all of these vehicles, the cost of operating the vehicle is heavily weighted by the labor of the driver, followed by the fuel costs. While the HEV begins as the lowest cost powertrain for passenger vehicles, fuel cells are forecast to reach cost parity by 2030 when hydrogen prices reach $\$ 5$/kg while battery electric vehicles (BEV) reach cost parity by 2035 at a battery cost of $\$ 98$ per usable kWh of capacity, with these two technologies being the lowest cost in 2050. For the class 8 day cab tractor, the HEV and ICE vehicle begin as the lowest cost powertrains, and the 250-mile BEV reduces in cost from the most expensive to the least expensive by 2030.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Realistic costs of carbon capture

There is a growing interest in carbon capture and storage (CCS) as a means of reducing carbon dioxide (CO2) emissions. However there are substantial uncertainties about the costs of CCS. Costs for pre-combustion capture with compression (i.e. excluding costs of transport and storage and any revenue from EOR associated with storage) are examined in this discussion paper for First-of-a-Kind (FOAK) plant and for more mature technologies, or Nth-of-a-Kind plant (NOAK). For FOAK plant using solid fuels the levelised cost of electricity on a 2008 basis is approximately 10 cents/kWh higher with capture than for conventional plants (with a range of 8-12 cents/kWh). Costs of abatement are found typically to be approximately US$150/tCO2 avoided (with a range of US$120-180/tCO2 avoided). For NOAK plants the additional cost of electricity with capture is approximately 2-5 cents/kWh, with costs of the range of US$35-70/tCO2 avoided. Costs of abatement with carbon capture for other fuels and technologies are also estimated for NOAK plants. The costs of abatement are calculated with reference to conventional SCPC plant for both emissions and costs of electricity. Estimates for both FOAK and NOAK are mainly based on cost data from 2008, which was at the end of a period of sustained escalation in the costs of power generation plant and other large capital projects. There are now indications of costs falling from these levels. This may reduce the costs of abatement and costs presented here may be 'peak of the market' estimates. If general cost levels return, for example, to those prevailing in 2005 to 2006 (by which time significant cost escalation had already occurred from previous levels), then costs of capture and compression for FOAK plants are expected to be US$110/tCO2 avoided (with a range of US$90-135/tCO2 avoided). For NOAK plants costs are expected to be US$25-50/tCO2. Based on these considerations a likely representative range of costs of abatement from CCS excluding transport and storage costs appears to be US$100-150/tCO2 for first-of-a-kind plants and perhaps US$30-50/tCO2 for nth-of-a-kind plants.The estimates for FOAK and NOAK costs appear to be broadly consistent in the light of estimates of the potential for cost reductions with increased experience. Cost reductions are expected from increasing scale, learning on individual components, and technological innovation including improved plant integration. Innovation and integration can both lower costs and increase net output with a given cost base. These factors are expected to reduce abatement costs by approximately 65% by 2030. The range of estimated costs for NOAK plants is within the range of plausible future carbon prices, implying that mature technology would be competitive with conventional fossil fuel plants at prevailing carbon prices.

01 COAL, LIGNITE, AND PEAT↗

Cost Risk Analysis Based on Perception of the Engineering Process

In most cost estimating applications at the NASA Langley Research Center (LaRC), it is desirable to present predicted cost as a range of possible costs rather than a single predicted cost. A cost risk analysis generates a range of cost for a project and assigns a probability level to each cost value in the range. Constructing a cost risk curve requires a good estimate of the expected cost of a project. It must also include a good estimate of expected variance of the cost. Many cost risk analyses are based upon an expert's knowledge of the cost of similar projects in the past. In a common scenario, a manager or engineer, asked to estimate the cost of a project in his area of expertise, will gather historical cost data from a similar completed project. The cost of the completed project is adjusted using the perceived technical and economic differences between the two projects. This allows errors from at least three sources. The historical cost data may be in error by some unknown amount. The managers' evaluation of the new project and its similarity to the old project may be in error. The factors used to adjust the cost of the old project may not correctly reflect the differences. Some risk analyses are based on untested hypotheses about the form of the statistical distribution that underlies the distribution of possible cost. The usual problem is not just to come up with an estimate of the cost of a project, but to predict the range of values into which the cost may fall and with what level of confidence the prediction is made. Risk analysis techniques that assume the shape of the underlying cost distribution and derive the risk curve from a single estimate plus and minus some amount usually fail to take into account the actual magnitude of the uncertainty in cost due to technical factors in the project itself. This paper addresses a cost risk method that is based on parametric estimates of the technical factors involved in the project being costed. The engineering process parameters are elicited from the engineer/expert on the project and are based on that expert's technical knowledge. These are converted by a parametric cost model into a cost estimate. The method discussed makes no assumptions about the distribution underlying the distribution of possible costs, and is not tied to the analysis of previous projects, except through the expert calibrations performed by the parametric cost analyst.

Dean, Edwin B.↗

Assessing I 2 S-LWR economic competitiveness using systematic differential capital cost evaluation methodology

One of the major factors impeding nuclear power plant (NPP) construction is their economics. In this study, a systematic differential economics evaluation approach was developed through the use of the Code of Accounts guidelines to assess the costs of nuclear power plants. The methodology, entirely based on publicly available data, may serve as a template to evaluate direct costs for reactors of any size and design at any stage of developments. In particular, this approach was used to assess the costs of the Integral Inherently Safe Light Water Reactor (I 2 S-LWR). The I 2 S-LWR is a design concept of a large (~1000 MWe) light water reactor. One of its key design features promoting inherent safety is implementation of an integral primary circuit configuration, which however necessitates a compact design of the core and primary circuit components. Through the methodology here presented, a representative loop PWR design was taken as a reference and the differential cost was estimated for each individual account based on the design difference, or similarity. Cost scaling techniques were applied to the accounts representing systems that differ from the ones of the reference PWR. Cost estimating techniques were used to evaluate cost of innovative components that are not part of standard PWR designs. By evaluating the cost difference of the I 2 S-LWR from the standard PWR, rather than the absolute cost, the uncertainty in the estimate is reduced. A similar approach was used by ORNL to estimate the cost of a Fluoride-salt High-temperature Reactor (FHR). A traditional four-loop PWR plant with a core thermal power of 3417 MWth (1144 MWe) was selected as the reference. Costs for that plant were prepared in 1978 by the Department of Energy (DOE) Energy Economics Data Base (EEDB), averaging actual cost incurred in the construction of several nuclear power plants (NPP), itemized with a great level of detail according to the Code of Accounts. This best estimate costs are denoted PWR12-BE. For each account, the cost of equipment, site labor and site material is provided. Industry experts at Westinghouse Electric Company performed a “sanity check” of the cost items, adjusting the cost of several items to match the current market and supply chain data. The detailed cost assessment of I 2 S-LWR was performed, systematically analyzing cost for each account, and applying the differential economics approach. First, Relative importance of each account, i.e., its contribution to the total cost was established, to help focus analysis on the most significant contributors. Moreover, the accounts describing components that are different than that of the PWR12-BE were identified. The integral configuration of the reactor has important implications on the cost of the reactor plant equipment (accounts 22x). Turbine generator equipment (Accounts 23x) is not believed to be much different than that of the reference design. I 2 S-LWR structures (Accounts 21x) mainly differ from that of a standard LWR as several buildings (containment building, shield building, annex building, waste processing building, fuel storage building) are integrated into a single building (nuclear island). Yardwork has a higher cost for the I 2 S-LWR, as the NI is partially below grade. On the other hand, due to its compact Nuclear Island footprint, I 2 S-LWR facilitates (and includes in its reference version) the use of seismic isolators, which contribute to reducing the direct cost. The total capital investment cost (TCIC), on the $/kW basis, of I 2 S-LWR is 5.84% lower than that of PWR12-BE, in spite of the lower power output of I 2 S-LWR. However, for the Western US (0.7 g), benefits of the seismic isolation are more pronounced, and the I 2 S-LWR total capital investment cost is 13.02% lower than that of PWR12-BE. If the I 2 S-LWR is compared to a PWR10-BE (traditional loop design, but scaled to the same power level as I 2 S-LWR), the savings are even higher, in the range 11.12%–17.89%. The analysis indicates that I 2 S-LWR has potential to offer an economically attractive design, with TCIC lower than that of a nuclear power plant based on a traditional loop PWR design. In other words, I 2 S-LWR design offers significantly enhanced safety, while at the same time improving economics. The differential economics approach developed in this paper can be used in identifying changes in cost of key components in order to improve the economics of a nuclear reactor design. The method can also help compare the economics of advanced Generation IV reactors and innovative water-cooled SMR (Small Modular Reactors) with respect to standard LWR technologies. In summary, the differential economics approach and can be used as a tool capable of helping stakeholder decisions.

Economic↗

Integrated Cost and Schedule using Monte Carlo Simulation of a CPM Model - 12419

This discussion of the recommended practice (RP) 57R-09 of AACE International defines the integrated analysis of schedule and cost risk to estimate the appropriate level of cost and schedule contingency reserve on projects. The main contribution of this RP is to include the impact of schedule risk on cost risk and hence on the need for cost contingency reserves. Additional benefits include the prioritizing of the risks to cost, some of which are risks to schedule, so that risk mitigation may be conducted in a cost-effective way, scatter diagrams of time-cost pairs for developing joint targets of time and cost, and probabilistic cash flow which shows cash flow at different levels of certainty. Integrating cost and schedule risk into one analysis based on the project schedule loaded with costed resources from the cost estimate provides both: (1) more accurate cost estimates than if the schedule risk were ignored or incorporated only partially, and (2) illustrates the importance of schedule risk to cost risk when the durations of activities using labor-type (time-dependent) resources are risky. Many activities such as detailed engineering, construction or software development are mainly conducted by people who need to be paid even if their work takes longer than scheduled. Level-of-effort resources, such as the project management team, are extreme examples of time-dependent resources, since if the project duration exceeds its planned duration the cost of these resources will increase over their budgeted amount. The integrated cost-schedule risk analysis is based on: - A high quality CPM schedule with logic tight enough so that it will provide the correct dates and critical paths during simulation automatically without manual intervention. - A contingency-free estimate of project costs that is loaded on the activities of the schedule. - Resolves inconsistencies between cost estimate and schedule that often creep into those documents as project execution proceeds. - Good-quality risk data that are usually collected in risk interviews of the project team, management and others knowledgeable in the risk of the project. The risks from the risk register are used as the basis of the risk data in the risk driver method. The risk driver method is based in the fundamental principle that identifiable risks drive overall cost and schedule risk. - A Monte Carlo simulation software program that can simulate schedule risk, burn WM2012 rate risk and time-independent resource risk. The results include the standard histograms and cumulative distributions of possible cost and time results for the project. However, by simulating both cost and time simultaneously we can collect the cost-time pairs of results and hence show the scatter diagram ('football chart') that indicates the joint probability of finishing on time and on budget. Also, we can derive the probabilistic cash flow for comparison with the time-phased project budget. Finally the risks to schedule completion and to cost can be prioritized, say at the P-80 level of confidence, to help focus the risk mitigation efforts. If the cost and schedule estimates including contingency reserves are not acceptable to the project stakeholders the project team should conduct risk mitigation workshops and studies, deciding which risk mitigation actions to take, and re-run the Monte Carlo simulation to determine the possible improvement to the project's objectives. Finally, it is recommended that the contingency reserves of cost and of time, calculated at a level that represents an acceptable degree of certainty and uncertainty for the project stakeholders, be added as a resource-loaded activity to the project schedule for strategic planning purposes. The risk analysis described in this paper is correct only for the current plan, represented by the schedule. The project contingency reserve of time and cost that are the main results of this analysis apply if that plan is to be followed. Of course project managers have the option of re-planning and re-scheduling in the face of new facts, in part by mitigating risk. This analysis identifies the high-priority risks to cost and to schedule, which assist the project manager in planning further risk mitigation. Some project managers reject the results and argue that they cannot possibly be so late or so overrun. Those project managers may be wasting an opportunity to mitigate risk and get a more favorable outcome. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Process Cost Modeling for Multi-Disciplinary Design Optimization

For early design concepts, the conventional approach to cost is normally some kind of parametric weight-based cost model. There is now ample evidence that this approach can be misleading and inaccurate. By the nature of its development, a parametric cost model requires historical data and is valid only if the new design is analogous to those for which the model was derived. Advanced aerospace vehicles have no historical production data and are nowhere near the vehicles of the past. Using an existing weight-based cost model would only lead to errors and distortions of the true production cost. This report outlines the development of a process-based cost model in which the physical elements of the vehicle are costed according to a first-order dynamics model. This theoretical cost model, first advocated by early work at MIT, has been expanded to cover the basic structures of an advanced aerospace vehicle. Elemental costs based on the geometry of the design can be summed up to provide an overall estimation of the total production cost for a design configuration. This capability to directly link any design configuration to realistic cost estimation is a key requirement for high payoff MDO problems. Another important consideration in this report is the handling of part or product complexity. Here the concept of cost modulus is introduced to take into account variability due to different materials, sizes, shapes, precision of fabrication, and equipment requirements. The most important implication of the development of the proposed process-based cost model is that different design configurations can now be quickly related to their cost estimates in a seamless calculation process easily implemented on any spreadsheet tool. In successive sections, the report addresses the issues of cost modeling as follows. First, an introduction is presented to provide the background for the research work. Next, a quick review of cost estimation techniques is made with the intention to highlight their inappropriateness for what is really needed at the conceptual phase of the design process. The First-Order Process Velocity Cost Model (FOPV) is discussed at length in the next section. This is followed by an application of the FOPV cost model to a generic wing. For designs that have no precedence as far as acquisition costs are concerned, cost data derived from the FOPV cost model may not be accurate enough because of new requirements for shape complexity, material, equipment and precision/tolerance. The concept of Cost Modulus is introduced at this point to compensate for these new burdens on the basic processes. This is treated in section 5. The cost of a design must be conveniently linked to its CAD representation. The interfacing of CAD models and spreadsheets containing the cost equations is the subject of the next section, section 6. The last section of the report is a summary of the progress made so far, and the anticipated research work to be achieved in the future.

Bao, Han P.↗

Life cycle costing of waste management systems: Overview, calculation principles and case studies

Highlights: • We propose a comprehensive model for cost assessment of waste management systems. • The model includes three types of LCC: Conventional, Environmental and Societal LCCs. • The applicability of the proposed model is tested with two case studies. - Abstract: This paper provides a detailed and comprehensive cost model for the economic assessment of solid waste management systems. The model was based on the principles of Life Cycle Costing (LCC) and followed a bottom-up calculation approach providing detailed cost items for all key technologies within modern waste systems. All technologies were defined per tonne of waste input, and each cost item within a technology was characterised by both a technical and an economic parameter (for example amount and cost of fuel related to waste collection), to ensure transparency, applicability and reproducibility. Cost items were classified as: (1) budget costs, (2) transfers (for example taxes, subsidies and fees) and (3) externality costs (for example damage or abatement costs related to emissions and disamenities). Technology costs were obtained as the sum of all cost items (of the same type) within a specific technology, while scenario costs were the sum of all technologies involved in a scenario. The cost model allows for the completion of three types of LCC: a Conventional LCC, for the assessment of financial costs, an Environmental LCC, for the assessment of financial costs whose results are complemented by a Life Cycle Assessment (LCA) for the same system, and a Societal LCC, for socio-economic assessments. Conventional and Environmental LCCs includes budget costs and transfers, while Societal LCCs includes budget and externality costs. Critical aspects were found in the existing literature regarding the cost assessment of waste management, namely system boundary equivalency, accounting for temporally distributed emissions and impacts, inclusions of transfers, the internalisation of environmental impacts and the coverage of shadow prices, and there was also significant confusion regarding terminology. The presented cost model was implemented in two case study scenarios assessing the costs involved in the source segregation of organic waste from 100,000 Danish households and the subsequent co-digestion of organic waste with animal manure. Overall, source segregation resulted in higher financial costs than the alternative of incinerating the organic waste with the residual waste: 1.6 M€/year, of which 0.9 M€/year was costs for extra bins and bags used by the households, 1.0 M€/year for extra collections and −0.3 M€/year saved on incineration.

09 BIOMASS FUELS↗

Globally Gridded Groundwater Extraction Volumes and Costs under Six Depletion and Ponded Depth Targets

This repository contains simulated outputs from superwell – a hydro-economic tool for long-term assessment of groundwater cost and supply – providing globally gridded groundwater extractable volumes and associated unit costs ($/km³) for accessible groundwater production, based on a variety of user-defined depletion and ponded depth scenarios. Key model documentation: Niazi, H., Ferencz, S. B., Graham, N. T., Yoon, J., Wild, T. B., Hejazi, M., Watson, D. J., & Vernon, C. R. (2025). Long-term hydro-economic analysis tool for evaluating global groundwater cost and supply: Superwell v1.1. Geoscientific Model Development, 18(5), 1737-1767. https://doi.org/10.5194/gmd-18-1737-2025 Find the source code of the superwell model on GitHub: https://github.com/JGCRI/superwell Repository Overview Main output: superwell_outputs.7z contains 6 files (4.5 GB) named as superwell_py_deep_all_0.*PD_0.*DL.csv. These files present superwell outputs of global groundwater extraction volumes and cost estimates on a 0.5° scale for six scenarios with different Ponded Depth (PD; 0.3 and 0.6 m) and Depletion Limit (DL; 5%, 25%, and 40% of available volume) targets over the entire pumping lifetime of a grid cell superwell_py_deep_all_0.3PD_0.25DL_sample_100.csv contains superwell outputs for 100 data points sampled to match the global inputs' distribution superwell_py_deep_all_0.3PD_0.25DL_Grid_72548.csv contains superwell output for a single grid cell concept_v5.png provides an overview of the superwell workflow Outputs Description year_number: year of pumping depletion_limit: set depletion limit (DL) as a volume fraction of total available groundwater Mappings: continent, country, gcam_basin_id, Basin_long_name, grid_id: geographic identifiers and basin information Inputs: grid_area (km²): area of the grid cell whyclass: hydrogeological classification of the aquifer permeability (m/day), porosity (%), total_thickness (m), depth_to_water (m): aquifer properties. The geo-processed input data has been published separately: https://doi.org/10.57931/2307831 Model outputs: orig_aqfr_sat_thickness (m), aqfr_sat_thickness (m): original and remaining/instantaneous saturated thickness of the aquifer hydraulic_conductivity (m/day), transmissivity (m²/day): hydraulic properties of the aquifer radius_of_influence (m), areal_extent (km²): well radius and area of influence from the center of the well number_of_wells (-): number of wells in a grid cell determined by a ratio of well area and grid area max_drawdown (m), drawdown (m), drawdown_interference (m): well and aquifer drawdown during extraction total_head (m): total lift for the groundwater (depth to water plus drawdown) total_well_length (m): total depth of wells drilled well_yield (m³/day): pumping rate or well yield power (kW), energy (kWh): power and energy required for pumping groundwater Volume Outputs: volume_produced_perwell (m³), cumulative_vol_produced_perwell (m³): production volume metrics per well volume_produced_allwells (m³), cumulative_vol_produced_allwells (m³): aggregate extraction volumes for all wells in a grid cell available_volume (m³): available groundwater in storage for the grid cell as determined by aquifer properties depleted_vol_fraction: fraction of total volume pumped over available volumes in a grid cell (same as depletion limit) Cost Outputs: well_installation_cost ($): well installation cost based on the hydrogeological complexity of the aquifer annual_capital_cost, maintenance_cost, nonenergy_cost ($): nonenergy costs energy_cost_rate ($/kWh): electricity rate energy_cost ($): energy cost of pumping groundwater total_cost_perwell ($), total_cost_allwells ($): total annual energy and non-energy cost for each and all wells in a grid cell a unit_cost ($/m³), unit_cost_per_km3 ($/km³), unit_cost_per_acreft ($/acre-ft): total cost of pumping a unit of groundwater, indicated for different spatial units Key Resources Model documentation: Niazi, H., Ferencz, S., Graham, N., Yoon, J., Wild, T., Hejazi, M., Watson, D., & Vernon, C. (2024; In-prep). Long-term Hydro-economic Assessment Tool for Evaluating Global Groundwater Cost and Supply: Superwell v1. Geoscientific Model Development. Input data: Niazi, H., Watson, D., Hejazi, M., Yonkofski, C., Ferencz, S., Vernon, C., Graham, N., Wild, T., & Yoon, J. (2024). Global Geo-processed Data of Aquifer Properties by 0.5° Grid, Country and Water Basins. MSD-LIVE Data repository. https://doi.org/10.57931/2307831 superwell source code: https://github.com/JGCRI/superwell Cite as Niazi, H., Ferencz, S., Yoon, J., Graham, N., Wild, T., Hejazi, M., Watson, D., & Vernon, C. (2024). Globally Gridded Groundwater Extraction Volumes and Costs under Six Depletion and Ponded Depth Targets. MSD-LIVE Data repository. https://doi.org/10.57931/2307832 Contact Reach out to Hassan Niazi or Stephen Ferencz or open an issue in the superwell repository for questions or suggestions.

Earth Systems↗