TPSAS-NF1676L-17243-DND

This presentation captures ERA Project's effort in using integrated cost-schedule-risk analysis tool, identifying and capturing explicit relationships between program funds, schedule, and discrete risks. The project team merged a myriad of cost and schedule data for timely, objective, uncertainty analysis of the ITD's budget and schedule. The project team conducted detailed schedule uncertainty analysis showing schedule activities and how their interrelationships were impacted, representing an impressive advance beyond routine Gantt charts. Furthermore, the ERA Project collected discrete risk events including their impacts to costs and/or schedule and interwove these risks into cost and schedule logic networks, providing the foundation to conduct cost and schedule analyses. The team integrated this data into the analysis model, providing probabilistic results that were then used by the ERA Project's senior management for decision-making purposes. The ERA Project management team, through technical and pathfinder expertise in integrating cost, schedule, risk, and technical content, consistently provided risk-informed recommendations to Implementing Centers and ISRP senior management which ultimately ensured the successful ARMD Key Decision Point (KDP) review of the ERA Phase 2 ITD Portfolio and increased the likelihood of achieving technical objectives within cost and schedule constraints.

Gaudy M Bezos-O'Connor↗

Modeling of Isotope Fractionation in Stratospheric CO2, N2O, CH4, and O3: Investigations of Stratospheric Chemistry and Transport, Stratosphere-Troposphere Exchange, and Their Influence on Global Isotope Budgets

We investigated the isotopic fractionation of CH4 and hydrogen (H2) in the stratosphere by incorporating isotope-specific rate coefficients into the Lawrence Livermore National Laboratory (LLNL) 2D model and comparing the model results with new observations from the NASA ER-2 aircraft (funded through a separate task under the Upper Atmosphere Research Program). The model results reveal that fractionation which occurs in the stratosphere has a significant influence on isotope compositions in the free troposphere, an important point which had previously been ignored, unrecognized or unquantified for many long-lived trace gases, including CH4 and H2 which we have focused our efforts on to date. Our analyses of the model results and new isotope observations have also been used to test how well the kinetic isotope effects are known, at least to within the uncertainties in model chemistry and transport. Overall, these results represent an important step forward in our understanding of isotope fractionation in the atmosphere and demonstrate that stratospheric isotope fractionation cannot be ignored in modeling studies which use isotope observations in the troposphere to infer the global budgets of CH4 (an important greenhouse gas) and of H2 (a gas whose atmospheric budget must be better quantified, particularly before a large human perturbation from fuel cell use is realized). Our analyses of model results and observations from the NASA ER-2 aircraft are briefly summarized separately below for CH4, H2, and H2O and for the contribution of these modeling studies to date to our understanding of isotope fractionation for N2O, CO2, and O3 as well.

Boering, Kristie A.↗

Lessons learned - MO&DA at JPL

The issues of how to avoid future surprise growth in Mission Operations and Data Analysis (MO&DA) costs and how to minimize total MO&DA costs for planetary missions are discussed within the context of JPL mission operations support. It is argued that there is no simple, single solution: the entire Project life-cycle must be addressed. It is concluded that cost models that can predict both MO&DA cost as well as Ground System development costs are needed. The first year MO&DA budget plotted against the total of ground and flight systems developments is shown. In order to better recognize changes and control costs in general, a modified funding line item breakdown is recommended to distinguish between development costs (prelaunch and postlaunch) and MO&DA costs.

Handley, Thomas H., Jr.↗

MANAGING ENGINEERING ACTIVITIES FOR THE PLATEAU REMEDIATION CONTRACT - HANFORD

In 2008, the primary Hanford clean-up contract transitioned to the CH2MHill Plateau Remediation Company (CHPRC). Prior to transition, Engineering resources assigned to remediation/Decontamination and Decommissioning (D&D) activities were a part of a centralized engineering organization and matrixed to the performing projects. Following transition, these resources were reassigned directly to the performing project, with a loose matrix through a smaller Central Engineering (CE) organization. The smaller (10 FTE) central organization has retained responsibility for the overall technical quality of engineering for the CHPRC, but no longer performs staffing and personnel functions. As the organization has matured, there are lessons learned that can be shared with other organizations going through or contemplating performing a similar change. Benefits that have been seen from the CHPRC CE organization structure include the following: (1) Staff are closely aligned with the 'Project/facility' that they are assigned to support; (2) Engineering priorities are managed to be consistent with the 'Project/facility' priorities; (3) Individual Engineering managers are accountable for identifying staffing needs and the filling of staffing positions; (4) Budget priorities are managed within the local organization structure; (5) Rather than being considered a 'functional' organization, engineering is considered a part of a line, direct funded organization; (6) The central engineering organization is able to provide 'overview' activities and maintain independence from the engineering organizations in the field; and (7) The central engineering organization is able to maintain a stable of specialized experts that are able to provide independent reviews of field projects and day-to-day activities.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Copper Mountain Conference Series, 2015-2018 (Final Report)

This four-year project supports the annual conferences of the Copper Mountain Conference Series, held in late March or early April each year at Copper Mountain, Colorado. Begun in 1983, the Series represents an important forum for the exchange of ideas in these two closely related fields. The subject of the Copper Mountain Conference Series alternates between Multigrid Methods in odd-numbered years and Iterative Methods in even-numbered years. Funding for the conferences in this period was provided mainly by grants from the DOE, with some contributions from a variety of other sources. The DOE project budget includes basic organizational costs and support for participation by students, women, minorities, and disabled.

97 MATHEMATICS AND COMPUTING↗

Introduction to SIMRAND: Simulation of research and development project

SIMRAND: SIMulation of Research ANd Development Projects is a methodology developed to aid the engineering and management decision process in the selection of the optimal set of systems or tasks to be funded on a research and development project. A project may have a set of systems or tasks under consideration for which the total cost exceeds the allocated budget. Other factors such as personnel and facilities may also enter as constraints. Thus the project's management must select, from among the complete set of systems or tasks under consideration, a partial set that satisfies all project constraints. The SIMRAND methodology uses analytical techniques and probability theory, decision analysis of management science, and computer simulation, in the selection of this optimal partial set. The SIMRAND methodology is truly a management tool. It initially specifies the information that must be generated by the engineers, thus providing information for the management direction of the engineers, and it ranks the alternatives according to the preferences of the decision makers.

Miles, R. F., Jr.↗

Implementing an Applied Science Program

The work implied in the NASA Applied Science Program requires a delicate balancing act for the those doing it. At the implementation level there are multiple tensions intrinsic to the program. For example each application of an existing product to a decision support process requires deep knowledge about the data and deep knowledge about the decision making process. It is highly probable no one person has this range of knowledge. Otherwise the decision making process would already be using the data. Therefore, a team is required. But building a team usually requires time, especially across agencies. Yet the program mandates efforts of relatively short duration. Further, those who know the data are scientists, which makes them essential to the program. But scientists are evaluated on their publication record. Anything which diverts a scientist from the research for his next publication is an anathema to him and potential death to their career. Trying to get another agency to use NASA data does not strike most scientists as material inherently suitable for publication. Also, NASA wishes to rapidly implement often substantial changes to another agency's process. For many reasons, such as budget and program constraints, speed is important. But the owner of a decision making process is tightly constrained, usually by law, regulation, organization and custom. Changes when made are slow, cautious, even hesitant, and always done according a process specific to the situation. To manage this work MSFC must balance these and other tensions. Some things we have relatively little control over, such as budget. These we try to handle by structural techniques. For example by insisting all of our people work on multiple projects simultaneously we inherently have diversification of funding for all of our people. In many cases we explicitly use some elements of tension to be productive. For example the need for the scientists to constantly publish is motivation to keep tasks short and to the immediate point. As another example, the DSS agency and it personnel are treated as integral to the effort at every step. Thus, their ways of doing things, their problems and their assets become part of the solution. MSFC also manages the Applied Science work' within a strategic framework.' First, the scientists are necessarily at the core of all of this work as well as all of the work within the larger' organization. We therefore strive to keep a roughly 50-50 balance between the work done on tasks funded directly by the research side of NASA's Science Mission Directorate and funding from the applied side. Done at both the organization level and the level of the individual, this keeps the scientist both happy and productive over the long term. We also try diligently to remove as much burden from the scientist as practical by employing people such as the authors and others to do tasks not requiring; scientific knowledge. We also have designed our effort to take full use of external partners. We actively seek and support, including fund, people from multiple organizations to join us as committed collaborators. In this we use today's money and today's problem to help us diversify and strengthen for tomorrow. MSFC also considers the Applied Science work holistically. Each element is viewed as a step in a larger process. At a management level we can chose to emphasize or encourage certain areas which service long term goals. Thus, if we think work in a particular area should be developed, we can start with the smaller, less costly elements and grow.

Rickman, Doug↗

Seeker Free-Flying Inspector GNC System Overview

Seeker is an ultra-low cost approach to highly automated extravehicular inspection of crewed or uncrewed spacecraft that has been designed and built in-house at the NASA Johnson Space Center (JSC). The first version of Seeker is intended to be an incremental development towards an advanced inspection capability. This effort builds on past free-flying inspector development efforts such as the Autonomous Extravehicular Activity Robotic Camera Sprint (AERCam Sprint) and Mini AERCam. Seeker was funded as an International Space Station (ISS) "X-by" Project, which required delivery of the vehicle approximately one year after authority to proceed and within the budget of $1.8 million. Seeker will fly onboard the NG-11 Cygnus mission in 2019 and will deploy after Cygnus' primary mission is completed. Seeker will perform inspection-like maneuvers within 50 meters of the target vehicle (Cygnus) and then dispose itself. The Seeker Guidance, Navigation, and Control (GNC) system is composed entirely of commercial off-the-shelf (COTS) and space-rated COTS items, an inertial-relative Multiplicative Extended Kalman Filter (MEKF), point-to-point guidance (with various additional modes such as stationkeeping), proportional-integral translational control, phase plane rotational control, and a state machine for automated mission moding with minimal ground input.

Navigation↗

Savannah River Remediation Cost Savings Initiative - 12339

Savannah River enjoyed two years of increased funding as a result of the American Reinvestment and Recovery Act and Department of Energy (DOE) directed scope additions. Moving into FY2012, a much lower funding level is anticipated. In the past, the first response to a reduced funding scenario was to defer scope and slow down the program. This time, Savannah River decided that a better process was needed to try to maximize value to the government. This approach was named the Cost Savings Initiative (CSI). The CSI process is similar to a zero-based budget concept. Every element of work scope was screened to eliminate everything that was not directly related to safety and regulatory compliance. Then the schedules for the regulatory-driven scope were deferred such that the regulatory milestones were achieved just in time with no acceleration. This resulted in a strategy that met regulatory requirements in FY2012-13 with some remaining funding but not in FY2014-15. The remaining funding was then invested in cost savings initiatives in FY2012-13 to reduce the future cost of doing business in the FY2014-15 timeframe and beyond. This resulted in a Strategy that: - Meets all regulatory commitments; - Meets some regulatory commitments early; and - Preserves most of the life cycle savings that were built in to the baseline plan The CSI process used at Savannah River may be considered for application elsewhere in the DOE Complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of Anthropogenic and Climatic Impacts on the Global Carbon Cycle Using a 3-D Model Constrained by Isotopic Carbon Measurements and Remote Sensing of Vegetation

Our original proposal called for improved modeling of the terrestrial biospheric carbon cycle, specifically using biome-specific process models to account for both the energy and water budgets of plant growth, to facilitate investigations into recent changes in global atmospheric CO2 abundance and regional distribution. The carbon fluxes predicted by these models were to be incorporated into a global model of CO2 transport to establish large-scale regional fluxes of CO2 to and from the terrestrial biosphere subject to constraints imposed by direct measurements of atmospheric CO2 and its 13C/12C isotopic ratio. Our work was coordinated with a NASA project (NASA NAGW-3151) at the University of Montana under the direction of Steven Running, and was partially funded by the Electric Power Research Institute. The primary objective of this project was to develop and test the Biome-BGC model, a global biological process model with a daily time step which simulates the water, energy and carbon budgets of plant growth. The primary product, the unique global gridded daily land temperature, and the precipitation data set which was used to drive the process model is described. The Biome-BGC model was tested by comparison with a simpler biological model driven by satellite-derived (NDVI) Normalized Difference Vegetation Index and (PAR) Photosynthetically Active Radiation data and by comparison with atmospheric CO2 observations. The simple NDVI model is also described. To facilitate the comparison with atmospheric CO2 observations, a three-dimensional atmospheric transport model was used to produce predictions of atmospheric CO2 variations given CO2 fluxes owing to (NPP) Net Primary Productivity and heterotrophic respiration that were produced by the Biome-BGC model and by the NDVI model. The transport model that we used in this project, and errors associated with transport simulations, were characterized by a comparison of 12 transport models.

Keeling, Charles D.↗

Performance Contracting and Energy Efficiency in the State Government Market

There is growing interest in energy efficiency (EE) among state policymakers as a result of increasing environmental concerns, rising electricity and natural gas prices, and lean economic times that motivate states to look more aggressively for cost-saving opportunities in public sector buildings. One logical place for state policymakers to demonstrate their commitment to energy efficiency is to 'lead by example' by developing and implementing strategies to reduce the energy consumption of state government facilities through investments in energy efficient technologies. Traditionally, energy efficiency improvements at state government facilities are viewed as a subset in the general category of building maintenance and construction. These projects are typically funded through direct appropriations. However, energy efficiency projects are often delayed or reduced in scope whereby not all cost-effective measures are implemented because many states have tight capital budgets. Energy Savings Performance Contracting (ESPC) offers a potentially useful strategy for state program and facility managers to proactively finance and develop energy efficiency projects. In an ESPC project, Energy Service Companies (ESCOs) typically guarantee that the energy and cost savings produced by the project will equal or exceed all costs associated with implementing the project over the term of the contract. ESCOs typically provide turnkey design, installation, and maintenance services and also help arrange project financing. Between 1990 and 2006, U.S. ESCOs reported market activity of {approx}$28 Billion, with about {approx}75-80% of that activity concentrated in the institutional markets (K-12 schools, colleges/universities, state/local/federal government and hospitals). In this study, we review the magnitude of energy efficiency investment in state facilities and identify 'best practices' while employing performance contracting in the state government sector. The state government market is defined to include state offices, state universities, correctional facilities, and other state facilities. This study is part of a series of reports prepared by Lawrence Berkeley National Laboratory (LBNL) and the National Association of Energy Services Companies (NAESCO) on the ESCO market and industry trends. The scope of previous reports was much broader: Goldman et al. (2002) analyzed ESCO project costs and savings in public and private sector facilities, Hopper et al. (2005) focused on ESCO project activity in all public and institutional sectors, while Hopper et al (2007) provided aggregate results of a comprehensive survey of ESCOs on current industry activity and future prospects. We decided to focus the current study on ESCO and energy efficiency activity and potential market barriers in the state government market because previous studies suggested that this institutional sector has significant remaining energy efficiency opportunities. Moreover, ESCO activity in the state government market has lagged behind other institutional markets (e.g., K-12 schools, local governments, and the federal market). Our primary objectives were as follows: (1) Assess existing state agency energy information and data sources that could be utilized to develop performance metrics to assess progress among ESPC programs in states; (2) Conduct a comparative review of the performance of selected state ESPC programs in reducing energy usage and costs in state government buildings; and (3) Delineate the extent to which state government sector facilities are implementing energy efficiency projects apart from ESPC programs using other strategies (e.g. utility ratepayer-funded energy efficiency programs, loan funds).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NASA's In Space Propulsion Technology Program Accomplishments and Lessons Learned

NASA's In-Space Propulsion Technology (ISPT) Program was managed for 5 years at the NASA MSFC and significant strides were made in the advancement of key transportation technologies that will enable or enhance future robotic science and deep space exploration missions. At the program's inception, a set of technology investment priorities were established using an NASA-wide, mission-driven prioritization process and, for the most part, these priorities changed little - thus allowing a consistent framework in which to fund and manage technology development. Technologies in the portfolio included aerocapture, advanced chemical propulsion, solar electric propulsion, solar sail propulsion, electrodynamic and momentum transfer tethers, and various very advanced propulsion technologies with significantly lower technology readiness. The program invested in technologies that have the potential to revolutionize the robotic exploration of deep space. For robotic exploration and science missions, increased efficiencies of future propulsion systems are critical to reduce overall life-cycle costs and, in some cases, enable missions previously considered impossible. Continued reliance on conventional chemical propulsion alone will not enable the robust exploration of deep space - the maximum theoretical efficiencies have almost been reached and they are insufficient to meet needs for many ambitious science missions currently being considered. By developing the capability to support mid-term robotic mission needs, the program was to lay the technological foundation for travel to nearby interstellar space. The ambitious goals of the program at its inception included supporting the development of technologies that could support all of NASA's missions, both human and robotic. As time went on and budgets were never as high as planned, the scope of the program was reduced almost every year, forcing the elimination of not only the broader goals of the initial program, but also of funding for over half of the technologies in the original portfolio. In addition, the frequency at which the application requirements for the program changed exceeded the development time required to mature technologies: forcing sometimes radical rescoping of research efforts already halfway (or more) to completion. At the end of its fifth year, both the scope and funding of the program were at a minimum despite the program successfully meeting all of it's initial high priority objectives. This paper will describe the program, its requirements, technology portfolio, and technology maturation processes. Also discussed will be the major technology milestones achieved and the lessons learned from managing a $100M+ technology program.

Johnson, Les C.↗

Physics with CMS and Electronic Upgrades

The current funding is for continued work on the Compact Muon Solenoid (CMS) at the CERN Large Hadron Collider (LHC) as part of the Energy Frontier experimental program. The current budget year covers the first year of physics running at 13 TeV (Run 2). During this period we have concentrated on commisioning of the μTCA electronics, a new standard for distribution of CMS trigger and timing control signals and high bandwidth data aquistiion as well as participating in Run 2 physics.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The Lunar Mapping and Modeling Project

LMMP was initiated in 2007 to help in making the anticipated results of the LRO spacecraft useful and accessible to Constellation. The LMMP is managing and developing a suite of lunar mapping and modeling tools and products that support the Constellation Program (CxP) and other lunar exploration activities. In addition to the LRO Principal Investigators, relevant activities and expertise that had already been funded by NASA was identified at ARC, CRREL (Army Cold Regions Research & Engineering Laboratory), GSFC, JPL, & USGS. LMMP is a cost capped, design-to-cost project (Project budget was established prior to obtaining Constellation needs)

Noble, Sarah↗

Agency Agreements Process Champion Support Intern

This document will provide information on the 2018 Spring semester NIFS Intern who represented the Office of Chief Financial Officer (OCFO) as a Reimbursable Accountant at Kennedy Space Center (KSC). This intern supported the Agency Agreements Process Champions and Team Lead, Susan Kroskey, Sandy Massey and Mecca Murphy, with major initiatives to advance the KSC OCFO's vision of creating and innovating healthy financial management practices that maximize the value of resources entrusted to NASA. These initiatives include, but are not limited to: updating the Agency Guidance and NASA Procedural Guidance 9090.1 Agreements, implementing a new budget structure to be utilized across all centers, submitting a Call Request (CRQ) to enhance non-federal customer reporting, initiating a discussion to incorporate a 3-year funding program for NASA agreements, and undertaking the Office of Inspector General (OIG) Audit. In support of these initiatives, this intern identified technical methods to enhance and reduce the workload of financial processes for reimbursable and non-reimbursable agreements, prepared reports in support of accounting functions, and performed administrative work and miscellaneous technical tasks in support of the OCFO as requested. In conclusion of the internship, the intern will become knowledgeable on reimbursable accounting, reimbursable policy, types of reimbursable agreements, the agreements process, estimated pricing reports, and the roles and responsibilities of the Financial Accounting and Financial Services offices.

Process Champion↗

ConocoPhillips Sweeny IGCC/CCS Project

Under its Industrial Carbon Capture and Sequestration (ICCS) Program, the United States (U.S.) Department of Energy (DOE) selected ConocoPhillips Company (ConocoPhillips) to receive funding through the American Recovery and Reinvestment Act (ARRA) of 2009 for the proposed Sweeny Integrated Gasification Combined Cycle (IGCC)/Carbon Capture and Storage (CCS) Project (Project) to be located in Brazoria County, Texas. Under the program, the DOE is partnering with industry to demonstrate the commercial viability and operational readiness of technologies that would capture carbon dioxide (CO{sub 2}) emissions from industrial sources and either sequester those emissions, or beneficially reuse them. The primary objective of the proposed Project was to demonstrate the efficacy of advanced technologies that capture CO{sub 2} from a large industrial source and store the CO{sub 2} in underground formations, while achieving a successful business venture for the entity (entities) involved. The Project would capture 85% of the CO{sub 2} produced from a petroleum coke (petcoke) fed, 703 MWnet (1,000 MWgross) IGCC power plant, using the ConocoPhillips (COP) proprietary and commercially proven E-Gas{trademark} gasification technology, at the existing 247,000 barrel per day COP Sweeny Refinery. In addition, a number of other commercially available technologies would be integrated into a conventional IGCC Plant in a unique, efficient, and reliable design that would capture CO{sub 2}. The primary destination for the CO{sub 2} would be a depleted natural gas field suitable for CO{sub 2} storage ('Storage Facility'). COP would also develop commercial options to sell a portion of the IGCC Plant's CO{sub 2} output to the growing Gulf Coast enhanced oil recovery (EOR) market. The IGCC Plant would produce electric power for sale in the Electric Reliability Council of Texas Houston Zone. The existing refinery effluent water would be treated and reused to fulfill all process water needs. The DOE ICCS program adopts a two-phase approach. During the 7-month Phase 1 period, ConocoPhillips further defined the Project by advancing the preliminary design, permits, and contracts. In addition, ConocoPhillips was developing a Phase 2 renewal application to seek continued DOE funding for the Project's design, construction, and early operations. The DOE and ConocoPhillips entered into a Phase1 Cooperative Agreement (DOE Award Number DE-FE0001859) on November 16, 2009, agreeing to share cost on a 50/50 basis during the Phase 1 period, with a DOE budget of $2,989,174. On April 7, 2010, ConocoPhillips informed the DOE that it would not participate in Phase 2 of the DOE ICCS program. The company believes that enabling legislation and regulations at both the federal and state levels will not be approved and implemented in time to make a final investment decision such that the Project would be substantially constructed by September 30, 2015, the end of the AARA funding period. Considering current price assumptions, the Project would not generate investment level returns. ConocoPhillips elected not to submit a Phase 2 renewal application, which was due on April 16, 2010. This Final Scientific/Technical Report provides an overview of the Project, including highlights and benefits of the proposed carbon capture and storage project scope, sites, and technologies. It also summarizes the work accomplishments during the Phase 1 period from November 16, 2009 to June 16, 2010. Due to ConocoPhillips decision not to submit the Phase 2 renewal application and not to enter into related agreements, certain information regarding the proposed CO{sub 2} storage facility cannot be publicly reported due to confidentiality agreements.

01 COAL, LIGNITE, AND PEAT↗

Somerset County Renewable Energy Initiative

The County of Somerset, New Jersey, through the Somerset County Improvement Authority (SCIA), applied Federal funding through the U.S. Department of Energy to will apply project funds to buy-down the capital costs of equipment associated with the installation of solar photovoltaic (PV) systems at two sites owned by the County. This Renewable Energy Initiative allows the County to take advantage of clean renewable energy, without any adverse debt impacts, and at a price that results in operating budget savings beyond what is presently available in the marketplace. This project addressed the objectives of the Office of Energy Efficiency and Renewable Energy by making the acquisition of renewable energy more affordable for the County, thereby, encouraging other counties and local units to develop similar programs and increase the deployment of solar energy technologies. The two sites that were funded by the DOE grant are part of a much larger, ambitious, and unique renewable energy project, described in the next section.

14 SOLAR ENERGY↗

Emerging Propulsion Technologies

The Emerging Propulsion Technologies (EPT) investment area is the newest area within the In-Space Propulsion Technology (ISPT) Project and strives to bridge technologies in the lower Technology Readiness Level (TRL) range (2 to 3) to the mid TRL range (4 to 6). A prioritization process, the Integrated In-Space Transportation Planning (IISTP), was developed and applied in FY01 to establish initial program priorities. The EPT investment area emerged for technologies that scored well in the IISTP but had a low technical maturity level. One particular technology, the Momentum-eXchange Electrodynamic-Reboost (MXER) tether, scored extraordinarily high and had broad applicability in the IISTP. However, its technical maturity was too low for ranking alongside technologies like the ion engine or aerocapture. Thus MXER tethers assumed top priority at EPT startup in FY03 with an aggressive schedule and adequate budget. It was originally envisioned that future technologies would enter the ISP portfolio through EPT, and EPT developed an EPT/ISP Entrance Process for future candidate ISP technologies. EPT has funded the following secondary, candidate ISP technologies at a low level: ultra-lightweight solar sails, general space/near-earth tether development, electrodynamic tether development, advanced electric propulsion, and in-space mechanism development. However, the scope of the ISPT program has focused over time to more closely match SMD needs and technology advancement successes. As a result, the funding for MXER and other EPT technologies is not currently available. Consequently, the MXER tether tasks and other EPT tasks were expected to phased out by November 2006. Presentation slides are presented which provide activity overviews for the aerocapture technology and emerging propulsion technology projects.

Keys, Andrew S.↗