Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Ares”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 271 records · Page 15

The Ares Projects Office: Building an Exploration Culture from the Inside Up

NASA is building its first new human-rated space exploration vehicles in nearly 40 years. This marks an important operational and cultural change from the Space Shuttle. In the wake of the Columbia disaster, the agency and the nation realized that NASA's goals and culture needed to change. The Ares Projects Office (APO), which is building the launch vehicles that will power human beings to the Moon, Mars, and beyond, is taking a page from the Saturn playbook by having NASA lead both the overall integration and the development of the Ares I upper stage. APO is also creating a new culture of cooperation, openness, and informed risk taking as we set our sights on other worlds. APO has established a team environment where issues can be discussed, information is shared, fun and teamwork are encouraged, and constructive conflict and accountability are expected. Following a "One NASA" philosophy, APO is taking steps to strengthen cooperation among space centers, contractor partners, engineering and scientific communities, and headquarters personnel. As we learn lessons from things that Went wrong with the Space Shuttle, we are also borrowing best practices from what has gone right with that program and others. All of these cultural elements will be necessary as we take the next steps beyond Earth orbit.

Leahy, Bartholomew↗

Design of a Mars Airplane Propulsion System for the Aerial Regional-Scale Environmental Survey (ARES) Mission Concept

The Aerial Regional-Scale Environmental Survey (ARES) is a Mars exploration mission concept that utilizes a rocket propelled airplane to take scientific measurements of atmospheric, surface, and subsurface phenomena. The liquid rocket propulsion system design has matured through several design cycles and trade studies since the inception of the ARES concept in 2002. This paper describes the process of selecting a bipropellant system over other propulsion system options, and provides details on the rocket system design, thrusters, propellant tank and PMD design, propellant isolation, and flow control hardware. The paper also summarizes computer model results of thruster plume interactions and simulated flight performance. The airplane has a 6.25 m wingspan with a total wet mass of 185 kg and has to ability to fly over 600 km through the atmosphere of Mars with 45 kg of MMH / MON3 propellant.

Kuhl, Christopher A.↗

Risk Assessment for Titanium Pressure Vessels Operating Inside the ARES I's Liquid Hydrogen Tank Environment

Titanium alloy (Ti-6-4) is currently being proposed for the manufacturing of pressure vessels (PV) for storage of compressed helium gas, which are mounted inside the ARES I's liquid hydrogen (LH2) tank. At cryogenic temperature, titanium alloys usually have the highest strength-to-weight ratio property and have been considered as the metallic materials of choice for lightweight PV operating in LH2 environment. Titanium PV s are also considered as heritage hardware because they have been used by NASA for the Saturn IV-B rocket s LH2 tank in the mid 1960 s. However, hydrogen embrittlement is possible if Ti-6-4 alloy is exposed to gaseous hydrogen at certain pressure and temperature during the LH2 tank filling and draining operations on the launch pad, and during the J2X engine burn period for the ARES I s upper stage. Additionally, the fracture toughness and ductility properties of Ti-6-4 are significantly decreased at cryogenic temperature. These factors do not necessary preclude the use of titanium PV in hydrogen or at cryogenic applications; however, their synergistic effects and the material damage tolerance must be accounted for in the mission life assessment for PV s, which are considered as fracture critical hardware. In this paper, an overview of the risk assessment for Ti-6-4 alloy, strategy to control hydrogen embrittlement and brief metallic material trade study for PV operating in LH2 tank will be presented.

Lee, Jonathan A.↗

From Concept to Design: Progress on the J-2X Upper Stage Engine for the Ares Launch Vehicles

In accordance with national policy and NASA's Global Exploration Strategy, the Ares Projects Office is embarking on development of a new launch vehicle fleet to fulfill the national goals of replacing the space shuttle fleet, returning to the moon, and exploring farther destinations like Mars. These goals are shaped by the decision to retire the shuttle fleet by 2010, budgetary constraints, and the requirement to create a new fleet that is safer, more reliable, operationally more efficient than the shuttle fleet, and capable of supporting long-range exploration goals. The present architecture for the Constellation Program is the result of extensive trades during the Exploration Systems Architecture Study and subsequent refinement by the Ares Projects Office at Marshall Space Flight Center.

Byrd, Thomas↗

ARES I-X USS Fracture Analysis Loads Spectra Development

This report describes the development of a set of bounding load spectra for the ARES I-X launch vehicle. These load spectra are used in the determination of the critical initial flaw size (CIFS) of the welds in the ARES I-X upper stage simulator (USS).

Larsen, Curtis↗

Evaluation of Ares-I Control System Robustness to Uncertain Aerodynamics and Flex Dynamics

This paper discusses the application of robust control theory to evaluate robustness of the Ares-I control systems. Three techniques for estimating upper and lower bounds of uncertain parameters which yield stable closed-loop response are used here: (1) Monte Carlo analysis, (2) mu analysis, and (3) characteristic frequency response analysis. All three methods are used to evaluate stability envelopes of the Ares-I control systems with uncertain aerodynamics and flex dynamics. The results show that characteristic frequency response analysis is the most effective of these methods for assessing robustness.

Jang, Jiann-Woei↗

Analysis of Ares 1 Ascent Navigation Options

The paper documents a collaborative analysis of ascent Navigation options for the Ares 1 launch vehicle by the NASA Marshall Space Flight Center (MSFC) and the C. S. Draper Laboratory. The objective of the work was the development of a Navigation concept and supporting requirements which meet the Ares 1 accuracy specification in a manner which is straightforward, reliable, and cost effective. Six primary Navigation architectures were considered. In each case analysis was performed to determine under what conditions the required accuracy at second stage cutoff could be achieved. Those architectures which met the accuracy requirements were then assessed in terms of cost, complexity, and reliability to determine a baseline Navigation approach and the primary supporting requirements.

Norris, Lee↗

Development of a Smooth Trajectory Maneuver Method to Accommodate the Ares I Flight Control Constraints

Six degree-of-freedom (DOF) launch vehicle trajectories are designed to follow an optimized 3-DOF reference trajectory. A vehicle has a finite amount of control power that it can allocate to performing maneuvers. Therefore, the 3-DOF trajectory must be designed to refrain from using 100% of the allowable control capability to perform maneuvers, saving control power for handling off-nominal conditions, wind gusts and other perturbations. During the Ares I trajectory analysis, two maneuvers were found to be hard for the control system to implement; a roll maneuver prior to the gravity turn and an angle of attack maneuver immediately after the J-2X engine start-up. It was decided to develop an approach for creating smooth maneuvers in the optimized reference trajectories that accounts for the thrust available from the engines. A feature of this method is that no additional angular velocity in the direction of the maneuver has been added to the vehicle after the maneuver completion. This paper discusses the equations behind these new maneuvers and their implementation into the Ares I trajectory design cycle. Also discussed is a possible extension to adjusting closed-loop guidance.

Pinson, Robin M.↗

Integrated System Test Approaches for the NASA Ares I Crew Launch Vehicle

NASA is maturing test and evaluation plans leading to flight readiness of the Ares I crew launch vehicle. Key development, qualification, and verification tests are planned . Upper stage engine sea-level and altitude testing. First stage development and qualification motors. Upper stage structural and thermal development and qualification test articles. Main Propulsion Test Article (MPTA). Upper stage green run testing. Integrated Vehicle Ground Vibration Testing (IVGVT). Aerodynamic characterization testing. Test and evaluation supports initial validation flights (Ares I-Y and Orion 1) and design certification.

Cockrell, Charles↗

NDE for the ARES I Upper Stage Common Bulkhead

The current design of the ARES 1 Upper Stage uses a common bulkhead to separate the liquid hydrogen and liquid oxygen tanks. The bulkhead consists of aluminum face sheets bonded to a Phenolic honeycomb core. The face sheets, or domes, are friction stir welded to Y-rings that connect the bulkhead to the barrel sections of the liquid hydrogen and liquid oxygen tanks. Load between the Y-rings is carried by an externally attached bolting ring. The development of nondestructive evaluation methods for the ARES I Upper Stage Common Bulkhead are outlined in this presentation. Methods for inspecting the various components of the bulkhead are covered focusing in on the dome skins, core-to-dome bond lines and friction stir welds as well as structural details like the fastener holes. Thermography, shearography and ultrasonic methods are discussed for the bond lines. Eddy current methods are discussed for the fastener holes and dome skins. A combination of phased array ultrasound, liquid penetrant and radiography are to being investigated for use on the friction stir welds. Keywords: Composite materials, NDE, Cryogenic structures

Walker, James↗

Concept of Operations Visualization in Support of Ares I Production

Boeing was selected in 2007 to manufacture Ares I Upper Stage and Instrument Unit according to NASA's design which would require the use of the latest manufacturing and integration processes to meet NASA budget and schedule targets. Past production experience has established that the majority of the life cycle cost is established during the initial design process. Concept of Operations (CONOPs) visualizations/simulations help to reduce life cycle cost during the early design stage. Production and operation visualizations can reduce tooling, factory capacity, safety, and build process risks while spreading program support across government, academic, media and public constituencies. The NASA/Boeing production visualization (DELMIA; Digital Enterprise Lean Manufacturing Interactive Application) promotes timely, concurrent and collaborative producibility analysis (Boeing)while supporting Upper Stage Design Cycles (NASA). The DELMIA CONOPs visualization reduced overall Upper Stage production flow time at the manufacturing facility by over 100 man-days to 312.5 man-days and helped to identify technical access issues. The NASA/Boeing Interactive Concept of Operations (ICON) provides interactive access to Ares using real mission parameters, allows users to configure the mission which encourages ownership and identifies areas for improvement, allows mission operations or spacecraft detail to be added as needed, and provides an effective, low coast advocacy, outreach and education tool.

Chilton, James H.↗

Stellar Imager (SI): Enhancements to the Mission Enabled by the Constellation Architecture (Ares I/Ares V)

Stellar Imager (SI) is a space-based, UV/Optical Interferometer (UVOI) with over 200x the resolution of HST. It will enable 0.1 milli-aresec spectral imaging of stellar surfaces and the Universe in general and open an enormous new "discovery space" for astrophysics with its combination of high angular resolution, dynamic imaging , and spectral energy resolution. SI's goal is to study the role of magnetism in the Universe and revolutionize our understanding of 1) Solar/Stellar Magnetic Activity and their impact on Space Weather, Planetary Climates, and Life, 2) Magnetic and Accretion Processes and their roles in the Origin & Evolution of Structure and in the Transport of Matter throughout the Universe, 3) the close-in structure of Active Galactic Nuclei and their winds, and 4) Exo-Solar Planet Transits and Disks. SI is a "Landmark-Discovery Mission" in 2005 Heliophysics Roadmap and a candidate UVOI in the 2006 Astrophysics Strategic Plan and is targeted for launch in the mid-2020's. It is a NASA Vision Mission and has been recommended for further study in a 2008 NRC report on missions potentially enabled/enhanced by an Ares V launch. In this paper, we discuss the science goals and required capabilities of SI, the baseline architecture of the mission assuming launch on one or more Delta rockets, and then the potential significant enhancements to the SI science and mission architecture that would be made possible by a launch in the larger volume Ares V payload fairing, and by servicing options under consideration in the Constellation program.

Carpenter, Kenneth G.↗

Upper Atmospheric Monitoring for Ares I-X Ascent Loads and Trajectory Evaluation on the Day-of-Launch

During the launch countdown of the Ares I-X test vehicle, engineers from Langley Research Center will use profiles of atmospheric density and winds in evaluating vehicle ascent loads and controllability. A schedule for the release of balloons to measure atmospheric density and winds has been developed by the Natural Environments Branch at Marshall Space Flight Center to help ensure timely evaluation of the vehicle ascent loads and controllability parameters and support a successful launch of the Ares I-X vehicle.

Roberts, Barry C.↗

The Ares Launch Vehicles: Critical for America's Continued Leadership in Space

This video is designed to accompany the presentation of the paper delivered at the Joint Army, Navy, NASA, Airforce (JANNAF) Propulsion Meeting held in 2009. It shows various scenes: from the construction of the A-3 test stand, construction of portions of the vehicles, through various tests of the components of the Ares Launch Vehicles, including wind tunnel testing of the Ares V, shell buckling tests, and thermal tests of the avionics, to the construction of the TPS thermal spray booth.

Cook, Stephen A.↗

Potential Science Missions Enabled by NASA's Planned Ares V

NASA s planned Ares V cargo vehicle with its 10 meter diameter fairing and ~60,000 kg payload mass to L2 offers the potential to launch entirely new classes of space science missions such as 8-meter monolithic aperture telescopes, 12-meter aperture x-ray telescopes, 16 to 24 meter segmented telescopes and highly capable outer planet missions. The paper will summarize the current Ares V baseline performance capabilities and review potential mission concepts enabled by these capabilities.

Stahl, H. Philip↗

Ares I First Stage: Powering Exploration

I. Ares First Stage design is on schedule. a) Avionics; b) Major Structures; c) Motor; and d) Deceleration System II. Ares I-X hardware is complete and assembly at KSC is underway. Launch scheduled for October 31. III. Recovery system testing is on schedule a) Drogue; b) Main chute; and c) Cluster. DM-1 static firing is scheduled for August 25, 2009

Tiller, Bruce K.↗

Potential Astrophysics Science Missions Enabled by NASA's Planned Ares V

NASA s planned Ares V cargo vehicle with its 10 meter diameter fairing and ~60,000 kg payload mass to L2 offers the potential to launch entirely new classes of space science missions such as 8-meter monolithic aperture telescopes, 12- meter aperture x-ray telescopes, 16 to 24 meter segmented telescopes and highly capable outer planet missions. The paper will summarize the current Ares V baseline performance capabilities and review potential mission concepts enabled by these capabilities.

Stahl, H. Philip↗