Cost Estimation of a Permanent Magnet Synchronous Machine for Use in Adjustable Speed-Pumped Storage Hydropower
Electric machine design has become an easier process with the availability of computers in recent decades. However, the interest in electric machine design among students has declined. University-level design courses must compete with courses perceived as more desirable by the potential job market. Hence, the power system engineers with this expertise are very few and are nearing retirement. Contrarily, renewable energy has been picking up in the past few decades. The indeterminacy and variation of renewable energy sources require a balancing mechanism to maintain the constant voltage and frequency of the grid. Adjustable-Speed Pumped-Storage Hydropower plants are considered the contender for future energy storage, providing large capacity and fast-acting response. Large-scale hydropower applications depend on the natural characteristics of each project site, making less expensive, off-the-shelf generators unfeasible. This work gives a shortcut to estimate the cost of constructing a permanent magnet generator for low-volume manufacturing.