Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “shutdown”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Implementation of an in-vessel calibration light source for JET

An in-vessel calibration light source (ICLS) has been implemented for remote use during extended shutdown periods of the Joint European Torus (JET). The ICLS facilitated the in situ calibration of optical diagnostics, which previously were performed when the diagnostics were removed from JET. Since the ICLS is used to calibrate diagnostics over the entire, exact optical path as used when plasma discharge data are measured, the ICLS calibration implicitly accounts for any vignetting losses in the JET vessel viewports in addition to the vacuum window transmission. At least ten diagnostic systems have benefited from the ICLS during the extended ITER-like wall shutdown of 2009-2011. Examples of the use of the ICLS in JET are given.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Measurement of injected impurity assimilation during massive gas injection experiments in DIII-D

Impurities (H2, D2, Ne or Ar) injected into steady (non-disrupting) discharges with massive gas injection (MGI) are shown to mix into the plasma core dominantly via magnetohydrodynamic activity during the plasma thermal quench (TQ). Mixing efficiencies of injected impurities into the plasma core are measured to be of order 0.05-0.4. 0D modeling of the experiments is found to reproduce observed TQ and current quench durations reasonably well (typically within plus/minus 25% or so), although shutdown onset times are underestimated (by around 2x). Preliminary 0D modeling of ITER based on DIII-D mixing efficiencies suggests that MGI will work well in ITER with regard to disruption heat load and vessel force mitigation, but may not collisionally suppress runaway electrons.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Activities ONDRAF/NIRAS related to the decommissioning of nuclear facilities

Since 1980, the Agency is responsible by law for the safe management of all radioactive waste produced in Belgium, including decommissioning wastes. By the law of 11 January 1991 and the implementing Royal Decree of 16/10/1991, ONDRAF/NIRAS has been entrusted with a mission concerning the decommissioning of nuclear facilities. This mission involves the collection and assessment of data concerning decommissioning forecasts for nuclear facilities, the approval of facilities' decommissioning programmes, the establishment - in consultation with operators - of financing conditions for decommissioning, as well as the implementation of these programmes on request by the operator, or in the case of its failure to do so. This is the case for the company Best Medical Belgium SA located at Fleurus (MDS Nordion SA, till April 2011), which produced radioisotopes for medical applications and went bankrupt in 2012. These installations have been entrusted to ONDRAF/NIRAS. A plan of action was developed for taking over the operations in the framework of remediation and decommissioning. Steps have been taken to integrate his new role as a nuclear operator. The installations of Best Medical Belgium SA are now referred to as the 'O/N - Site Fleurus.' Nuclear facility operators, or any person requesting to operate a nuclear facility, are obliged to provide ONDRAF/NIRAS, under their responsibility and in due time, with all the necessary information concerning these facilities' decommissioning forecasts, the nature, quantities and dates of transfer of the resulting waste, and the financing conditions for these facilities' decommissioning. In order to make the necessary funds available for decommissioning a nuclear facility when it will be shut down, operators are obliged to establish provisions during the facility's active life. These provisions are calculated in such a way that the total amount established at the time of the final shutdown covers all costs resulting from the facility's final phase, namely the preparation of decommissioning, decontamination, more or less long-term maintenance, dismantling, treatment, conditioning and disposal of waste produced during this phase. In order to face to multiple and repeated evaluation processes, the Agency, already in the early 90's, started with the implementation of its own integrated data processing system, recording the physical and radiological inventories of nuclear facilities, and allowing the evaluation of the quantities of decommissioning materials and wastes as well as of the decommissioning costs of these facilities. The cost evaluations cover all decommissioning activities from final shutdown of the facility until final release from nuclear control, as well as conventional demolition and site restoration if required. Beside the information related to the inventories, the database involves so called auxiliary tables integrating unit prices of the various decontamination and dismantling techniques, unit rates for radioactive waste processing, interim storage and final disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing a concept for a national used fuel interim storage facility in the United States

In the United States (U.S.) the nuclear waste issue has plagued the nuclear industry for decades. Originally, spent fuel was to be reprocessed but with the threat of nuclear proliferation, spent fuel reprocessing has been eliminated, at least for now. In 1983, the Nuclear Waste Policy Act of 1982 [1] was established, authorizing development of one or more spent fuel and high-level nuclear waste geological repositories and a consolidated national storage facility, called a 'Monitored Retrievable Storage' facility, that could store the spent nuclear fuel until it could be placed into the geological repository. Plans were under way to build a geological repository, Yucca Mountain, but with the decision by President Obama to terminate the development of Yucca Mountain, a consolidated national storage facility that can store spent fuel for an interim period until a new repository is established has become very important. Since reactor sites have not been able to wait for the government to come up with a storage or disposal location, spent fuel remains in wet or dry storage at each nuclear plant. The purpose of this paper is to present a concept developed to address the DOE's goals stated above. This concept was developed over the past few months by collaboration between the DOE and industry experts that have experience in designing spent nuclear fuel facilities. The paper examines the current spent fuel storage conditions at shutdown reactor sites, operating reactor sites, and the type of storage systems (transportable versus non-transportable, welded or bolted). The concept lays out the basis for a pilot storage facility to house spent fuel from shutdown reactor sites and then how the pilot facility can be enlarged to a larger full scale consolidated interim storage facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decay Heat Removal in GEN IV Gas‐Cooled Fast Reactors

The safety goal of the current designs of advanced high‐temperature thermal gas‐cooled reactors (HTRs) is that no core meltdown would occur in a depressurization event with a combination of concurrent safety system failures. This study focused on the analysis of passive decay heat removal (DHR) in a GEN IV direct‐cycle gas‐cooled fast reactor (GFR) which is based on the technology developments of the HTRs. Given the different criteria and design characteristics of the GFR, an approach different from that taken for the HTRs for passive DHR would have to be explored. Different design options based on maintaining core flow were evaluated by performing transient analysis of a depressurization accident using the system code RELAP5‐3D. The study also reviewed the conceptual design of autonomous systems for shutdown decay heat removal and recommends that future work in this area should be focused on the potential for Brayton cycle DHRs.

Cheng, Lap-Yan↗

The Final Demise of East Tennessee Technology Park Building [Slides]

Building K-33 was constructed in 1954 as the final section of the five-stage uranium enrichment cascade at the Oak Ridge Gaseous Diffusion Plant (ORGDP). The two original building (K-25 and K-27) were used to produce weapons grade highly enriched uranium (HEU). Building K-29, K-31, and K-33 were added to produce low enriched uranium (LEU) for nuclear power plant fuel. During ORGDP operations K-33 produced a peak enrichment of 2.5%. Thousands of tons of reactor tails fed into gaseous diffusion plants in the 1950s and early 1960s introducing some fission products and transuranics. Building K-33 was a two-story, 25-meters (82-feet) tall structure with approximately 30 hectare (64 acres) of floor space. The Operations (first) Floor contained offices, change houses, feed vaporization rooms, and auxiliary equipment to support enrichment operations. The Cell (second) Floor contained the enrichment process equipment and was divided into eight process units (designated K-902-1 through K-902-8). Each unit contained ten cells, and each cell contained eight process stages (diffusers) for a total of 640 enrichment stages. 1985: LEU buildings were taken off-line after the anticipated demand for uranium enrichment failed to materialize. 1987: LEU buildings were placed in permanent shutdown. Process equipment were maintained in a shutdown state. 1997: DOE signed an Action Memorandum for equipment removal and decontamination of Buildings K-29, K-31, K-33; BNFL awarded contract to reindustrialize the buildings under the Three Buildings D&D and Recycle Project. 2002: Equipment removal complete and effort shifts to vacuuming, chemical cleaning, scabbling, etc. 2005: Decontamination efforts in K-33 cease. Building left with significant 99 Tc contamination on metal structures and PCB contamination in concrete. Uranium, transuranics, and fission products also present on building shell. 2009: DOE targets Building K-33 for demolition. 2010: ORAU contracted to characterize Building K-33 for final disposition at the Environmental Management Waste Management Facility (EMWMF) in Oak Ridge. ORAU collected 439 samples from May and June. LATA Sharp started removing transite panels in September. 2011: LATA Sharp began demolition in January and expects the last waste shipment to EMWMF in September. Approximately 237,000 m 3 (310,000 yd 3 , bulked) of waste taken to EMWMF in 23,000 truckloads expected by project completion.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Activation, Heating and Exposure Rates for Mo‐99 Experiments with 25‐Disk Targets

An MCNPX model of the 25-disk target assembly inside the vacuum cube inside the shielded box was prepared. This was used to calculate heating and photon and neutron fluxes throughout the model. Production rates for photonuclear reaction products were calculated using the photon fluxes and ENDF/B-VII cross sections. Measured isomer to ground state yield ratios were used where available. Where not available the new correlation between spin deficit and isomer to ground state yield ratios presented at AccApp'11 was used. The photonuclear production rates and neutron fluxes were input to CINDER2008 for transmutation calculations. A cross section update file was used to supply (n,n') reactions missing from CINDER2008 libraries. Decay photon spectra produced by CINDER2008 were then used to calculate exposure rates using the MCNPX model. Two electron beam irradiations were evaluated. The first was for a thermal test at 15 MeV with 1300 μA incident on one target end and the second was for a production test at 35 MeV with 350 μA incident on both target ends (700 μA total current on target). For the thermal test 1, 2, 3, 4, 5 and 6 h irradiation times were simulated, each followed by decay time steps out to 42 days. For the production test 6, 12, 18, 24, 30 and 36 h irradiation times were simulated followed by the same decay periods. For all simulations beam FWHMs in x and y were both assumed to be 6 mm. Simulations were run for Mo-100 enriched and natural Mo targets for both tests. It is planned that thermal test will be run for 4 h with natural target disks and production test will be run for 24 h with enriched target disks. Results for these two simulations only are presented in this report. Other results can be made available upon request. Post irradiation exposure rates were calculated at 30 cm distances from left, right, front and back of the following configurations: (1) Shielded box with everything in it (beam pipes, cooling pipes, vacuum cube, target housing weldment and target assembly), (2) Shielded box with everything in it except the target assembly, (3) Shielded box with nothing in it, (4) Target assembly taken outside of shielded box, (5) Target disks in cradle (target assembly with thermocouple weldment and flange removed), (6) Empty cradle, and (7) Target disks alone. Decay photon spectra from the CINDER2008 calculations were used as sources for the exposure rate calculations in the same model used for the flux calculations with beam on. As components were removed to simulate the seven cases considered the material compositions were changed to air and their respective sources were turned off. The MCNPX model geometry is plotted in Figure 1. The left and right detector locations for cases 1, 2 and 3 were 30 cm from the shielded box walls and 30 cm from the beam pipe openings in the left and right sides of the model (they are not in the beam line). A zoomed in plot of the target assembly alone is in Figure 2. Exposure rates for the seven cases are plotted as a function of time after irradiation in Figures 3, 4 and 5. To aid in comparison between the cases, all of these figures have been plotted using the same scale. Figures 3 and 4 are respectively the thermal and production test results for cases 1 through 6. Figure 5 includes case 7 results for both. Differences between cases 1 and 2 for both tests are not statistically significant showing that activation of components other than the target assembly, many of which are also shielding the target assembly, dominates exposure rates outside the shielded box. Case 3 shows the contribution from activation of the shield box itself. In front where shielded box wall is thickest box activation accounts for essentially all of the exposure rate outside. Differences between cases 4 and 5 are also minimal, showing that the contribution to target assembly exposure rates from the thermocouple flange and weldment are small compared to the target disks and cradle. From the numerical results the contribution is about 1%. Results for case 6, the cradle itself, are initially about half of the target assembly exposure rates. For the thermal test maximum shielded box exposure rates with or without the target assembly in it are about 1 mR/h 1 h after shutdown versus 65 mR/h for the production test. In front of the shielded box where a person would be positioned for target removal activities the calculated exposure rate is about 20% of the maximum for the production test, and after a few hours of decay is less than 1 mR/h. However, the window was not modeled. Typically lead glass is about one quarter as effective as solid lead for the same thickness and drawing indicates a window thickness about double the front wall thickness suggesting exposure rate in front of the window will likely be comparable to what it is in the back, 25 mR/h 1 h after shutdown and about 10 mR/h at 1 d.

07 ISOTOPE AND RADIATION SOURCES↗

10 CFR 830 Major Modification Determination for the Advanced Test Reactor Remote Monitoring and Management Capability

The Advanced Test Reactor (ATR; TRA-670), which is located in the ATR Complex at Idaho National Laboratory, was constructed in the 1960s for the purpose of irradiating reactor fuels and materials. Other irradiation services, such as radioisotope production, are also performed at ATR. While ATR is safely fulfilling current mission requirements, assessments are continuing. These assessments intend to identify areas to provide defense–in-depth and improve safety for ATR. One of the assessments performed by an independent group of nuclear industry experts recommended that a remote accident management capability be provided. The report stated that: “contemporary practice in commercial power reactors is to provide a remote shutdown station or stations to allow shutdown of the reactor and management of long-term cooling of the reactor (i.e., management of reactivity, inventory, and cooling) should the main control room be disabled (e.g., due to a fire in the control room or affecting the control room).” This project will install remote reactor monitoring and management capabilities for ATR. Remote capabilities will allow for post scram reactor management and monitoring in the event the main Reactor Control Room (RCR) must be evacuated.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Operational Characteristics of an Accelerator Driven Fissile Solution System

Operational characteristics represent the set of responses that a nuclear system exhibits during normal operation. Operators rely on this behavior to assess the status of the system and to predict the consequences of off-normal events. These characteristics largely refer to the relationship between power and system operating conditions. The static and dynamic behavior of a chain-reacting system, operating at sufficient power, is primarily governed by reactivity effects. The science of reactor physics has identified and evaluated a number of such effects, including Doppler broadening and shifts in the thermal neutron spectrum. Often these reactivity effects are quantified in the form of feedback coefficients that serve as coupling coefficients relating the neutron population and the physical mechanisms that drive reactivity effects, such as fissile material temperature and density changes. The operational characteristics of such nuclear systems usually manifest themselves when perturbations between system power (neutron population) and system operating conditions arise. Successful operation of such systems requires the establishment of steady equilibrium conditions. However, prior to obtaining the desired equilibrium (steady-state) conditions, an approach from zero-power (startup) must occur. This operational regime may possess certain limiting system conditions that must be maintained to achieve effective startup. Once steady-state is achieved, a key characteristic of this operational regime is the level of stability that the system possesses. Finally, a third operational regime, shutdown, may also possess limiting conditions of operation that must be maintained. This report documents the operational characteristics of a “generic” Accelerator Driven Fissile Solution (ADFS) system during the various operational regimes of startup, steady-state operation, and shutdown. Typical time-dependent behavior for each operational regime will be illustrated, and key system parameters, such as response times, will be quantified. A generalized linear systems analysis of steady-state operations will be performed to evaluate the level of stability of ADFS systems. This information should provide a basic understanding of typical ADFS system operational behavior, and facilitate the development of monitoring procedures and operator aids.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

ARE660 Wind Generator: Low Wind Speed Technology for Small Turbine Development

This project is for the design of a wind turbine that can generate most or all of the net energy required for homes and small businesses in moderately windy areas. The purpose is to expand the current market for residential wind generators by providing cost effective power in a lower wind regime than current technology has made available, as well as reduce noise and improve reliability and safety. Robert W. Preus’ experience designing and/or maintaining residential wind generators of many configurations helped identify the need for an improved experience of safety for the consumer. Current small wind products have unreliable or no method of stopping the wind generator in fault or high wind conditions. Consumers and their neighbors do not want to hear their wind generators. In addition, with current technology, only sites with unusually high wind speeds provide payback times that are acceptable for the on-grid user. Abundant Renewable Energy’s (ARE) basic original concept for the ARE660 was a combination of a stall controlled variable speed small wind generator and automatic fail safe furling for shutdown. The stall control for a small wind generator is not novel, but has not been developed for a variable speed application with a permanent magnet alternator (PMA). The fail safe furling approach for shutdown has not been used to our knowledge.

17 WIND ENERGY↗

Reactivity Accountability Attributed to Reflector Poisons in the High Flux Isotope Reactor

The objective of this study is to develop a methodology to predict the reactivity impact as a function of outage time between cycles of 3He, 6Li, and other poisons in the High Flux Isotope Reactor s (HFIR) beryllium reflector. The reactivity worth at startup of the HFIR has been incorrectly predicted in the past after the reactor has been shut-down for long periods of time. The incorrect prediction was postulated to be due to the erroneous calculation of 3He buildup in the beryllium reflector. It is necessary to develop a better estimate of the start-of-cycle symmetric critical control element positions since if the estimated and actual symmetrical critical control element positions differ by more than $1.55 in reactivity (approximately one-half inch in control element startup position), HFIR is to be shutdown and a technical evaluation is performed to resolve the discrepancy prior to restart. 3He is generated and depleted during operation, but during an outage, the depletion of 3He ceases because it is a stable isotope. 3He is born from the radioactive decay of tritium, and thus the concentration of 3He increases during shutdown. SCALE, specifically the TRITON and CSAS5 control modules including the KENO V.A, COUPLE, and ORIGEN functional modules were utilized in this study. An equation relating the down time (td) to the change in symmetric control element position was generated and validated against measurements for approximately 40 HFIR operating cycles. The newly-derived correlation was shown to improve accuracy of predictions for long periods of down time.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

P-986 Letter of Intent: Medium-Energy Antiproton Physics at Fermilab

Fermilab has long had the world's most intense antiproton source. Despite this, the opportunities for medium-energy antiproton physics at Fermilab have been limited in the past and - with the antiproton source now exclusively dedicated to serving the needs of the Tevatron Collider - are currently nonexistent. The anticipated shutdown of the Tevatron in 2010 presents the opportunity for a world-leading medium-energy antiproton program. We summarize the current status of the Fermilab antiproton facility and review some physics topics for which the experiment we propose could make the world's best measurements. Among these, the ones with the clearest potential for high impact and visibility are in the area of charm mixing and CP violation. Continued running of the Antiproton Source following the shutdown of the Tevatron is thus one of the simplest ways that Fermilab can restore a degree of breadth to its future research program. The impact on the rest of the program will be minor. We request a small amount of effort over the coming months in order to assess these issues in more detail.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Undulator Hall Air Temperature Fault Scenarios

Recent experience indicates that the LCLS undulator segments must not, at any time following tuning, be allowed to change temperature by more than about {+-}2.5 C or the magnetic center will irreversibly shift outside of acceptable tolerances. This vulnerability raises a concern that under fault conditions the ambient temperature in the Undulator Hall might go outside of the safe range and potentially could require removal and retuning of all the segments. In this note we estimate changes that can be expected in the Undulator Hall air temperature for three fault scenarios: (1) System-wide power failure; (2) Heating Ventilation and Air Conditioning (HVAC) system shutdown; and (3) HVAC system temperature regulation fault. We find that for either a system-wide power failure or an HVAC system shutdown (with the technical equipment left on), the short-term temperature changes of the air would be modest due to the ability of the walls and floor to act as a heat ballast. No action would be needed to protect the undulator system in the event of a system-wide power failure. Some action to adjust the heat balance, in the case of the HVAC power failure with the equipment left on, might be desirable but is not required. On the other hand, a temperature regulation failure of the HVAC system can quickly cause large excursions in air temperature and prompt action would be required to avoid damage to the undulator system.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

OM Code Requirements For MOVs -- OMN-1 and Appendix III

The purpose or scope of the ASME OM Code is to establish the requirements for pre-service and in-service testing of nuclear power plant components to assess their operational readiness. For MOVs this includes those that perform a specific function in shutting down a reactor to the safe shutdown condition, maintaining the safe shutdown condition, and mitigating the consequences of an accident. This paper will present a brief history of industry and regulatory activities related to MOVs and the development of Code requirements to address weaknesses in earlier versions of the OM Code. The paper will discuss the MOV requirements contained in the 2009 version of ASME OM Code, specifically Mandatory Appendix III and OMN-1, Revision 1.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

SNS target reaches end-of-life

On Sunday, April 3, 2011, the Spallation Neutron Source (SNS) target reached an end-of-life condition, so user operations were shut down to change the stainless steel target housing the liquid mercury. This is the third change out of the target vessel; it is an expected event and took about two weeks. We took advantage of this time to do maintenance work that was planned for the longer summer shutdown. This will shorten that shutdown and recover the neutron production time. SNS restarted user operations on April 20.

36 MATERIALS SCIENCE↗

SPALLATION NEUTRON SOURCE HIGH-POWER PROTECTION MODULE TEST STAND

The Spallation Neutron Source (SNS) High-Power Protection Module (HPM) provides interlocks and fast shutdown for the radio frequency (RF) system to protect the accelerating structures and high power RF (HPRF) Distribution System. The HPM has required some functional upgrades since the start of beam operations and an upgrade to the HPM test stand was required to support these added features. The HPM test stand currently verifies functionality, RF channel calibration, and measurement of the speed of shutdown to ensure the specifications are met. The upgraded test stand was implemented in a Field Programmable Gate Array (FPGA) to allow for future growth and flexibility. Work is currently progressing on automation of the test stand to better perform the required module calibration schedule.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Decommissioning Plan of the Musashi Reactor and Its Progress

The Musashi Reactor is a TRIGA-II, tank-type research reactor, as shown in Table 1. The reactor had been operated at maximum thermal power level of 100 kW since first critical, January 30, 1963. Reactor operation was shut down due to small leakage of water from the reactor tank on December 21,1989. After shutdown, investigation of the causes, making plan of repair and discussions on restart or decommissioning had been done. Finally, decision of decommissioning was made in May, 2003. The initial plan of the decommissioning was submitted to the competent authority in January, 2004. Now, the reactor is under decommissioning. The plan of decommissioning and its progress are described. In conclusion: considering the status of undertaking plan of the waste disposal facility for the low level radioactive waste from research reactors, the phased decommissioning was selected for the Musashi Reactor. First phase of the decommissioning activities including the actions of permanent shutdown and delivering the spent nuclear fuels to US DOE was completed.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Regulatory Experiences for the Decommissioning of the Research Reactor in Korea

The first research reactor in Korea (KRR-1, TRIGA Mark-II) has operated since 1962, and the second one (KRR-2, TRIGA Mark-III), since 1972. Both of them were phased out in 1995 due to their lives and the operation of a new research reactor, HANARO (30 MW thermal power) operated by KAERI (Korea Atomic Energy Research Institute). After deciding the shutdown by the Nuclear Development and Utilization Committee in March 1996, KAERI began to prepare the decommissioning plan, including the environmental impact assessment, and submitted the plan to the Ministry of Science and Technology (MOST) in December 1998. Korea Institute of Nuclear Safety (KINS) reviewed document and prepared the review report in 1999. KINS is an organization of technical expertise which performs regulatory functions, entrusted by the MOST in accordance with the Atomic Energy Act and its Enforcement Decree. The review report written by KINS was consulted by the Special Committee on Nuclear Safety in January 2000. The committee submitted their consultation results to the Nuclear Safety Commission for the final approval by the Minister of MOST. The license was issued in November 2000. With the consent of the Korean government to the US Record of Decision, the spent fuel of KRR-1 and 2 was safely transported to the United States in July 1998. The decontamination and dismantling of KRR-2 was completed at the end of 2005 but the decommissioning of KRR-1 has been suspended by the problem for the memorial of the reactor. After the decommissioning of the research reactor is finished, the site will be returned to the site owner, Korea Electric Power Corporation (KEPCO). In this paper, the state-of-art and lessons learnt from recent regulatory activities for decommissioning of KRR- 2 are summarized. In conclusion: since the shutdown of KRR-1 and 2 had been decided, the safe assessment and licensing review were carried out after applying for decommissioning plan of those research reactors by operator. Through the safety assessment and license review, the plan was approved in 2000. The D and D of KRR-2 except Reactor hall of KRR-1 has been performed safely and completed in 2005. On the other hand the integrated safety for the decommissioning has been confirmed by regulatory team inspection. The radioactive waste arising from the dismantling work has been packed mainly in a 4 m{sup 3} containers and stored on site, reactor hall of KRR-2, until the LILW disposal facility is operational. For the whole dismantling work, with respect to the ALARA principle, not only worker protection from radiation and industrial hazard, but also the environment protection should be the first priority. Also much attention has been paid to the record keeping for the future decommissioning of nuclear power plants.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗