Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

MaROS: Information Management Service

This software is provided by the Mars Relay Operations Service (MaROS) task to a variety of Mars projects for the purpose of coordinating communications sessions between landed spacecraft assets and orbiting spacecraft assets at Mars. The Information Management Service centralizes a set of functions previously distributed across multiple spacecraft operations teams, and as such, greatly improves visibility into the end-to-end strategic coordination process. Most of the process revolves around the scheduling of communications sessions between the spacecraft during periods of time when a landed asset on Mars is geometrically visible by an orbiting spacecraft. These relay sessions are used to transfer data both to and from the landed asset via the orbiting asset on behalf of Earth-based spacecraft operators. This software component is an application process running as a Java virtual machine. The component provides all service interfaces via a Representational State Transfer (REST) protocol over https to external clients. There are two general interaction modes with the service: upload and download of data. For data upload, the service must execute logic specific to the upload data type and trigger any applicable calculations including pass delivery latencies and overflight conflicts. For data download, the software must retrieve and correlate requested information and deliver to the requesting client. The provision of this service enables several key advancements over legacy processes and systems. For one, this service represents the first time that end-to-end relay information is correlated into a single shared repository. The software also provides the first multimission latency calculator; previous latency calculations had been performed on a mission-by-mission basis.

Allard, Daniel A.↗

TRMM Precipitation Application Examples Using Data Services at NASA GES DISC

Data services to support precipitation applications are important for maximizing the NASA TRMM (Tropical Rainfall Measuring Mission) and the future GPM (Global Precipitation Mission) mission's societal benefits. TRMM Application examples using data services at the NASA GES DISC, including samples from users around the world will be presented in this poster. Precipitation applications often require near-real-time support. The GES DISC provides such support through: 1) Providing near-real-time precipitation products through TOVAS; 2) Maps of current conditions for monitoring precipitation and its anomaly around the world; 3) A user friendly tool (TOVAS) to analyze and visualize near-real-time and historical precipitation products; and 4) The GES DISC Hurricane Portal that provides near-real-time monitoring services for the Atlantic basin. Since the launch of TRMM, the GES DISC has developed data services to support precipitation applications around the world. In addition to the near-real-time services, other services include: 1) User friendly TRMM Online Visualization and Analysis System (TOVAS; URL: http://disc2.nascom.nasa.gov/Giovanni/tovas/); 2) Mirador (http://mirador.gsfc.nasa.gov/), a simplified interface for searching, browsing, and ordering Earth science data at GES DISC. Mirador is designed to be fast and easy to learn; 3) Data via OPeNDAP (http://disc.sci.gsfc.nasa.gov/services/opendap/). The OPeNDAP provides remote access to individual variables within datasets in a form usable by many tools, such as IDV, McIDAS-V, Panoply, Ferret and GrADS; and 4) The Open Geospatial Consortium (OGC) Web Map Service (WMS) (http://disc.sci.gsfc.nasa.gov/services/wxs_ogc.shtml). The WMS is an interface that allows the use of data and enables clients to build customized maps with data coming from a different network.

Liu, Zhong↗

The Evolution of Payload Data Capabilities on the Commercial Visiting Vehicles that Service the International Space Station

For over 10 years, NASA has been working with U.S.-based commercial companies to support the design, development, and operations of new commercial space vehicles. The purpose of these vehicles is to provide cargo and crew transportation services to the International Space Station (ISS) and to stimulate the commercial space transportation industry to Low-Earth Orbit (LEO). Along with the ability to provide a couple tons of cargo to the ISS each mission, the commercial visiting vehicles also provide the ability to transfer NASA payloads to and from the ISS in an active, powered state. To take advantage of this capability, NASA requirements for the data services that payloads need while they are integrated into the visiting vehicles have grown with each set of commercial contracts. Today, NASA desires for payload data services encompass a variety of capabilities including payload health and status (H&S) telemetry monitoring, visiting vehicle environment data monitoring, and payload commanding. The intent of these capabilities is to provide payload developers with situational awareness and the ability to quickly diagnose any problems with payload operations prior to vehicle docking or post-landing to support immediate troubleshooting response. As new requirements for payload data services have emerged over the years, the ISS Payload Operations Integration Center (POIC) at the NASA Marshall Space Flight Center (MSFC) has established ground segment interfaces to the visiting vehicle control centers to enable payload developers to use these services. Many technical and programmatic challenges have been faced while establishing these interfaces. The most significant challenge faced has been in finding the right balance amongst providing interfaces to payloads that are compatible with the ISS so that payload hardware or software changes are not necessary to ensure compatibility with the visiting vehicles; keeping POIC ground system development costs low by standardizing implementation approaches across commercial vehicle partners; and fostering commercialization through supporting vendor-unique implementations that are commercially economical. This paper will first detail the data services that will be available to payload users under each commercial visiting vehicle contract. Secondly, this paper will offer discussion of the most significant technical and programmatic challenges faced to-date in offering these new data services to payload developers.

Wiggins, Lindsay M.↗

An Update on GPM and TRMM Data Services at NASA GES DISC

The Goddard Earth Sciences (GES) Data and Information Services Center (DISC) is home to data archives of the NASA-JAXA Global Precipitation Measurement (GPM), the Tropical Rainfall Measuring Mission (TRMM), and other NASA missions and projects. To maximize the use of NASA data products in scientific research and applications as well as for societal benefits, we provide data and information services that make datasets easy to find and use through simplification of data access for users at all levels around the world. Over the years, user-friendly data services have been developed at GES DISC, including data subsetting, format conversion, online visualization and analysis (i.e. Giovanni), user support system, etc. We routinely analyze questions, feedback, and use cases from users and algorithm developers around the world as well as best practices and new technology to improve existing services and formulate new data services. Interaction between users and algorithm developers is an important process for identifying issues in products, collecting user requirements, and improving product quality and usability. Staff members regularly communicate with algorithm developers with user questions and concerns through conferences and workshops. We publish peer-reviewed papers and articles in major Earth science journals and book chapters to describe NASA global and regional precipitation datasets and services with examples. News articles about GPM and TRMM datasets associated with significant events are regularly posted in the GES DISC Web portal and social media. We also actively participate in training activities. In this presentation, we present our latest activities about GPM and TRMM data services, data/service metrics, and future plans at GES DISC.

Liu, Z.↗

Interoperability and Concepts of Operation Assessment for Space Relay Services and Partnerships

The United States National Space Policy provides guidance and directives for U.S. Government agencies to purchase commercial space services and capabilities to the maximum extent practical. In alignment with this guidance, NASA is exploring potential industry partnerships to leverage current or planned commercial space communication and navigation infrastructure to provide services to NASA user missions in the mid-2020s. Leveraging commercial infrastructure and reducing NASA’s reliance on government-owned and operated infrastructure should yield substantial development and operations cost savings. Additionally, the commercial services market will offer NASA a variety of service offerings at competitive prices, while simultaneously allowing NASA to benefit from commercial best practices. Under Appendix G of the Next Space Technologies for Exploration Partnerships (NextSTEP-2) Broad Agency Announcement (BAA), NASA awarded contracts to eight study vendors in May 2019 to investigate the feasibility of applying commercial services concepts to the NASA user mission community. The studies, managed by NASA Glenn Research Center, were completed in October 2019 and detailed ten study topic areas, three of which included: service provider interoperability, user terminal interoperability, and commercial services concept of operations. This report provides a summary of the significant (non-proprietary) findings and recommendations relating to those study areas from the BAA study vendors.

Eric J Knoblock↗

Zero Trust and Identity Access Management in Support of Service-Based Urban Air Mobility Applications

Urban Air Mobility environments will contain of a collection of service-based services, which will be typically hosted within cloud infrastructures. The underlying data for these UAM services will need to be secured. One approach to securing these UAM services would be to leverage the Zero Trust framework, that focuses on securing services and associated data, instead of securing the network. An early step in moving towards a Zero Trust framework is to standardize identity access manage support for an ever-widening set of services, where users must explicitly be granted access to each service.

UAM↗

Simulation Study for Interoperability of Urban Air Mobility Scheduling and Separation Services in Ideal Conditions

Provision of strategic scheduling and tactical separation services is vital to the safe and efficient operation of vehicles in the urban airspace. This paper describes the efforts made towards the integration of two such services in a simulation environment under ideal conditions and the subsequent studies done on evaluation of system performance. The scheduling and separation services are set up to complement each other to ensure safe separation between airborne aircraft. The utility of these services will become important as the level of traffic increases. This paper describes the simulation experiments conducted to identify cases where the system performance measured by the number of observed losses of separation degrades even with the scheduling and separation services active. From the results obtained, we identify conditions under which the required maneuvers increase and when we observe airborne conflicts even with separation service active. Results obtained will inform requirements for future advancements both in these services independently and in their joint operations.

Urban Air Mobility↗

Simulation Study for Interoperability of Urban Air Mobility Scheduling and Separation Services in Ideal Conditions

Provision of strategic scheduling and tactical separation services is vital to the safe and efficient operation of vehicles in the urban airspace. This paper describes the efforts made towards the integration of two such services in a simulation environment under ideal conditions and the subsequent studies done on evaluation of system performance. The scheduling and separation services are set up to complement each other to ensure safe separation between airborne aircraft. The utility of these services will become important as the level of traffic increases. This paper describes the simulation experiments conducted to identify cases where the system performance measured by the number of observed losses of separation degrades even with the scheduling and separation services active. From the results obtained, we identify conditions under which the required maneuvers increase and when we observe airborne conflicts even with separation service active. Results obtained will inform requirements for future advancements both in these services independently and in their joint operations.

Urban Air Mobility↗

Big Data Platforms as a Service: Challenges and Approach

Infrastructure-as-a-Service has revolutionized the manner in which users commission computing infrastructure. Coupled with Big Data platforms (Hadoop, Cassandra), IaaS has democratized the ability to store and process massive datasets. For users that need to customize or create new Big Data stacks, however, readily available solutions do not yet exist. Users must first acquire the necessary cloud computing infrastructure, and manually install the prerequisite software. For complex distributed services this can be a daunting challenge. To address this issue, we argue that distributed services should be viewed as a single application consisting of virtual machines. Users should no longer be concerned about individual machines or their internal organization. To illustrate this concept, we introduce Cloud-Get, a distributed package manager that enables the simple installation of distributed services in a cloud computing environment. Cloud-Get enables users to instantiate and modify distributed services, including Big Data services, using simple commands. Cloud-Get also simplifies creating new distributed services via standardized package definitions.

99 GENERAL AND MISCELLANEOUS↗

Blended service schedule for a power generator

A power generation system includes a power generator operatively connected to a plurality of sensors and a processor. The processor is configured to observe usage-based or event-based data regarding one or more components and consumables of the power generator. A usage-based service schedule is observed for the one or more event-based components and consumables. Operation-based data is received from the plurality of sensors regarding the functioning of the power generation system and one or more operation-based components and consumables of the power generator. An operation-based service schedule is determined for the one or more operation-based components and consumables based on the operation-based data. A blended service schedule is generated, the blended service schedule including the usage-based service schedule and the operation-based service schedule. The blended service schedule is then provided to at least one of a local monitor or a remote monitor.

Keene, Kevin↗

Characterization of Connected Lighting System Potential for Grid Services Under Real-Time Pricing

Increasingly over the last decade, the management of end-use electricity demand has been examined as a potential source of services for the electric power grid beyond contracts with large commercial and industrial customers. Lighting represents about 17\% of U.S. commercial building annual electricity consumption; however, its potential rapid speed of response may position it to uniquely contribute to services that improve the reliability and resilience of the grid. Connected lighting systems (CLS), which build upon solid-state lamp technology, can change state by adjusting power demand more quickly than most other building electricity end uses and could be used as a platform to monitor lighting electricity use and space conditions. But the potential of CLS to provide grid services has not been extensively studied. In this paper, we describe initial research to evaluate the potential of CLS for grid services. We develop a model for CLS using a set of parameters to represent operation behaviors and constraints: maximal power, minimal power, nominal power, ramp rate, and time delay. Parameter values are generated for representative building types. CLS demand curves are constructed, indirectly capturing building occupant preferences for lighting as functions of electricity price. The CLS model and the demand curves are incorporated into a Transactive Control and Coordination (TCC) Platform to simulate CLS providing grid services. Previous research has shown TCC to be a powerful tool to enable end uses to provide grid services through a hybrid economic-control approach. Initial quantitative results will be provided for CLS grid services potential.

Wang, Peng↗

Sustainable Public Transport: Providing Responsive, On-Demand Service with Clean Energy

The National Renewable Energy Laboratory (NREL) uses the Mobility Energy Productivity (MEP) as a metric and a lens to guide applied research into high performance public mobility. In the current initiative to abate global warming, the US needs not only zero-emission vehicles in the transit fleet (such as buses and shuttles) but also time- and cost-effective services to connect people with goods, services and employment toward a high-quality of life. Our current transportation system is overly dependent on personally-owned automobiles for high quality mobility, with public modes being less viable in many areas. Simply electrifying the drivetrains of existing public transit modes will fail to improve the quality of mobility for those that do not have access to private automobiles. The slow rebound by transit from the pandemic reveals the need to reinvent public transit service. Using the MEP lens, NREL researchers have tracked various novel developments in the public mobility space, with the confluence of shared, on-demand transit (ODT) services using light duty vehicles emerging as a key enabler of high-efficiency public mobility. Deployments such as those in Arlington, TX, Dallas, TX, Fort Erie, ON, and Innisfil, ON showcase the use of fleets of light-duty vehicles as the basis for community circulation and first/last mile to intra-regional transit. ODT services have demonstrated improvements in being more time efficient for riders, more energy efficient in operation (even before the introduction of fully electric vehicles), as well as being cost effective. It appears that aspects of the long-awaited promise of Personal Rapid Transit from the 1970s are beginning to be realized through ODT deployments, leveraging transportation network company (TNC) logistics, popularized by Uber and Lyft, but applied to public mobility. Currently, manually driven ODT operations are already cost competitive with traditional transit systems on a cost per ride basis, and full automation promises to reduce costs by 50% while providing additional safety and verified customer service. Connecting these ODT systems with efficient and effective intra-regional backbone transit service is the next step, with transit agencies like DART providing early results. This discussion will walk through the evidence for this postulated outcome and show results from a series of case-studies.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

In-service Inspection of Radioactive Waste Tanks at the Savannah River Site – 15410

Liquid radioactive wastes from the Savannah River Site (SRS) separation process are stored in large underground carbon steel tanks. The high level wastes are processed in several of the tanks and then transferred by piping to other site facilities for further processing before they are stabilized in a vitrified or grout waste form. Based on waste removal and processing schedules, many of the tanks will be required to be in service for times exceeding the initial intended life. Until the waste is removed from storage, transferred, and processed, the materials and structures of the tanks must maintain a confinement function by providing a barrier to the environment and by maintaining acceptable structural stability during design basis events, which include loadings from both normal service and abnormal (e.g., earthquake) conditions. A structural integrity program is in place to maintain the structural and leak integrity functions of these waste tanks throughout their intended service life. In-service inspection (ISI) is an essential element of a comprehensive structural integrity program for the waste tanks at the Savannah River Site (SRS). The ISI program was developed to determine the degree of degradation the waste tanks have experienced due to service conditions. As a result of the inspections, an assessment can be made of the effectiveness of corrosion controls for the waste chemistry, which precludes accelerated localized and general corrosion of the waste tanks. Ultrasonic inspections (UT) are performed to detect and quantify the degree of general wall thinning, pitting and cracking as a measure of tank degradation. The results from these inspections through 2013, for the 27 Type III/IIIA tanks, indicate no reportable in-service corrosion degradation in the primary tank (i.e., general, pitting, or cracking). The average wall thickness for all tanks remains above the manufactured nominal thickness minus 0.25 millimeter and the largest pit identified is approximately 1.70 millimeter deep (i.e., less than 10% through-wall). Improvements to the inspection program were recently instituted to provide additional confidence in the degradation rates. Thickness measurements from a single vertical strip along the accessible height of the primary tank have been used as a baseline to compare historical measurements. Changes in wall thickness and pit depths along this vertical strip are utilized to estimate the rate of corrosion degradation. An independent review of the ISI program methodology, results, and path forward was held in August 2009. The review recommended statistical sampling of the tanks to improve the confidence of the single strip inspection program. The statistical sampling plan required that SRS increase the amount of area scanned per tank. Therefore, in addition to the baseline vertical strip that is obtained for historical comparisons, four additional randomly selected vertical strips are inspected. To date, a total of 104 independent vertical strips along the height of the primary tank have been completed. A statistical analysis of the data indicates that at this coverage level there is a 99.5% confidence level that one of the worst 5% of all the vertical strips was inspected. That is, there is a relatively high likelihood that the SRS inspection program has covered one of the most corroded areas of any of the Type III/IIIA waste tanks. These data further support the conclusion that there are no significant indications of wall thinning or pitting. Random sampling will continue to increase the confidence that one of the worst 5% has been inspected. In order to obtain the additional vertical strips, and minimize budget and schedule impacts, data collection speed for the UT system was optimized. Prior to 2009, the system collected data at a rate of 32 square centimeters per minute. The scan rate was increased to 129 - 160 square centimeters per minute by increasing the scanner step and pixel sizes in the data acquisition set-up. Laboratory testing was utilized to optimize the scan index/pixel size such that the requirements for wall thinning and pit detection were still maintained. SRS continues to evaluate improvements to ultrasonic equipment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-service inspection of radioactive waste tanks at the Savannah River Site - 15410

Liquid radioactive wastes from the Savannah River Site (SRS) separation process are stored in large underground carbon steel tanks. The high level wastes are processed in several of the tanks and then transferred by piping to other site facilities for further processing before they are stabilized in a vitrified or grout waste form. Based on waste removal and processing schedules, many of the tanks, will be required to be in service for times exceeding the initial intended life. Until the waste is removed from storage, transferred, and processed, the materials and structures of the tanks must maintain a confinement function by providing a barrier to the environment and by maintaining acceptable structural stability during design basis events, which include loadings from both normal service and abnormal (e.g., earthquake) conditions. A structural integrity program is in place to maintain the structural and leak integrity functions of these waste tanks throughout their intended service life. In-service inspection (ISI) is an essential element of a comprehensive structural integrity program for the waste tanks at the Savannah River Site (SRS). The ISI program was developed to determine the degree of degradation the waste tanks have experienced due to service conditions. As a result of the inspections, an assessment can be made of the effectiveness of corrosion controls for the waste chemistry, which precludes accelerated localized and general corrosion of the waste tanks. Ultrasonic inspections (UT) are performed to detect and quantify the degree of general wall thinning, pitting and cracking as a measure of tank degradation. The results from these inspections through 2013, for the 27 Type III/IIIA tanks, indicate no reportable in-service corrosion degradation in the primary tank (i.e., general, pitting, or cracking). The average wall thickness for all tanks remains above the manufactured nominal thickness minus 0.25 millimeter and the largest pit identified is approximately 1.70 millimeter deep (i.e., less than 10% through-wall). Improvements to the inspection program were recently instituted to provide additional confidence in the degradation rates. Thickness measurements from a single vertical strip along the accessible height of the primary tank have been used as a baseline to compare historical measurements. Changes in wall thickness and pit depths along this vertical strip are utilized to estimate the rate of corrosion degradation. An independent review of the ISI program methodology, results, and path forward was held in August 2009. The review recommended statistical sampling of the tanks to improve the confidence of the single strip inspection program. The statistical sampling plan required that SRS increase the amount of area scanned per tank. Therefore, in addition to the baseline vertical strip that is obtained for historical comparisons, four additional randomly selected vertical strips are inspected. To date, a total of 104 independent vertical strips along the height of the primary tank have been completed. A statistical analysis of the data indicates that at this coverage level there is a 99.5% confidence level that one of the worst 5% of all the vertical strips was inspected. That is, there is a relatively high likelihood that the SRS inspection program has covered one of the most corroded areas of any of the Type III/IIIA waste tanks. These data further support the conclusion that there are no significant indications of wall thinning or pitting. Random sampling will continue to increase the confidence that one of the worst 5% has been inspected. In order to obtain the additional vertical strips, and minimize budget and schedule impacts, data collection speed for the UT system was optimized. Prior to 2009, the system collected data at a rate of 32 square centimeters per minute. The scan rate was increased to 129 - 160 square centimeters per minute by increasing the scanner step and pixel sizes in the data acquisition set-up. Laboratory testing was utilized to optimize the scan index/pixel size such that the requirements for wall thinning and pit detection were still maintained. SRS continues to evaluate improvements to ultrasonic equipment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Electricity Markets and Long-Duration Energy Storage: A Survey of Grid Services and Revenue Streams

Purpose of Review Long Duration Energy Storage (LDES) is increasingly viewed as a potential resource for providing grid services that enhance the stability and flexibility of electricity systems. While some LDES services are integrated into existing market frameworks, traditional mechanisms may not fully account for their operational characteristics, potentially leading to undervaluation. Within this context, this paper reviews the literature and industry practices to assess potential grid services for LDES, evaluates existing compensation mechanisms, and identifies challenges to full market integration. Recent Findings We first review existing literature and identify key grid services unique to LDES, including enhancing grid resilience during extreme weather events, enabling long-term energy shifting, and providing flexible and firm energy in systems with limited dispatchable resources. Here, we also review how LDES services are compensated in current market frameworks and the challenges associated with the full realization of LDES values. Additionally, we summarize market mechanisms for storage technologies across U.S. wholesale markets. We find that some markets are adjusting incentive structures, such as incorporating storage duration in capacity accreditation, to better align with system needs and LDES contributions to the grid. However, further refinements in capacity remuneration and dispatch timeframes may be needed for more effective realization of LDES value. Summary This review evaluates potential grid services for LDES, examines existing compensation mechanisms for LDES technologies, and identifies gaps between these mechanisms and LDES operational characteristics. The review concludes by outlining potential market enhancements for more effective LDES integration and articulating additional research needs to support its efficient participation in future power systems.

Flexible resources↗

An Evaluation of the Flywheel Potential for Providing Regulation Service in California

Flywheels can provide regulation and frequency response services to the power grids. This study presents the technical characteristics, modeling approach, methodologies, and results for providing regulation services in the California Independent System Operator (CAISO) market. Breakeven cost analyses were developed for two cases: 1) flywheel provides the regulation service alone; and 2) flywheel provides the regulation service together with a hydro power plant. For both cases, we evaluated two payment methods: pay-by-energy and pay-by-capacity. Based on the results of the technical and cost analyses, the opportunities for the flywheel providing regulation services are discussed; field test results for the flywheel’s physical characteristics are presented; and performance metrics of the flywheel to provide the regulation services are suggested.

25 ENERGY STORAGE↗

Incentivizing Distributed Energy Resource Participation in Grid Services

The bulk power system is experiencing a dramatic shift as renewable generation growth continues to accelerate. Large-scale renewables adoption will help societies transition to a low-carbon, low-cost, and environmentally friendly electrical power system. However, the transition from a paradigm of generation following load to one where load follows generation will require large-scale interconnection and coordinated operation of Distributed Energy Resources (DERs), supported by open communication protocols. In this future grid scenario, DER aggregations will provide critical grid services that enable high penetration levels of renewable generation. This position paper presents an Energy Service Interface (ESI) that defines scope for ensuring secure, trustworthy information exchange between grid service providers and DERs. The goal of the ESI is to encourage large-scale participation of DERs in order to provide grid services through dispatch of DER aggregations. This position paper also presents an open smart energy communications protocol that allows DERs to advertise their characteristics and participate in grid services, within constraints established by the ESI. The paper presents several monetization incentives that grid service providers could use to encourage large-scale DER participation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Second use of transportation batteries: Maximizing the value of batteries for transportation and grid services

Plug-in hybrid electric vehicles (PHEVs) and electric vehicles (EVs) are expected to gain significant market share over the next decade. The economic viability for such vehicles is contingent upon the availability of cost-effective batteries with high power and energy density. For initial commercial success, government subsidies will be highly instrumental in allowing PHEVs to gain a foothold. However, in the long-term, for electric vehicles to be commercially viable, the economics have to be self-sustaining. Towards the end of battery life in the vehicle, the energy capacity left in the battery is not sufficient to provide the designed range for the vehicle. Typically, the automotive manufacturers indicated the need for battery replacement when the remaining energy capacity reaches 70-80%. There is still sufficient power (kW) and energy capacity (kWh) left in the battery to support various grid ancillary services such as balancing, spinning reserve, load following services. As renewable energy penetration increases, the need for such balancing services is expected to increase. This work explores optimality for the replacement of transportation batteries to be subsequently used for grid services. This analysis maximizes the value of an electric vehicle battery to be used as a transportation battery (in its first life) and then as a resource for providing grid services (in its second life). The results are presented across a range of key parameters, such as depth of discharge (DOD), number of batteries used over the life of the vehicle, battery life in vehicle, battery state of health (SOH) at end of life in vehicle and ancillary services rate. The results provide valuable insights for the automotive industry into maximizing the utility and the value of the vehicle batteries in an effort to either reduce the selling price of EVs and PHEVs or maximize the profitability of the emerging electrification of transportation.

(DOD)↗