Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “risk reduction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Molecular Accumulation during JWST’s Optical Telescope Cryogenic Thermal Vacuum Testing

Maintaining molecular cleanliness during the JWST’s Optical Telescope/Instrument Module (OTIS) Cryogenic Thermal Vacuum (TV) test campaign was critical to the success of its optical mission on orbit. In the thermal vacuum tests leading up to the final cryogenic test to validate the OTIS flight hardware, NASA Johnson Space Center’s (JSC’s) TV Chamber A was fully characterized for molecular contamination. It was found to contain common volatile condensable materials (VCM), including hydrocarbons, plasticizers, and silicones, all of which absorb in JWST’s infrared wavelength region. Due to the risks involved, cleaning molecular contamination from the OTIS mirrors was not an option and heating the Primary Mirror (PM) segments would have also been a risky and expensive endeavor. As a result, a monitoring process was developed and implemented during four different Pathfinder or risk reduction tests that were scheduled to occur prior to the flight hardware test. The goal was to quantify and assess the risk of molecular contamination depositing on the PM resulting from relatively warm chamber shrouds “leading” colder PM mirrors during warmup, by a margin of 10-50 Kelvin (K). This was accomplished using Cryogenic Quartz Crystal Microbalances (CQCMs), held at temperatures slightly cooler than the segments to signal the onset of contamination events. Per the JWST Contamination Control Plan (CCP)1, the total Primary Mirror molecular allocation requirement was 50 angstroms. In all tests, the results showed an average accumulated molecular contamination of <10 angstroms.

optics↗

Molecular Accumulation during JWST’s Optical Telescope Cryogenic Thermal Vacuum Testing

Maintaining molecular cleanliness during the JWST’s Optical Telescope/Instrument Module (OTIS) Cryogenic Thermal Vacuum (TV) test campaign was critical to the success of its optical mission on orbit. In the thermal vacuum tests leading up to the final cryogenic test to validate the OTIS flight hardware, NASA Johnson Space Center’s (JSC’s) TV Chamber A was fully characterized for molecular contamination. It was found to contain common volatile condensable materials (VCM), including hydrocarbons, plasticizers, and silicones, all of which absorb in JWST’s infrared wavelength region. Due to the risks involved, cleaning molecular contamination from the OTIS mirrors was not an option and heating the Primary Mirror (PM) segments would have also been a risky and expensive endeavor. As a result, a monitoring process was developed and implemented during four different Pathfinder or risk reduction tests that were scheduled to occur prior to the flight hardware test. The goal was to quantify and assess the risk of molecular contamination depositing on the PM resulting from relatively warm chamber shrouds “leading” colder PM mirrors during warmup, by a margin of 10-50 Kelvin (K). This was accomplished using Cryogenic Quartz Crystal Microbalances (CQCMs), held at temperatures slightly cooler than the segments to signal the onset of contamination events. Per the JWST Contamination Control Plan (CCP)1, the total Primary Mirror molecular allocation requirement was 50 angstroms. In all tests, the results showed an average accumulated molecular contamination of <10 angstroms.

molecular, contamination, thermal vacuum, cryogeni↗

EHS Health Assessment & Health Action Plan Report (CY 2020)

Sandia National Laboratories (SNL) Employee Health Services (EHS) program believes that good health is essential to getting the most out of life, which is why we offer a variety of worksite wellness programs that put employees in control of their own health. These programs are based on current research and strategies that are proven to minimize risk and decrease the impact of illness through early detection and treatment. Services includes Health Assessments, the Virgin Pulse (VP) online wellness platform, and Health Action Plans (HAP) which include one-on-one education, organizational health initiatives, a video library, an events calendar, onsite fitness facilities, and group fitness classes. Participation in these programs help employees and their spouses earn funding for their Health Reimbursement Accounts (HRAs). The EHS Health Action Plan (HAP) initiative targets the key health risks identified through the 8-15-80 model by engaging employees to change their own healthcare story. EHS identified the most prevalent of the health risks amongst our population through Health Risk Assessment (HRA) and used that data to build Health Action Plans (HAPs). The 2020 Health Action Plans addressed improving upon inadequate sleep, lack of energy, stress, weight, physical inactivity, cardiometabolic issues (hypertension, high cholesterol, diabetes), low back pain, allergies, asthma, digestive health, tobacco use, and living well to maintaining low risk for those individuals who do not have a chronic condition to manage. These plans connect employees with our onsite registered dietitians, fitness professionals, health coaches, physical therapists, and physicians as appropriate. In addition to addressing the physical aspects of health, the plans also emphasized pre/post-assessments to encourage building behavioral and emotional skills that promote health and facilitate lifestyle changes over a minimum of three months. Just one risk reduction or behavior change can make an impact on the health of the participant’s Division as well as Sandia’s overall risk levels and ultimately its healthcare costs. Sandia employees achieved an Overall Wellness Score of 69 based on the WellSource Health Assessment (the same as last year). A score of 70-100 is considered “Doing Well”, and a score of 40-69 is in the “Caution” category. Overall in CY 2019, Sandia saw a 34% participation rate in Health Action Plan (HAP) programs (up from 33% in CY 2019) with an 89% completion rate (4% lower than CY 2019). Overall, 5,039 (347 more than CY 2019) individuals participated in 8,329 HAPs, which is 1,005 more than the last calendar year (7,324).

59 BASIC BIOLOGICAL SCIENCES↗

Heat Melt Compactor Development Progress

The status of the Heat Melt Compactor (HMC) development project is reported. HMC Generation 2 (Gen 2) has been assembled and initial testing has begun. A baseline mission use case for trash volume reduction, water recovery, trash sterilization, and the venting of effluent gases and water vapor to space has been conceptualized. A test campaign to reduce technical risks is underway. This risk reduction testing examines the many varied operating scenarios and conditions needed for processing trash during a space mission. The test results along with performance characterization of HMC Gen 2 will be used to prescribe requirements and specifications for a future ISS flight Technology Demonstration. We report on the current status, technical risks, and test results in the context of an ISS vent-to-space Technology Demonstration.

ECLSS↗

Optimizing spacecraft design - optimization engine development : progress and plans

At JPL and NASA, a process has been developed to perform life cycle risk management. This process requires users to identify: goals and objectives to be achieved (and their relative priorities), the various risks to achieving those goals and objectives, and options for risk mitigation (prevention, detection ahead of time, and alleviation). Risks are broadly defined to include the risk of failing to design a system with adequate performance, compatibility and robustness in addition to more traditional implementation and operational risks. The options for mitigating these different kinds of risks can include architectural and design choices, technology plans and technology back-up options, test-bed and simulation options, engineering models and hardware/software development techniques and other more traditional risk reduction techniques.

risk↗

2015 Space Radiation Standing Review Panel

The 2015 Space Radiation Standing Review Panel (from here on referred to as the SRP) met for a site visit in Houston, TX on December 8 - 9, 2015. The SRP met with representatives from the Space Radiation Element and members of the Human Research Program (HRP) to review the updated research plan for the Risk of Radiation Carcinogenesis Cancer Risk. The SRP also reviewed the newly revised Evidence Reports for the Risk of Acute Radiation Syndromes Due to Solar Particle Events (SPEs) (Acute Risk), the Risk of Acute (In-flight) and Late Central Nervous System Effects from Radiation Exposure (CNS Risk), and the Risk of Cardiovascular Disease and Other Degenerative Tissue Effects from Radiation (Degen Risk), as well as a status update on these Risks. The SRP would like to commend Dr. Simonsen, Dr. Huff, Dr. Nelson, and Dr. Patel for their detailed presentations. The Space Radiation Element did a great job presenting a very large volume of material. The SRP considers it to be a strong program that is well-organized, well-coordinated and generates valuable data. The SRP commended the tissue sharing protocols, working groups, systems biology analysis, and standardization of models. In several of the discussed areas the SRP suggested improvements of the research plans in the future. These include the following: It is important that the team has expanded efforts examining immunology and inflammation as important components of the space radiation biological response. This is an overarching and important focus that is likely to apply to all aspects of the program including acute, CVD, CNS, cancer and others. Given that the area of immunology/inflammation is highly complex (and especially so as it relates to radiation), it warrants the expansion of investigators expertise in immunology and inflammation to work with the individual research projects and also the NASA Specialized Center of Research (NSCORs). Historical data on radiation injury to be entered into the Watson “big data” study must be used with caution. The general scientific issues of reproducibility, details of experimental methods and data analysis from preclinical and basic research laboratories have been raised broadly over the last few years (not specific to this work) and indicate that caution must be applied in the ways these data are used. This pertains to preclinical data and also to phase 3 clinical trials in radiation oncology and medical oncology. Of course, appropriate use and analysis of these “big-data” sets also offer the potential of pinpointing limitations and extracting remaining useful information. Emphasis should be placed on the latter possibility. A key target is risk reduction from radiation exposure. Progress of the entire space program, now moving towards the Mars mission, requires timely answers to key components of human risk, which are known to be complex. Periodic review of progress should be conducted with additional resources directed into achieving critical milestones. Turning the long red bars to yellow and green (or for some risks such as CNS possibly to grey) must be high priority. That such progress will require new science and not engineering means that it should be viewed in a knowledge-based light. The technology-based aspects of engineering issues are certainly as important, however, science and knowledge-based problems are solved in a different way than engineering. Timelines for engineering are more predictable, while for science, progress can be methodical with occasional major incremental findings that can rapidly change the rate of progress. As opportunities for rapid incremental changes arise, periodic enhancement of investment is strongly recommended to enable such new knowledge to be quickly and efficiently exploited. Collaborations and linkages with National Institute of Allergy and Infectious Diseases (NIAID), the Biomedical Advanced Research and Development Authority (BARDA) and the Department of Defense (DoD) are in place and more are encouraged, where possible, with the radiation injury and medical countermeasure studies. This could include utilizing some of their animal model testing contracts to facilitate obtaining results using common platforms. Such approach will facilitate the comparison of results among laboratories, and will facilitate and accelerate the development of medical countermeasures. It is particularly noteworthy that the NASA Space Radiation Element is reaching out to the Multidisciplinary European Low Dose Initiative (MELODI) platform coordinating low dose radiation risk research, and to other international agencies that are studying low dose radiation effects in an effort to fill the void generated by the cancelation of the Department of Energy (DOE) low dose radiation program. While NASA is working actively with NIAID and BARDA to integrate their relevant findings of radiation mitigator investigations to NASA programs, the committee notes its disappointment that the United States currently lacks a dedicated low dose radiation program with clear mechanistic orientation and aimed at the quantification and mitigation of human radiation risk on Earth. This void gives to the NASA Space Radiation Program Element special societal value, but also makes its overall design more challenging.

Steinberg, Susan↗

MAVEN Information Security Governance, Risk Management, and Compliance (GRC): Lessons Learned

As the first interplanetary mission managed by the NASA Goddard Space Flight Center, the Mars Atmosphere and Volatile EvolutioN (MAVEN) had three IT security goals for its ground system: COMPLIANCE, (IT) RISK REDUCTION, and COST REDUCTION. In a multiorganizational environment in which government, industry and academia work together in support of the ground system and mission operations, information security governance, risk management, and compliance (GRC) becomes a challenge as each component of the ground system has and follows its own set of IT security requirements. These requirements are not necessarily the same or even similar to each other's, making the auditing of the ground system security a challenging feat. A combination of standards-based information security management based on the National Institute of Standards and Technology (NIST) Risk Management Framework (RMF), due diligence by the Mission's leadership, and effective collaboration among all elements of the ground system enabled MAVEN to successfully meet NASA's requirements for IT security, and therefore meet Federal Information Security Management Act (FISMA) mandate on the Agency. Throughout the implementation of GRC on MAVEN during the early stages of the mission development, the Project faced many challenges some of which have been identified in this paper. The purpose of this paper is to document these challenges, and provide a brief analysis of the lessons MAVEN learned. The historical information documented herein, derived from an internal pre-launch lessons learned analysis, can be used by current and future missions and organizations implementing and auditing GRC.

FISMA↗

Optimizing fluvial flood mitigation strategies: A multi-objective approach for cost-effective and socially-aware infrastructure feasibility analysis

Effective levee planning must balance capital cost, risk reduction, and community priorities. These objectives are rarely optimized together. This study presents a feasibility phase, simulationin-the-loop framework that couples terrain-based flood modeling with a socially aware multiobjective optimizer. Flood risk is measured as Expected Annual Exposed Population (EAEP), obtained by integrating exposure over Annual Exceedance Probability (AEP) nodes, mirroring the Hydrologic Engineering Center's Flood Damage Reduction Analysis (HEC-FDA) expected-annual formulation but with people rather than dollars. Exposure per scenario is computed by overlaying binary inundation masks with a population surface at the tract level. Distributional fairness is encoded through a Group Benefit Share (GBS) constraint that requires high-SVI tracts to receive at least a baseline share of annualized benefits. Capital cost is represented by a height-dependent unit-cost model suitable for screening. This study addresses the two-objective problem, minimize cost and expected annual exposure subject to the GBS constraint, using Non-Dominated Sorting Genetic Algorithm II (NSGA-II) and leveraging Pareto front for feasibility phase decision making. Implemented with terrain-based flood modeling, GeoFlood, for rapid scenario evaluation, the framework is demonstrated in Southeast Texas. The results reveal clear trade-offs among cost, risk, and social benefits and identify non-dominated levee height configurations that satisfy the benefit-share floor. The contributions are a scalable decision support method that operationalizes expected annual population-based risk, embeds enforceable benefit-sharing guarantees, and uses lightweight simulation to explore large design spaces before higher fidelity design stages.

Flood mitigation↗

Reliability Assessment Of Conceptual Launch Vehicles

Planning is underway for new NASA missions to the moon and to MARS. These missions carry a great deal of risk, as the Challenger and Columbia accidents demonstrate. In order to minimize the risks to the crew and the mission, risk reduction must be done at every stage, not only in quality manufacturing, but also in design. It is necessary, therefore, to be able to compare the risks posed in different launch vehicle designs. Further, these designs have not yet been implemented, so it is necessary to compare these risks without being able to test the vehicles themselves. This paper will discuss some of the issues involved in this type of comparison. It will start with a general discussion of reliability estimation. It will continue with a short look at some software designed to make this estimation easier and faster. It will conclude with a few recommendations for future tools.

Bloomer, Lisa A.↗

Orion Heat Shield Manufacturing Producibility Improvements for the EM-1 Flight Test Program

This paper describes how the Orion program is incorporating improvements in the heat shield design and manufacturing processes reducing programmatic risk and ensuring crew safety in support of NASA’s Exploration Missions. The Orion program successfully completed the EFT-1 flight test in 2014 and is currently developing the EM-1 spacecraft to meet the test objectives of an orbital mission to the moon and return to earth in 2019. Lessons learned from the EFT-1 manufacturing and flight test experience are being incorporated into a wide variety of vehicle systems and manufacturing processes to reduce risk to the Orion missions and flight crew. A critical contributor to crew safety is the heat shield that protects the crew capsule during re-entry through the earth’s atmosphere for return from deep space. The first flight test vehicle, EFT-1, was manufactured and tested in the Neil Armstrong Operations and Checkout (O&C) facility at KSC to demonstrate early risk reduction including the functionality of the Thermal Protection Systems (TPS) for capsule safe return to earth. The approach for the EFT-1 heat shield utilized a low risk approach using Apollo heritage design and manufacturing processes using an Avcoat TPS ablator with a honeycomb substrate to provide a one piece heat shield to meet the mission re-entry heating environments. The manufacturing processes used honeycomb cell injection guns which were redeveloped from the Apollo Lunar Program processes to build the EFT-1 heat shield. The completed heat shield was transported across the country by aircraft to the O&C at KSC for installation onto the capsule. The EFT-1 heat shield successfully performed its mission and experienced ~80% of the re-entry velocity (50% heating rate) for a lunar return for an Exploration Mission. The second flight test vehicle is the EM-1 mission which will have additional flight systems installed to fly to the moon and return. Heat shield design and producibility improvements have been incorporated in the EM-1 vehicle to meet deep space mission and programmatic requirements. The design continues to use the Avcoat material, but in a “block” configuration to enable improvements in the application processes as well as additional improvements in the carrier structure design and manufacturing operations. Incorporating flight test results and producibility improvements from EFT-1 for the heat shield system design and processes have improved the thermal protection capability, improved the producibility, and cost for EM-1 flight test.

Producibility↗

Expedited Walkdowns and Preparation of Cost Estimates for Decontamination and Demolition of Excess Facilities - 20335

Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Improved Risk Priority Measure for the Management of Project Risk

Monte Carlo-based project risk models are essential tools in project risk management, particularly for large, complex projects in which it is difficult to glean intuitively the importance of individual risks to the overall project. Conventional correlation-based methods for measuring the importance of contributing risks in such models are argued here to be both statistically flawed and unintuitive in the importance metrics they produce. Drawing on and adapting methods more traditionally associated with engineering risk models, Risk Reduction Worth (RRW) is introduced as an importance measure. RRW is shown to be statistically robust and provide an easily interpretable, quantitative measure of the importance of a risk to the overall performance of a project; specifically, measuring the extent to which removal of a risk would improve confidence in project outcomes. To ensure practicality of the method, an approach is described in which RRWs can be produced for all contributing risks based on a single Monte Carlo sample. This is demonstrated through application to a large, complex project risk model from which intuitive risk importance insights provide a robust, transparent basis for the allocation of risk management resources.

Risk↗

Risk as a Resource: A New Paradigm

In the new NASA, risk management must be developed as a skill to a far greater degree than has existed in the past. Past approaches have produced great successes but at great cost and lengthy schedules. In the future, risk and its component contributors must be re-evaluated. There are three contexts of risk that will be addressed in this paper: risk as a resource, which expands and shifts traditional risk considerations; marginal cost of risk, which addresses the cumulative and time related effects of risk reduction; and an alternative definition or new meaning of success and how it relates to work.

risk management risk success mission risk↗

Developing a Gap Taxonomy to Address Crew Health Risks in NASA's Human Research Program

The mission of NASA's Human Research Program (HRP) is to understand and reduce the risk to crew health and performance in exploration missions. The HRP addresses 27 specific risks by identifying and then filling gaps in understanding the risks and in the ability to disposition the risks. The primary bases for identifying gaps have been past experience and requirements definition. This approach has been very effective in identifying some important, relevant gaps, but may be inadequate for identifying gaps outside the past experience base. We are exploring the use of a gap taxonomy as a comprehensive, underlying conceptual framework that allows a more systematic identification of gaps. The taxonomy is based on these stages in medical care: prediction, prevention, detection/diagnosis, treatment, monitoring, rehabilitation, and lifetime surveillance. This gap taxonomy approach identifies new gaps in HRP health risks. Many of the new gaps suggest risk reduction approaches that are more cost effective than present approaches. A major benefit of the gap taxonomy approach is to identify new, economical approaches that reduce the likelihood and/or consequence of a risk.

Kundrot, Craig E.↗

Affordable Development and Qualification Strategy for Nuclear Thermal Propulsion

A number of recent assessments have confirmed the results of several earlier studies that Nuclear Thermal Propulsion (NTP) is a leading technology for human exploration of Mars. It is generally acknowledged that NTP provides the best prospects for the transportation of humans to Mars in the 2030's. Its high Isp coupled with the high thrusts achievable, allow reasonable trip times, thereby alleviating concerns about space radiation and "claustrophobia" effects. NASA has embarked on the latest phase of the development of NTP systems, and is adopting an affordable approach in response to the pressure of the times. The affordable strategy is built on maximizing the use of the large NTP technology base developed in the 1950's and 60's. The fact that the NTP engines were actually demonstrated to work as planned, is a great risk reduction feature in its development. The strategy utilizes non-nuclear testing to the fullest extent possible, and uses focused nuclear tests for the essential qualification and certification tests. The perceived cost risk of conducting the ground tests is being addressed by considering novel testing approaches. This includes the use of boreholes to contain radioactive effluents, and use of fuel with very high retention capability for fission products. The use of prototype flight tests is being considered as final steps in the development prior to undertaking human flight missions. In addition to the technical issues, plans are being prepared to address the institutional and political issues that need to be considered in this major venture. While the development and deployment of NTP system is not expected to be cheap, the value of the system will be very high, and amortized over the many missions that it enables and enhances, the imputed costs will be very reasonable. Using the approach outlined, NASA and its partners, currently the DOE, and subsequently industry, have a good chance of creating a sustained development program leading to human missions to Mars within the next few decades.

Gerrish, Harold P., Jr.↗

Natural Hazard Risk Assessments at the Global Scale

Since 1990, natural hazards have led to over 1.6 million fatalities globally, and economic losses are estimated at an average of around USD 260–310 billion per year. The scientific and policy communities recognise the need to reduce these risks. As a result, the last decade has seen a rapid development of global models for assessing risk from natural hazards at the global scale. In this paper, we review the scientific literature on natural hazard risk assessments at the global scale, and we specifically examine whether and how they have examined future projections of hazard, exposure, and/or vulnerability. In doing so, we examine similarities and differences between the approaches taken across the different hazards, and we identify potential ways in which different hazard communities can learn from each other. For example, there are a number of global risk studies focusing on hydrological, climatological, and meteorological hazards that have included future projections and disaster risk reduction measures (in the case of floods), whereas fewer exist in the peer-reviewed literature for global studies related to geological hazards. On the other hand, studies of earthquake and tsunami risk are now using stochastic modelling approaches to allow for a fully probabilistic assessment of risk, which could benefit the modelling of risk from other hazards. Finally, we discuss opportunities for learning from methods and approaches being developed and applied to assess natural hazard risks at more continental or regional scales. Through this paper, we hope to encourage further dialogue on knowledge sharing between disciplines and communities working on different hazards and risk and at different spatial scales.

Philip J. Ward↗

Systemic Risk From the Perspective of Climate, Environmental and Disaster Risk Science and Practice

Understanding and managing systemic risk is more important than ever due to our immense global connectivity (e.g., between sectors, such as food-health-water-energy, countries and continents, down to individuals). Despite the fact that the notion of systemic risk is several decades old, the term is used in diverse ways across different disciplines (e.g., financial systems, medicine, earth system sciences, disaster risk research and climate science). Triggered by the repercussions of the global financial crisis of the late 2000s, and more recently the COVID-19 pandemic, which are clear realization of systemic risk, the perception of systemic risk has often been focused on global and catastrophic or even existential risks. Systemic risk, however, can be seen as a feature of systems at all possible scales (e.g., global, national, regional, local) with system boundaries varying depending on the context. Addressing current societal challenges, such as climate change, in terms of systemic risk requires integrating different systems perspectives and fostering system thinking, while implementing key intergovernmental agendas, such as the Paris Agreement, the Sendai Framework for Disaster Risk Reduction and the Sustainable Development Goals. Based on insights gained and knowledge collected from an expert workshop, literature review and expert elicitation, we give an integrated perspective of climate, environmental and disaster risk science and practice on systemic risk as summarized in a Briefing Note to the International Science Council. We provide an overview of concepts of systemic risk that have evolved over time and identify commonalities across terminologies and perspectives associated with systemic risk used in different contexts. Key attributes of systemic risk are outlined without prescribing a single definition, and information and data requirements are discussed that are essential for a better and more actionable understanding of the systemic nature of risk. Finally, the opportunities to connect research and policy for addressing systemic risk are highlighted.

systemic risk↗

How Can We Efficiently Build A Spacecraft That Has Longevity? Experiences From the GSFC Perspective to Inform Lunar Exploration and Science Orbiter’s Architecture

Recent successes in NASA planetary science missions has shown that long-lived missions can yield significant science return. These missions, despite their longevity, were not planned to operate beyond their deign life. For example, the Lunar Reconnaissance Orbiter has a design life of 2-3 years, and yet we are entering its 14th year on orbit. Spacecraft longevity in practice has been related to: 1) mission class; 2) did we test it long enough and resolve all the anomalies to be beyond the early failure curve; 3) consumables budgets, and 4) how components are de-signed and tested. Mission class has been perceived as one of the primary ways to drive longevity. But higher mission class is a significant cost and mission driver. Parts selection only from the limited military standard parts and extensive parts qualification adds to development time and cost. Largely redundant (often erroneously interpreted as fully redundant) adds to launch mass and increases testing complexity (which may reduce the amount of testing in the nominal con-figuration). Lower Risk Posture (reflected in a higher mission class) drives significant additional processes and quality assurance analyses. Higher mission class also drives significantly greater sparing and life testing costs. This discussion focuses on whether this is indeed the best way to achieve longevity efficiently or whether there are more efficient ways to achieve longevity. Empirical evidence shows that lower mission classes that implement effective risk reduction and selective redundancy generally results in long life at a lower Spacecraft bus cost. By evaluating redundancy careful-ly, spacecraft cost can be lowered which can enable a more capable payload. Risk of the mission is highly dependent on the complexity of the mission and is only loosely dependent on Class of Mission. High complexity missions can have many single point failures and require the development of new technology, while lower class mission can have lower risk by baselining or incorporating: (selective) redundancy, fault-tolerant design, design for minimum risk, ability to reset, and/or design for graceful degradation. The team met with Goddard Space Flight Center Space Systems Mission Operations leaders to discuss which avionics have proven in flight to be the most reliable and which have had lifetime issues. The paper proposes a list of components to focus on for redundancy for a long-lived lunar mission. Reliability numbers are presented for both single string and dual string missions. The history of life-time performance versus planned mission life according to mission class is presented. A mission with well thought out selective redundancy and effective on the ground test program, can be expected to last well beyond its mission lifetime and provided enhanced return for the community. This approach minimizes project expenditures that do not retire significant risk and allows the project to focus risk mitigation efforts on those risks that will have a significant likelihood of threatening mission success. This is aided by keeping the amount of technology maturation and mission complexity low, while focusing effort on ensuring all component stress-ing parameters well within the bounds of their capabilities.

Lessons Learned↗