Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ramp”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Ramp Traffic Console (RTC) Lessons Learned

This presentation provides lessons learned for use of ramp traffic control (RTC) and ramp manager traffic console (RMTC) features of the ATD-2 (Airspace Technology Demonstration 2) Integrated Arrival, Departure, and Surface (IADS) system in an operational environment.

Jung, Yoon↗

The Rapid Variability of Wave Electric Fields Within and Near Quasiperpendicular Interplanetary Shock Ramps: STEREO Observations

We present STEREO observations within 1500 proton gyroradii of 12 quasiperpendicular interplanetary shocks, with long-duration burst mode electric field acquisition by S/WAVES enabling observation of the evolution of waves throughout the entire ramp of interplanetary shocks. The shocks are low Mach number (Mf ~1-5), with beta ( ) ~0.2-1.8. High variability in frequency, amplitude, and wave mode is observed upstream, downstream, and in shock ramps. Observations in every region include ion acoustic-like waves, electron cyclotron drift instability driven waves, electrostatic solitary waves, and high frequency whistler mode waves. We also show for the fi rst time the existence of electrostatic waves with frequencies in the ion acoustic range which are frequency dispersed in time and the first observations of electron cyclotron drift instability (ECDI) driven waves at interplanetary shocks. The waves are bursty, large amplitude (~5 to > 200 mV/m), and seen in all three regions. All wave modes are more commonly observed downstream than upstream.

Z. A. Cohen↗

Commercial Smallsat Data Acquisition Program On-ramp #2 Airbus U.S. Synthetic Aperture Radar (SAR) Evaluation Report

In 2017, NASA’s Earth Science Division (ESD) launched the Private-Sector Small Constellation Satellite Data Product Pilot, now referred to as the Commercial Smallsat Data Acquisition (CSDA) program. The objective of CSDA is to identify, evaluate, and acquire commercial remote sensing data that support NASA’s Earth science research and application activities. The Pilot successfully concluded in early 2020, when CSDA transitioned into a sustained program with on-ramping opportunities for new vendors as the industry emerges with new candidates and capabilities. In October 2019, a Request for Information (RFI) seeking capability statements from parties interested in providing data from spaceborne platforms was released for the CSDA on-ramp #2 evaluations. To be responsive to the RFI, the commercial satellite constellations had to consist of three or more operating spacecraft actively collecting data in a non-geostationary orbit with full latitudinal coverage and be U.S. companies. Two vendors responded to the RFI and were evaluated by a committee composed of NASA ESD leadership, program managers, and scientists. Both vendors satisfied the RFI requirements and were asked to respond to a Request for Proposal (RFP). After review of the proposals, NASA entered into a Blanket Purchase Agreement (BPA) with Airbus Defense and Space GEO, Inc. (Airbus) U.S. in September 2021 and with BlackSky Geospatial Solutions, Inc. (BlackSky) in November 2021. In this report, CSDA provides an evaluation of the usefulness of data provided by the Airbus U.S. Synthetic Aperture Radar (SAR) satellite constellation, consisting of TerraSAR-X (launched in 2007), TanDEM-X (launched in 2010), and PAZ (launched in 2018), for advancing NASA’s Earth system science research and applications. The evaluation of the BlackSky commercial data will be provided in a separate report. To conduct the Airbus evaluation, NASA’s ESD augmented 13 existing research projects that could potentially benefit from, and had the expertise to evaluate, the commercial data being considered for longer-term purchase. Investigators from NASA’s Research and Analysis Program science focus areas and from NASA’s Applied Sciences Program elements participated in the evaluation. A summary of the research areas evaluated by the Principal Investigator (PI) teams is presented in Figure 3. CSDA also funded a dedicated activity to evaluate the satellite data quality (calibration and geolocation) independently by assessing the accuracy of data from Airbus. Evaluation activities were carried out by the selected PIs from December 7, 2022, to December 7, 2023. Delivery of datasets requested by the researchers began in January 2023. The vendors were evaluated on the accessibility of data, accuracy and completeness of metadata, and promptness and quality of user support services. Datasets purchased during the evaluation have been archived by NASA and will be made available to current and future government-funded researchers in accordance with the End User License Agreement (EULA). This synthesis report distills and integrates the findings of research reports commissioned by NASA for the Airbus evaluation. This report also includes recommendations that inform the way ahead for the program. The scientific results from the evaluations demonstrated that the commercial data from Airbus were able to advance NASA research and applications. However, the PIs encountered limitations that diminished the usefulness of the data due to the amount of effort that was required to access, preprocess, and analyze these data. One significant issue encountered was the limited spatial and temporal coverage of the data in the Airbus archive that could be used to conduct time series analyses or assessments over large spatial scales. Overall, however, the utility and the quality of the evaluated data outweighed the difficulties encountered, and NASA has concluded that the Airbus SAR data would complement NASA’s existing Earth observation capabilities and Airbus U.S. would qualify to participate in the sustained phase of the program.

Batuhan Osmanoglu↗

Operational experiences of the spallation neutron source superconducting linac and power ramp-up

The spallation neutron source (SNS) is a second generation pulsed neutron source and designed to provide a 1-GeV, 1.44-MW proton beam to a mercury target for neutron production. Since the commissioning of the accelerator complex in 2006, the SNS has started its operation for neutron production and beam power ramp-up has been in progress toward the design goal. All subsystems of the SNS were designed and developed for substantial improvements compared to existing accelerators because the design beam power is almost an order of magnitude higher compared to existing neutron facilities and the achievable neutron scattering performance will exceed present sources by more than a factor of 20 to 100. In this paper, the operational experiences with the SNS Superconducting Linac (SCL), Power Ramp-up Plan to reach the design goal and the Power Upgrade Plan (PUP) will be presented including machine, subsystem and beam related issues.

43 PARTICLE ACCELERATORS↗

Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations: Preprint

The recent increased interest in utilizing variable generation (VG) resources such as wind and solar in power systems has motivated investigations into new operating procedures. Although these resources provide desirable value to a system (e.g., no fuel costs or emissions), interconnecting them provides unique challenges. Their variable, non-controllable nature in particular requires significant attention, because it directly results in increased power system variability and uncertainty. One way to handle this is via new operating reserve schemes. Operating reserves provide upward and downward generation and ramping capacity to counteract uncertainty and variability prior to their realization. For instance, uncertainty and variability in real-time dispatch can be accounted for in the hour-ahead unit commitment. New operating reserve methodologies that specifically account for the increased variability and uncertainty caused by VG are currently being investigated and developed by academia and industry. This paper examines one method inspired by the new operating reserve product being proposed by the California Independent System Operator. The method is based on examining the potential ramping requirements at any given time and enforcing those requirements via a reserve demand curve in the market-clearing optimization as an additional ancillary service product.

24 POWER TRANSMISSION AND DISTRIBUTION↗

RAMPING UP THE SNS BEAM CURRENT WITH THE LBNL BASELINE H- SOURCE

Over the last two years the Spallation Neutron Source (SNS) has ramped up the repetition rate, pulse length, and the beam current to reach 540 kW, which has challenged many subsystems including the H- source designed and built by Lawrence Berkeley National Laboratory (LBNL). This paper discusses the major modifications of the H- source implemented to consistently and routinely output the beam current required by the SNS beam power ramp up plan. At this time, 32 mA LINAC beam current are routinely produced, which meets the requirement for 690 kW planned for end of 2008. In June 2008, a 14-day production run used 37 mA, which is close to the 38 mA required for 1.44 MW. A medium energy beam transport (MEBT) beam current of 46 mA was demonstrated on September 2, 2008.

43 PARTICLE ACCELERATORS↗

Ramping up the SNS Beam Power with the H- Source using 0 mg Cs/Day

This paper describes the ramp up of the beam power for the Spallation Neutron Source by ramping up the pulse length, the repetition rate, and the beam current emerging from the H- source. Starting out with low rep rates (<10 Hz) and short pulse lengths (<<0.3 ms) the H- source and LEBT delivered from LBNL exceeded the requirements with almost perfect availability. This paper discusses the modifications that were required to exceed 0.2 ms pulse length and 0.2% duty factor with acceptable availability and performance. Currently the source is supporting neutron production at 1 MW with 38 mA LINAC beam current at 60 Hz and 0.9 ms pulse length. The pulse length will be increased to ~1.1 ms to meet the requirements for neutron production with a power between 1 and 1.4 MW. A MEBT beam current of 46 mA with a 5.4% duty factor has been demonstrated for 32 hours. A 56mA MEBT beam current with a 4.1% duty factor has been demonstrated for 20 minutes at the conclusion of a 12 day production run. This is close to the 59 mA needed for 3 MW neutron productions. Also notable is the Cs2CrO4 cesium system, which dispenses ~10 mg of Cs during the startup of the ion source, sufficient for producing the required 38 mA for 4 weeks without significant degradation.

H- source↗

Gas turbine power plant with supersonic shock compression ramps

A gas turbine engine. The engine is based on the use of a gas turbine driven rotor having a compression ramp traveling at a local supersonic inlet velocity (based on the combination of inlet gas velocity and tangential speed of the ramp) which compresses inlet gas against a stationary sidewall. The supersonic compressor efficiently achieves high compression ratios while utilizing a compact, stabilized gasdynamic flow path. Operated at supersonic speeds, the inlet stabilizes an oblique/normal shock system in the gasdynamic flow path formed between the rim of the rotor, the strakes, and a stationary external housing. Part load efficiency is enhanced by use of a lean pre-mix system, a pre-swirl compressor, and a bypass stream to bleed a portion of the gas after passing through the pre-swirl compressor to the combustion gas outlet. Use of a stationary low NOx combustor provides excellent emissions results.

20 FOSSIL-FUELED POWER PLANTS↗

Optimizing on-ramp merging for connected and automated vehicles: A hierarchical approach using deep reinforcement learning and optimal control

On-ramp merging for Connected and Automated Vehicles (CAVs) presents significant challenges in dynamic traffic environments. Traditional methods and recent learning-based approaches often fail to simultaneously address decision-making complexity and execution precision under fluctuating conditions. This study introduces a novel hierarchical framework that combines: (1) a high-level Deep Reinforcement Learning (DRL) module that coordinates merging sequences through Virtual Traffic Signals (VTS) with Yield/Green phases and (2) a low-level optimal controller generating collision-free speed trajectories via pseudospectral convex optimization. A convolutional autoencoder compresses high-dimensional traffic states to enhance responsiveness. Extensive simulations demonstrate a 12.5% improvement in mainline throughput a 28% reduction in emergency braking events, and 31.66% lower fuel consumption compared to baseline methods. Furthermore, the framework’s effectiveness in coordinating CAV merges highlights its potential for real-world deployment. Future work will extend validation to multi-lane scenarios with mixed traffic and large-scale multiple merging points.

Connected and automated vehicles↗

Cooperative Game Approach to Optimal Merging Sequence and On-Ramp Merging Control of Connected and Automated Vehicles

Vehicle merging is one of the main causes of reduced traffic efficiency, increased risk of collision, and fuel consumption. Connected and automated vehicles (CAVs) can improve traffic efficiency, increase safety, and reduce the negative environmental impacts through effective communication and control. Therefore, to improve the traffic efficiency and reduce the fuel consumption in on-ramp scenarios, this paper addresses the global and optimal coordination of the CAVs in a merging zone. In this work, a cooperative multi-player game-based optimization framework and an algorithm are presented to coordinate vehicles and achieve minimum values for the global pay-off conditions. Fuel consumption, passenger comfort, and travel time within the merging control zone were used as the pay-off conditions. After analyzing the characteristics of the merging control zone and selecting the appropriate control decision duration, multi-player games were decomposed into multiple two-player games. An optimal merging strategy was, thereby, derived from a pay-off matrix, and minimum payoffs were predicted for a number of different potential strategies. The optimal trajectory corresponding to the predicted minimum payoffs was then utilized as the control law to coordinate the vehicles merging. The proposed control scheme derives an optimal merging sequence and an optimal trajectory for each vehicle. The effectiveness of the proposed model is validated through simulation. Finally, the proposed controller is compared with two alternative methods to demonstrate its potential to reduce fuel consumption and travel time and to improve passenger comfort and traffic efficiency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Energy Adequacy Studies: Nodal vs Zonal and Ramp-Rate Representation

This work investigates limitations in current energy adequacy studies, particularly concerning the representation of grid complexities. We highlight how traditional zonal modeling approaches, which simplify large geographic areas and generator capabilities, can mask critical transmission constraints and localized resource shortfalls. By analyzing nodal versus zonal pricing differences and the empirical distribution of generator ramp-rates, we demonstrate that these simplified assumptions may misrepresent system flexibility and deliverability. Our findings underscore the need for more granular, nodal-level analyses and data-driven characterizations of generation assets to provide a more accurate and robust assessment of energy reliability and adequacy, ultimately supporting a more resilient and efficient energy infrastructure.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wind Plant Ramping Behavior

With the increasing wind penetrations, utilities and operators (ISOs) are quickly trying to understand the impacts on system operations and planning. This report focuses on ramping imapcts within the Xcel service region.

17 WIND ENERGY↗