Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power asset utilization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

SLAPex Freeze/Thaw 2015: The First Dedicated Soil Freeze/Thaw Airborne Campaign

Soil freezing and thawing is an important process in the terrestrial water, energy, and carbon cycles, marking the change between two very different hydraulic, thermal, and biological regimes. NASA's Soil Moisture Active/Passive (SMAP) mission includes a binary freeze/thaw data product. While there have been ground-based remote sensing field measurements observing soil freeze/thaw at the point scale, and airborne campaigns that observed some frozen soil areas (e.g., BOREAS), the recently-completed SLAPex Freeze/Thaw (F/T) campaign is the first airborne campaign dedicated solely to observing frozen/thawed soil with both passive and active microwave sensors and dedicated ground truth, in order to enable detailed process-level exploration of the remote sensing signatures and in situ soil conditions. SLAPex F/T utilized the Scanning L-band Active/Passive (SLAP) instrument, an airborne simulator of SMAP developed at NASA's Goddard Space Flight Center, and was conducted near Winnipeg, Manitoba, Canada, in October/November, 2015. Future soil moisture missions are also expected to include soil freeze/thaw products, and the loss of the radar on SMAP means that airborne radar-radiometer observations like those that SLAP provides are unique assets for freeze/thaw algorithm development. This paper will present an overview of SLAPex F/T, including descriptions of the site, airborne and ground-based remote sensing, ground truth, as well as preliminary results.

BOREAS↗

Architecture Options for Navigation in Cislunar Space for Human Landing System Vehicles

As part of architecture studies and insight analysis focused on requirements development into Human Landing System lunar architecture designs, multiple studies are underway to understand the sensitivities and options for achieving high precision landing on the lunar surface. The baseline approach utilizes a combination of multiple sensors to capture autonomous state observations of the lander with respect to the lunar surface. These systems are typically constrained in terms of operational altitudes by parameters such as onboard map size, camera focus, or sensor transmitted power (for altimeter observations). While these sensor suites do enable high precision landing, they are typically very complex and expensive. For a human-rated vehicle, fault detection algorithms are needed in addition to redundant sensors drive additional design complexity. Conversely, for these early missions, mass performance is key, so extended analysis is required to identify numbers of sensors, their ideal placement, and integration algorithms. A key part of this analysis is to help identify key sensor suites and options to help alleviate this design tension. An alternate approach is to take advantage and build out in-situ assets to allow for GPS-like navigation within the lunar regime through the use of navigation references or beacons. This can be achieved through the integration of navigation services into potential relays and pre-placed lunar surface assets. This research focuses on the capability of this infrastructure to support navigation in all areas of cislunar space such as: approach to the moon, in orbit around the moon, and ascent/descent operations to the surface. An augmented state linear covariance analysis (LinCov) and navigation state covariance analysis (NavCov) tools were used to assess a variety of navigation reference locations and how they can support vehicle operations through both understanding of state uncertainties and trajectory dispersions. This research helps to supplement existing studies focused on communication link analysis by providing additional insight into specific vehicle operational scenarios that are tied closely to potential Human Landing System scenarios. Key aspect of this analysis focus on the sensitivity to state knowledge of the references, the accuracy of inter-asset measurements, and placement in support of the various scenarios.

Evan J Anzalone↗

Electric Utility Distribution Costs: Scoping Study on Trends, Drivers, and Possible Response Strategies [Slides]

This scoping study synthesizes information that will help stakeholders understand the scope, scale, and drivers of recent increases in investor-owned utility (IOU) expenditures on local distribution power grids, while providing regulators and other decision-makers with potential strategies to keep electricity bills down. The study includes five distinct components. Drawing first on data from FERC Form 1, it summarizes key trends in past and recent IOU distribution costs. Next, through a review of a sample of distribution-system plans, it characterizes material drivers of planned distribution expenditures. Ultimately, regulators must approve cost recovery for IOU expenditures, including those for the distribution system. The study therefore also: examines trends in utility requests and regulatory approvals related to changes in retail rates and return on equity; identifies areas where utility shareholder and customer incentives may be misaligned; and develops a menu of options that state regulators might consider to optimize distribution system expenditures. Some of the key findings include: - IOU distribution spending at a national level has grown by 6%/yr since 2014 in real dollar terms, 4x faster than in the prior 20 years and consisting mostly of capital (not operating) expenditure. - On a per-kWh basis, increases in IOU distribution costs since 2014 represent over 30% of the overall national-average increase in retail electricity rates. - Regional spending growth has ranged from 2-8%/yr, with larger estimated rate impacts in CAISO, then NYISO & ISO-NE, and then the Southeast, MISO & PJM (see figure). - Some utilities are planning for significantly increased distribution system spending. Planned spending on managing the existing system (asset replacement, safety & reliability, and resilience are all important drivers) exceeds that for capacity expansion. - IOU rate increase requests ($18 billion in 2025) and public utility commission (PUC) approval levels (average of 64% of requested amounts from 2021-2025) have recently hit multi-decadal highs. - PUCs in New England and the Southeast have recently approved a greater fraction of rate requests (>75%, on average) than in ther regions, while PUCs in California and the Southeast have generally authorized higher equity returns than in other regions. - Regulators have many tools to tackle potential misalignments between utility and customer interests and, more specifically, to optimize and reduce distribution costs. Shorter-term options include those related to return on equity, capital structure, depreciation, trackers, construction work in progress, and securitization. Longer-term options include performance-based regulation and a wide variety of planning-related requirements. All options embed important tradeoffs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Deep reinforcement learning assisted co-optimization of Volt-VAR grid service in distribution networks

With the increasing penetration of distributed energy resources in distribution networks, Volt-VAR control and optimization (VVC/VVO) have become very important to ensure an acceptable quality of service to all customers. System operators can rely on slow-responding utility devices, including capacitor banks and on-load tap changing transformers, along with fast-responding battery and photovoltaic (PV) inverters for the VVC/VVO implementation. Because of variations in response time of these two classes of devices, and different control actions (discrete versus continuous), coordinated and optimal scheduling and operation have become of utmost importance. Here, this paper develops a look-ahead deep reinforcement learning (DRL)-based multi-objective VVO technique to improve the voltage profile of active distribution networks, decrease network and inverter power loss, and save the operational cost of the grid. It proposes a deep deterministic policy gradient (DDPG)-based approach to schedule the optimal reactive and/or active power set-points of fast-responding inverters, and a deep Q-network (DQN)-based DRL agent to schedule the discrete decisions variables of slow-responding assets. The reactive power output of PV and battery smart inverters are scheduled at 30-minute intervals and the capacitors’ commitment status is scheduled with several hour intervals. The proposed framework is validated on the modified IEEE 34-bus and 123-bus test cases with embedded PV and PV-plus-storage. To validate the efficacy of the proposed VVO, it is compared with several scenarios, including the base case without VVO, localized droop control of DERs, DDPG-only, and twin delayed DDPG (TD3) agent-based DRL techniques. The results justify the superior performance of the proposed method to improve the voltage profile, reduce network power loss, and minimize the look-ahead grid operational cost while minimizing the undesirable power losses in inverters as a result of power factor adjustments.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Survey and Gap Prioritization of U.S. Electric Vehicle Charge Management Deployments

The goal of this study was to survey and characterize the scope of current technical and programmatic knowledge pertaining to EV charge management technologies and practices in the US and relevant international jurisdictions. This characterization of existing field demonstrations and knowledge derived were used to determine gaps in the SCM demonstration landscape. Addressing these gaps through research and demonstration could increase confidence in the U.S. that load management and EV charge control could achieve overarching societal benefits. A survey of charge management deployments and input from stakeholders was completed to determine the state-of-the-art of smart charge management (SCM) where SCM is defined as controlling the amount of power exchanged between chargers and EVs to meet customers' charging needs while also responding to external power demand or pricing signals to provide load management, resilience, or other benefits to the customer and electric grid. The survey was the basis of the gap analysis in this report and determines which areas are well understood, with high confidence, and which areas need further investigation. Existing examples of EV charge management are characterized here to determine aspects that are ready for widespread deployment and have been demonstrated in the field. These include demonstration studies, pilots, programs, and EV-specific tariffs. In all, 110 examples of charge management were characterized. The data sources were public literature and utility filings as well as targeted interviews. In addition, 43 interviews with stakeholders were conducted with a consistent set of questions used in each interview. This study prioritized gaps in demonstrated SCM capabilities based on 1) Urgency of the particular use-case to offset traditional grid assets, 2) Impact, extensibility, and scaling of results across the entire spectrum of 3000+ utility service territories including projected technical and market potential for a given grid service, and 3) Value of federal funding in addressing the gap, including potential to leverage and/or add scope to existing field demonstrations funded by other non-federal funding mechanisms.

33 ADVANCED PROPULSION SYSTEMS↗

Advancing Grid Resilience through Smart Charge Management: Findings from Maryland’s Pilot

This report presents research findings from a four-year Smart Charge Management (SCM) pilot program conducted by Maryland’s largest electric utilities—Baltimore Gas and Electric (BGE), Potomac Electric Power Company (Pepco), and Delmarva Power & Light (DPL)—to evaluate strategies for optimizing electric vehicle (EV) charging loads and enhancing grid stability. Supported by the U.S. Department of Energy (DOE), Argonne National Laboratory collaborated with all project partners and examined the effectiveness of Time-of-Use (TOU) and Load Balancing (LB) strategies in managing peak demand, deferring costly infrastructure upgrades, and reducing grid constraints at the feeder level. Using charging data from over 4,600 EV drivers, the study analyzed SCM’s impact on the distribution systems of BGE and Pepco, which consists of over 2000 feeders. Unlike prior research that focused on system-wide trends or synthetic feeders, this analysis offers granular, feeder-level insights based on real-world operational data. It highlights how transformer density, load profiles, and infrastructure constraints influence smart charging performance. Results show feeder-level conditions play a crucial role in SCM effectiveness, with most feeders benefiting more from LB, while TOU-based SCM may be sufficient for others. By 2035, LB reduced peak charging loads by 27% on average, compared to 23% under TOU-based SCM, though some feeders saw reductions exceeding 35%, while others experienced minimal impact. Feeders with higher transformer utilization and limited capacity benefited more from LB, which more effectively distributed charging demand during off-peak hours. Beyond reducing grid constraints, SCM offers long-term operational and financial benefits. By shifting EV charging demand strategically, utilities can optimize asset utilization, delay infrastructure investments, and enhance grid performance. In terms of infrastructure upgrade deferrals, at the feeder level, LB consistently reduced peak charging loads and resulting infrastructure upgrade costs, particularly in high EV enrollment areas, decreasing the number of overloaded transformers by up to 35%, while TOU-based SCM achieved 20-30% reductions depending on feeder characteristics. At the system level, LB has the potential to defer total upgrade costs by $\$$186 million for BGE, compared to $\$$159 million under TOU-based SCM. For Pepco, TOU-based SCM performed slightly better, deferring upgrade costs by $\$$30 million, compared to $\$$29 million under LB. Section 4.5 reviews some of the system differences between BGE and Pepco. However, as EV adoption scales, TOU-based SCM will introduce secondary peak charging loads, reinforcing the need for more advanced, adaptive SCM approaches to prevent new grid challenges. As EV adoption continues to grow, feeder-level managed charging strategies will be essential for mitigating grid stress, improving infrastructure efficiency, and maintaining energy affordability for consumers. This report provides critical insights for utilities, Public Utility Commissions (PUCs), and state agencies on the role of feeder-specific smart charging in infrastructure planning, policy development, and grid modernization. The findings underscore the importance of tailored, data-driven SCM solutions that align with local grid conditions, ensuring a resilient, cost-effective transition to increasing EV adoption while safeguarding distribution system performance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

COMPASS Final Report: Lunar Communications Terminal (LCT)

The Lunar Communications Terminal (LCT) COllaborative Modeling and Parametric Assessment of Space Systems (COMPASS) session designed a terminal to provide communications between lunar South Pole assets, communications relay to/from these assets through an orbiting Lunar Relay Satellite (LRS) and navigation support. The design included a complete master equipment list, power requirement list, configuration design, and brief risk assessment and cost analysis. The Terminal consists of a pallet containing the communications and avionics equipment, surrounded by the thermal control system (radiator), an attached, deployable 10-m tower, upon which were mounted locally broadcasting and receiving modems and a deployable 1 m diameter Ka/S band dish which provides relay communications with the lunar relay satellites and, as a backup, Earth when it is in view. All power was assumed to come from the lunar outpost Habitat. Three LCT design options were explored: a stand-alone LCT servicing the manned outpost, an integrated LCT (into the Habitat or Lunar Lander), and a mini-LCT which provides a reduced level of communication for primarily robotic areas dealing as in situ resource utilization (ISRU) and remote science. Where possible all the designs assumed single fault tolerance. Significant mass savings were found when integrating the LCT into the Habitat or Lander but increases in costs occurred depending upon the level of man rating required for such designs.

Oleson, Steven R.↗

Voltage positioning using co-optimization of controllable grid assets in radial networks

With increasing penetration of solar PV, some distribution feeders are experiencing highly variable net-load flows and even reverse flows. To optimize distribution systems under such conditions, the scheduling of mechanical devices, such as OLTCs and capacitor banks, needs to take into account forecasted solar PV and actual grid conditions. However, these legacy switching assets are operated on a daily or hourly timescale, due to the wear and tear associated with mechanical switching, which makes them unsuitable for real-time control. Therefore, there is a natural timescale- separation between these slower mechanical assets and the responsive nature of inverter-based resources. In this paper, we present a network admissible convex formulation for holistically scheduling controllable grid assets to position voltage optimally against solar PV. An optimal hourly schedule is presented that utilizes mechanical resources to position the predicted voltages close to nominal values, while minimizing the use of inverter-based resources (i.e., DERs), making them available for control at a faster time-scale (after the uncertainty reveals itself). A convex, inner approximation of the OPF problem is adapted to a mixed-integer linear program that minimizes voltage deviations from nominal (i.e., maximizes voltage margins). Here, the resulting OPF solution respects all the network constraints and is, hence, robust against modeling simplifications. Simulation based analysis on IEEE distribution feeders validates the approach.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Bridging the Gap on Data and Analysis for Distribution System Planning: Information That Utilities Can Provide Regulators, State Energy Offices and Other Stakeholders

Electric utilities conduct planning annually to ensure their distribution system meets technical standards, policies, and regulations; addresses forecasted grid conditions; satisfies customer needs; and advances utility priorities. The plan identifies grid deficiencies, analyzes potential solutions, and prioritizes capital investments and other expenditures. About 20 U.S. states and jurisdictions require regulated utilities to file some type of distribution system plan with the public utility commission for review. Requirements for sharing distribution system data and analyses vary widely, from few specific requirements to a detailed list of information that must be provided. While utilities conduct extensive analysis to develop distribution system plans, in most jurisdictions regulators and stakeholders do not know what data are available and how the utility uses the data in planning and investing. This report aims to bridge the gap by increasing understanding of the types of data and analyses utilities employ to develop distribution system plans and how the information affects their decision-making. The report describes information that states and stakeholders can ask for related to 11 data categories: -Forecasting loads and distributed energy resources (DERs) -Scenario analysis -Worst-performing circuits -Asset management strategy -Hosting capacity analysis -Value of DERs -Grid needs assessment -Cost-effectiveness framework for investments -Distribution system investment strategy and implementation -Geotargeted programs -Non-wires alternatives procurements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Enhanced Computational Framework for Energy Storage Participation in Transmission Planning with Electricity Market Participation: Dynamic Market Participation Restriction Estimation

In the previous study and report, we developed a computational framework to explore the technical and economic viability of the dual use of pumped storage hydropower (PSH) for both transmission assets and market participation. The rationale for the dual-use application is to improve the resource utilization rate and reduce the cost recovery burden. A PSH-based transmission solution generally has a large capacity, which corresponds to a higher investment cost compared to a traditional line solution. Market participation may allow the PSH asset to offset part of its high investment cost. A critical question is whether it is economically and technically viable to allow dual use of a PSH-based transmission project without jeopardizing transmission system reliability. And a more specific follow-up question is how to improve market participation performance while maintaining transmission reliability. In this study, we extend the computational framework by updating the method to determine transmission service obligation requirements dynamically based on the possibility of the need for transmission service in operation. Specifically, we correlate the need for transmission service with the probability of thermal overloading on a monitored transmission line, which is essentially based on the probability distribution of power flow and its probability of exceeding the line rating based on system dispatch and operational uncertainties. In addition, the need depends on the level of risk that a system operator is willing to take. The higher the risk tolerance, the lower the requirement that the system operator would apply to the PSH project as a transmission asset. The requirements are updated every day before the PSH project determines its market participation strategy. With the updated transmission service requirements, it is expected that a PSH project can serve as a transmission asset when the transmission system is at risk and really needs it, while it can participate in a market with sufficient information and certain restrictions. In this way, the transmission service quality and market participation performance can both be improved.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Application of Cyber-Informed Engineering for Protecting BESS

This white paper synthesizes an array of crucial grid services provided by BESS technology, assesses its architecture and communications, and presents a case study for analysis against the principles introduced by Cyber-Informed Engineering (CIE). Furthermore, in walking through the analysis, this paper presents a framework to evaluate risks and solutions when considering BESS components. Asset owners and buyers could perform this analysis to assess their BESS product implementations, alternative inverter-based resources (IBR), and energy management systems (EMS). Battery systems fulfill various roles contingent on the unique market demands and the specific challenges presented by regional grid infrastructures. These roles also vary due to the differing utility models for ownership and operation, which are adapted to meet regional and local capabilities and requirements. Concerns have been raised regarding the potential for adversaries to exploit knowledge of battery operational patterns to orchestrate decisive attacks. However, the security of operational data for these systems may not be the primary vulnerability, as much of this information is already well-understood within the community. Applying a modest degree of subject matter expertise can often yield valuable predictions regarding how a battery will respond under certain conditions, such as grid emergencies, high or low-temperature days, Public Safety Power Shutoff (PSPS) events, and outages. The operational characteristics of batteries are well-documented, and their capabilities, including the risks associated with misoperation and the resulting consequences, are published and understood within the industry. CIE practices represent the next step in gaining functional assurance and providing an acceptable level of risk, regardless of whether a battery vendor can support a trusted and validated supply chain. While this issue has exacerbated supply chain challenges, it is not an isolated condition. This foreign supply route is the primary source of BESS for the U.S. market. Significant efforts are underway through the Bipartisan Infrastructure Law (BIL) to change that. Still, strategic short-term operational mitigations are needed to ensure the security of our operational technology (OT) systems, which are enhanced by instilling trust and are separate from vendors implementing CIE principles.

25 ENERGY STORAGE↗

Concept for Hydrogen-Impregnated Nanofiber/Photovoltaic Cargo Stowage System

A stowage system was conceived that consists of collapsible, reconfigurable stowage bags, rigid polyethylene or metal inserts, stainless-steel hooks, flexible photovoltaic materials, and webbing curtains that provide power generation, thermal stabilization, impact resistance, work/sleeping surfaces, and radiation protection to spaceflight hardware and crew members. Providing materials to the Lunar surface is costly from both a mass and a volume standpoint. Most of the materials that will be transferred to other planets or celestial bodies will not be returned to the Earth. In developing a plan to reconfigure pressurized logistics modules, it was determined that there was a requirement to be able to utilize the interior volume of these modules and transform them from Logistics Modules to Storage/Living Quarters. Logistics-to-living must re-utilize stowage bags and the structures that support them to construct living spaces, partitions, furniture, protective shelters from solar particle events, galactic cosmic radiation, and workspaces. In addition to reusing these logistics items for development of the interior living spaces, these items could also be reused outside the habitable volumes to build berms that protect assets from secondary blast ejecta, to define pathways, to stabilize high traffic areas, to protect against dust contamination, to secure assets to mobility elements, to provide thermal protection, and to create other types of protective shelters for surface experiments. Unique features of this innovation include hydrogen-impregnated nano fibers encapsulated in a polyethelyne coating that act as radiation shielding, flexible solar collection cells that can be connected together with cells from other bags via the webbing walls to create a solar array, and the ability to reconfigure each bag to satisfy multiple needs.

Kennedy, Kriss J.↗

Real-Time Federated Cyber-Transmission-Distribution Testbed Architecture for the Resiliency Analysis

With the ongoing automation driven by the push toward the smart electric grid and the advancement in associated cyber infrastructure, the interaction between physical [electric transmission and distribution (T&D) systems], cyber (communication, automation, and control), and human (grid operators and decision-makers) is increasingly becoming more complex. This creates the requirement of analyzing the effect of the transmission system on the distribution system and vice versa with consideration of the additional complexity of the cyber infrastructure. Such an integrated testbed will also help with resiliency analysis, where resiliency refers to the ability of the system to continue serving energy to the critical loads even with limited extreme contingencies. Interaction of the physical power grid with the cyber layer can be effectively modeled using real-time (RT) simulator for developing and validating various operational and control algorithms. Testbeds using RT simulators with multiple capabilities have been developed at different institutions. Still, no single existing testbed can offer full scalability while simultaneously meeting high fidelity requirements for resiliency experimentation. Co-simulating federated testbed assets can provide a scalable experimentation platform that can be leveraged for verification and validation. In this article, an architecture is developed for federated cyber-physical testbed. A local federation with two real-time simulators is developed: real-time digital simulator (RTDS) and OPAL-RT have been interfaced using VILLAS framework for end-to-end testing. Also, a real-time linear predictor is developed and integrated here to address the communication latency impact on geographically allocated federated RT simulation. Finally, resiliency analysis tools are formulated and utilized for T&D systems. Finally as an illustrative use case, the resiliency of a T&D test system is simulated, and the results are analyzed. A 179-bus Western Electricity Coordinating Council (WECC) transmission system is developed using OPAL-RT/ HYPERSIM, and a modified IEEE 13 node feeder system is modeled in RTDS/RSCAD and interfaced for resiliency analysis.

42 ENGINEERING↗

Leveraging Existing Assets for Long Duration Energy Storage

Increased renewables penetration to electrical grid is necessary to reduce overall emissions from the electrical power generation sector. Nonetheless, its integration creates challenges to grid operators who must match the power being generated by intermittent renewables and other traditional energy sources with the demand from consumers, while ensuring the reliability and power quality for the entire system. Energy storage has been proposed as an alternative to natural gas peaking plants and a form to deliver excess renewable energy generation at times of peak demand. For energy storage to provide benefits to end customers (energy consumers), it must be reliable, efficient, and cost effective. The Illinois Sustainable Technology Center (ISTC), one of the surveys that integrate the Prairie Research Institute (PRI), aims to develop a Center for Energy Storage at Existing Assets (CESEA) at UIUC with the participation of Waste Pressure Corp and Ecotek Engineering USA LLC. CESEA will focus on LDES systems that can integrate to existing infrastructure in a manner that reduces the initial capital expenditure and demonstrates the ability to repurpose fossil assets that would otherwise become stranded, to serve the energy transition. CESEA aims to leverage UIUC’s unique facilities to validate LDES systems performance at a relevant operating environment. UIUC’s facilities include a 85-MW combined heat and power (CHP) power plant, two (2) solar PV plants totaling over 18 MWdc of installed capacity, an electrical grid along with a substation at transmission and distribution voltages, a 22-mile gas pipeline network operating at two pressure levels, along with steam and chilled water distribution networks. The new LDES systems will connect to the existing UIUC grid through a new test electrical station, which will have the capacity to accommodate additional connections to test new devices and technologies as part of future CESEA R&D activities. The test electrical station will contain meters, instrumentation, and controls to accurately capture data and allow optimization of control algorithms. CESEA will initially focus on technologies that: i) utilize existing equipment or facilities to perform at least one of the process steps in LDES (charging, storage, or discharging), ii) leverage mature or commercially available components or controls, iii) show potential for cost-leadership in 10+ hour storage at a commercial scale. Initial technologies that were identified to meet these criteria include Compressed Gas Energy Storage (CGES), and TES. CGES stores electricity by raising the pressure of a compressible gas inside a control volume and converting the stored energy to electricity via expansion-generation. CGES is a generalization of CAES that covers any working gas (not just air). A successful CGES demo will help to circumvent many challenges faced by CAES (long development times due to site prospecting, high cost of compression and storage, heat recovery management, etc.) by: 1) utilizing existing infrastructure (compressors, pipelines, underground storage or pressure vessels) used in the transportation and storage of industrial gases for LDES charging and storage; 2) deploying over sites already-developed for industrial applications with minor additional work; 3) leveraging the price structure of commercial industrial gas to cover the costs of electricity used during charging. A previous DOE-sponsored conceptual study (DE-FE-0032018) estimated the levelized cost of energy of a 1.1 MW / 17 MWh CGES system at $0.08/kWh, with a commercial 10x scale system cost estimated at <$0.04/kWh (Giardinella, 2022). The pilot-sized system was estimated to avoid up to 2693 tons of CO2/year.

25 ENERGY STORAGE↗

Customer enrollment and participation in building demand management programs: A review of key factors

Increasing the efficiency and flexibility of electricity demand is necessary for ensuring a cost-effective and reliable transition to zero-carbon electricity systems. Such demand-side management (DSM) resources have been procured by utilities for decades via energy efficiency and demand response programs; however, the key drivers of program enrollment and customer participation levels remain poorly understood — even as governments and grid planners seek to scale up the deployment of DSM assets to meet climate targets. Here we systematically review the evidence on multiple factors that may influence customer enrollment and participation in building DSM programs, focusing primarily on residential and commercial buildings. We examine the contexts in which relationships between DSM factors and outcomes are most often explored and with which methods; we also score the strength, direction, and internal consistency of each factor's reported impact on the enrollment and participation outcomes. We find that studies most commonly assess the effects of economic incentives for load flexibility on program participation levels, often using simulation-based methods in lieu of measured data. Few studies focus on program enrollment outcomes or regulatory drivers of either enrollment or participation, and gaps are also evident in the coverage of emerging DSM opportunities like load electrification. Removal of structural barriers (e.g., the lack of controls infrastructure) and the use of third party services (e.g., load aggregators) are the factors with the largest positive impacts on DSM outcomes, but no single factor emerges as clearly most impactful. For a given factor, the range of reported impacts typically varies widely across the relevant studies reviewed. Our findings provide a snapshot of the state of knowledge about building DSM and customer decision-making, and they expose key gaps in understanding that must be filled if building DSM is to expand as a critical resource for operating clean power grids.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Energy Management Information Systems Cybersecurity Best Practices

Energy management information systems (EMIS) are a broad and rapidly evolving family of tools that monitor, analyze, and control building energy use and system performance. Critical systems are often integrated with or operate on the same networks as EMIS scope systems, necessitating stable, continuous, and secure communication. When connecting EMIS to building automation and utility control systems, there are also many physical assets that could cause harm to the building and its occupants if a malicious act or human error were introduced. It is imperative to ensure all EMIS scope systems are connected securely to the EMIS and do not open vulnerable pathways to other facility networks and operations. The Federal Energy Management Program (FEMP) promotes best practices for impactful utilization of EMIS at federal facilities. This best practice document is part of a series of fact sheets created to help accelerate the market adoption and use of EMIS in the federal sector. It provides an overview of required EMIS cybersecurity standards for compliance and authority to operate along with additional recommendations.

cybersecurity↗

Modeling occupancy-driven building loads for large and diversified building stocks through the use of parametric schedules

Building energy modeling provides a fundamental tool to assess the potential for energy efficiency to contribute to reducing world energy consumption and global emissions. Occupancy-related operations are a key source of uncertainty for building energy analysis, particularly for aggregated building stocks. At a district or city level, it is critical to estimate aggregated power load profiles for sizing power grid infrastructure, power plant capacity allocation, and energy efficiency measures. The stochastic nature of behavior-related operations complicates the creation of models that accurately capture building load profiles for entire building stocks. This research introduces a new methodology called parametric schedules to model occupancy-driven schedules for large and diverse building stocks. In contrast to computationally expensive methodologies proposed in the literature, our work does not use a recursive time-consuming step. Occupancy is estimated by the extrapolation of operation times directly from metered electric consumption data; occupancy-related schedules are stochastically assigned to each building model, guaranteeing diversity of operation times in the stock. Our procedure has been tested on a large, diversified data-set of 25,000 commercial buildings in Los Angeles, California. It proved to be able to adequately represent the stochastic schedules diversity of the stock and to refine the stock calibration process by 1%. This innovative approach represents a useful asset for utility companies, grid operators, urban planners, and balancing authorities, seeking to improve building stock modeling and better estimate the impact of energy conservation measures. – This work is part of a larger stock modeling tool called ComStock, which is under development by NREL.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Lunar Node 1 and Beyond

Lunar Node 1 (LN-1) is an S-band Navigation beacon for lunar applications that was recently designed and built at MSFC. As part of NASA's Commercial Lunar Payload Services initiative, this beacon will be delivered to the moon's surface on Intuitive Machine's NOVA-C lunar lander in November 2021. During this mission, LN-1’s goal will be to demonstrate navigation technologies that can support local surface and orbital operations around the moon, enabling autonomy which would decrease dependency on heavily utilized Earth based assets like the Deep Space Network. To do this, LN-1’s design leverages Cubesat components as well as the Multi-spacecraft Autonomous Positioning System (MAPS) algorithms, which enable the autonomous spacecraft positioning through communication-integrated navigation measurements. In addition to demonstrating the MAPS payload, the radio will also be used in standard tone-based non-coherent ranging and Doppler tracking to provide an alternate approaches and comparisons for navigation performance. LN-1 will represent a single node in a potential greater MAPS network of assets. While LN-1 awaits launch to demonstrate this initial use of one-way navigation, designs are already under way for proposed subsequent missions like LN-2 to enable expanded capability. The next steps in these missions seek to include a receive capability to allow two-way ranging support with other operational spacecraft in the lunar vicinity, and to provide some component upgrades related to the radio, power, and thermal systems that will improve the longevity of the payload in the harsh lunar environment. The LN-1 design details, status, and potential forward work with mission like LN-2 will be outlined in this presentation.

Evan John Anzalone↗