Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “phase 1”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Phases 1 & 2—Coal-Based Oxy-Fuel System Evaluation and Combustor Development and Phase 2A—Recovery Act: Oxy-Fuel Turbomachinery Development for Energy Intensive Industrial Applications (Final Report, Rev.1)

Clean Energy Systems, Inc. (CES) partnered with the U.S. Department of Energy’s National Energy Technology Laboratory in 2005 to study and develop a competing technology for use in future fossil-fueled power generation facilities that could operate with near zero emissions. CES’s background in oxy-fuel (O-F) rocket technology lead to the award of Cooperative Agreement DE-FC26-05NT42645, “Coal-Based Oxy-Fuel System Evaluation and Combustor Development,” where CES was to first evaluate the potential of these O-F power cycles, then develop the detailed design of a commercial-scale O-F combustor for use in these clean burning fossil-fueled plants. Throughout the studies, CES found that in order to operate at competitive cycle efficiencies a high-temperature intermediate pressure turbine was required. This led to an extension of the Agreement for, “Oxy-Fuel Turbomachinery Development for Energy Intensive Industrial Applications” where CES was to also develop an intermediate-pressure O-F turbine (OFT) that could be deployed in O-F industrial plants that capture and sequester >99% of produced CO 2 , at competitive cycle efficiencies using diverse fuels. The following report details CES’ activities from October 2005 through March 2013, to evaluate O-F power cycles, develop and validate detailed designs of O-F combustors (main and reheat), and to design, manufacture, and test a commercial-scale OFT, under the three-phase Cooperative Agreement.

01 COAL, LIGNITE, AND PEAT↗

Validation of the SURE Program, phase 1

Presented are the results of the first phase in the validation of the SURE (Semi-Markov Unreliability Range Evaluator) program. The SURE program gives lower and upper bounds on the death-state probabilities of a semi-Markov model. With these bounds, the reliability of a semi-Markov model of a fault-tolerant computer system can be analyzed. For the first phase in the validation, fifteen semi-Markov models were solved analytically for the exact death-state probabilities and these solutions compared to the corresponding bounds given by SURE. In every case, the SURE bounds covered the exact solution. The bounds, however, had a tendency to separate in cases where the recovery rate was slow or the fault arrival rate was fast.

Dotson, Kelly J.↗

HPT Clearance Control: Intelligent Engine Systems-Phase 1

The following work has been completed to satisfy the Phase I Deliverables for the "HPT Clearance Control" project under NASA GRC's "Intelligent Engine Systems" program: (1) Need for the development of an advanced HPT ACC system has been very clearly laid out, (2) Several existing and potential clearance control systems have been reviewed, (3) A scorecard has been developed to document the system, performance (fuel burn, range, payload, etc.), thermal, and mechanical characteristics of the existing clearance control systems, (4) Engine size and flight cycle selection for the advanced HPT ACC system has been reviewed with "large engine"/"long range mission" combination showing the most benefit, (5) A scoring criteria has been developed to tie together performance parameters for an objective, data driven comparison of competing systems, and (6) The existing HPT ACC systems have been scored based on this scoring system.

Source record↗

Tank 48H Phase 1 Initial Testing Using Sodium Permanganate to Decompose Tetraphenylborate: As-Received Characterization of HTF-48-25-1

This report provides results from a detailed characterization study of Tank 48H sample HTF-48-25-17 performed by the Savannah River National Laboratory (SRNL). The slurry sample was retrieved from Savannah River Site (SRS) Tank 48H on February 25, 2025, and received at the SRNL shielded cells on 02/25/2026. This effort completes the first task of a multi-phase approach, requested by Savannah River Mission Completion (SRMC), to study tetraphenylborate (TPB) decomposition in Tank 48H using sodium permanganate with radioactive waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Prototypes and system test stands for the Phase 1 upgrade of the CMS pixel detector

The CMS pixel phase-1 upgrade project replaces the current pixel detector with an upgraded system with faster readout electronics during the extended year-end technical stop of 2016/2017. New electronics prototypes for the system have been developed, and tests in a realistic environment for a comprehensive evaluation are needed. A full readout test stand with either the same hardware as used in the current CMS pixel detector or the latest prototypes of upgrade electronics has been built. The setup enables the observation and investigation of a jitter increase in the data line associated with trigger rate increases. This effect is due to the way in which the clock and trigger distribution is implemented in CMS. A new prototype of the electronics with a PLL based on a voltage controlled quartz crystal oscillator (QPLL), which works as jitter filter, in the clock distribution path was produced. With the test stand, it was confirmed that the jitter increase is not seen with the prototype, and also good performance was confirmed at the expected detector operation temperature ($-$20 °C).

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Conceptual design study for a teleoperator visual system, phase 1

Results are reported for work performed during the first phase of the conceptual design study for a teleoperator visual system. This phase consists of four tasks: General requirements, concept development, subsystem requirements and analysis, and concept evaluation.

Adams, D.↗

Tank 48H Phase 1 Initial Testing Using Sodium Permanganate to Decompose Tetraphenylborate: Simulant Studies with Shaker Oven and 2-L Vessel

Tank 48H currently holds legacy material including organic tetraphenylborate (TPB) compounds from the operation of the In-Tank Precipitation process. The large quantity of TPB is not compatible with the waste treatment facilities at SRS and must be removed or undergo treatment to oxidize the organic compounds before the tank can be returned to routine Tank Farm service. Tank 48H currently holds approximately 270,000 gallons of legacy material comprised of decontaminated salt solution, approximately 20,000 kilograms of TPB solids, 3,400 kilograms of sludge solids, and 1,800 kilograms of monosodium titanate (MST).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Evaluation of Sensor Concepts for Ageless Aerospace Vehicles: Report 4 - Phase 1 Implementation of the Concept Demonstrator

This report describes the first phase of the implementation of the Concept Demonstrator. The Concept Demonstrator system is a powerful and flexible experimental test-bed platform for developing sensors, communications systems, and multi-agent based algorithms for an intelligent vehicle health monitoring system for deployment in aerospace vehicles. The Concept Demonstrator contains sensors and processing hardware distributed throughout the structure, and uses multi-agent algorithms to characterize impacts and determine an appropriate response to these impacts.

Abbott, David↗

Novel Blue Phosphorescent Emitter Materials for OLED Lighting (Phase 1 FY2019 Final Technical Report)

Research carried out under the DOE SBIR Phase I project has resulted in the identification of novel blue emitter materials that have application for OLED lighting. The materials demonstrate the capability to produce blue light when incorporated in thin-films which are useful for OLED lighting. The technology offers the potential to combine high efficiency, operational stability suitable for commercial application and lower manufacturing cost. The materials are also considered scalable for manufacturing/commercialization operations. Discovery of efficient and operationally stable blue emitters that are scalable represent a long-standing challenge for the advancement of OLED lighting.

36 MATERIALS SCIENCE↗

Joint research effort on vibrations of twisted plates, phase 1: Final results

The complete theoretical and experimental results of the first phase of a joint government/industry/university research study on the vibration characteristics of twisted cantilever plates are given. The study is conducted to generate an experimental data base and to compare many different theoretical methods with each other and with the experimental results. Plates with aspect ratios, thickness ratios, and twist angles representative of current gas turbine engine blading are investigated. The theoretical results are generated by numerous finite element, shell, and beam analysis methods. The experimental results are obtained by precision matching a set of twisted plates and testing them at two laboratories. The second and final phase of the study will concern the effects of rotation.

Kielb, R. E.↗

Phase 1 Program Joint Report

This report consists of inputs from each of the Phase I Program Joint Working Groups. The Working Groups were tasked to describe the organizational structure and work processes that they used during the program, joint accomplishments, lessons learned, and applications to the International Space Station Program. This report is a top-level joint reference document that contains information of interest to both countries.

Nield, George C.↗

NASA/Mir Phase 1: A Lesson Learned in Long Duration Mission Planning and Operations

The NASA/Mir Phase I Program is a precursor to the assembly and operations of the International Space Station (ISS). The Phase I Program covers a four-year period and encompasses over ten shuttle flights to the Mir, culminating with the flight of STS-91 in June 1998. The Mir-Orbiting Station (Mir-OS) provides an excellent environment, both onboard and on the ground, for learning and studying the characteristics associated with crew-tended operations on long duration missions. By the end of the Phase I program, NASA astronauts will have accumulated over two years of continuous operations experience working and living onboard the Mir-OS. Ground controllers, working in Russia and at remote sites in the United States, will have gained valuable experience in the generation, maintenance, and coordination of the information and products required to support the long duration crew members onboard the Mir-OS. The experience gained by the crew and ground support personnel in the area of long duration mission operations has resulted in a number of factors that need to be considered in the definition and implementation of the processes and products for the ISS. While there are many areas in which experience has been gained, this paper focuses on the lessons learned regarding the level of detail and flexibility of crew timelines. Provided in this paper is an overview of the characteristics associated with long duration mission timeline development and execution, a summary of applicable lessons learned identified and documented through participation in the NASA/Mir Phase I Program, a detailed discussion of "Gross Timelines" as implementation which addresses the lessons learned. Also discussed are the challenges that must be overcome in getting the ISS program to recognize, evaluate, and learn from the crew and ground controller experience gained through participation in the NASA/Mir Phase I Program.

Hagopian, Jeff↗

Optics implications of implementing Nb3Sn magnets in the LHC phase 1 upgrade

CERN has encouraged the US-LARP collaboration to participate in Phase I of the LHC luminosity upgrade by analyzing the benefits gained by using Nb3Sn technology to replace the functionality of select NbTi magnets that CERN is committed to construct. Early studies have shown that the much higher gradients (shorter magnetic lengths) and temperature margins (quench stability) of Nb3Sn magnets compared to their NbTi counterparts is favorable--allowing the insertion of additional absorbers between Q1 and Q2, for example. This paper discusses the relative merits of the NbTi and Nb3Sn options.

43 PARTICLE ACCELERATORS↗

Crew interface definition study, phase 1

The timeline analysis of the Shuttle orbiter missions which was conducted in the Phase I Crew Interface Definition Study and the requirements for the man-in-the-loop simulation study are presented. Mission definitions and objectives are presented as they relate to various Shuttle Orbiter missions. The requirements for crew participation and the information required by the crew are discussed, and finally the rationale behind the display concept and calling procedures is given. The simulation objectives, the simulation mechanization, including a detailed presentation of the display and control concept, the simulator test plan and the results are discussed.

Callihan, J. C.↗

Relative Navigation Algorithms for Phase 1 of the MMS Formation

This paper evaluates several navigation approaches for the first phase of the Magnetospheric Multiscale (MMS) mission, which consists of a tetrahedral formation of four satellites in highly eccentric Earth orbits of approximately 1.2 by 12 Earth radii at an inclination of 10 degrees. The inter-satellite separation is approximately 10 kilometers near apogees. Navigation approaches were studied using ground station m g e =d two-way Doppler measurements, Global Positioning System (GPS) pseudorange measurements, crosslink range measurements among the members flying in formation, and various combinations of these measurement types. An absolute position accuracy of 10 kilometers or better can be achieved with most of the approaches studied and a relative position accuracy of 100 meters or better can be achieved at apogee in some cases. Among the various approaches studied, the approaches that use a combination of GPS and crosslink measurements were found to be more reliable in terms of absolute and relative navigation accuracies and operational flexibility.

Kelbel, David↗

Thin Film Hydrogen Sensor Development, Testing and Integration Into Low Cost Wireless Sensing Systems (SBIR Phase 1 Final Report)

Element One, Inc. is reporting on the results of its DOE SBIR Phase I project for the development and testing of low-cost thin film hydrogen sensors and their subsequent integration into wireless sensing systems and networks. This work is based on Element One’s chemo-chromic sensing technology which indicates hydrogen presence (leaks) colorimetrically and electronically with no power required. The lack of required power makes them particularly suitable for passive Radio Frequency Identification Device (RFID) technology which can be deployed affordably and abundantly to detect leaks in hazardous environments. Element One built upon its experience with chemochromic materials that change color in the presence of hydrogen. Both thin films and pigments have been used, but thin films have the ability to change conductivity by more than three orders of magnitude making them ideal for resistive sensors. Prototype sensors were fabricated, tested and characterized. For the wireless component, Element One partnered with Esensor, Inc. to construct and test a wireless sensing network. The network was tested and validated at the National Renewable Energy Laboratory (NREL) in February and March. The tests involved exposing the wireless system to hydrogen gas concentrations of 1% and 5%. There were no significant problems encountered, and the system is ready for commercial development. The system demonstrated the viability of wireless hydrogen sensing networks for hydrogen leak detection and other applications.

08 HYDROGEN↗

Analytical and experimental investigation of aircraft metal structures reinforced with filamentary composites. Phase 1: Concept development and feasibility

The analytical and experimental investigations are described in the first phase of a program to establish the feasibility of reinforcing metal aircraft structures with advanced filamentary composites. The interactions resulting from combining the two types of materials into single assemblies as well as their ability to function structurally were studied. The combinations studied were boron-epoxy reinforced aluminum, boron-epoxy reinforced titanium, and boron-polyimide reinforced titanium. The concepts used unidirectional composites as reinforcement in the primary loading direction and metal for carrying the transverse loads as well as its portion of the primary load. The program established that several realistic concepts could be fabricated, that these concepts could perform to a level that would result in significant weight savings, and that there are means for predicting their capability within a reasonable degree of accuracy. This program also encountered problems related to the application of polyimide systems that resulted in their relatively poor and variable performance.

Oken, S.↗