Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “outage management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

PHY and MAC Layer Design of Hybrid Spread Spectrum Based Smart Meter Network

The smart grid is a combined process of revitalizing the traditional power grid applications and introducing new applications to improve the efficiency of power generation, transmission and distribution. This can be achieved by leveraging advanced communication and networking technologies. Therefore the selection of the appropriate communication technology for different smart grid applications has been debated a lot in the recent past. After comparing different possible technologies, a recent research study has arrived at a conclusion that the 3G cellular technology is the right choice for distribution side smart grid applications like smart metering, advanced distribution automation and demand response management system. In this paper, we argue that the current 3G/4G cellular technologies are not an appropriate choice for smart grid distribution applications and propose a Hybrid Spread Spectrum (HSS) based Advanced Metering Infrastructure (AMI) as one of the alternatives to 3G/4G technologies. We present a preliminary PHY and MAC layer design of a HSS based AMI network and evaluate their performance using matlab and NS2 simulations. Also, we propose a time hierarchical scheme that can significantly reduce the volume of random access traffic generated during blackouts and the delay in power outage reporting.

Kuruganti, Phani Teja↗

Mode Meter for Mitigating Forced Oscillations on the Grid

Increased renewable energy sources connected to the power grid leads to forced power oscillations that result in costly outages and an unstable grid. Forecasting and predicting fluctuations is difficult for grid operators. PNNL, Montana Tech and the University of Wyoming developed Mode Meter, a power tool that detects and reports grid instabilities. Using three advanced algorithms, Mode Meter detects, analyzes, and helps localize power swings that are growing unstable. Mode Meter uses precise, time-synchronized data collected from thousands of advanced sensors placed on powerlines and other transmission devices. Information is reported in an easy-to-read visual tool. The patented innovation is available for commercialization. Contact Commercialization Manager Peter Christensen at peter.christensen@pnnl.gov

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrated Waste Treatment Unit (IWTU) Input Coal Analyses and Off-Gass Filter (OGF) Content Analyses

A full engineering scale Fluidized Bed Steam Reformer (FBSR) system is being used at the Idaho Nuclear Technology and Engineering Center (INTEC) to stabilize acidic Low Activity Waste (LAW) known as Sodium Bearing Waste (SBW). The INTEC facility, known as the Integrated Waste Treatment Unit (IWTU), underwent an Operational Readiness Review (ORR) and a Technology Readiness Assessment (TRA) in March 2014. The IWTU began non-radioactive simulant processing in late 2014 and by January, 2015 ; the IWTU had processed 62,000 gallons of simulant. The facility is currently in a planned outage for inspection of the equipment and will resume processing simulated waste feed before commencing to process 900,000 gallons of radioactive SBW. The SBW acidic waste will be made into a granular FBSR product (carbonate based) for disposal in the Waste Isolation Pilot Plant (WIPP).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Monitoring Airspace Complexity and Determining Contributing Factors

The national airspace has evolved over many years to accommodate increased traffic demand while simultaneously maintaining air travel as one of the safest forms of transportation. One of the reasons for this success is the ability of the air traffic control system and the operators to adapt and accommodate to situations that routinely disrupt normal operations. These situations may include: adverse weather, delays, early arrivals, equipment outages, and other factors that are outside the operators’ ability to control. These factors can lead to states where automation is unable to properly handle these issues, and therefore air traffic controllers and pilots have to intervene — ultimately increasing communication between operators resulting in higher workload. As controller workload increases to handle sub-optimal operating conditions, complexity increases. This is because, under these conditions humans are required to make tactical decisions in response to external factors. This results in a departure from the original strategic plan where operations would be more efficiently managed. Human operators manage airspace complexity under rigid regulations but in a constantly changing environment. The airspace is divided into sectors and the number of aircraft assigned to each controller is limited for safe handling. Some prior studies devised airspace complexity metrics in commercial aviation and related these metrics to controller workload. The upper bounds on the system load are pre-determined. Such bounds on complexity make for a safe system, but the system cannot scale and adapt to autonomous, dense, and heterogeneous traffic — including the many types of Unmanned Aerial Vehicles (UAVs) envisioned to be added to the operations. We hypothesize that, as traffic density and heterogeneity grow, and other key metrics change, there will be phase transitions at which the way traffic should be managed changes significantly. We offer a method for in-time detection of contributing factors that lead to phase transitions, characterized by increased complexity. To the best of our knowledge, there is no tool similar to ours that identifies such contributing factors or precursor patterns.

Precursor↗

Integrated Waste Treatment Unit Plan for Vessel and Canister Decontamination - 19283

The Integrated Waste Treatment Unit (IWTU) was designed to use a proprietary fluidized-bed steam reforming process to treat 3,400,000 L (898,184 gal) of radioactive sodium bearing waste (SBW). IWTU is currently in commissioning and startup phase prior to future processing of SBW. The current simulant SBW is introduced into the denitration mineralization reformer and transformed into a dry, granular product that is filtered and eventually transferred into a product canister. The intention of the facility is to process the SBW and store the product canisters in vaults to await shipping to a depository at a later date. The IWTU is a part of the Idaho Cleanup Project Core, located at the INL Site and operated by Fluor Idaho, LLC. During early operation and testing of the facility, it was observed that the original process equipment decontamination system did not possess the capability to recover from plant shutdowns that result from upset conditions or maintenance outages; thus, a need for a redesigned decontamination system was identified. This paper discusses current decontamination methods and their capabilities and areas where these methods fall short of decontaminating process equipment and product canisters. This paper discusses the design and purpose of the decontamination methods being tested and developed for implementation into the IWTU. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Monitoring Airspace Complexity and Determining Contributing Factors

The national airspace has evolved over many years to accommodate increased traffic demand [1] while simultaneously maintaining one of the safest forms of transportation [2], [3]. One of the reasons for this success is the ability of the system and the operators to adapt and accommodate to situations that routinely disrupt optimal operations. These situations may include: adverse weather, delays, early arrivals, equipment outages, and other factors that are outside the operators ability to control. These factors can lead to states where automation is unable to properly handle these issues and therefore air traffic controllers and pilots have to intervene, ultimately increasing communication between operators resulting in higher workload. As controller workload increases to handle sub-optimal operating conditions this can be viewed as an increase in complexity. The reasoning for this is because humans are now required to make tactical decisions in response to external factors, resulting in a departure from the strategic plan where operations would be more efficiently managed. Human operators control airspace complexity under rigid regulations that are constantly changing. The airspace is divided into sectors and the number of aircraft assigned to each controller is limited for safe handling. There has been past work that devised airspace complexity metrics in commercial aviation and related these metrics to controller workload (e.g., [4],[5]). The upper bounds on the system load are pre-determined. Such bounds on complexity make for a safe system, but the system cannot scale and adapt to autonomous, dense, and heterogeneous traffic, including the many types of Unmanned Aerial Vehicles (UAVs) envisioned to be added to the operations. We hypothesize that, as traffic density and heterogeneity grow, and other key metrics change, there will be phase transitions at which the way traffic should be managed changes significantly [6]. We offer a method for in-time detection of contributing factors that lead to phase transitions, characterized by increased complexity. To the best of our knowledge, there is no tool similar to our proposed effort that identifies such contributing factors or precursor patterns. To define the scope we are proposing to measure complexity from the viewpoint of the Terminal Radar Approach Control Facilities (TRACON) controller’s perspective. In particular we are analyzing arrivals into KSFO. With safety as the top concern for airspace operators, it is important to recognize that as density and heterogeneity grow, the focus of the system will change. Times of the day when the airspace has low density and heterogeneity, the flights will follow more efficient paths where the aircraft move on established routes that are more or less directly to the destination. However, when density and heterogeneity increases, the system will begin changing focus to avoiding conflicts and collisions and route the flights in a more flexible way. Higher flexibility requires more communication and coordination between controllers and pilots which the current automation is unable to handle. This paper proposes a novel approach that monitors airspace complexity at multiple scales, uses a Machine Learning-based tool that predicts when operations will transition to a regime of greater complexity, and identifies actions that can reduce the complexity while still maintaining efficient and safe operations. We demonstrate our proposed approach using data from multiple complementary sources. This includes, but is not limited to: historical aircraft surveillance data from NASA’s Sherlock Data Warehouse [7], METAR weather data, and airport configuration data from Aviation System Performance Metrics (ASPM). The surveillance data flight paths are sampled at a variable sample rate — increasing as the aircraft approaches the airport. This is due to how Sherlock manages flight track stitching between different radar facilities which have different sampling rates. The weather and performance data are logged at defined intervals throughout the day at a courser refresh rate. In addition to the logged data and metrics, we leverage pre-defined Standard Terminal Arrival Routes (STARs) procedures to characterize the path of each flight. Each flight files for one of these routes in the flight plan well before entering the terminal airspace, and approximately follows the route until it leaves the STAR, typically on the final fix of a runway transition. However, most flights do not always fly the full STAR procedure to completion [8], but the majority do adhere to the fixes within the common route of the procedure. Our approach leverages fixes in the common route of each of the STARs to build a reference path to the airport. This allows us to characterize the flight paths in what we are defining as the “maneuvering area” (the airspace between the STAR and before the flight is lined up on the runway’s final approach) to determine how off nominal the flights are to calculate its complexity score. Determining airspace complexity is a concept that does not have a concrete answer. In designing this metric, we consider what increases the workload for the air traffic controllers. Consequently more specialized vectoring maneuvers results in higher workload. Accordingly, we start with a theory: each flight has a direct path it takes from the STAR’s common route to the final approach’s outer marker fix for the flight’s landing runway. It is important to note that the direct path is only used as a reference. If the majority of the flights have a large consistent offset as compared to other routes it does not necessarily mean that those flights have higher complexity. We are merely building a distribution based on this direct path for that particular STAR and runway pair to determine the normal mode of operations for that route. Flights that are in the upper tail of these distributions will result in higher complexity scores and flights that fly in the median will represent the normal mode of operations and therefore will have lower complexity scores. Since flights following each STAR route take different paths to the airport, we have a different distribution for each STAR route and therefore can model these distributions to compute a complexity score from their respective normalized distributions. To evaluate the effectiveness of our proposed airspace complexity metric we will compare against an established approach based on trajectory clustering [9]. This unsupervised learning technique consists of the following steps: (1) identify the general maneuvering areas (waypoints) by performing $\kappa$-means or DBSCAN clustering on locations where aircraft frequently turn based on the surveillance radar track data, (2) map flight trajectories onto sequences of waypoints, and (3) cluster the sequences based on their common subsequences. From a high-level perspective, this baseline model learns nominal operations in the airspace through the sequence of waypoints that are representative of where aircraft change direction and defines deviations from the nominal operations as “complex.” Therefore, more deviations from the nominal operations correspond to higher complexity values. For our validation, we re-implemented this technique and tune model hyper-parameters to correctly detect waypoints for the arrival traffic into the San Francisco bay area. We will compute the complexity measure over a one-year period using our proposed technique as well as the baseline. Our validation will be based on each technique’s ability to detect a set of undesirable outcomes (e.g., go-arounds, holding patterns, average time in the airspace, etc.). Since our current complexity metric is derived from the offset from the direct reference path, it’s important to understand what causes these offsets. In many of the flights with high offset distance, flights performing holding patterns and S turns can be observed. These maneuvering tactics are utilized to add distance between the aircraft and the destination runway to prevent multiple flights from having conflicting arrival times. In order to predict a rise in complexity (or the precursor to complexity), it’s necessary to be able to identify these potential conflicts (which in turn, result in higher offsets). To do this, we define a “representative flight” for each STAR route and runway pair. This flight is approximately the path the flight would take if there was a clear path with no other flights in the airspace — including the time remaining to the airport. We first identify the flights for a given STAR runway pair using the offset to the reference path distributions that fall between the 44-55 percentiles. This yields the flights that conform to the most normal mode of operation. Each of these flights is partitioned based on the percent complete from the entry point into the maneuvering areas from 0\% – 100\% complete. Then for each percent “bin”, we take the median value of the flight’s latitude/longitude coordinates, airspeed, and (non causal) time remaining to the airport to construct a lookup table for each percent complete bin on a given route. As a flight enters the maneuvering area, we can find the estimated arrival time of a flight to the airport by finding the closest point to the representative path’s percent complete bin (relative to the flight’s current position at any snapshot in the airspace) and therefore retrieve the corresponding remaining time left on the “representative path”. We assume that the flight will follow the representative path to completion when deriving these estimates. We can then compare these estimated arrival times against other flights for the same snapshot in time to identify potential conflicts. If more flights are estimated to arrive within a tolerance window than there are runways available, then we have a potential conflict. We can use this derived measure along with other factors expected to add disruption to the operation such as weather and runway configuration changes as an input to machine learning tools to detect precursors that increases in our complexity measure. This novel method will assist in uncovering insights into the contributing factors that lead to increased complexity that may allow for in-time responses to avoid reaching a high complexity state in the airspace.

complexity↗

Corrosion Testing of Refractory in Contact with Molten Glasses Designed for Waste Vitrification

It is known that the predictive life of the refractory ceramic liner of nuclear waste glass melters is conservative, as demonstrated by performance of these materials such as in the Defense Waste Processing Facility (DWPF). The motivation for this task is to maximize the useful life of the melters that will be operated at the Waste Treatment and Immobilization Plant (WTP), which will in turn minimize procurement and disposal costs and melter outage times, as well as to identify maximum loadings in the waste glass of those species that corrode melter components. This task was initiated jointly with Pacific Northwest National Laboratory (PNNL) with the objective to develop a methodology and model to enable more accurate prediction of refractory service life under prototypic conditions from laboratory-scale material corrosion tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solving Operational Challenges with INL's Integrated Waste Treatment Unit (IWTU) - 19003

In 2005, the THOR steam reforming fluidized-bed reactor technology was selected by the U.S. Department of Energy for treatment of sodium-bearing waste at the INL. The initial commissioning was typical, until June of 2012 when an over-pressurization event resulted in a significant release of solids. Recovery and subsequent testing systematically dealt with challenges associated with operation of three primary vessels: the denitration and mineralization reformer, the process gas filter, and the carbon reduction reformer. Additional challenges with the following ancillary systems surfaced during testing: the auger/grinder, sample system, and the approach to decontamination of the process vessels prior to outages. The major operational challenges covered fluidization issues, premature refractory failure, high-temperature gaseous filter element blinding, cementitious material formation in solids handling equipment, sampling reliability, and vessel decontamination. The purpose of this paper is to share the lessons learned during the extended commissioning of the Integrated Waste Treatment Unit. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Aerosol and Cloud Experiments in the Eastern North Atlantic (ACE-ENA) Winter Intensive Operational Period: Aerodynamic Particle Sizer Field Campaign Report

An aerodynamic particle sizer spectrometer (APS, model 3321 by TSI Inc., Shoreview, Minnesota) was deployed at the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) user facility Eastern North Atlantic (ENA) observatory during the second (winter) intensive operational period (IOP) of the Aerosol and Cloud Experiments in the Eastern North Atlantic (ACE-ENA) field campaign. Data were collected from January 9 through February 26, 2018, covering the second deployment of the ARM Aerial Facility (AAF) aircraft within ACE-ENA. The standard ENA instrument suite does not provide measurements of aerosol particle size distribution for diameters greater than one micron. Properties of coarse-mode (super-micron) aerosols are rarely measured, although super-micron particles can play an important role in the aerosol life cycle, affecting aerosol optical properties and cloud nuclei activity (e.g., Clarke et al. 2003). The APS was deployed to fill this gap in particle size measurements: it is capable of measuring size-resolved concentration of the aerosols in the 0.5-20 μm range (aerodynamic diameter). The APS was installed in the aerosol trailer to sample through the main stack. Special attention was given to selection of the instrument location (just below the main stack) to minimize particle losses in the connecting lines. Most atmospheric aerosols are hygroscopic, so the measurement of the aerosol size distributions should either be performed in a controlled humidity environment or accompanied by concurrent measurement of the temperature and humidity of the sample air. The latter strategy was used during this deployment: a high-precision humidity/temperature transmitter (model EE08 by E+E Elektonik GMBH, Engerwitzdorf, Germany) was mounted in the APS sampling line immediately upstream of the APS inlet. A dedicated laptop computer was used for data collection and communications. The APS was controlled with vendor-supplied software (Aerosol Instrument Manager, ver. 10.1, TSI); aerosol size distribution data were collected over a period of 55 seconds and converted to one-minute averages. Temperature and humidity analog signals were acquired via analog-to-digital converter (ADC) module (model WTAIN-M by Weeder Technologies, Fort Walton Beach, Florida) using vendor-supplied software (ModCom) with 1- sec resolution. In post-processing, the APS data were exported from TSI proprietary format into “comma-separated value” American Standard Code for Information Interchange (ASCII) files and matched with appropriately averaged temperature and humidity data. Two significant periods of missing data were caused by local power outages. Vendor-supplied software was not designed for unattended operation: it needs to be manually restarted including sensor configuration setup.

ACE-ENA, Azores, ultra-high-sensitivity aerosol sp↗

VersiCharge-SG - Smart Grid Capable Electric Vehicle Supply Equipment (EVSE) for Residential Applications

In his 2011 State of the Union address, President Obama called for one million electric vehicles on the road by 2015 [1]. With large-scale Electric Vehicle (EV) or Plug-in Electric Vehicle (PEV or EV for short) or Plug-in Hybrid Electric Vehicle (PHEV) penetration into the US market, there will be drastic reduction in fossil fuel consumption, thus significantly reducing our dependency on foreign oil [2-6]. There will also be significant reduction on Green House Gas (GHG) emissions and smog in the major US cities [3, 7, 8]. Similar studies have also been done other industrial counties [9]. For the fuel cost, with the home electricity rate around $0.13 per kWh, it would cost about $0.05 per mile for DC operation and $0.03 cents per mile for AC operation. But, assuming 25 miles per gallon for a typical vehicle and $4 per gallon, fossil fuel will cost $0.16 per mile [10]. The overall lifecycle cost of PEVs will be several folds lower than the existing fossil fueled vehicles. Despite the above advantages of the EVs, the current cost of EVSE is not affordable for the average consumer. Presently, the cost of installing state-of-the-art residential EVSE ranges from $1500 to $2500 [11]. Low priced EVSE technology, which is easy to install, and affordable to operate and maintain by an average consumer, is essential for the large-scale market penetration of EVs. In addition, the long-term success of this technology is contingent on the PEVs having minimal excessive load and shift impact on the grid, especially at peak times. In a report [2] published by the Pacific Northwest National Laboratory (PNNL), the exiting electric power generation infrastructure, if used at its full capacity 24 hours a day, would support up to 84% of the nation’s cars, pickup trucks and SUVs for an average daily drive of 33 miles. This mileage estimate is certainly much below what an average driver would drive his/her vehicle per day. Another report [3] by the National Renewable Energy Laboratory (NREL) shows that an increased PEV penetration would significantly increase pressure on the peak generation, if no controlled charging strategy was put in place. Investigations from Oak Ridge National Laboratory (ORNL) show that in many regions, additional power generation facilities must be put in place and operate in evening times to recharge the EVs [12]. By all accounts, large PEV penetration will bring to the power grid enormous challenges due to the excessive and stochastic demand, and can entirely change the peak time distribution and behavior, perhaps, into a bi-modal distribution capable of exhausting primary, secondary and even reserves (spinning or non-spinning). To minimize the infrastructure upgrade costs and risks to the grid, and to ensure that power quality and reliability remain within the set standards, the demand for EV plug-ins must then be controlled and coordinated locally and at regional levels. Novel control techniques must be devised to allow for close collaboration between neighboring plug-in requestors, between neighboring communities, and between these and more central power authorities. The concept of electric drive vehicle is not new. The development of electric vehicle has been around since 19th century [13]. But due to a number of reasons and practical limitations at the time, including lower cost of gasoline compared to electricity, excessive refueling times, and abundance of gasoline, the automobile industry embraced gasoline-powered vehicles worldwide [13]. With the global warming, ever reducing reservoirs of fossil oil around the world and increasing political pressure to reduce the national dependency on foreign oil, the last decade of the 20th century witnessed major technological breakthroughs in Alternative Fueled Vehicle (AFV) technologies, including electric vehicles. With GHG emissions and carbon footprint in the minds of many more consumers and politicians, the first decade of the 21stCentury witnessed more breakthroughs with some real life experimentation and sporadic deployment of these technologies [14]. By many accounts, the second decade of the 21st Century is expected to be the time when mass volume production and popular usage of these AFV technologies, especially EV, will materialize. The current DOE request for proposals recognizes the need for major technological changes to ensure that the above national goal is realizable. Two major challenges have been identified: (1) major reduction in the cost of ownership of EVSEs, and (2) managing additional EV loads in the power grid while maintaining power quality, reliability, and affordability. We note that the two challenges are closely linked – A holistic approach to true lifecycle cost of EVSE ownership will certainly include any taxes and surcharges that can be put in place for major potential investments in the grid, and higher electricity charges in case of more frequent and longer peak periods. From a societal perspective, this cost could also include the lost GDP (computed on a local basis) and revenue for businesses at local and regional levels when the grid is no longer capable of meeting the demand and unexpected outages occur. A typical end-point electrical distribution system delivers power to a residential EVSE from the neighborhood distribution pole, as shown in Fig.1. This pole has a transformer (neighboring step-down transformer) that steps down the utility medium voltage to dual 120VAC single phase (also called 240VAC split phase). This voltage is fed through a meter into the residential load control center. The load control center consists of branch circuit breakers and distributes the power supply within various areas of the residential unit. One of the branch circuits from the load control center feeds EV charging station for the unit. An electric vehicle charger is plugged into the socket of the EV charging station and other end of this charger is connected to the vehicle during charging. Figure 1 illustrates a typical configuration of the power grid. The left side of the figure shows the power grid from the power generation to the neighboring step-down transformer, while the right side of the figure shows multiple EVs with the respective charging stations. The typical step-down transformer has an upper limit representing the maximum load that can be requested from these neighboring houses altogether (typically 24 kW). In case the total load increases beyond the supported limit, the protection system (e.g. a circuit breaker) attached to the step-down transformer gets activated automatically.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Fairfax Water Resources: Estimating Urban Flood Susceptibility, Historical Flooding Extent, and Land Cover Change in Fairfax County, Virginia to Aid in Flood Mitigation Planning

Between 2000 and 2020, Fairfax County, Virginia experienced extreme weather events that caused severe flooding and degradation of roads, businesses, and other public property. A single flood event on July 8th, 2019 resulted in $14.8 million in damages. These flood events routinely impact the community, often resulting in power outages, school closures, and downed trees. The Fairfax County Department of Public Works and Environmental Services partnered with DEVELOP to explore how remotely sensed data could be integrated to support its current flood mitigation efforts. This project used environmental factors such as elevation, slope, and topographic wetness index from Earth observation derived data to map flood susceptibility. We utilized Landsat 5 Thematic Mapper (TM), Landsat 7 Enhanced Thematic Mapper Plus (ETM+), Landsat 8 Operational Land Imager (OLI), Sentinel-1 C-Band Synthetic Aperture Radar (C-SAR), and Sentinel-2 Multispectral Instrument (MSI) to map historic flooding events in Fairfax County. These maps will support flood management practices for the Fairfax County Department of Public Works and Environmental Services through the integration of remotely sensed data. Our results show that developed areas in the county are more susceptible to flooding, coinciding with analysis of flood factors, which indicated that imperviousness and tree canopy were the most influential drivers in flood susceptibility. Other results show that using Earth observations to map historical flooding is limited in urban areas due to false positives from SAR imagery between water and shadows. Further research is necessary to evolve the historical flood mapping technique if Earth observations are to be incorporated in future historical flood analysis.

Kaitlynn Hietpas↗

AGC-4 Experiment Irradiation Monitoring Data Qualification Interim Report

The Graphite Technology Development Program is running a series of six experiments to quantify the effects of irradiation on nuclear grade graphite. The fourth experiment, Advanced Graphite Creep 4 (AGC 4), began with Advanced Test Reactor (ATR) cycle 157D on May 30, 2015, and has been irradiated for two cycles. The capsule was removed from the reactor after ATR cycle 158A, which ended on January 2, 2016, due to interference with another experiment. Irradiation will resume when the interfering experiment is removed from the reactor. This report documents qualification of AGC 4 experiment irradiation monitoring data for use by the Advanced Reactor Technologies (ART) Technology Development Office (TDO) Program for research and development activities required to design and license the first HTR nuclear plant. Qualified data meet the requirements for use as described in the experiment planning and quality assurance documents. Failed data do not meet the requirements and provide no useable information. Trend data may not meet all requirements, but still provide some useable information. Use of Trend data requires assessment of how any deficiencies affect a particular use of the data. All thermocouples (TCs) have functioned throughout the AGC-4 experiment. All temperature data are Qualified for use by the ART TDO Program. Argon, helium, and total gas flow data were within expected ranges and are Qualified for use by the ART TDO Program. Discharge gas line moisture values were consistently low during cycle 157D. At the start of cycle 158A, gas moisture briefly spiked to over 600 ppmv and then declined throughout the cycle. Moisture values are within the measurement range of the instrument and are Qualified for use by the ART TDO Program. Graphite creep specimens were subjected to one of three loads, 393, 491, or 589 lbf. For a brief period during cycle 157D between 12:19 on June 2, 2015 and 08:23 on June 11, 2015 the load cells were wired incorrectly resulting in missing stack load data. Missing stack loads were estimated from measured ram pressures using regression equations developed from the existing data from cycle 157D. Estimated stack loads during this period are considered to be an accurate representation of actual load applied to the stacks. These loads deviate slightly from the planned loads. This deviation does not prevent the data from being Qualified for use, but must be taken into account when analyzing the effect of load on creep. Stack displacement increased consistently throughout the first two cycles with total displacement ranging from 0.4 to 0.8 in. During ATR outages, a set of pneumatic rams raised the stacks of graphite creep specimens to ensure the specimens were not stuck within the test train. This stack raising was performed twice. All stacks were raised successfully each time. The load and displacement data are Qualified for use by the ART TDO Program.

36 MATERIALS SCIENCE↗

Cooperation in Transmission Expansion Planning: Enhancing Grid Reliability and Efficiency Under a Changing Climate

Electricity grids are challenged to maintain reliability during more intense and frequent extreme weather events due to climate change. This challenge is exacerbated by multi-sector electrification and power sector decarbonization through increased reliance on variable renewable energy, which necessitates the expansion of transmission infrastructure. However, transmission expansion planning is often complicated by intertwined planning authorities and jurisdictions, and allocation of large capital investment needs. These factors cause authorities to manage transmission investments individually (i.e., only/mostly intraregional planning), which can lead to suboptimal transmission networks. This study investigates the potential benefits of cooperative transmission expansion planning (i.e., both intraregional and interregional planning that optimizes transmission investments across the entire physical system). Using sectoral and economic optimization, and machine learning models, it analyzes the impact of different levels of cooperation among transmission planning regions within U.S. Western Interconnection in 2019 and 2059 via an iterative investment process. Furthermore, it examines the effects of future climate change on transmission cooperation by simulating historical heat waves from 2019 under conditions of 2059. The results indicate that cooperative transmission planning leads to lower wholesale electricity prices, decreased energy outages, and reduced greenhouse gas emissions. However, the advantages of collaboration diminish during widespread heat waves, despite remaining beneficial especially for regions like California Independent System Operator with substantial solar installations. The study underscores the importance of transmission cooperation in reducing costs and enhancing reliability, emphasizing the need for strategic investments in storage to address challenges posed by future extreme weather events with varying spatial scales.

Capacity Expansion Model↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

A two-stage service restoration method for electric power distribution systems

Improving the reliability of power distribution systems is critically important for both utilities and customers. This calls for an efficient service restoration module within a distribution management system to support the implementation of self-healing smart grid networks. Although the emerging smart grid technologies, including distributed generators (DGs) and remote-controlled switches, enhance the self-healing capability and allow faster recovery, they still pose additional complexity to the service restoration problem, especially under cold load pickup (CLPU) conditions. Herein, a novel two-stage restoration framework is proposed to generate a restoration solutions with a sequence of control actions. The first stage generates a restoration plan that supports both the traditional service restoration using feeder reconfiguration and the grid-forming DG-assisted intentional islanding methods. The second stage generates an optimal sequence of switching operations to bring the outaged system quickly to the final restored configuration. The problem is formulated as a mixed-integer linear program that incorporates system connectivity, operating constraints, and the CLPU models. It is demonstrated that on using a multi-feeder test case, the proposed framework is effective in utilizing all available resources to quickly restore the service and generate an optimal sequence of switching actions to be used by the operator to reach the desired optimal configuration.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Rooftop Photovoltaics and Electric Vehicle Co-Adoption: Attitudes, Norms, Diffusion, and Economics

The overall objectives of the project were to (1) Identify personal and social norms, peer effects, demographics and contextual factors (such as household energy expenditures, experience with outages, charging infrastructure availability) that may facilitate or hinder Solar-EV co-adoption; (2) outline strategies for the design of programs and practices that will enable reasoned RPV and EV adoption and their co-adoption; and (3) assemble a dataset comprised of survey responses of RPV-EV co-adopters, RPV-only adopters, EV-only adopters, and non-adopters. These objectives were only partially fulfilled given the decision to terminate the project. The research team was able to complete the semi-structured interviews, the core BY1 task and summarize the results below. As well, once the team learned of the research project’s fate, it sought and obtained the DOE SETO Technical Manager’s approval to repurpose funds for BY2 tasks to the extent feasible. Rather than invest further resources in expanding the pool of potential survey respondents and having no budget to survey, the research team repurposed funds subject and undertook a more limited (geographically) survey, but also expanded to it to include contingent valuation questions. The analysis of the survey data will necessarily be delayed given the lack of budget support, although some information on the respondent sample is in the results. Given a lack of attention to co-adoption previously, the insights generated in this project should assist decision-makers and industry actors in the development of programs and practices that enable reasoned RPV adoption and EV adoption and their co-adoption.

14 SOLAR ENERGY↗

An Analysis of Database Replication Technologies with Regard to Deep Space Network Application Requirements

The Deep Space Network (DSN) has three communication facilities which handle telemetry, commands, and other data relating to spacecraft missions. The network requires these three sites to share data with each other and with the Jet Propulsion Laboratory for processing and distribution. Many database management systems have replication capabilities built in, which means that data updates made at one location will be automatically propagated to other locations. This project examines multiple replication solutions, looking for stability, automation, flexibility, performance, and cost. After comparing these features, Oracle Streams is chosen for closer analysis. Two Streams environments are configured - one with a Master/Slave architecture, in which a single server is the source for all data updates, and the second with a Multi-Master architecture, in which updates originating from any of the servers will be propagated to all of the others. These environments are tested for data type support, conflict resolution, performance, changes to the data structure, and behavior during and after network or server outages. Through this experimentation, it is determined which requirements of the DSN can be met by Oracle Streams and which cannot.

Oracle Database File System↗