Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “optimal scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 253 records · Page 14

Alternative mixed integer linear programming optimization for joint job scheduling and data allocation in grid computing

This paper presents a novel approach to the joint optimization of job scheduling and data allocation in grid computing environments. We formulate this joint optimization problem as a mixed integer quadratically constrained program. To tackle the nonlinearity in the constraint, we alternatively fix a subset of decision variables and optimize the remaining ones via Mixed Integer Linear Programming (MILP). We solve the MILP problem at each iteration via an off-the-shelf MILP solver. Our experimental results show that our method significantly outperforms existing heuristic methods, employing either independent optimization or joint optimization strategies. We have also verified the generalization ability of our method over grid environments with various sizes and its high robustness to the algorithm setting.

97 MATHEMATICS AND COMPUTING↗

Bridging Equipment Reliability Data and Risk Informed Decisions in a Plant Operation Context

Industry equipment reliability and asset management programs are essential elements that help ensure the safe and economical operation of nuclear power plants. The effectiveness of these programs is addressed in several industry-developed and regulatory programs. The Risk-Informed Asset Management (RIAM) project is tasked to develop tools in support of the equipment reliability and asset management programs at nuclear power plants. These tools are designed to create a direct bridge between component health/lifecycle data and decision making (e.g., maintenance scheduling and project prioritization). The goal of this article is to provide a guide for specific use cases that the RIAM project is targeting. We have grouped uses cases into three main areas. The first area focuses on the analysis of equipment reliability data with a particular emphasis on condition-based data, such as test/surveillance reports and component monitoring data. The second area focuses on the integration of equipment reliability into system/plant reliability models to determine system/plant health and identify the components that are critical to maintain an operational system. Lastly, the third area manages plant resources, such as maintenance activities and replacement scheduling using optimization methods. Here the primary focus is on supporting typical system engineer decisions regarding maintenance activity scheduling and component aging management. This is performed in a risk-informed context where the term “risk” is broadly constructed to include both plant reliability and economics. This framework combines data analytics tools to analyze equipment reliability data with risk-informed methods designed to support system engineer decisions (e.g., maintenance and replacement schedules, optimal maintenance posture) in a customizable workflow.

97 - MATHEMATICS AND COMPUTING↗

Power system restoration incorporating diverse distributed energy resources

An example system includes an aggregator configured to receive a service collaboration request and iteratively determine, based on minimum and maximum power values for DERs under its management, an optimized operation schedule. The aggregator may also be configured to iteratively determine, based on the optimized operation schedule, an estimated flexibility range for devices under its management and output an indication thereof. The system may also include a power management unit (PMU) configured to iteratively receive the indication and determine, based on a network model that includes the estimated flexibility range, a reconfiguration plan and an overall optimized operation schedule for the network. The PMU may also be configured to iteratively cause reconfiguration of the network based on the plan. The PMU and aggregator may also be configured to iteratively, at a fast timescale, cause energy resources under their management to modify operation based on the overall optimized operation schedule.

Ding, Fei↗

Final Report: Assessment of Combined Heat and Power Premium Power Applications in California

This report analyzes the current economic and environmental performance of combined heat and power (CHP) systems in power interruption intolerant commercial facilities. Through a series of three case studies, key trade-offs are analyzed with regard to the provision of black-out ridethrough capability with the CHP systems and the resutling ability to avoid the need for at least some diesel backup generator capacity located at the case study sites. Each of the selected sites currently have a CHP or combined heating, cooling, and power (CCHP) system in addition to diesel backup generators. In all cases the CHP/CCHP system have a small fraction of the electrical capacity of the diesel generators. Although none of the selected sites currently have the ability to run the CHP systems as emergency backup power, all could be retrofitted to provide this blackout ride-through capability, and new CHP systems can be installed with this capability. The following three sites/systems were used for this analysis: (1) Sierra Nevada Brewery - Using 1MW of installed Molten Carbonate Fuel Cells operating on a combination of digestor gas (from the beer brewing process) and natural gas, this facility can produce electricty and heat for the brewery and attached bottling plant. The major thermal load on-site is to keep the brewing tanks at appropriate temperatures. (2) NetApp Data Center - Using 1.125 MW of Hess Microgen natural gas fired reciprocating engine-generators, with exhaust gas and jacket water heat recovery attached to over 300 tons of of adsorption chillers, this combined cooling and power system provides electricity and cooling to a data center with a 1,200 kW peak electrical load. (3) Kaiser Permanente Hayward Hospital - With 180kW of Tecogen natural gas fired reciprocating engine-generators this CHP system generates steam for space heating, and hot water for a city hospital. For all sites, similar assumptions are made about the economic and technological constraints of the power generation system. Using the Distributed Energy Resource Customer Adoption Model (DER-CAM) developed at the Lawrence Berkeley National Laboratory, we model three representative scenarios and find the optimal operation scheduling, yearly energy cost, and energy technology investments for each scenario below: Scenario 1 - Diesel generators and CHP/CCHP equipment as installed in the current facility. Scenario 1 represents a baseline forced investment in currently installed energy equipment. Scenario 2 - Existing CHP equipment installed with blackout ride-through capability to replace approximately the same capacity of diesel generators. In Scenario 2 the cost of the replaced diesel units is saved, however additional capital cost for the controls and switchgear for blackout ride-through capability is necessary. Scenario 3 - Fully optimized site analysis, allowing DER-CAM to specify the number of diesel and CHP/CCHP units (with blackout ride-through capability) that should be installed ignoring any constraints on backup generation. Scenario 3 allows DER-CAM to optimize scheduling and number of generation units from the currently available technologies at a particular site. The results of this analysis, using real data to model the optimal schedulding of hypothetical and actual CHP systems for a brewery, data center, and hospital, lead to some interesting conclusions. First, facilities with high heating loads will typically prove to be the most appropriate for CHP installation from a purely economic standpoint. Second, absorption/adsorption cooling systems may only be economically feasible if the technology for these chillers can increase above current best system efficiency. At a coefficient of performance (COP) of 0.8, for instance, an adsorption chiller paired with a natural gas generator with waste heat recovery at a facility with large cooling loads, like a data center, will cost no less on a yearly basis than purchasing electricity and natural gas directly from a utility. Third, at marginal additional cost, if the reliability of CHP systems proves to be at least as high as diesel generators (which we expect to be the case), the CHP system could replace the diesel generator at little or no additional cost. This is true if the thermal to electric (relative) load of those facilities was already high enough to economically justify a CHP system. Last, in terms of greenhouse gas emissions, the modeled CHP and CCHP systems provide some degree of decreased emissions relative to systems with less CHP installed. The emission reduction can be up to 10% in the optimized case (Scenario 3) in the application with the highest relative thermal load, in this case the hospital. Although these results should be qualified because they are only based on the three case studies, the general results and lessons learned are expected to be applicable across a broad range of potential and existing CCHP systems.

25 ENERGY STORAGE↗

4-1BB Aptamer-Based Immunomodulation Enhances the Therapeutic Index of Radiation Therapy in Murine Tumor Models

Purpose: To report a novel strategy using oligonucleotide aptamers to 4-1BB as an alternate method for costimulation, and show that combinatorial therapy with radiation improves the therapeutic ratio over equivalent monoclonal antibodies. Methods and Materials: Subcutaneous 4T1 (mouse mammary carcinoma) tumors were established (approximately 100 mm{sup 3}), and a radiation therapy (RT) dose/fractionation schedule that optimally synergizes with 4-1BB monoclonal antibody (mAb) was identified. Comparable tumor control and animal survival was observed when either 4-1BB antibody or aptamer were combined with RT using models of breast cancer and melanoma (4T1 and B16-F10). Off-target CD8{sup +} T-cell toxicity was evaluated by quantification of CD8{sup +} T cells in livers and spleens of treated animals. Results: When combined with 4-1BB mAb, significant differences in tumor control were observed by varying RT dose and fractionation schedules. Optimal synergy between RT and 4-1BB mAb was observed at 5 Gy × 6. Testing 4-1BB mAb and aptamer independently using the optimal RT (5 Gy × 6 for 4T1/Balb/c and 12 Gy × 1 for B16/C57BL6J mouse models) revealed equivalent tumor control using 4-1BB aptamer and 4-1BB mAb. 4-1BB mAb, but not 4-1BB aptamer-treated animals, exhibited increased lymphocytic liver infiltrates and increased splenic and liver CD8{sup +} T cells. Conclusions: Radiation therapy synergizes with 4-1BB mAb, and this effect is dependent on RT dose and fractionation. Tumor control by 4-1BB aptamer is equivalent to 4-1BB mAb when combined with optimal RT dose, without eliciting off-target liver and spleen CD8{sup +} expansion. 4-1BB aptamer-based costimulation affords a comparable and less toxic strategy to augment RT-mediated tumor control.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Mean-Variance Optimization-Based Energy Storage Scheduling Considering Day-Ahead and Real-Time LMP Uncertainties

In this letter, a new mean-variance optimization-based energy storage scheduling method is proposed with the consideration of both day-ahead (DA) and real-time (RT) energy markets price uncertainties. It considers the locational marginal price (LMP) forecast uncertainties in the DA and RT markets. The energy storage arbitrage risk associated with the LMP forecast uncertainty is explicitly modeled through the variance component in the objective function. The quadratic term of this variance is transformed into a second-order cone constraint using the charging and discharging power complementarity of the energy storage system. Finally, the proposed model is formulated as a mixed-integer conic programming problem. Numerical case studies demonstrate the effectiveness of the proposed model for energy storage scheduling considering price uncertainty.

25 ENERGY STORAGE↗

Revisiting the definition of field capacity as a functional parameter in a layered agronomic soil profile beneath irrigated maize

The soil water content at the condition of field capacity (θ FC ) is a key parameter in irrigation scheduling and has been suggested to be determined by running a synthetic drainage experiment until the flux rate (q) at the bottom of the soil profile achieves a predefined negligible value (q FC ). We question the impact of q FC on the assessment of field capacity. Moreover, calculating θ FC as the integral mean of the water content profile when q is equal to q FC is strictly valid only for uniform soil profiles. By contrast, this practice is ambiguous and biased for stratified soil profiles due to the soil water content discontinuity at the layer interfaces. In this study, the concept of field capacity was revisited and adapted to practical agronomic heuristics. By resorting to the assessment of root-zone water storage capacity (W), we envision field capacity as a functional hydraulic parameter derived from synthetic irrigation scheduling scenarios to minimize drought stress, drainage, and nitrate leachate below the root zone. A functional analysis was carried out on a 135-cm-thick layered soil profile beneath maize in eastern Nebraska. On-farm irrigation scheduling applications and agricultural practices were recorded for 20 years (2001–2020) at a daily time step. Hydrus-1D was calibrated and validated with direct measurements of the soil water retention curve and soil water content data, respectively, in each soil layer. A set of functional field capacity values was derived from 24 irrigation scheduling scenarios, and the optimal water storage capacity at field capacity (W FC ) was approximately 50 cm (corresponding to about 80% saturation in the soil profile). An average irrigation amount of 217.5 mm distributed over 21 events was obtained by using optimal irrigation scheduling, which was initiated when the matric pressure head took on a value of –700 cm and the irrigation rate was set at 1.0 cm d –1 . This irrigation practice ensured water storage at approximately the same level (ideally at W FC ) by sustaining only evapotranspiration fluxes in the uppermost portion of the root zone and by limiting excessive drainage. This protocol can be transferred to other agricultural fields.

54 ENVIRONMENTAL SCIENCES↗

Spot and Runway Departure Advisor

The Spot and Runway Departure Advisor (SARDA) is a research prototype of a decision support tool for ATC tower controllers to assist in manging and controlling traffic on the surface of an airport. SARDA employs a scheduler to generate an optimal runway schedule and gate push-back - spot release sequence and schedule that improves efficiency of surface operations. The advisories for ATC tower controllers are displayed on an Electronic Flight Strip (EFS) system. The human-in-the-loop simulation of the SARDA tool was conducted for east operations of Dallas-Ft. Worth International Airport (DFW) to evaluate performance of the SARDA tool and human factors, such as situational awareness and workload. The results indicates noticeable taxi delay reduction and fuel savings by using the SARDA tool. Reduction in controller workload were also observed throughout the scenario runs. The future plan includes modeling and simulation of the ramp operations of the Charlotte International Airport, and develop a decision support tool for the ramp controllers.

decision support tool↗

Economic Dispatch Optimization of Multi-Unit SMR Site

With the increase of integration of variable renewable into the grid, grid resilience can be compromised without flexible electricity suppliers. Flexible operation of NPP can expand the scope of integration of new nuclear power plants in regions with high share of renewables. It also provides opportunity to increase profits through participation in ancillary services. In this research, NuScale modules are used as the case study. NuScale is an integrated pressurized water reactor with thermal power of 250 MWth. Having multiple units can provide higher flexibility in changing power levels and supplying the grid with electricity all year long. Additionally, load-following might perturbate the ordered sequence of refueling (every 24 months for NuScale). To maintain the 2 year refueling cycles, the loading patterns will need to be adjusted in a year-to-year basis, resulting in additional unnecessary costs. Another solution is to find the optimal outage schedule. This will also shift the focus of the planned outage to a more optimized predictive outages and maintenance. Results from short-term optimization (i.e., daily participation in energy and ancillary services markets) shows that average commitment to regulation down ancillary service markets during late night and early morning hours can increase revenues. Participating in upward reserves during pre-work commuting hours and early evening hours can also generate additional revenues due to high ramp up of electricity demand. Having multiple units at a single site can also help operate flexibly. Results from long-term optimization show that daily fluctuation in electric power is usually handled by few units while other units operate on base-load profile. It is possible to combine base-load operation with flexible operation to extend component remaining useful life in some units and find optimal outage schedule for the units.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗